HomeMy WebLinkAboutgr00090_000048_pg256EYISTING DR.eiiM.GE FACILITIES:
In connection with thra construction of the basic sanitary sa war systa*, the
high water tablra necesaitat.d dewaiterizxg of the trenches in order to prop.rly
install tha sewers. Topography in Mbunds View is such that theca is no natural way
to diapose of than dewaaternng water. To prev of inundation of water in the Villas*,,
a surfacs water drainage system was constructed in connaction with the sanitary
sewer aystseae. Said drainage system consists of a series of small diiaeatsr pipes
and ditches. Catch basins wars inatallad at low points in dug street spot** to
pro' ida outlets for stoma vaterr run-off. In essenco, this drain system 'uncti .
only at& sa aeans of providing outlasts and rav, ntu*l drainage from °a+uriou* 1001 pointa
in the Village.
As davalopaecent progressed in the Vi11a3a, new etreats have ?say construct*d
and the xaurface water drainage systole extasaadud. The Village is now faced with the
condition that furtb r extsnaiona cannot be ads. 13 additiuu,, the capacity of
th oulatiag conduit systam b+acose+ieas oaceaded tuna frenuantly causing excr*aiaive
ptrading in any areas. This condition will bo further ag revstsd as more of the
Vi:lag* becomes built up As additional runoff is craatad by buildings, driveways
and otra attjt.
Additional building within the coofine:s of the existing surface water drainage'
oyatam will place an increased burden on a aystaen which is already inadaquets.
Covalop:>ant of tho era .aa1siag °pan space throughout the Village will raquirs that
a:Riac uata dr- ainaga facilities are provided. is light of'thesa fades, Mounds Viaw
haa rcevchad the point °born asarioaus consideration :should be given to either cone
sa r:ict.inw au sad' gww.a atom as ier *3y3t9eaa or proridiug a suitable alternative.
OP& Se : >iITUIN ` M& VILLAGE:
An i vantory wL as tan of th8 vacant property within the Village as it now
ealata. Far t .* puapoaas of diacusaion, the VilLj* was divided into five parts.
Tray rsrfa a.r 20110W5: