HomeMy WebLinkAboutgr00090_000006_pg133PROCEEDINGS OF THE VILLAGE COUNCIL
VILLAGE OF MOUNDS VIEW
RAMSEY COUNTY; MINNESOTA
The regular meeting of the Mounds View Village Council was called
to order by Acting Mayor Hodges at 8:0O P,M., September llth, 1961 at
the Red Oak School, Sherwood Rd. and Red Oak Dr., Minneapolis, Minn.
000133
Present were
Acting Mayor:
Clerk:
Trustees:
Engineer:
Attorney:
Adm. Clerk:
Donald Hodges
Lloyd Blanchard
Perry Malvin
Les Knutson
Richard Meyers
Paul Boog
Motion by Malvin to accept minutes of August 28th meeting as pre-
sented. Seconded by Hodges. 3 Ayes.
The minutes of special meeting held September 6th(assessment hearing)
;ere read.
Motion by Hodges to accept minutes as read. Seconded by Malvin,
3 Ayes.
Mr. Hodges and Mr. Malvin reported that the recreation Commission
.nd Lakeside Park Commission budget would be availab2 e for ctudy at the
next budget meeting, Monday September 18th.
Mr. Roy Juntunen, . Police Commission member, read the Police report
for August. (copy on file)
He also read a letter of resignation from Officer Dale Pierce and
a letter from the Police Commission with a recommendation for ao:eptence
of said resignation. (copies of both on file)
Motion by Hodges to concur with the Police Commission's recommendation
and to accept the resignation of Dale Pierce effective September 22nd,1961.
Seconded by Blanchard. 3 Ayes.
Motion by Blanchard to concur with the Village Engineer recommendation
and to accept the low bid and award the contract to North Star Concrete
Co, for furnishing storm sewer conduit for Lambert Park. Said bid in
the the amount of $1,355.05. Seconded by Malvin. 3 Ayes.
A letter from the Dedolph Co. regarding heating of water utility
building was read. (copy on file)
The Engineer stated that the contractor would meet his complet; "-on
date on the utility building with the exception of the treatment plant
portion which was delayed by Council action.
Mr. Knutson further reported that the building should be ready for
occupancy within 60 to 70 days and advised the Council that some sight
grading would be necessary for parking and pedestrians traffic
The matter of telephone service to the building was also discussed
and will be acted on at a future date.
Motion by Hodges to send a work order to the County to grade the
utility building site per specs. from Village Engineer. Seconded by
Malvin, 3 Ayes.
The Engineer advised that an intensive program of flushing of the
water mains be instituted and maintained until the treatment plant is
installed.