Loading...
HomeMy WebLinkAboutgr00090_000006_pg118.3. Mr. Frits stated that as the Irondale Inn was being vacated after purchase by the State Hiyvay Department, perhaps the Recreation Department could use the building on one of the Park sights. Mr. Hodges was instructed to investigate this matter. Mr. Malvin reported that the Lakeside Park Commission was having an overall plan drawn up for the Park and mould be meeting with the Council on this matter in the near future. Mr. Christensen moved that a work order to the county be sent to do the excavating work necessary for the installation and the connection of condUitto the existing culvert, fill material over conduit, and lowering of existing culvert to grade for the storm drainage of Lambert Playground. Seconded by Blanchard. 5 Ayes. Mr. Christensen reported that after a tour with Mr.Skiba a list of additional work to be done on the roads by the contractors will be submitted to the Village Engineer. He further reported that small patching jobs in the Village were being undertaken by the Village, with Village employees doing some of the work in an effort to cut costs on patching. Motion by Christensen to have work order sent to County to Scarify Pinewood Drive from Jackson to Quincy and to oil and sand. Work order to have notice to notify Village Engineer when work is to commence for possible grade corrections. Seconded by Malvin.. 5 Ayes. Mr. Christensen also reported that the pending work order are scheduled but he has not received any notification as to starting date. The matter of Gloria Circle drainage was brought up. It was stated that the flushing of the hydrants at the dead end of that water line will possibly cause a hazard this winter. The attorney was instructed to contact the contractor regarding the $500.00 dedicated for construction of Gloria Circle. Mr. Piehowski further reported that after further investigation the house at Sherwood and Fairchild was not sub-standard. Motion by Crane to appoint Mr. Walter Waibel, 7150 Knollwood Dr., to the Planning Commission to fill the unexpired term of H. Carnes. Term expires December 31st, 1962. Seconded by Malvin. 5 Ayes. The Engineer reported that the contractor on project 1961 -1 would start work this week. The matter of right of way easement for Fairchild Ave. for the water project was brought up. Five of the residents concerned were present and expressed the view that 27 feet as proposed was actually more than needed to fill the Village requirements. After much discussion Mr. Crane moved that the Village acquire 17 additional feet on the West side of Fairchild Ave. Motion lost for lack of second. Mr. Christensen then instructed the three home- owners on the South end of the road to come to an agreement among themselves as to where they feel the water line should go. The engineer will then decide if their location of the line is feasable from an engineering stand point and to correct it if it is not feaseable. This would be the easement that would then be obt ained .