Loading...
HomeMy WebLinkAboutResolution 4461 . -. . RESOLUTION NO. 4461 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION RESCINDING RESOLUTION NO. 4325 AND ESTABLISHING A UNIFORM SCHEDULE OF FEES AND CHARGES, EXHIBIT A ATTACHED WHEREAS, all the fees and charges of the City of Mounds View are listed on a uniform scheduled entitled, Exhibit A; and WHEREAS, staff has examined the current license/permit/fee schedule and revised the schedule to be consistent with costs and also comparable with Metropolitan cities; and WHEREAS, the Police Department has revised the Administrative Offense Schedule which is now more consistent with Ramsey County charges; and WHEREAS, in an effort to better coordinate the Schedule with the budget process, the license/permit/fee schedule, Exhibit A, attached, staff recommends the adoption of this Schedule prior to the end of each year. NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of Mounds View approves the Uniform Schedule of Fees and Charges attached hereto and referred to as Exhibit A. Adopted this 13th day of December, 1993. ATTEST: (SEAL) EXHIBIT A . . CITY OF MOUNDS VIEW PROPOSED 1994 FEE SCHEDULE . Accessory Building 102 . Accident Report 79 Addition (First Floor) 102 Addition (Mobile Home) 102 Administrative Offense 101 Agendas 74 Air Conditioning 18 Air Conditioning 102 Amusement Center 67 Amusement Device 67 Amusement Rides 69 Apartment List 110 Apartment Registration 50 Asphalt 3 Assessment Search 72 Attached Garage 102 . Basement (Semi-Finished) 102 Basement (Unfinished) 102 Basic Floor Area 102 Billboards 19 Blue Prints 81 Bowling Alley 68 Boxing Permit 71 Buildings 1 Business List, Mounds View 111 Carnivals 69 Carport 102 Circuses 69 City Code Book 77 City Hall Shelter Rental 85 Code Appeal 33 . Code Book 77 Community Room Rental 83 . Comprehensive land Use Plan 77 Comprehensive land Use Plan Amendment 108 Conditional Use Permit 32 Contractor licenses 28 Contractor (State) license Verification 106 Copies 73 Council Meeting Packets 76 Crawl Space 102 Curb Stop Shut Off 45 Deck 102 Detached Garage 102 Development Plan Review 34 Dog licenses 48 . Door and Window Installation 9 Driveway 3 Duct work 20 Electrical Work 89 Elevators 23 Excavating 2 Fans 20 Fence 8 Filing Fee for City Office 78 Filling 2 Fire Sprinkling Permit 16 Fireplace 102 Footings 1 Furnace 20 Garbage Enclosure 10 . Garbage Hauler 61 . Garage Gas Piping Gasoline Station Grading Half Way House Heating House Permit Hydrant Incinerators Insufficient Funds Check Intoxicating liquor Investigation Fee Kennel license lakeside Park Rental late Water Bill (penalty) license Verification (Contractor) liquor license load limits Major Subdivision Maps Meter Reading Card (Non-Return) Meter Testing Minor Subdivision Minutes Mobile Home Permit Mobile Homes Moving Buildings Multiple Dwelling list Multiple Dwelling Registration New Car Sales . . 102 16 62 2 66 20 102 94 22 92 51-56 56,64,106 49 84 43 106 51-60 47 36 81 42 103 35 75 29 24 14,15 110 50 63 . New Resident List Non-Intoxicating Liquor Notary Public NSF Check Office Filing Fee Open Carport Park Dedication Fee Park Shelter Building Parking Lot Patio Peddlers License & ID Photocopies Picnic Kit Picnic Shelter Pipe Fitting Plan Check Fee Plan Review Planned Unit Development/ Amendment Planning Sign Deposit Platforms Plumbing Police Report Porch PUD Development/Amendment Raising Recreational Structures Recuperation House Refrigeration Relocation of Building Remodeling Reroof . . 82 57-60 80 92 78 102 97 84,85 3 3 64 73 104 85 16 91 34 107 96 7. 17 79 102 107 13 102 66 18 37 102 5 Reshingling 5 . Residing 6 Restaurant License 65 Restoration Fee 44 Returned Check 92 Rezoning 30 Road Restriction Permit 47 Rubbish Hauler 61 S.A.C. Charge 86 Sales Tax 93 Satellite Dishes 25 Seating 7 Service Restoration 44 Sewer Availability Charge (SAC) 86 Sewer Rate 99 . Sewer Connection Permit 46 Shed 102 Sheet Metal 21 Shoring 13 Shut Off Fee 45 Sidewalks 3 Sign Code, Copy 77 Signs 19 Sign Permit, Temporary 27 Silver View Park Shelter Building 84 Sign Deposit, Planning 96 Site Plan Review 34 Solicitors License 64 Special Assessment Search 72 . Sprinkler Permit 16 . . . Sprinkling System State License Verification Storage Shed Storm Water Management Street Light Utility Street Opening Permit Structures Stucco Subdivision Surcharge Surface Water Management Swimming Pool, Permit Fees Swimming Pools SWM Charge Tapping Water or Sewer Main Tax, Sales Temporary Mobile Home Permit 29 Temporary Sign Permit 27 Three-Season Porch 102 Transfer of Apartment/Multiple Dwelling Registration 50 Transient Merchant 64 Tree Removal 95 Unit Charge (Sewer) 88 Used Car Sales 63 Utility Bill 43 Utility (Bill) Search 72 Utility Shed 102 Valuation Table Page 1 Variance 31 Ventilation 20 102 106 102 87 109 70 1 4 35,36 90 113 102 26 87 100 93 . . . Video Tape Copies 105 W.A.C. Charge 39 Water Availability Charge (WAC) 39 Water Bill (late fee) 43 Water Rate 98 Water Connection Permit 40 Water Hydrant 94 Water Meter 41 Water Quality 114 Testing Charge - MN Dept. Health Water Service Restoration 44 Water Shut Off Fee 45 Wetland Alteration Permit 38 Wood Burning Stove 11 Wrecking 12 Wrestling Permit 71 Zoning Code, Copy 77 . Building Permits (Chapter 59) Minimum Fee. The minimum fee for all permits shall be $15.00 unless otherwise specified. Valuation Table. The following Valuation Table shall be used to determine fees for those permits so indicated below and in all cases where the work is of such a nature that the permit fees cannot be determined from the schedule established below for such work. $1.00 to $500.00 $15.00 for the first $501.00 to $2,000.00 $500.00 plus $2.00 for each additional $100.00 or fraction thereof, to and including $2,000.00 $2,001.00 to $45.00 for the first $25,000.00 $2,000.00 plus $9.00 for . each additional $1,000.00 or fraction thereof, to and including $25,000.00 $25,001.00 to $252.00 for the first $50,000.00 $25,000.00 plus $6.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $50,001.00 to $414.50 for the first $100,000.00 $50,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $100,001.00 to $639.50 for the first $500,000.00 $100,000.00 plus $3.50 for each additional $1,000.00 or . fraction thereof to and including $500,000.00 $500,001.00 and up $2,039.50 for the first $500,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof . ****************************************************************** General Construction: SURCHARGES NOT INCLUDED IN ALL FIGURES LISTED BELOW (See "Surcharge" for further information)l 1. buildings, structures, footings - use valuation table 2. excavating, grading, filling - $20.00 plus $2.00 per 1,000 square feet or fraction thereof over the first 1,000 square feet plus 2.5 times any expense for survey work by the City plus $.50 surcharge 3. sidewalks, driveway, parking lots, patio (no surcharge) - . $15.00 plus $2.00 per 1,000 square feet or fraction thereof over 1 ,000 square feet 4. stucco - $15.00 plus $4.00 per 1,000 square feet or fraction thereof over 1,000 square feet plus $.50 surcharge 5. reshingling - $15.00 plus $2.00 per 1,000 square feet or fraction thereof over 1,000 square feet plus $.50 surcharge 6. residing - $15.00 plus $2.00 per 1,000 square feet or fraction thereof over 1,000 square feet plus $.50 surcharge 7. platforms, seating - $20.00 per platform and $15.00 per seating unit plus $.50 surcharge 8. fences (no surcharge) - $20.00 per installation 9. door or window installation using existing window frames - no fee . door or window installation using existing rough opening but changing window frames - $15.00 plus $2.00 per window door or window change in rough opening - use valuation table . 