HomeMy WebLinkAboutgr00090_000038_pg188-4-
September 22, 1975
Councilman Shelquist said the Planning Commission did take note of this
when they recommended the lot split be approved.
MSP (Johnson - Shelquist) to approve the preliminary plat of Ingvald Johnson
Terrace as presented with the stipulation that the back lot elevation be
at a level to encourgg& rainage from the back of the lot lines out to
the streets and so that the contour as presented on the preliminary plat
be maintained on the back lot lines and that the easements be maintained
as presented. (Exhibit "A ", preliminary plat retained for the files)
4 Ayes
Mayor Johnson called the regular meeting back to order at 9:19 p.m.
Mayor Johnson recognized the Briar Lake final plat.
Mr. Carlson said he made the additional soil borings and had complied
with Council's requests.
MSP (Johnson- Baumgartner) to approve the final plat of Briar Lake
addition owned by Richard Carlson. 4 Ayes
MSP (Johnson - Shelquist) that the elevations of new home construction
in the City of Mounds View be maintained at a level of four feet
above the water table with the basement floor as opposed to the
footings and that the inspection department be notified of this motion and
on the Briar Lake preliminary approval that the elevation requirement
be amended to four feet above the water table for the basement floor. 3 Ayes
Baumgartner Naye
Mayor Johnson presented change order #6 to the city hall addition.
Administrator Achen explained the reason for change order #6. It is
necessary to install a filter system around the building because
the tile line inside the building is filling with sand. Twin City
Testing feels the sand is coming from the perimeter of the tile. They
feel we need to redo the entire perimeter tile with 6 inches of rock
and 6 inches of mortar sand, making a 12 inch filter media to filter
out sugar sand.
Mayor Johnson questioned the number of the change order and the dollar
amount. Administrator Achen said our records indicate this is not
the correct number or amount.
MSP (Shelquist - Pickar) to approve change order #7 to the City Hall for
$4,138 to correct the drainage around the perimeter of the building
noting that the total is for the total contract and state on the bottom
of the change order that it is incorrect number and amount and it is to the same
conditions read into the August 25, 1975 minutes by Attorney Meyers
which at that time pertained to change order #3 and #4. That this
is subject to the conditions of the minutes of September 22, 1975. 4 Ayes
Engineer Bearden reported on Ardan Avenue drainage improvement.
He said there was a problem at 2749 and 2741 Ardan where water
was ponding on the lawns. He said a sketch was given to
contractors for estimates on building up the driveway. Engineer
Bearden read the bid results. He said the city crew had initially
tried to correct the problem but had created a hump in the driveway
causing the cars to hang up.