RESOLUTION RECOMMENDING APPROVAL OF THE CONCEPT PLAN,
DEVELOPMENT STAGE, AND WETLAND ALTERATION PERMIT,
MOUNDS VIEW BUSINESS PARK SOUTH, PLANNED UNIT DEVELOPMENT,
PLANNING CASE NO. 199-86
WHEREAS, Everest Development has requested general concept
and development stage approval and wetland alteration permit to
construct three buildings as follows:
Building H
Building I
Building J
74,998 square feet
123,648 square feet
72,312 square feet
The site is located at the southwest intersection of Highway 10
and Woodale Drive; and
WHEREAS, the Developer of this development, as requested,
requires the following approvals:
.
1. General Concept Plan
2. Development Stage
WHEREAS, upon project approval, the Developer shall enter
into a development agreement with the City of Mounds View; and
WHEREAS, the Planning Commission and City Council have
reviewed the Staff recommendation and information submitted by
the applicant which includes the following:
l.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ll.
. 12.
Boundary and topography survey received February 3,
1989.
Preliminary plat dated January 6, 1989.
Site plan dated December 30, 1988.
Mounds View wetland boundary received February 3,
1989.
Army Corps of Engineers wetland boundary received
February 3, 1989.
Preliminary grading, drainage and erosion control plan
dated January 9, 1989.
Preliminary utility plan dated January 9, 1989.
Landscape Master Plan dated December 29, 1988.
Wetland Enhancement Plan (no date)
Extension of proposed Trailway Plan dated December 28,
1988.
Building elevations dated December 28, 1988.
Sections dated December 28, 1988.
.
.
.
RESOLUTION NO. 2501
PAGE TWO
WHEREAS, the applicant has submitted a project that meets
the requirements of City Code Chapter 40.24, Subd. C(2),
commercial or industrial planned unit development; and
WHEREAS, the applicant has provided the information
required by Chapter 40.24, Subd. E(l), general concept stage; and
WHEREAS, the Planning Commission and City Council have
reviewed the Concept Plan taking into consideration the
requirements of Chapter 40.24, Subd. D(2); and
WHEREAS, the Planning Commission and City Council have
been provided the information required by Chapter 40.24, Subd.
E(2), Development Stage; and
WHEREAS, the Planning Commission and City Council have
reviewed the on-site circulation, there being no public streets
or pedestrianways proposed; and
WHEREAS, the Planning Commission and City Council have
reviewed the land use proposed and recognizes it is appropriate
given the site zoning and is in accordance with the Comprehensive
Plan; and
WHEREAS, the Planning Commission and City Council
recognizes the timing of the project and approves the schedule
dependent upon the developer obtaining the needed approvals; and
WHEREAS, the Developer, Everest Development, has requested
approval of a wetland alteration permit to carry out grading work
associated with the development proposal for Mounds View Business
Park South; and
WHEREAS, a wetland alteration permit is required as a
result of the placement of structures within the wetland buffer
zone.
WHEREAS, the City Council, Planning Commission, City Staff,
and the City's Engineering Consultant have reviewed this
development request; and
WHEREAS, this development must conform to the requirements
of Chapters 48 and 49A becaUse this development is in a wetland
zoning district; and
WHEREAS, Chapter 48.05, Subd. 5 A, Band C requires all
land proposed to be subdivided and lying within a wetland zoning
district to have the following:
RESOLUTION NO. 2501
PAGE THREE
.
A. Minimum lot size - 20,000 square feet
B. Minimum lot width - 125 feet as measured at the
building setback line
C. All structures shall be setback at least 100 feet
from the wetland: and
WHEREAS, the City Council has seen fit to develop these
requirements to regulate the wetland because the Council has
found the following:
Chapter 48.01, Subd. 2
.
The Council finds that wetlands within the City, as part
of the ecosystem, are critical to the present and future
health, safety and general welfare of the land, animals,
and people within the City, as well as within the Rice
Creek Watershed District: that existing and potential
development within the City and Rice Creek Watershed
District poses increasing ecological and economic problems
and demands, having the effect of potentially despoiling,
polluting, accelerating the aging, eliminating or
negatively and irretrievably altering both the wetlandS
and their functions (and the processes associated
therewith) which, if conserved and maintained, constitute
important physical, educational, ecological, aesthetic,
recreational, and economic assets for existing and future
residents of the community and the Rice Creek Watershed
District: and
WHEREAS, the City Council has found the intent of Chapter
48 to be the following:
Chapter 48.01, Subd. 2A
.
To preserve wetlands in as natural a state as possible to
serve as natural retention and detention areas for surface
waters: to regulate the use of areas adjacent to the
wetlands in order to protect the natural function of the
wetlands: to provide for the protection, preservation,
proper maintenance and use of wetland zoning districts: to
minimize the disturbance to them and to prevent damage
from excessive sedimentation, eutrophication, or
pollution: to prevent loss of beneficial aquatic
organisms, wildlife, and vegetation of the habitats of the
same: to provide for the protection of fresh water
supplies from the danger of drought, overdraft, pollution,
or mismanagement: to secure safety from floods: to reduce
the financial burdens imposed upon the community through
rescue and relief efforts occasioned by the occupancy or
.
.
.
