Loading...
HomeMy WebLinkAboutgr00090_000038_pg188-4- September 22, 1975 Councilman Shelquist said the Planning Commission did take note of this when they recommended the lot split be approved. MSP (Johnson - Shelquist) to approve the preliminary plat of Ingvald Johnson Terrace as presented with the stipulation that the back lot elevation be at a level to encourgg& rainage from the back of the lot lines out to the streets and so that the contour as presented on the preliminary plat be maintained on the back lot lines and that the easements be maintained as presented. (Exhibit "A ", preliminary plat retained for the files) 4 Ayes Mayor Johnson called the regular meeting back to order at 9:19 p.m. Mayor Johnson recognized the Briar Lake final plat. Mr. Carlson said he made the additional soil borings and had complied with Council's requests. MSP (Johnson- Baumgartner) to approve the final plat of Briar Lake addition owned by Richard Carlson. 4 Ayes MSP (Johnson - Shelquist) that the elevations of new home construction in the City of Mounds View be maintained at a level of four feet above the water table with the basement floor as opposed to the footings and that the inspection department be notified of this motion and on the Briar Lake preliminary approval that the elevation requirement be amended to four feet above the water table for the basement floor. 3 Ayes Baumgartner Naye Mayor Johnson presented change order #6 to the city hall addition. Administrator Achen explained the reason for change order #6. It is necessary to install a filter system around the building because the tile line inside the building is filling with sand. Twin City Testing feels the sand is coming from the perimeter of the tile. They feel we need to redo the entire perimeter tile with 6 inches of rock and 6 inches of mortar sand, making a 12 inch filter media to filter out sugar sand. Mayor Johnson questioned the number of the change order and the dollar amount. Administrator Achen said our records indicate this is not the correct number or amount. MSP (Shelquist - Pickar) to approve change order #7 to the City Hall for $4,138 to correct the drainage around the perimeter of the building noting that the total is for the total contract and state on the bottom of the change order that it is incorrect number and amount and it is to the same conditions read into the August 25, 1975 minutes by Attorney Meyers which at that time pertained to change order #3 and #4. That this is subject to the conditions of the minutes of September 22, 1975. 4 Ayes Engineer Bearden reported on Ardan Avenue drainage improvement. He said there was a problem at 2749 and 2741 Ardan where water was ponding on the lawns. He said a sketch was given to contractors for estimates on building up the driveway. Engineer Bearden read the bid results. He said the city crew had initially tried to correct the problem but had created a hump in the driveway causing the cars to hang up.