My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000026_pg50
MoundsView
>
Commissions
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000026
>
gr00090_000026_pg50
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 2:41:13 PM
Creation date
4/12/2011 9:15:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 3 - <br />Base Bid No. 2 (Con't) <br />Planholder Bid Surety Schedule A Schedule B Schedule C <br />Randall Bros. <br />3400 Silver Lk.Rde Agr.Ins. <br />Minneapolis,Minn. 5% $256,758.80 $176,142.60 $432,901.40 <br />Krohn Drainage,Inc. <br />1501 West 80th StP F&M <br />Minneapolis,Minn. 10% $299,165.00 $224,991.00 No Bid <br />Richard Knutson,Inc. <br />Route No. 2 The Am.Ins. <br />Prior Lake,Minn. 107 $169,800.00 No Bid No Bid <br />MSP (Blanchard /Neisen) To authorize the engineer to prepare the assessment roles <br />for Project 1971 -1 and 1971 -la. 4 Ayes <br />MSP (Hodges /Johnson) To adopt Resolution #526 relating to the Village encroaching <br />on the right -of -way for new STH 10. 4 Ayes <br />Engineer Boehm stated that Mr. Greiling, the HUD field engineer, will be making his <br />final inspection of 1968 -3 this week. <br />Councilman Neisen asked if a survey of all the streets had been made to determine <br />if they needed seal coating. <br />Engineer Boehm explained that all the streets constructed in 1966 and 1967 are in <br />need of repair. <br />MSP (Neisen /Johnson) To direct the engineer to draw up specifications for seal <br />coating approximately one third of the Village and set the bid opening for 12 noon <br />on July 26th. <br />4 Ayes <br />MSP (Blanchard /Hodges) To allow Johnson Brothers Construction to work two shifts <br />on Project 1971 -1 and 1971 -la. 4 Ayes <br />Councilman Neisen stated that he has received no reply from the Postmaster on <br />renumbering streets. <br />MSP (Neisen /Johnson) To adjourn at 9:00 P.M. 4 Ayes <br />Respectfully Submitted, <br />Dennis S. Zy <br />Clerk - Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.