Loading...
HomeMy WebLinkAboutgr00090_000010_pg137-005to order the main interceptor and then the laterals. Next week's hearing will cover the area with larger lots. It was again pointed out that the primary purpose of the hearing was to supply the residents with information as to what the entire sewer program is about. This includes engineering details and the financial proposals in- volved. This will give everyone the chance to see how it affects him individual- ly and, if he does not approve, to so voice his objections, or clarify any misunderstandings. If the improvement is ordered, assessment hearings will be held at a later date. So there can be no misunderstanding, Mr. Meyers again reiterated- - "The hearing tonight is primarily to see whether or not these improvements should be ordered." Mr. Meyers then introduced Mr. Les Knutsen, Engineer with Comstock & Davis who gave a review of the technical background of this project. A series of maps were displayed which defined the area to be covered by sewer improve- ment, method of drainage, and the proposed building which would house the maintenance equipment for the Village. Mr. Knutsen stated that seven reports were submitted to the Council representing a great deal of consideration on their part in the entire matter. He gave a review of the items discussed last week involving the construction of the main interceptor system to serve the entire Village. He emphasized that this is a drainage proposal for the community and not a storm drainage system. The drainage system concerns three areas all outletting to Rice Creek. The system itself has a twofold purpose -- elevation and soil type had to be considered. The additional feature of the drainage system is the addition of culverts over all roads and right of ways. The proposed construction takes into consideration the present needs and future development requirements. It is of sufficient depth