HomeMy WebLinkAboutResolution 6616 . . RESOLUTION NO. 6616 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA AWARDING A CONSTRUCTION CONTRACT, AWARDING A MOVING AND STORAGE CONTRACT, AND APPROVING A LETTER AGREEMENT WITH SEH FOR THE CITY HALL REHABILITATION PROJECT WHEREAS, on July 25, 2005, the City Council approved Resolution No. 6583, which approved the final plans and specifications and set a bid date of August 24, 2005 for the City Hall Rehabilitation Project; and WHEREAS, bids for the City Hall Rehabilitation Project were received at 1 :00 p.m. on Wednesday, August 24, 2005 at City Hall and were composed of the base bid to perform the rehabilitation construction of the building and a bid alternate for a "tower" style entrance; and e WHEREAS, a total of ten (10) bids were received for this project, with the base low bid of $1,185,000.00 being submitted by Arkay Construction Incorporated of Golden Valley, Minnesota with a bid alternate for the "tower" style entrance of $30,000.00; and WHEREAS, the bid from Arkay Construction Incorporated has been reviewed and found to be in order and Arkay Construction Incorporated has met the prequalification requirements; and WHEREAS, on September 7,2005, the engineering firm of Short, Elliott, Hendrickson, Inc. (SEH) submitted a letter of agreement to provide construction administration services for the City Hall Rehabilitation Project; and WHEREAS, should this project proceed, it is recommended that the City utilize the construction administration services of SEH to over see the project and ensure that the contractor adheres to the plans and specifications; and WHEREAS, the estimated cost of construction administration service work is 46,000; and WHEREAS, quotes for moving all City Hall items for the City Hall Rehabilitation Project were solicited and a total of three (3) quotes were received with the low quote submitted by True-King Inc. in the amount of $6,012.00 with additional items that will be needed for the move that can be provided by Truc- King as included in their price list; and .e WHEREAS, in addition to construction administration services, moving and storage costs, there are several other anticipated costs that could be and may be encountered as part of this project; and . . WHEREAS, each item will require City Council approval and will be presented to the City Council at a later date; and WHEREAS, The total estimated City Hall Rehabilitation Project costs, including all of the aforementioned items, is $1,409,300; and WHEREAS, the Special Projects Fund of the 2005 budget (Account No. 280-4160-7050) has $1,600,000 budgeted for the City Hall Rehabilitation Project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds View, Ramsey County, Minnesota as follows: 1. That the Base Bid from Arkay Construction Incorporated of Golden Valley Minnesota in the amount of $1,185,000.00 for the City Hall Rehabilitation Project is the lowest responsive bid. 2. That a contract to perform said work is awarded to Arkay Construction Incorporated and that the Mayor and City Administrator are hereby authorized and directed to enter into a contract with said bidder, contingent on City legal Counsel approval. e 3. That a bid alternate for the "tower" style entrance was submitted in the amount of $30,000.00 is hereby REJECTED. Funds that would have been spent on this bid alternate will be applied towards the replacement of the City Hall Message Board. 4. The Public Works Department is authorized and directed to return the deposit made for said bids, except the deposit of the successful bidder, which shall be retained until a contract has been signed. 