10. garbage/recycling enclosure - $20.00 (no surcharge) 11 . wood burning stove - use valuation table 12. wrecking - $20.00 plus $2.00 per 1,000 cubic feet or fraction thereof over 2,000 cubic feet plus $.50 surcharge 13. raising, shoring - use valuation table-see surcharge and plan check fee for additional charges 14. moving buildings over streets A. larger than 12' x 24' x 25' other than accessory building - $110.00 per building plus $.50 surcharge B. accessory building larger than 12' x 24' x 25'- $ 70.00 per building plus $.50 surcharge . C. smaller than 12' x 24' x 25' - $ 35.00 per building plus $.50 surcharge 15. moving buildings over private land - $30.00 per building plus $.50 surcharge 16. Pipe Fitting (plus surcharge) A. gas, oil piping - use valuation table B. steam, hot water heating systems - $25.00 plus $5.00 per 100,000 BTU per hour or fraction thereof over 200,000 BTU per hour C. fire extinguishing equipment (1) standpipes - $20.00 per standpipe . (2) sprinkler equipment- $30.00 plus $4.00 for each ten sprinkler heads or fraction thereof over ten heads 17. Plumbing Work (plus surcharge) . A. plumbing fixture, devices, connections - $15.00 plus $7.00 per fixture, device and connection 18. Refrigeration Work (plus surcharge) A. equipment under 100,000 BTU per hour capacity (12,000 BTU per ton) - $15.00 plus $2.00 per 10,000 BTU per hour or fraction thereof over 10,000 BTU per hour capacity B. equipment over 100,000 BTU per hour capacity (12,000 per ton) - $35.00 plus $2.00 per 100,000 BTU per hour or fraction thereof over 100,000 BTU per hour capacity 19. Signs, Billboards (no surcharge) A. signs up to 100 square feet - $50.00 $35.00 for the first 24 square feet plus $5.00 for each additional 25 square feet or fraction thereof of to 100 square feet . B. signs 100 square feet and over - $75.00 $65.00 for the first 100 square feet plus $10.00 for each additional 100 square feet or fraction thereof C. signs: refacing or altering - $20.00 per installation 20. Heating and Ventilation Work (plus surcharge) A. gas, oil burner equipment - $25.00 plus $5.00 per 100,000 BTU per hour or fraction thereof over 100,000 BTU per hour input (commercial, rooftop units) B. gravity warm air heating - $35.00 per installation repair, alteration or extension C. mechanical warm air heating - $25.00 plus $5.00 per 100,000 BTU per hour or fraction thereof over 200,000 BTU per hour input capacity . D. duct or tin work - Use Valuation Table E. ventilation systems . (1) using fans less than 100 CFM - $5.00 plus $2.00 for each fan (2) using fans more than 100 CFM - $25.00 plus $2.00 per 1,000 CFM or fraction thereof over 3,000 CFM plus $5.00 for each fan 21. General Sheet Metal Work - Use Valuation Table (plus surcharge) 22. Incinerators (plus surcharge) A. domestic portable incinerator - $25.00 per unit B. commercial, industrial incinerator - $60.00 per unit 23. Elevators, etc. - Use Valuation Table (see surcharge and plan check fee for additional charges) . 24. Installation of Mobile Homes - $35.00 per Installation (plus $.50 surcharge) 25. Satellite Dishes - $20.00 per Installation (plus $.50 surcharge) 26. Swimming Pools Filling - $25.00 plus $1.9 1Q. per 1,000 gallons of water used Bldg. Permit Valuation Per Square Foot Above Ground $6.00 Below Ground $20.00 With Decking/Fencing Add: $2.00 See Valuation Table when value has been determined. Also see surcharge and plan check fee for additional charges. 