Loading...
HomeMy WebLinkAboutgr00090_000053_pg145MOUNDS VIEW CITY COUNCIL Regular Meeting PAGE 4 May 12, 1980 (c) the minimum square feet area requirements in (2) above shall be provided; (d) all existing structures and any proposed structures shall meet all yard requirements under Chapter 40.05. This revision allows the 82.5 foot lot frontages on Bayport Plat. At this time, Staff is recommending that the plat be approved upon the following conditions: 1. The developer finalizes his plat and drainage plans pursuant to the S.E.H. recommendation in a letter dated 11/2/79. 2. That the ponding and drainageway areas be noted as drainage easements on the final plat. 3. That the Developer submit his revised plat and drainage plan to Rice Creek Watershed District for written approval prior to the City's final action on the plat. 4. That staff be directed to draft a resolution and development agreement for final approval. The development agreement would include the following: Exhibits: Final Plat, Grade Plan, Legal Description Bond or Letter of Credit or cash in the amount of $5,500. Dan Boxrud, City Engineer, briefly reviewed the planning considerations of the proposal, indicating the pond elevation will be raised to 905.5 to allow for extra drainage. The Mayor opened the meeting to discussion and questions from the audience: Q.How many inches of rainfall would have to fall within a 24 hour period before I would have the overflow in my place? (Harry Gum, 7805 Greenwood) A.(Engineer) No more water will leave the site in the future than it does today. Pursuant to Res. 983, plans show a water detention area which will detain water after a major storm and release the water to the existing storm sewer at the north property line at the same rate were the property left in its undeveloped state. Q.Will the sewer head take a 50 year storm? (Sharon McCarthy,) ). A.(Engineer) No, but the pond will take a 50 year storm.