. J
RESOLUTION NO. 2501
PAGE FOUR
use of areas subject to periodic flooding; to prevent loss
of life, property damage, and the losses and risks
associated with flood conditions; to reduce the financial
burdens imposed upon the community through correction of
erosion problems that, with proper foresight, could be
avoided; to avoid the financial burden of the need for the
community to reclaim its water quality; and to preserve
the location, character and extent of natural drainage
courses; and
WHEREAS, the developer has requested a wetlands alteration
permit to work within the 100 foot setback requirement because he
claims exceptional circumstances apply to the property which do
not apply generally to other properties; and
WHEREAS, in the granting of a wetland alteration
permit, the City Council must find each of the following in
Section 40.26, Subd. D, to be true:
(I) Exceptional or extraordinary circumstances apply to
the properties which do not apply generally to other
properties in the same zone or vicinity and result
from lot size or shape, topography or other
circumstances over which the owners of the property,
since enactment of this Code, have no control.
(2) The literal interpretation of the provisions of this
90de would deprive the applicant of rights commonly
enjoyed by other properties in the same district under
the terms of this Code.
(3) That the special conditions or circumstances do not
result from the actions of the applicant.
(4) That granting the wetland alteration permit requested
will not confer on the applicant any special privilege
that is denied by this Code to owners of other lands,
structures or buildings in the same district.
(5) That the wetland alteration permit requested is the
minimum request which would alleviate the hardship.
Economic conditions alone shall not be considered a
hardship.
(6) The wetland alteration permit would not be materially
detrimental to the purpose of this Code, or to other
property in the same zone.
.
.
.
. )
RESOLUTION NO. 2501
PAGE FIVE
(7) The requested wetland alteration permit will not
impair an adequate supply of light and air to adjacent
property, or substantially increase the congestion of
the public streets, or increase the danger of fire or
endanger the public safety, or substantially diminish
or impair property values within the neighborhood.
The Board of Adjustment and Appeals may impose such
restrictions and conditions upon the premises
benefitted by a variance as may be necessary to comply
with the standards established by this Code, or to
reduce or minimize the effect of such variance upon
other properties in the neighborhood, and to better
carry out the intent of the variance; and
WHEREAS, the City Council finds that this property does
have exceptional circumstances which apply to this property and
which do not apply generally to other properties in the same zone
or vicinity; and
WHEREAS, the City Council finds that the special
conditions do not result from the actions of the applicant; and
WHEREAS, the City Council finds the wetland alteration
permit request is the minimum wetland alteration permit which
would alleviate the hardship; and
WHEREAS, the City's Consulting Engineers have reviewed the
wetland alteration permit application and evaluated it based on
Chapter 48.06, Subdivision 3; and
WHEREAS, it has been determined that organic waste will
not be discharged directly into the wetland; and
WHEREAS, it has been determined that the proposed
development will not cause the total natural phosphorus stripping
capacity of the wetland to fall below the projected phosphorus
production from the whole developed wetland watershed; and
WHEREAS, it is recognized that the lowest floor elevation
will be at least two feet above the elevation of the adjacent
wetland boundary.
WHEREAS, Everest Development will construct a business
park, a road extension to the entrance of the site from T.H. 10
on Woodale Drive, and two (2) storm water runoff detention
basins; and
WHEREAS, approximately two (2) acres of the business park
are located within the buffer zone of the 1-3 Wetland Zoning
District; and
.
.
.
.
. .
RESOLUTION NO. 2501
PAGE SIX
WHEREAS, construction activities associated with the
Business Park reportedly will impact 0.006 acres of the wetland:
and
WHEREAS, two (2) storm water runoff detention basins will
be constructed as part of the development. The detention basins
are located on uplands and are designed to provide storm water
storage and water quality treatment. The discharge from the
largest detention basin is directed to the wetland and the
discharge from the smaller detention basin is directed to Rice
Creek: and
WHEREAS, the Planning Commission and City Council have
reviewed the location and extent of the ponding areas proposed:
and
WHEREAS, it has been determined that the storm water
run-off from the proposed development will be substantially free
of silt, debris and chemical pollutants and will not disturb
vegetation: and
WHEREAS, it has been determined that the proposed
development will not cause storm water run-off from the wetland
to take place at a rate which would exceed the natural rate of
run-off: and
WHEREAS, the results from Barr Engineering's review of the
development proposal indicates that the development proposal is
in compliance with the permit requirements: and
WHEREAS, the Planning Commission and City Council have
received a positive review from the Environmental Quality Task
Force for the project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of
the City of Mounds View approves the concept plan and development
stage plans of the PUD proposal and excluding the following:
1. Enhancement of Wetland No. 1-3 as proposed by the
Wetland Enhancement Plan.
2~ Extension of Woodale Drive from a point beginning at
the development site entrance on Woodale moving west
to the point where Woodale Drive currently deadends at
the intersection of Woodale Drive and O'Connell Drive.
BE IT FURTHER RESOLVED that the City Council of the City
of Mounds View approves the wetland alteration permit requests to
perform work within the 100 foot buffer and within the wetland.
.
.
.
.~
, ,)
RESOLUTION NO. 2501
PAGE SEVEN
BE IT FURTHER RESOLVED that the City Council approves the
wetland alteration permit to allow for working within a wetland
zoning district contingent upon the following:
1) The developer submit a plan illustrating the
boundaries of the work areas and that these boundaries
be the minimum necessary to complete the proposed
work.
2) The developer place silt fences and hay bales as
erosion control measures along all boundaries of the
existing wetland and the work area.
3) The developer present the City with a maintenance plan
and schedule for the on-site storm water ponds.
4) The storm water detention basins shall be constructed
during general site grading and maintained immediately
following completion of the development.
5) The limits of construction shall be specified and
staked in the wetland zoning district.
6) A specific construction schedule shall be provided.
BE IT FINALLY RESOLVED that Staff is directed to prepare
an ordinance effecting the rezoning of the project site to
PUD/I -1.
Adopted this 24
, 1989.
day of
July
ATTEST: