Loading...
HomeMy WebLinkAboutgr000990_000040_pg168June 14, 1976 Page 8 in terms of dollars, 1% of the value of the shopping center to keep the storm water away from one intersection, and he feels that this is getting too severe for him to bear. Adm. Achen asked if he knows whether there is a 100 year capacity on the site now and Mr. Gottsacker replied that he can say positively there is no longer 100. He stated that he was surprised to find that the actual capacity of the ponds is close to their original capacity. The administrator asked what would the cost be to build those ponds as you designed them and Mr. Gottsacker replied that he would have to go back and calculate. He would not venture a guess at this stage. Adm. Achen asked if the erosion problem that is apparent has reduced capacity of those ponds from the original construction? Mr. Gottsacker replied, very little. Adm. Achen asked if it was his original design that 2/3 of the drainage would go to the N.W. holding pond? The reason he asked was because that was what the situation was when they encountered the situation. Mr. Gottsacker replied that the drainage line splits almost into two equal triangles. Looking at the site the split in the parking lots is the same. The big difference is what is coming off the roof. Adm. Achen said that in your original design you did not intend to have that roof drain off there and Mr. Gottsacker said that it was supposed to be released slowly later after the storm passed. They did not discuss how it would be accomplished. Mr. Paster is willing to pay something for the ditch, the matter of how much is to be negotiated. He does not feel that the benefits received are equal to the number of dollars. Atty Meyers asked what the simple solution was? Mr. Gottsacker replied that the ditch had to be regraded to some degree. In July had they lowered the culvert just some, regrading would probably have solved the problem, as water tends to stand but goes away fast, too. That would have been a reasonable solution. Atty Meyers inquired as to whether the installation of a culvert would release some of the water and Mr. Gottsacker replied, definitely, if installed at the grade there would have been some relief. Adm. Achen asked him that, if in his professional opinion, by not having storage on the roof, by simply installing a curb on that driveway, and providing a straight -line grade, would that relieve all flooding north of County Rd. I? Mr. Gottsacker replied that it would not contain the kind of storms experienced in the spring of 1975. Since then the catch basin has been rebuilt, but it was reported that water was backing up from that point. The administrator stated that it had flowed out of the northwest pond to the east. Eng. Bearden inserted that all of the water had flowed off the roof on the north side of the building until the roof downspouts were altered to make it flow off the east side. Mr. Gottsacker stated that originally the developer recognized some sort of problem would exist. We had some discussion of