5. The execution of a letter of agreement for construction administration services with SEH in an amount not to exceed $46,000.00 is hereby approved. 6. The Mayor and City Administrator are hereby authorized to execute said Letter of Agreement, contingent on City legal Counsel approval. 7. A contract to perform moving activities as well as provide storage facilities and moving material for the City Hall Rehabilitation Project is awarded to True-King Incorporated. e 8. The Mayor and City Administrator are hereby authorized and directed to enter into a contract with said contractor, contingent on City legal Counsel approval. . . 9. The funds to administer the aforementioned contracts associated with the City Hall Rehabilitation Project are to be derived from the Special Project Account (Account No. 280-4180-7050) and other applicable funding sources such as the Cable Television Fund. 10. The City Administrator is authorized to make minor adjustments to these contracts provided that they do not exceed $5,000, and that any such adjustments be reported to the City Council at the next scheduled meeting. Adopted this 1 in day of September 2005. /'J (ATTEST) ~~- Rob Marty, Mayor \'-..-) "\ '~'L~ (SEAL) , /~~ Kurt Ulrich, City Administrator e e . . e e &HGGrr A ,~ :i ,.P'i'; . ..w!;..:.J~;~r:~. SE~~ September 7, 2()()5 RE: City Hall F:lcility Improvements City 0:' J\,10Ullds View Bid A '.\':\rd Recol~1I1iendati\)n ~Ei I Nu. :\-M C.JL I'-: lli!.'U{)() I (ireg Lel' <Ji;cI .I i:l] Ec"s Public Worb Director and Engineel illg Assi:-;lallt, respectively Cily llf Mounds View 240 I Highway 1 () \-loilnds View, tviN 55 i 12 Dear tvlL Lee and ;vIr, Hess: Gids were ,)pl:llcd Wt.:dllcsclay HI 1:00 p.l;l. Oil August 24, 2005, f,)I' the abllve-rc;ferenccd improvement. The law bid was submitted by Arkay Construction, A complete tabulation of bids and Bidders Qualificatioll Fllrlll is enclosed with this letter, JI: my ()pinion, /\rkay Construction is the lowest, respollsive!rcspunsibh: bidder, and I reeollllllend award to them based on their bid of $1,185,000. With one exception, all the refcrences provided to us rated the firm good to very good. All but one of the: references would work with them again i:1 the futdre i r given [he dlOice, There were HUlny references that indicated that Arkay struggled with adIllilJistrative fonna'itics and wil! need outside a~;sistallce ~o :lssurc tl1:11 they are obtainiJJg the appr.:)\'ah 1T'l"ir,:,: ani; are anticipatil:g and adhering to schedules. We felt that after hearing that their workmanship is good and that 1:1e sl:pcrinlcnc!ent uses a "l:ands-<1n" style pi" overseeing his ;mtljects that the (:(::11P3I1Y w01ild "il! ;:l;1 into a '"recununcudcd" slat us for )lOLU' project. I v,ili ;)1"0;;e5, the Ch'lie:-iC::ontraclor Agrccrncnt wkn I receive cl1nfirlllalio:l ii-om you that ,he City Cuuncii has approved Ibe sllhmillcd bids Plca,e contact me ifyoll have any queslions. Sincerely, "J ;--, (. /- , ( ~'- ;J;x<7f-"- '----__.. .j'~_.J !\:311CY SchullZ, /\lA i'rincip:l1 Enclosure: Bid Tabulation and Biddcrs ()ualiiication Form c: Todd La VoId Short Ellioll Herldrickson Inc., [luller S'i"Are [ll,ilding, Slllle 71 Or., 10a North 61h Slreel, M'nneapolis, MN 55~U:;. 1515 SEH is an e~llJa: u~}pCJr:unily elllployc( I www_schinc:.colll I 612 7!j8 G70e \ 86G.830 :~3BH I 6127GB C7Cl :;:3:.. . ~ SEH . .. Bid Tabulation Mounds Vie\\.' City lIall Rehabilitation Mounds, MN SEH No. A-MOtJND04D3.01 BiDS DUE: Wednesday, August 24,2005 at 1 :OOp.m. CONTR.