HomeMy WebLinkAboutgr00090_000018_pg106Motion by Johnson to order curb and gutter for Eastwood
between County Road H and Woodcrest and on Greenwood between
Woodcrest and Woodale. Seconded by Malvin. 5 Ayes.
Mr. Boehm, Village Engineer, presented several change
orders.
Motion by Blanchard to adopt change order #3 for Project
1966 -5. Seconded by Johnson. 5 Ayes.
Motion by Malvin to adopt change order #1 for Project
1966 -8. Seconded by Lang. 5 Ayes.
Motion by Rustad to adopt change order #1 for Project
1966 -1. Seconded by Johnson. 5 Ayes.
The Engineer was directed to have oil seal coat on
streets as per direction of Gary Lang under change order
with Dunki'j Surfacing.
The Council's decision for assessments is as follows:
1. $1.50 for street assessment for Quincy and Bona Road
2. The full cost of Ardan Avenue Road Improvement
Extension to be borne by abbutting property owners.
3. Greenwood Road not to be completed. Mr. Skiba was
directed -to putrrbtrticbde =yin- place. .1%
4. C6untyYRoads •will:'be; assessed $1.50 per foot.
5. Fourth Street - delete construction south of Woodcrest
The matter of open basements on Quincy Street, north of
Hillview, was referred to Mr. Johnson.
Motion by Blanchard to allow a 4 foot variance for a
garage at 2242 Lambert Avenue, subject to filing of fees
and forms. Seconded by Johnson. 5 Ayes.
(Lang abstained.)
Motion by Blanchard to adjourn. Seconded by Lang.
5 Ayes.
Meeting adjourned at 9 :20 P.M.
Res•ectfully submitted
Lloyd J. :lanchard
Village Clerk