Loading...
HomeMy WebLinkAboutgr00090_000010_pg132-007He emphasized the point that this is not a complete storm sewer system, but would convey surface waters from road surfaces and road ditches and successfully drain all low areas in the community. He pointed out the system as proposed would serve the needs of the community at present and in the future. The capacity is adequate to provide for additional development, residential and commercial. It is of sufficient depth to permit lateral lines to be connected to the interceptor. Another feature of the proposed construction is the probability that when trenches are opened the contractor will close them as soon as possible to provide use for traffic, etc., with as little incon- venience as possible. There is the question of restoration of county roads and village streets. The proposal is to restore all disturbed by this constructi,.n. Boulevards will be restored with suitable lawn grass. The intent is to provide for minimum maintenance with least possible cost. Maintenance and future construction is of the type which can be handled by Village forces with a minimum of equipment. He pointed out that street surfacing cannot follow right away as time should, be allowed for the fill to settle and be packed down by use for a year. Then the complete resurfacing of roads can be done if the Council so agrees. This plan will save the Village money and result in ultimate- ly better quality. During the course of construction some of the County roads will be disturbed. This matter will have to be resolved with Council and the County. The Council instructed that estimates be prepared on certain types of equipment for repairing breaks in lines, etc., and he --4--