<\CTOR 1. Arkay ConstructIOn 2. Ebert Construction 3. Gcn^Con 4. Gladstone Construction 5. Merrimae Construction 6. Lund Martin Construction 7. George F. Cook Construction 8. Shaw Lundquist Associates 9. Jorgenson Construction 10. Socon Construction I I BASE BID I i I IS 1,185,000.00 I ! S i ,202,000.00 $ 1.217,300.00 $ 1,225,000.00 S 1,225,594.00 S 1,239,500.00 ! $ 1,248,000.00 $ 1,275.000.00 $ 1,282,000.00 $ 1,41 S,SUO.OO I I , Doc. I ! 00432 I ! ! , i I Yes/No .----1 ALLOWANCE II\CLUDED I is i I Yes/No i $ Y es/N 0 $ Y es/N 0 $ Y es/N 0 $ i YesfNc $ -- I Yes/No $ , Yes/No i$ N I j> ALTElli,"A Tf '0. I,IJ) 1 : SECClUTY $ 40,000.00 $ 39,000.00 Y es/N 0 ! $ 1$31,000.00 -. -------------j_. , l'cs ----..- j-- y:- Yes/No $ \v;\M\\fc"Aj;-'::)\CnJr::l\I..GEl'L\~O.PDS\SEND TO MOUND 090705\HID "IABUL.:\: !l..J:"i~' it. ':';~.lJC"__ ! $ 59.500.00 I . '{es Yes RECEIPT OF A DDE;\,DA No. - I Yes i I I I. Yes I Yes ! I Yes Yes I I Yes Yes ! ! Yes I Yes --r----~~~---1 ~.~ 1.I[ClIlCH.:r : ~(h"!:". &H15rr B . DOClJMENT UU452 . BlDDEHS QUAUFTC\TIO:--l FOHJ\lS PART I GENEHAL I.Ol CONTRACTOR'S QUALIFICATION STATEMEI\T A. Conti'actor shall certify, by SlIbmission of a Bid, that all subcontractors arc responsible birldcrs as dciined by this Section. It shall be grounds for disqllalitieatiol1 of a Bid that a subcontractor proposed to perfclllll Inore ,han 10% of the contract m:lOllnl is not a responsible Bidckr as detined herein. B. RF.SPONSlBJ ,r, BIDfJFR: i. The ()v.nc:r will (In\y consider bids ('r01l1 responsible bidders, "Responsible bidder" is hereby deiined as a bicdcr who: a. Is a manufacturer oi~ deals in, but is not a broker of, or is the agent of a manufacturer with full bwwh;dge ofsuppJic;s to be i'umishc;d; or b. If services are to be provided, has the necessary skills 0:' is in the business of supplying these services; and e c, C:ln demonstrate a satisf:'letory credit standing, lack of tax liability, alrd the financial capability to perfo~'r:l a c:()ntr;~ct :is cvi:1en:cd by the ahilily '0 [obta:n bondil'l' when nxmired: :lnd d. lIas no t:nresolveci record of f(jj]ure to perform. or of unsatisfactory per!Dr!Ti:u:ce "r cc'ntral't<; :"'! the OWllcr or other customers and is not currently debarrcd by another govcrnment cntity for any cause including delilUils 011 contracts, late deliveries, products not mccting spccifications, substandard installation, or service; and c Is otherwise qwdilied under nJe and law, including incorporation in or n:gistration to do business in Minnesota; nllcl f. Has r;ot engaged in unhwful practices, associatcd with organizcd crime, or operated under false namcs or fronts as a small business or a socially or ec:ollomically disadvantaged small business; and g. Is in complianc:c with al! t,iX laws of Minnesota, as evidenced by tin:.ely filing of all required relui"I1s, reports, payments, 2nd posscssion of all applicablc stamps, licenses, or other permits, and i"reedom from any j uclgmcnt, lien, or seizure of assets or property to satisfy tax payments or duties; ,ll1d h. Is willing to tiJrnish all inforJ112tionnccessary to determine responsibility as outlined in items it to g within 30 days or less or will1in a rcasonable arnounl of lime detennin:::u by ,1Iinr COI:s::~nsl"; bctween the bidder and the Uwner, upon request by Owner. e Bir!c!ers OI,8!ifi~c:;ior 1'0",-,0 ivl0LJND040301 00452 -1 . . e e 2. A bidder shall not be deemed a :'csj1ol1siblc biclcler if Olll' or mOle 0: thc follc)\Nlllg UC:l:U;'S a Conviction for commission of a cri:l1inal olTensc ,is ,',11 IIlc:cier.t cO "lx;I:ni:ig c!' :i:lcmpLlllg :,' obtilin a public or private eUll(r"ct or sllbcontract, or in the performance o!' [ht: cunlract or subcol1truct; b. COllviction tinder state or federal staluks of embezzlement, lheft, forgery, bribery, f,llsification