HomeMy WebLinkAboutgr00090_000046_pg038February 21, 1978 Page 3 continue north to Hillview Road along Eastwood Road. Phase I would also include construction of a small detention basin south of Hillview Road at Greenfield Avenue, with its outlet to be a 24 inch pipe installed on Oakwood Drive to flow eastward to the Rice Creek outlet at Quincy Street. Lateral storm sewers from County Road I and Jackson Drive would connect to this. Phase II would provide storm sewer laterals to connect the area generally north of Hillview Road and west of Long Lake Road to the Spring Creek trunk system built in Phase I. It would also include a 60 inch trunk system running from east of the Launching Pad Supper Club south across Highway 10 and County Road H to Rice Creek. To this system would be connected lateral lines draining the area generally north of existing Highway 10, south of County Road I, and west of Quincy Street. Phase II would also include lateral improvements to drain the area generally north of Hillview Road and east of Long Lake Road to the Rice Creek outlet at Quincy Street. Phase III would provide lateral extensions in several areas of the city to connect them with the three trunk systems established in Phases I and II. Mr. Short presented a slide presentation, showing how the proposed system would go through the City and the phases of the project. Mr. Sunde gave a geological background of Mounds View. He stated that between April 1975 and July 1975, the water level rose approximately 52 feet, and that in checking into other data available for the area, he found that the water levels that were experienced in 1975 were also experienced at other times, and had determined that rather than the 1975 instances being an extremely rare case, they were more the norm. He stated that the problem seemed more severe, however, because of the increase in housing. Mr. Sunde also stated that the proposed storm sewer system would not be a cure -all but would certainly help alleviate much of the problem. Mr. Short presented a graph prepared by Eigineer Hubbard, showing the required capacity of the system versus the present capacity. Seegar Swanson, of Swanson, Ehlers and Associates stated that the project would be constructed in three phases and financed in three phases. He also stated that the cost estimates have taken inflation into account, and that all cost estimates were`madh.,onthe high side. Mr. Swanson reported that the City had applied for Federal Assistance but was rejected by the Department of Housing and Urban Development but that outside assistance might still come through. Mr. Swanson stated that the Council has taken into consideration the fact that the northwest corner of Mounds View was recently assessed for storm sewer laterals under Project 1973 -4, and that property owners in that area would not be specially assessed for the new project. Other areas in the City would be assessed at a rate equivalent to that paid by the property owners included in Project 1973 -4, and that these special