HomeMy WebLinkAboutgr00090_000010_pg132-0052. Sanitary sewer outlet to be furnished under a cooperative agreement with the North Suburban Sanitary Sewer District. The estimated cost of the above improvement is $2,573,740. The area proposed to be assessed for said improve- ment will include the entire Village." Notice of the hearing was published on two dates: November 21, 1963 and November 28, 1963. There are 1,960 parcels in the Village and approximately 3,000 notices were mailed to all addresses avail- able, which included notices based on water billings. A technical review of the progress of the sewer program from its inception to the present time was given by Mr. Meyers. He stated that the septic tank problem first arose in September, 1958, at which time it was brought to the Councilts attention. Methods were discussed at that time and there was no outlet for sewage available. In Feb. of 1959 a delegation appeared before the Council requesting consideration of either a sanitary sewer system or water system and, in that same month, the Council requested the Village Engineer to make a preliminary study for the Village. On May 4, 1959 the Council authorized the Village Engineer to prepare a preliminary report with as much facts and figures as possible. There was no outlet for sewage at that time. On July 28, 1959 Dr0 Houle gave a report on the need for sanitary sewer and water in the Village and stated that there was a definite contamination problem. He warned that both systems should be looked into. Decisic:n was made to go ahead with the water. The Fall of 1959 was the beginning of the N.S.S.S.D and 5 or 6