u: destrllction of rccords, recciving stolcn propcrty, or other ofiense indicating a lack of business integrity or business honesty that currently, seriously, and directly affects responsibility as a state contI a~:lur; C. COl1 viClioJl 11l1ckr state or federal antitrust statutes nrISlllg out of the submission of bids or proposals; d. Violation of COl1tract provisions on other projects, as set forth in subite1l1s (I) and (2); 1) Fnilure without good cause to pcrlarm according to the specifications or within the time limit provided ill the conlract; or 2) ,\ reeG"t record of bihre 1.0 perform, or of 1111s,;tisfilctory pcriurmance, according to t!ie terms of olle llJ' Ilhlre conlrads; provided tlwt ll1i~ fllilure to perform OJ ullsat:slaCLOr)l perfornwncc was not caused by acts beyond the control of the cornraetor. 3 Bidder Qunlificiltions: a. This prl)ject involves a tl1tal rehaoilitatiol1 of MOlll1ds View City Hall. The City Hilil ilS it exi,ts is a patchwork of buildings constructed Juring 4 diJIercllt pha~es; 1 9G I, I Y7 5, 1994 iHid I Y90. Ti:is projcct must reconcile various systems and do so in a timely lU;lnnel' to avoid additiollnl1easing rc~~s lh(~~ \.\';il he ilL~;IU;.;d ~)). ~h..~ ()\\':H:.~.r. [c acidii.~Oll, t~le Chvn:..~r ha....: liirJilcd IlildllL:ltJ :.l'~:)~;i\:t.~~) i'.l commit to the pro)ccl. I\ccordingly, the project must be accomplished with a mil1lmum or inicrruj.ltioll, Oil time, and without cost overruns. Therefore, the Owner will be considering the quality ;]nJ expcrience o1'thc low bidder prior to awarding the contract. b. The apparent low biclclcr will be asked to submit the Bidder's Qualification Submittal Form (;:ttached to this Document) for thc OWller & Architect's use in evaluating contractor's qllalilications within 7 days ofthc hid opcning. c. The Owner will awuru :1 contract to the low responsive and responsible bidder, cl i\ c:ondil.iUil of ~he contract is that the contractor mi.lst keep the lead construction aclministrator (supcrintc:ldenl/project manager) specified on the bid 3S the lead construction administrator (supcrintendcnt/project manager) fi)I" the project. The only exceptions will be if the person is not physically or mClJtally able to perform those duties or is no longer employed by the cOlllractol. !\ replacemcntlcacl constl1lction 3dministrator mllst meet the qualifications of this Section 00452. c. 1\ biclcler will :lOt he considered as i1 conlr,lctor for this pmjectllnless the biddcr rcceivcs a rating or a ;east I U JloinlS, ns dderminecl by the Architect a:lr! tbe Owner, lISillg t[lC rol!owilig SYS'Clll for assigning points. Bidders ()l.J[jII:icatioll Forms ~_.______.__'R_"'__'____'~_'__'_'_"._" 00452 - 2 MOUND040301 . . e e The hidder shall have: [-jmii")]jj{ EV ALU~A.-;:i~ioN a{il~:EluA-----n---_.---- - I. __ _______ ___.....n____......_____ ......-. ..---....---.....------..----..-----------.----.--.---------..--- ....-.. POU-ITS a) :--';evcr dei~lU ited OIl a contract. 2 b) A full-time lead constructioll (superintendent and construction administrator) assigned to this prqject both hnving experience constnleling ami completing, as the lend construction superintendent amll:< 1IIs1ntd:lJf\ adminislr;.\lor, at least three renovation projects each exceeding $1.0 million !}[H! exceeding 10,000 SCjlJ<u'e feet within the past eight years, to the satisl'action of the O'.'