HomeMy WebLinkAboutgr00090_000005_pg522. 0J005;. Proceedings of Village Council Meeting Hay 8th, 1961 Water Filteration Plant Construction Bids Conttd. PLANHOLDERS ALT. #2 ALT.# 3 LUMP SUM COMPLETION Brick Outside BID TIME Walk Perry A. Swenson Co. Deduct Deduct 432 Endicott -4th ;5,800.00$6,700.00 $77,896.00 150 Calendar St.Paul 1, Minn. Days Aichinger & Green Deduct Deduct Const. Co. $6,000.00$6,700.00 $74,600.00 180 Cal.Days 1595 Selby Ave. St.Paul 4, Minn. Loeffell - Engstrand Deduct Deduct 3145 Hennepin Ave. $5,100.00$6,2oo.00 $79,800.00 250 Cal.Days. Minneapolis 8, Minn. Dailey Const. $6099.25$7,733.97 $83,895.97 90 Cal.Days 8510 Central Ave. N.E. Minneapolis 21, Minn. Motion by Malvin, seconded by Hodges to refer bids to Engineer for tabulation and recommendation to the Council. There were 4 ayes for approval. Mayor Crane called for bids on Street Improvement 1961 -1, no additional bids were brought forward. Upon being opened the bids were found to be as follows. PLANHOLDERS LUMP SUM COMPLETION BID TIME Mergens Excavating $1,625.00 May 29, 1961 & Grading Co. 2153 Dudley Ave. St.Paul 8, Minn. C.S. McCrossan, Inc. $14,500.00 As specified 4800 Osseo Rd. Minneapolis 12, Minn. Chies Bros. $ 2,000.00 As specified 420 Tyler St. N.E. Minneapolis 21, Minn. A.H. Contracting $1,450.00 As specified 1857 Phil. Rd. St.Paul, Minn. T.A. Schifsky $2,125.00 As specified 603 N.W. 2nd St. The low bidder was apparently A.H. Construction, but the decision to award the contract was postponed until later in the meeting. Mayor Crane called for the Public Hearing on Condemnation of Buildings. Attorney Meyers explained to the two signaturees as to the reasons for this action. The premises of the third Condemnation Case location of 8430 Eastwood Rd. had already been cleared. Mrs. Engar Rickard spokesman for the property at 8247 Spring Lk. Pk. Road explained that there was no easement to her home for repairs and the premises are used only for storage. After considerable dis- cussion the Mayor declared that this Condemnation Proceedings be postponed for two weeks so that a further report could be made by the Building Inspector to the Council.