27. Temporary Signs - $15/21 day period . 28. Contractor Licenses (Chapter 60) (see Building Dept. Procedures Manual for specific license type) - $40lYear State License Verification Fee - $5.00 per permit 29. Temporary Mobile Home Permit - $50 $36 + $10/Renewal . 30. Rezoning - $200/acre, minimum $200, maximum $1,000 31. Variance - R-1 to R-2 - $75, all others $200 32. Conditional Use Permit - R-1 to R-2 - $75, all others $200 33. Code Appeal - $75 34. Development/Site Plan Review - $100/acre, minimum $100, maximum $500 35. Minor Subdivision - $150 36. Major Subdivision - $250 plus $250.00 deposit 37. Relocation of Building (Chapter 45) - Expenses of Inspection . 38. Wetland Alteration Permit (Chapter 48) - $50 plus deposit determined by Staff Wetland Buffer Permit - $10.00 39. Water Availability Charge A. Residential - $200 $225 per unit B. Commercial/Industrial - Larger of $OOG $900 or $225 $200/36,000 Gallons of Water Consumption/Quarter 40. Water Connection/Repair Permit A. Service less than 4 inches - $2G $25 .:t...$.50 Surcharge B. Service 4 inches or greater $ 40 $50 + .50 Surcharge 41. Water Meter - $ 85 42. Non-Return of Meter Reading - $-t-G $15.00 Charge 43. Late Payment - 10% of Bill . 44. Service Restoration - $W $75 before 3:30 p.m. M-F: $100 after 3:30 p.m. M-F or weekends 45. Combination Shut Off & Curb Stop - Cost + $25 . 46. Sewer Connection/Repair Permit - $2G- $25 + $.50 Surcharge 47. Waiver of Load Umits (Chapter 80) - $ 20/entry/truck 48. Dog Ucenses (decreased by 50% after one year) A. Spayed or neutered - $ 7/2 Years B. Unspayed or Unneutered - $13/2 Years 49. Kennel A. Residential - $ 30IYear B. Commercial - $ 50IYear 50. Multiple Dwelling Registration - $5/Unit with minimum of $30/building/year Transfer - $15.00 Intoxicating Uquor (Chapter 100) . 51. On-Sale without Cabaret - $5,000 + $60/100 sq. ft. or part thereof of public area in excess of 4,000 square feet not to exceed $10,OOO/year 52. On-Sale with Cabaret - $5,000 + $85/100 sq. ft. of public area in excess of 4,000 square feet not to exceed $10,OOOlYear 53. On-Sale Wine - $8001Year 54. Off-Sale - $2001Year 55. Bottle Club - $3301Year 56. Investigation Fee A. B. C. Single Person Partnership Corporation wine general liquor $300 $350 $365 $385 $400 $450 . Non-Intoxicating Uquor (Chapter 100) - 3.2 Beer (subject to 10% late payment fee) 57. On-Sale - $1,000 . 58. Off-Sale - $1001Year 59. Set Ups - $3301Year 60. Club - $3301Year 61. Garbage and Rubbish Hauler (Chapter 104) - $75 + $20NehiclelYear (subject to 10% late payment fee) 62. Gasoline Stations (Chapter 106) - $50 + $8 Per Pump Exceeding 2IYear (subject to 10% late payment fee) 63. ' New and Used Car Sales (Chapter 109) - $1501Year (subject to 10% late payment fee) 64. PeddlersfTransient Merchant (Chapter 110) - $60/day, $100/month, $500/year, plus $10.00 investigation fee for new . peddler plus $2.50/person for I.D. card Transient Merchant - $60/day, $100/month, plus $10.00. investigation fee plus $2.50/person for I.D. card 65. Restaurant (Chapter 111) A. Class A (occupancy load greater than 100) (1 ) Operating 16 Hours/Day or Less - $2751Year (2) Operating More than 16 Hours/Day - $5501Year B. Class B (Occupancy Load of 100 or less) (1 ) Operation 16 Hours/Day or Less - $1651Year (2) Operating More than 16 Hours/Day - $3301Year 66. Recuperation or Half Way House (Chapter 113) A. Less than 10 Beds - $ 33IYear . B. 10-49 Beds - $ 55IYear C. 50-99 Beds - $ 821Y ear D. Over 110 Beds - $11 OlYear . 