.'11er. 4 I -I c) Project experience constructing :md renovatioll at least three facilities 4 exceeding $1.0 miLiun and exceeding 1 O,(J[){) square feet with;n the past eight YCilrs, [0 the satisfnclion ol'the Owncr. I d) for each additiorwl snbmittal :;)r the bidder's 1cad cP!1slructioll superintendent experience or pruject experience meeting requirements of h) 8.:. e) al,(}\'t.:. (I'r(n'ide Oil sCjJaiilk ~;h':l:I~) i .... .l.. The Owner may give parti1l1 c;reeJit in the amount two points for itcms b) and c) ifbiclJcr qualifies for at least one of the evaluation criteria Cill.O millioIl or 10,000 square fed). PART 2 PRODUCTS .:\ \lot Used PART.'\ EXECUTlON A. See Bidder's Qualification Formlistcd below. Bidders Qualification Forms -.- -.- 00452 - 3 MOUNDD40301 . . e e 88/31/2005 09:33 75~5443[j81 Af';KA'i CONSTRUCTICt~ P~:.GE ~!2 proiect ~ :tOle: Mounrls View City Hall Rehabilitation Bidder's Qualification Submittal F'orm (Answers to Questions from Bidder's Qualification Fonn - Section 00452-4) 1. Arkay Constnlction Company 620 Mendelssohn Avenue North Suite 156 Golden Valley, MN 55427 2. How many years has our organization been in business as a Contractor: 50 Years 3. Original Incorporation Date: Minnesota 1955 2nd Incorporation Date: Minnesota 1997 4, Approximate total RtulUal volume of contracting dollars; $20.000.000.00 5. General character of work perfomlCd by our firm. Specifically list categories ofv'iork normally performed with O\vn forces: 1. Concrete 2. Masonry 3. Carpenuy 6. I-Tas our organi7.ation ever de,faultc:d on a contract? No 7, Below are listed the major construction projects our organization has in progress, giving the name ofilia project, owner. architect, contract amount, percent complete and scheduled completion dute. The total worth of work in progress and under contract is: S14,914,000. (please note that I have not provided infonnation on some jobs that are completed but not necessarily paid in full.) a. Aeromedical Evacuation Training Facility Ov:.'ller: Minneapolis/St. Paul International Airport Army Reserve Center Archit:.:ct: US Anny Corps of Engineers . Contract Amount: $3,612,000 Percentage Complete: 67% Completion Date: October 10,2005 b. White Bear Lake 2005 Community Theater Renovations & Locker Rooms Remodel Owner: White Bear Lake Area Public Schools Architect: LHB. Inc. Contract Amount: $2,611.000 Percentage Complete: 41 % Completion Date: December 200S . . e e 88/31/2005 09:39 ARKAV CONSTRUCTICH PAG~ !'.13 753544'32)81 Century Collt:ge 2005 Partial Reroofing & Masonry Owner: Mirmcsota State Colleges & Universities Architect: Inspcc., !nc, Contract AmotUlt: $728,000 Percentage Complete: 26% Completion Date: November 2005 d. Dakota County Law Enforcement Center Addition & Remodeling Owner: Dakota County Architect: KKE Architects, Inc. Contract Amount: $7,963,000.00 Percentage Complete: 0% Completion Date: March 2007 c. g. Lead construction administrator name, title/position: Jack Schmidt. Proiect Monager Y cars of experience as a lead construction administrator: 33 Years Years with bidder's organization in this position: 29 Years Owner reference contact info: ? .A..rchitect reference contact info: ? Presflnt commitments of this lead construction administer for work currently under contract: a) Century College 2005 Pa.rtial Reroofing & Masonry b) Dakota County Law Enforcement Center Addition & Remodeling Lead construction superintendent name, title/position: Dave Mann. Superintendent Years of Experience as a lead construction superintendent: 11 Years Years with bidder's oreanization in this position: 11 Years Prescnt commitments of this lead construction superintendent for work currently under contract: a) Working at various projects. No long term superintendent commitments. Summary of experience as specified in Part B ofthe Bidder Evaluation Criteria: Jack Sclunidt: a) Centennial Student Union - Minnesota