Mr. Frits stated that as the Irondale Inn was being vacated after
purchase by the State Hiyvay Department, perhaps the Recreation Department
could use the building on one of the Park sights.
Mr. Hodges was instructed to investigate this matter.
Mr. Malvin reported that the Lakeside Park Commission was having
an overall plan drawn up for the Park and mould be meeting with the
Council on this matter in the near future.
Mr. Christensen moved that a work order to the county be sent to do
the excavating work necessary for the installation and the connection
of condUitto the existing culvert, fill material over conduit, and
lowering of existing culvert to grade for the storm drainage of Lambert
Playground. Seconded by Blanchard. 5 Ayes.
Mr. Christensen reported that after a tour with Mr.Skiba a list
of additional work to be done on the roads by the contractors will be
submitted to the Village Engineer. He further reported that small
patching jobs in the Village were being undertaken by the Village, with
Village employees doing some of the work in an effort to cut costs on
patching.
Motion by Christensen to have work order sent to County to Scarify
Pinewood Drive from Jackson to Quincy and to oil and sand. Work order
to have notice to notify Village Engineer when work is to commence for
possible grade corrections. Seconded by Malvin.. 5 Ayes.
Mr. Christensen also reported that the pending work order are scheduled
but he has not received any notification as to starting date.
The matter of Gloria Circle drainage was brought up. It was stated
that the flushing of the hydrants at the dead end of that water line will
possibly cause a hazard this winter.
The attorney was instructed to contact the contractor regarding the
$500.00 dedicated for construction of Gloria Circle.
Mr. Piehowski further reported that after further investigation the
house at Sherwood and Fairchild was not sub-standard.
Motion by Crane to appoint Mr. Walter Waibel, 7150 Knollwood Dr.,
to the Planning Commission to fill the unexpired term of H. Carnes. Term
expires December 31st, 1962. Seconded by Malvin. 5 Ayes.
The Engineer reported that the contractor on project 1961 -1 would
start work this week.
The matter of right of way easement for Fairchild Ave. for the water
project was brought up. Five of the residents concerned were present
and expressed the view that 27 feet as proposed was actually more than
needed to fill the Village requirements.
After much discussion Mr. Crane moved that the Village acquire 17
additional feet on the West side of Fairchild Ave. Motion lost for lack
of second.
Mr. Christensen then instructed the three home- owners on the South end
of the road to come to an agreement among themselves as to where they feel
the water line should go. The engineer will then decide if their location
of the line is feasable from an engineering stand point and to correct it
if it is not feaseable. This would be the easement that would then be
obt ained .