HomeMy WebLinkAboutgr00090_000048_pg228August 28, 1978 Page 3 is a time problem and they would like to begin construction as soon as possible. Administrator Achen asked how long it would be before the final plat would be prepared. Mr. Steinmueller replied that he would be taking it in tomorrow but had been told it might take a few weeks before it was finished. Administrator Achen asked who the legal owner of the property was. Mr. Steinmueller replied that he was. Administrator Achen pointed out that there would be a problem in giving final approval since the development agreements would have to be drawn up for each parcel. Attorney Meyers stated that if the owner of the property is willing to sign both development agreements, the final plat could be approved at this time. He added that they should have proof that the land has been sold to Mr. Thesenga, such as a copy of the deed. Councilmember Rowley stated that she had a problem with giving final approval at the same time as the preliminary approval. She explained that she has no problem with the preliminary plat the way it is but does not want to rush through on the final plat, and asked if the City has approved both preliminary plats and final plats together before. Administrator Achen replied that they had not in the time he has been with the City. Mr. Thesenga stated that he has done everything possible to comply with what the City has required. Councilmember Ziebarth asked if the entry on the south side of the NASCO property was a delivery area since it is just 40' from the curb cut. Mr. Thesenga replied that it was a garage for his car, and not a delivery area. Councilmember Ziebarth asked what size delivery vehicles they expect to have, since the area between the two buildings is only 120', with delivery stalls in between. Mr. Thesenga replied that they would be 40' vehicles and pointed out that most of the delivery docks are not directly across from each other, so there should be adequate maneuvering space. Councilmember Ziebarth asked if the developers were aware of the SDM charge. Mr. Steinmueller and Mr. Thesenga replied that they were very aware of it. Councilmember Ziebarth stated that he did not necessarily feel that giving approval on the final plat now was such a bad idea, and pointed out that if there is a difference between the preliminary plat and final plat, it would automatically go back to the Council. He added that he does rot want to hold up the development two or three weeks. Councilmember Rowley asked how soon a building permit could be drawn. Official Rose replied that he could not issue a building permit until the Council has approved the development agreement. Acting Mayor Hodges closed the public hearing and reopened the regular meeting. MSP (Baumgartner - Rowley) to approve the preliminary plat of Midway Industrial Supply, Inc., and Thesenga Land Company, at 2140 Mustang Road. 4 ayes