State University - Mankato Contract Amount: $8,090,000 Over 10,000 square feet b) Cleveland School- St. Paul Public Schools Contract Amount: $1,009,000 Over 10,000 square feet c) FieldIHale Schools - Minneapolis PubJic Schools Contract Amount: S3,663,000 Over 10,000 square feet d) Jack has managed and completed new construction and remodeling projects that tolal over $150,000,000.00 since he started at Arkay Construction Company. . . e e 68/31/2~05 09:39 ARI<AY CONSTRUCTION PAGE tl4 7535449081 Dave Marm: a) Field/Hale Schools - Minneapolis Public Schools Contract Amount: $3,663,000 Over 10,000 square feet b) Oak Park Heights - Minnesota Correctional Facility Contract Amount: $11,336,000 Over 10,000 square feet c) University of Mhmcsota Plant Growth Facility Contract Amount: $14,201,000 Over 10,000 square feet d) Dave Mann has been a field supervisor and bas completed projects that total over $60,000,000.00 siner;: he started at Arkay Construction Company. 9. 10f3: ~nnial Student Union 2003 Remodeling Completed in 2005 Description: Substantial remodd of existing student Wlion including food service area, hearth room, Icslrooms, conference room~ aud offices. Size ofFaeility: One building well over 10,000 squate feet. Lead Con.struction Administrator: Jack Sclunidt Original Contract Amount: $ 8,090,000.00 Final Contract Amount: $ 8,779,000.00 Construction Timc Frame: 1 year Owner Name & Contact Information: Architect Name and Contact Information: Minnesota State University 415 Main Street 358 Wiec1cing Center Mankato, MN 56001 Larry Kohanek 507-389-1545 Paulsen Architects 209 South 2nd Street, Suite 201 Mankato, MN 56001 Greg Borchert 507-389-2264 . . e e 0B/31/20G5 09:33 ARKAY CONSTRUCTION PAGE 05 7535449081 200: ~nnial High. Schoo1- RED Building Completed in 2004 . . . ' Description: COUlpMe renovatIon ofRY AC umts In most classrooms, neW fimshes through the bllilding, renovation of pool and pool area and new temperature control system. Size ofFacility: One building well over 10,000 square feet. Lead Construction Administrator: Dan Kristal Original Contract Amount: $ 3,687,000.00 Final Contract Amount: $ 3,969,548.00 Construction Time FraIne: 4 months Owner Name & Contact Information: Centennial Public Schools Independent School District No. 12 4707 North Road Circle Pine.s, MN' 55014 Bob Cierzan 763-792-6016 or Warren Tester 763-792-6001 Architect Nrom:: and Contact Information: ATS&R 8501 Golden Valley Road Golden Valley, MN 55427 Bill Martin 763-545-3731 3of3: ~sity of Minnesota Plant Growth Facility Completed in 2004 Description: Remodel offices and educational classrooms and addition of greenhouses. Size of Facility: Remodel of over 10,000 square feet plus addition of greonhouscs. Lead Construction Administrator: Jack Schmidt (Lead Superintendent: Dave Mann) Original Contract Amount: $ 14,424,000.00 Final Contract Amonnt: $ 15,166,000.00 ConstTuction Time Frame: 2 years Owner Name & Contact Information: Architect 'Kame and Contact Information: University of Mhmesota Capitol Planning & Project Management 400 Donhowc Building 319 lS\h Avenue SE Minneapolis, MN 55455 Fred Clayton 612-624-4940 RSP Architects 1220 Marshall Street NE Minneapolis, MN 55413 Bryan Gatzlaff 612~677-7100 E~HQB1r c:, . . ~;: H; ~~:.~ d) lb- UU Exhibit C Septernber 7, 2005 RE: City Hall Facility Improvements City of ~I()unds Vie\\ Construction Admin istration Serv ices SEll No. P-MOLJND03(J(J.O i C;:'e~ l.ee ~lIld J i:n Hess Public Works Director and Engineel'ing Assistant, respec(ively City of ?