HomeMy WebLinkAboutgr00090_000006_pg131PROCEEDINGS CF THE VILLAGE COUNCIL 000131
VILLAGE OF MOUNDS VIEW
RAMSEY COUNTY
MINNESOTA
Pursuant to due call and notice there6f,a Special Meeting of the
Village Council was called to order Se:pfemk of .6th, '1961, at'- P.M.'
at . the V ilige of f tcei 5499 Adats by acting Mayor Hodges.
Present were: Acting Mayor:
Clerk:
Adm, Clk:
Trustees:
Donald Hodges
Lloyd J. Blanchard
Paul Boog
Melford Christensen
Motion by Blanchard to recess the meeting and to reconvene at the
Red Oak School, Sherwood Rd. and Red Oak Dr., because of lack of space.
Seconded by Christensen. 3 Ayes.
At. Red Oak School the Village Attorney, Fiscal Agent, and Engineer
assissted various citizens in determining the amount of their assessment,,.
The meeting was again called to order at 8 :25 P.M. by acting Mayor
Hodges.
Present were: Acting Mayor: Donald Hodges
Clerk: Lloyd J. Blanchard
Trustees: Mulford Christensen
Perry Malvin
Engineer: Les Knutson
Attorney: Richard Meyers
Fiscal Agent: Mann
The Mayor explained that this hearing was for the purpose of deter-
mining and setting the individual assessment for the homes on the 1960-3
project. He then turned the floor over to Mr. Knutson, Village Engineer.
Mr. Knutson then explained that this project was initiated in 190
by the Village Council in answer to petitions received and a hearing
was held to determine where the water lines would go. The contL;.act was
awarded to Herbst Const. after due legal advertisement and the project
was completed this spring. The total cost of the job including all costs
such as engineer, legal fiscal, clerical, etc. amounted to $215,164.18.
The cost was then apportioned along those lots receiving benefits solely
on their front foot basis. This was done by dividing the total cost by
the front footage served. The front footage assessment then became $4.00
per lineal foot. In addition to this a number of connections were made.
The total cost of these services resulted in a cost per service of
$106.50 and that is the basis for this hearing, to apprise you of what
these amounts are and how they were determined.
Mr. Knutson cited as an example the difference in the cost of water
between Nounds View and Blaine. Blaine water cost on a 75ft. lot is
$482,00 while Mounds View lot on same size is $428.50 including the
service connections 46,389.,45 lineal ft., 286 services, and 278 assessable
services.