HomeMy WebLinkAboutgr00090_000044_pg175July 25, 1977 Page 4
Masonry - renewal (continued)
Gresser, Inc.
1971 Seneca Road
Eagan, MN 55122
Masonry Services
1030 Edgewater Ave. N.
Shoreview, MN 55112
Asphalt - renewal
T. A. Schifsky & Sons
2370 Highway 36
Fridley, MN 55432
Heating - renewal
St. Marie Sheet Metal
7940 Spring Lake Road
Minneapolis, MN 55432
American Burner Service
10101 Naples St. N.E.
Minneapolis, MN 55434
Soderville Plumbing
17616 Highway 65
Soderville, MN 55303
WELLER MINOR SUBDIVISION
Councilmember Baumgartner stated that approval of this subdivision should include
a variance of the garage side yard setback for the south lot. Admin. Achen
stated that because the Planning Commission has authority to grant the setback
variance and did so at its July 20th meeting, it was not included in the consent
agenda motion.
MSP (Baumgartner- Hodges) to approve Item F of the consent agenda as follows:
Approve, as recommended by the Planning Commission (July 20, 1977), the
minor subdivision request of Joseph Weller to create two lots from property
located at 7959 Sunnyside Road. The north lot shall be 76.00 feet wide and the
south lot 89.00 feet wide. A variance of the 85 foot minimum frontage requirement
is hereby authorized for the north lot.
SEAL COATING PROJECT 1977 -5
Engineer Hubbard reported that bids for the 1977 street seal coating project were
opened at 10:00 AM on July 25 and that only two bids were received, one from
Allied Blacktop Company, Inc. for $27,292.00 and the other from Bituminous Road-
ways, Inc. for $32,252.00. The low bid from Allied Blacktop was $10,608.00 less
than he had estimated it would be. Last year's low bid for the same area was
$43,915.00 but also included several street repairs. This year the City's Public
Works Department has repaired some of the bad areas and contracted out several of
the larger repairs. The City has spent approximately $2,000 on these repairs.
Eng. Hubbard reported that Allied Blacktop Co. has performed seal coat work
in Mounds View previously and is qualified to undertake the project and recommended
that the Council approve awarding the project to Allied Blacktop.
Mayor Pickar asked Eng. Hubbard why there could be such a large difference
between his estimate and the bid, even though the bid was lower rather than higher.
Eng. Hubbard explained that bidders may be more anxious for work this year, the material
prices bid were significantly lower than last year, and this year the miscellaneous
repair work is not included.
MSP (Pickar- Rowley) to award the contract for the seal coating project, 1977 -5,
to Allied Blacktop Company, Inc. at a cost of $27,292.00. 5 ayes