67. Amusement Devices and Centers (Chapter 114) A. Devices - $551Y ear Each B. Centers - $3001Year 68. Bowling Alleys (Chapter 115) - $20/AlleylYear 69. Amusement Rides, Carnivals, and Circuses (Chapter 116) - $125 for First Day + $20 for each additional day 70. Street Opening Permit - $500 to $700 per opening $16 + $16/Dcpocit/Sq. Ft. 71. Boxing and 'Nrcstling Procescing Fee $100/Event (regulated by the State of Minnesota) 72. A. Special Assessment Search - $10 B. Utility Bill Assessment Search - $1.Q . 73. Photocopies - $.25/Sheet 74. Mailed Agendas A. City Council - $20lYear B. Planning Commission - $10lYear 75. Mailed Minutes A. City Council - $40lYear B. Planning Commission - $20lYear 76. Council Meeting Packets A. City Council - $55/Ycar $250\Year B. Planning Commission - $30/Ycar $175.00\Year 77. City Code Book or Comprehensive Land Use Plan - $200 A. Zoning Chapter $40.00 B. Sign Chapter $5.00 78. Filing Fee for Public Office - $5.00 . 79. Police/Accident Report - $2/Page 80. Notary Public - $1 . 81. Blue Prints Up to 11 x 17 A. Blue Line - $ .50 B. Mylar - $1 .00 Up to 24 x 36 A. Blue Line - $1.75 B. Mylar - $4.00 Larger than 24 x 36 A. Blue Line - $.30/Sq.Ft. B. Mylar - $.75/Sq. Ft. 82. New Resident List - $10.00 . 83. Community Room Rental - $100.00 deposit plus $25.00 fee for residents/one time uses (i.e., showers, anniversary, Birthdays, parties, etc.) $100.00 fee for non-residents. No charge for community organizations for organization meetings 84. Silver View Park Shelter Rental - $50.00 clean-up deposit and $50.00 key deposit plus $20.00 fee for residents or $50.00 fee for non-residents Lakeside Park Rental - $100.00 deposit plus $20.00 fee for residents or $50.00 fee for non-residents 85. City Hall Shelter Rental - $25.00 deposit plus $20.00 fee for residents or $100.00 deposit plus $50.00 fee for non-residents 86. Sewer Availability Charge (SAC) - $750.00 $800.00 (Effective 1/1/934 per Metropolitan Waste Control Commission . 87. Storm Water Management (SWM) A. R-1 - $202.00/lot B. R-2 - $989.00/acre C. R-3 - $1 ,429/acre D. R-4, R-O, B-1 - $1 ,429/acre E. B-2, B-3, B-4, 1-1 - $1 ,996jacre 88. Unit Charge (Sewer) - $100.00 per new structure . 89. Electrical Work - Same as established in the MN State Board of Electricians March 1, 1972, Edition of Laws and Regulations Ucensing Electricians and Inspections of Electrical Installations or as amended. Electrical Inspector: Bob Clausen, 777-7885 Blank Forms Available - $1.50 each 90. A. Building Surcharge - .0005 times the valuation - If permit has a set fee (not determined by value such as reroof, reside, excavating, filling, etc.), then surcharge is $.50 B. Heating Surcharge - $.50 (unless permit fee exceeds $1,000) C. Plumbing Surcharge - $.50 (unless permit fee exceeds $1,000) D. Water Permit Surcharge - $.50 E. Sewer Permit Surcharge - $.50 91. Plan Check Fee - When a plan is required to be submitted by Subsection (C) of Section 301 of the Uniform Building Code, . except for residential garages, storage buildings, decks and additions costing less than $10,000.00 a plan review fee equal to 65% of the building permit fee shall be paid. When plans are incomplete or changed so as to require additional plan checking, an additional fee shall be paid based upon Table 3A of the Uniform Building Code. 92. Insufficient Funds (NSF) Check - $20.00 93. Tax - 6.5%, maps, copies 94. Water Hydrant Deposit - $75.00 $100.00 A. Water used from hydrant - $1.Ge15/1,OOO gallons B. Meter Deposit, 2-1/211 - $500.00 C. 5/811 Meter Deposit - $85.00 D. Wrench Deposit - $20.00 E. Hose Deposit - $20.00 F. Adapters - $20.00 deposit . 