HomeMy WebLinkAboutgr00090_000011_pg06-006were preparing plans with the N.S.S.S.D. which would provide
us with an outlet. A contract has now been let to begin the
main interceptor near Fridley. Ground is being broken for
that this week. Other contracts are being let now. Mounds
View has not signed the contract with N.S.S.S.D. as yet. This
is a decision to be made by the Council. Spring Lake Park has
signed the contract.
Mr. Meyers emphasized that the subject for discussion was
the construction of our internal system within the Village of
Mounds View. The first general hearing was village -wide for
the purpose of discussing the main interceptor system, the last
two hearings (actually three) described the laterals running
up and down the streets in front of the various properties.
This fourth hearing covered the laterals for the area designated
in the notice. He stated Mr. Knutsen, the Village Engineer,
would give a brief resume of the technical data on this project
and Mr. Anderson, the Fiscal Agent, would give an explanation
of the methods proposed to finance this particular project.
Mr. Meyers again stated the estimated costs for the pro-
posed sanitary sewer, surface drainage and street improvement
program would probably exceed $4,000,000 (the exact proposal
figure being $4,419,126), providing the entire system is built.
It is not known yet whether we will build whole or portions of
it. He stated the three main items for discussion which are:
-5-