HomeMy WebLinkAboutgr00090_000005_pg410000,11
PROCEEDINGS OF THE VILLAGE COUNCIL
VILLAGE OF MOUNDS VIEW
RAMSEY COUNTY, MINNESOTA
The regular meeting of the Village of Mounds View was called to
order at 800 P.M. Monday April 10th, 1961 at the Red Oak School,
Sherwood Road and Red Oak Drive, Minneapolis 21, Minnesota
Present Were:
Mayors
Clerk:
Trustees,:
Treasurers
Engineer!
Administrative Clerk
Attorney!
Absent#
Allan B. Crane
Lloyd J. Blanchard
onald Hodges
Perry Malvin
Irene Edberg
Les Knutson
*Paul Boog
Richard Meyers
Trustee Christensen(Attending
No.Sub.Sewer Comm.Meeting)
Minutes of previous meeting were read. Motion by Hodges to accept
minutes as presented. Seconded by Malvin. 4 Ayes.
The Engineer made his report and recommendation on Deep Well #2
bids. He recommended the low bidder be awarded the contract.
Motion by Malvin to award the contract for Deep Well #2 to the
Layne Minnesota Company of 3147 California Street, Minneapolis, Minn,.
for the bid of $23,960.00 for Stage 1, $300 per unit for Stage #2
and a completion date of 1 to 12 weeks for both stages. Seconded
by Hodges. 4 Ayes.
Motion by Malvin to make final payment for Deep Well #1 and enter
into a 1 year contract for Maintenance Bond Comm. as off- Apr.10th, 1961.
with Thein Well Co. Seconded by Hodges, 4 Ayes.
The Police Commission report was read by Crane and the following
action was taken:
Motion by Crane to raise Police Officer Carter Caldwell's Salary
$25.00 per month effective, May 1st, 1961. Seconded by Hodges. 4 Ayes.
The matter of authorization of the Police Chief to impose
suspension upon Police Officers was referred to the Attorney.
The Engineer reported that maps of the Village Water Supply system
had been forwarded to the Fire Underwriter's Bureau so they may adjust
Fire Insurance Rates in the Village. This was also referred to the
Attorney so he could check with the Underwirter's to make sure this
rate change would take place as soon as possible.
Motion by Crane to hire Midwest Planning and Research, Inc. as
Village Planning Consultants for 19t1 as per contract presented.
(Copy on file). Seconded by Blanchard. 4 Ayes.
The Water Superintendent reported that the installation of Water
Meters was going to require further help and recommended the Village
hire an additional one or two men.