HomeMy WebLinkAboutgr00090_000021_pg24- 3 -
The Attorney was requested to draw up a tentative draft of an ordinance
controlling excavation.
Mr. Hodges reported on fill for parks and requested that we consider putting
tile in ditches in the parks before the NSSSD work is restored.
Engineer Boehm will prepare estimates.
Attorney Meyers reported on court cases. The Flink property along Arden Avenue
comes to court on April 16.
The Watson Construction appeal will come to court soon.
Trustee Malvin will request that members of Spring Lake Park Lutheran Church
attend the agenda meeting next Monday night to discuss their Arden Avenue request.
Engineer Boehm discussed the HUD letter which indicates they will go along with
two separate bid lettings to permit test drilling first.
Engineer Boehm read a letter reporting on the Bona Road to Edgewood Drive
walkway surfacing. It will cost approximately $600.00 and can be included
with a surfacing contract to be let in the Eigenheer Addition.
Engineer Boehm reported on the R. Lund lot split. The 30' strip for future
road meets our requirements as it is drawn.
M /S /P (Rustad /Malvin) To approve the R. Lund lot split subject to granting
of easement.
M /S /P (Rustad /Walser) To confirm double patrol time for B & E during April
and May and fees of $300.00 per month instead of $150.00.
Mayor Rustad commented on the trying times. The President retiring, the death
of a great man, Mr. King. Only good news is the hope of peace in Vietnam.
5 Ayes
5 Ayes
M /S /P (Malvin /Lag) To adjourn at 9:05 P.M. 5 Ayes
Sincerely,
Robert A. Walser,
Village Clerk