Loading...
HomeMy WebLinkAboutgr00090_000051_pg232M0UUNDS VIEW CITY COUNCIL Page 2 Regular Meeting November 13, 1979 The applicant, Sahara Investment Co., requests to combine four lots- -2711, 2721, 2731 and 2741 Hwy. 10- -into one and to con- struct a 20,000 sq. ft. office /bank building. (Details of this proposal may be found in the Summary prepared by Staff under Case #36 -79.) The applicant requests conceptual approval of the Site Plan and a directive to complete final plans and specs. A development agree- ment would then be drawn up, reviewed by Council for approval, and a building permit would ultimately be issued. 7c. DEVELOPMENT CONTROLS- - OFFICE BLDG. CONCEPT, SAHARA INVESTMENT CO. Representing Sahara Investment Co. were Mr. Steve Winnick, Attorney; Duane Sorenson, Pres. of First State Bank of New Brighton; and Mike Wood, V.P. of Urban Scope. Also present was Jim Christensen of Midwest Planning. Mr. Christensen gave some of the details of his traffic study report, as well as a similar report drawn up by Jack Anderson Associates. A 15% increase in traffic volume is predicted with this proposed development, with a maximum of 60% increase on Hillview Rd. The majority of the traffic will be coming from the traffic stream to the bank, and back to the traffic stream, accounting for the 60% possibility. Robert Glazer, 2625 Hillview Rd., felt more of the neighboring residents should have been notified, beyond the 300 ft. which is required. He was concerned about the traffic impact on Hillview Rd. created by people using Hillview, going between the bank and shopping center. He requested Council to have a hearing, with the public notified so they may air their concerns. He was also concerned because the bank will be a drive -up facility, just as the previously proposed Burger Tower was. Richard Hedin, 8041 Long Lake Rd., was concerned that the drainage ditch might not be able to handle the runoff caused by the large amount of paved area around the bank. Rose explained the ditch proposed by the applicant meets the criteria of Resolution #983 and the Rice Creek Watershed. Wood stated the proposed ponding would be: 4 ft. deep at maximum, located in the front of the building, grassy in the summer, and not unsightly.