HomeMy WebLinkAboutgr00090_000007_pg55PROCEEDINGS OF THE VILLAGE COUNCIL
VILLAGE OF MOUNDS VIEW
RAMSEY COUNTY, MINNESOTA
030055
The regular meeting of the Mounds View Village Council
was called to order by Acting Mayor Hodges at 8 :10 P.M.,
April 23 1962, at 2401 Highway #10.
Present were:
Acting Mayor:
Clerk:
Trustees:
Engineer:
Attorney:
Treasurer:
Adm. Deputy Clerk:
Public Works
Absent:
Mayor:
Donald Hodges
Lloyd J. Blanchard
Perry Malvin
John L. Sullivan
Les Knutson
Richard Meyers
Irene Edberg
Paul E. Boog
Walter Skiba
Allan B. Crane
(excused while in hospital)
Acting Mayor, Hodges opened the Woodale Drive Thoroughfare,
Public Hearing.
The Attorney explained the Council had ordered this hearing
to enable them to reserve or designate the North 30 feet of
this road and to be able to legally control the building of
any structures in this area. Designation of this 30 feet will
not give the Village right of way, but will assure the Village
of not having to purchase buildings for future road construction.
Mr. Grande, 5165 Long Lake Road who presently owns
this 30 feet as the Southern 30 feet of his property made
the following request:
"I respectfully request the Village to postpone action
on this hearing, as I have at the present time, a prospective
purchaser that would rather have the road through the center
of this property, so he may build on two sides of the proposed
road. If the Council dedicated this thmnughfare, it may well
stop this purchaser from buying."
After much discussion, the following action was taken:
Motion by Sullivan to continue this hearing until
May 28, 1962, at 8:00 P.M. Seconded by Hodges. 4 Ayes
Mr. Sullivan requested Mr. Grande to have the
prospective purchaser present some type of proposal for this
property by the next regular meeting and the Council could
have the Village Planner study this and give his recommendations.
He further recommended that the Village request the Planner to
study this area and make road recommendationsto the Village.
There being no further action to be taken at this time, the
Acting Mayor declared the hearing closed.
Bids for water project 1962 -1 were opened and read.
After the Acting Mayor called 3 times for further bids, the
bids received were then opened and read as follows:
Name Securit
Randall Brothers 5 ° Bond
Herbst Construction 5% Bond
Horbal Construction 5 % Bond
Bid Comp. Time
$2700.00 as specified
$2349.00 40 Cal. days
$3379.00 as specified