Loading...
HomeMy WebLinkAboutgr00090_000010_pg137-019Mr. Meyers called attention to the items included in the sanitary sewer program which are: surface drainage, construction of sanitary sewer interceptors and laterals, complete street resurfacing, equipment necessary to service the sanitary sewer system and a maintenance building for storage and small repairs. Mr. Hodges took the floor at this time and sheets were distributed showing the method by which these improvements willbe paid. (copy attached) A short recess was called. Mr. Hodges introduced Mr. James Olson of Juran & Moody, who discussed the financial aspects of the plan. He explained that preliminary work done by the Engineers and information supplied from other sources were used in trying to work out a plan of financing which they feel is feasible for the Village. In a rapidly growing suburban area such as ours, financing is most important to the economic stability of the community. He stated this program does not necessarily mean this is the way it has to be done, but it is being considered by the Council, and for that reason it is explained in detail. The first step was to make an estimate of the principal and interest which might be required on bonds we would have to have. Wecan not go beyond thirty years for a bond issue, considering an improvement of this size and the amount of the assessments necessary. The cost of what it will take to operate a maintenance system is also considered. It is necessary to estimate where the money will come from to pay the money back. Basically, there are three sources: 1. Part will be assessed 2. Part will come from sewer rentals 3. Part from a tax increase Mr. Olson explained the assessment charges shown for the various size lots on the sheets which were distributed earlier. The assessments take -8-