95. Tree Removal - See City Forester 96. Planning Sign Deposit - $50.00 per sign . 97. Park Dedication Fee Residential: 0.0-2.0 Dwelling units/acre 2.1-3.0 Dwelling units/acre 3.1-4.0 Dwelling units/acre 4.1-5.0 Dwelling units/acre Over 5.0 Dwelling units/acre Commerci aI/I n d ustrial $100.00/acre $150.00/acre $200.00/acre $250.00/acre 10% of land of subdivision 10% of land... 98. Water Charge - $1.199.11,000 gallons 99. Sewer Charge - $43.00 per REC (billed quarterly) 100. Tapping (water or sewer) - City does not perform this service 101. . . Administrative Offense: Snowbirds $25.00 Fire Hydrant $25.00 Keys in Ignition $20$+G.00 30', Stop Sign $~$-1-G.00 Occupied Vehicle $25.00 Truck Parking $25.00 Load Limit $100.00 Signs $100.00 Public Nuisance $100.00 Animals $25.00 Junk Vehicles $50$25.00 Snowmobiles $25.00 Trespass $25.00 Alcohol in Public $50$25.00 Housing Code $100.00 Streets/ Driveways Fireworks $100.00 $100.00 Handicap Zone $200 $100.00 Fire Lane $25.00 Blocking Mailbox ~$+G.OO Expired Plates ~$2G.00 Platerrabs Missing ~$=H}.OO Other Illegal Prkg. ~$+G.OO Seat Belts ~$=H}.OO Zoning $100.00 Park Ordinance $25.00 Junk & Debris $50$25.00 Garbage Dumping $10026.00 Bldg. & Fire Code $100.00 Regulated Bus.Act. $100.00 Loitering Loud Parties/Noise $25.00 $50.00 Wetlands $100.00 House Numbers $25.00 . 102. House/Miscellaneous Building Permits Valuation per Square Foot Basic Floor Area 54.31 Basement (semi-finished) 14.92 Basement (unfinished) 11 .40 Attached Garage 0Nood Frame) 16.00 Detached Garage 0Nood Frame) 12.95 Open Carport 11 .44 Air Conditioning 2.45 Sprinkling System 1 .42 Fireplace: Brick Single (flat value) 2,000.00 Brick Double (flat value) 2,500.00 Free Standing (flat value) 1,000.00 Heatilator (flat value) 2,000.00 Deck 6.00 Deck (Mobile Home) 5.00 Addition 40.51 Second Floor Addition 40.51 Addition (Mobile Home) 20.00 Three Season Porch: Screened Only 18.00 Wood Frame-Windows/Patio Doors 28.00 Four Season Porch 40.12 Accessory Building (Shed): Cement Floor 7.50 Wood Floor 5.00 Swimming Pool Above Ground 6.00 Swimming Pool Below Ground 20.00 Decking/Fencing for Pool Add $2.00/square foot Remodeling (use valuation table) Remodeling (use valuation table) . WHEN TOTAL VALUATION IS DETERMINED SEE VALUATION TABLE FOR PERMIT FEE. SEE SURCHARGE AND PLAN CHECK FEE FOR ADDITIONAL CHARGES. 103. Meter Testing - $25.00 $50.00 (free if meter is faulty) 104. Picnic Kits - $10.00 (Residents Only) . 105. Video Tape Copies - $25.00 e ., -- 106. State Contractor License Verification - $5.00/Permit (General Contractor Only) 107. Planned Unit Development - $350 Planned Unit Development Amendment - $150 108. Comprehensive Plan Amendment - $200 109. Street Light Utility - user fees Residential (includes single family homes, duplexes, fourplexes, condominiums and townhomes 1 .21 .95/ unit (monthly) Apartments - ~ 4.20/acre (monthly) Commercial/Industrial - 6A8 4.75/acre (monthly) Institutional/Charitable - 6A8 4.75/acre (monthly) 110. Apartment/Multiple Dwelling List - $5.00 ~ Mounds View Business List - $10.00 112. Dog License List - $10.00 113. Surface Water Management Rates 114. R1. R2 Single & Two Family Residential $1.33/month R-3 Medium Density Residential $7.27/month R-4. R-5. RO High Density Residential Mobile Homes. Residential Office $8.82/month B-1. B-2. B-3. B-4 Neighborhood Business. Limited Business Highway Business. Regional Business $11.31/month 1-1 Industrial $8.82/month PF Public Facilities $3.48/month PUD Planned Unit Development $10.00/month CRP Conservancy. Recreation & Presentation $1.23/month School/Church. Public Private ~ Water Quality Testing Charge from MN Department of Health $1.43 per quarter