Loading...
HomeMy WebLinkAboutgr00090_000007_pg55PROCEEDINGS OF THE VILLAGE COUNCIL VILLAGE OF MOUNDS VIEW RAMSEY COUNTY, MINNESOTA 030055 The regular meeting of the Mounds View Village Council was called to order by Acting Mayor Hodges at 8 :10 P.M., April 23 1962, at 2401 Highway #10. Present were: Acting Mayor: Clerk: Trustees: Engineer: Attorney: Treasurer: Adm. Deputy Clerk: Public Works Absent: Mayor: Donald Hodges Lloyd J. Blanchard Perry Malvin John L. Sullivan Les Knutson Richard Meyers Irene Edberg Paul E. Boog Walter Skiba Allan B. Crane (excused while in hospital) Acting Mayor, Hodges opened the Woodale Drive Thoroughfare, Public Hearing. The Attorney explained the Council had ordered this hearing to enable them to reserve or designate the North 30 feet of this road and to be able to legally control the building of any structures in this area. Designation of this 30 feet will not give the Village right of way, but will assure the Village of not having to purchase buildings for future road construction. Mr. Grande, 5165 Long Lake Road who presently owns this 30 feet as the Southern 30 feet of his property made the following request: "I respectfully request the Village to postpone action on this hearing, as I have at the present time, a prospective purchaser that would rather have the road through the center of this property, so he may build on two sides of the proposed road. If the Council dedicated this thmnughfare, it may well stop this purchaser from buying." After much discussion, the following action was taken: Motion by Sullivan to continue this hearing until May 28, 1962, at 8:00 P.M. Seconded by Hodges. 4 Ayes Mr. Sullivan requested Mr. Grande to have the prospective purchaser present some type of proposal for this property by the next regular meeting and the Council could have the Village Planner study this and give his recommendations. He further recommended that the Village request the Planner to study this area and make road recommendationsto the Village. There being no further action to be taken at this time, the Acting Mayor declared the hearing closed. Bids for water project 1962 -1 were opened and read. After the Acting Mayor called 3 times for further bids, the bids received were then opened and read as follows: Name Securit Randall Brothers 5 ° Bond Herbst Construction 5% Bond Horbal Construction 5 % Bond Bid Comp. Time $2700.00 as specified $2349.00 40 Cal. days $3379.00 as specified