\lollnds View 240 I Ilighway 10 1\I01lnds View, ivlN 55112 Dear Mr Lee and Mr. Hess: e We have arriv'ed at the end of the Bidding Phase of your project and now it is time to share this information with decision makers to determine if they want to award a construction contract for the above referenced project. In a subseClnant letter we have made a recommendation to award the project to Arkay Construction. We have also reached the stage in the project that requries Sh0l1 Elliott Hendrickson Inc. (SEH1i'), [0 submit this proposal for architectural and engineering services to complete the project's Construction Administration Services Phase of this project. This phase will provide you with the professional services oversight needed to assure the contractor will be building the project according to the legal bidding documents. SCOPE OF WORK Our architectural, engineering, and project management services include the following designated services: e . . . e Greg l.ee and .filii Hess ,)'!!ptcmbcr 7, J{)()j Pas7(' 1 ....~ . - FEES FOR SERVICES The architect shall be paid on the following basis: The fees will be computed on a lump-sum basis for the amount of S43,75S for the Construction AdministratiDn Phase, not including reimbursable expenses. e.g.. rnileage. ~s, printing costs. ele.. r~la(ed (0 the prnjed TI:l' reimbursable expenses are e:;timated to be S I ,50U - $2,UOO dollars. We will bill you monthly for services, expens~s and equipment based on the percent of work cOlllplet.:d to date. If this amount meds with council approval w~ will amend the AlA B I 'i I Owner/Architect Agreement accordingly. SCHEDULE The following is our understanding of the project schedule: The Architect's services shall be performed according to the details of the Construction Documents, should the contractor fail to perform their responsibilities described in the Construction Documents we will self perform these services and recommend the Owner deduct them from the Owner/Contractor Agreement. The Contractor has stipulat.:d in the Bidding Documents that the work will be completed before April 2, 2006. If the work extends beyond that your fees for added services will be adjusted accordingly and again the Owner reserves the right to charge the Contractor for the extension in time. This is described in Section 01315 of the Construction D0CllIllCntS. REMARKS This ktter represents the entire understanding between you and SEH in respect to the project and may only be mlldified in writing, signed by both parties. We look forward to working with you on this project. If this letter proposal satisfactorily sets forth the conditions of our agreement, please sign in the space below and return one copy to our office and we will execute an amendment to AlA B 151 Agreement. This letter agreement will be incorporated as an exhibit into the agreement to describe help describe the work to be provided. Thank VOll again for the oppllrtllnity to propose these s0rvices. . Sincerely, ./""1 .', . / ______ (-.-....,1- . ( .)i(d~-1--'- ,.// ,--.J Nancy Schultz. AlA Project Manager . . . . Greg Lee and Jim / less September 7, ]OlJj PL1gt! } Schedule of Designated Services Scope of Services ."---"-- .'~' ,------- - ,'- I ResponsibilitV.__._.___'\' i-'Architect r Owner I Contractor . Remarks or Deliverables from Arch Contract Administration Phase - Timing: seven months An administrative task to assure the project is being built according to the Bidding Documents. Pre-construction Meeting Lead Participate Participate -----.-.-.---.-...--.- ----- .-.--.....-.-- --. ..--..--- Participation Project Administration for profession services Lead Participate ---- ~:~Je~_Ad rninisl~~ tio'l~..r._GOnstruG~~. Participate Construction Meetings -..--. Requests for Information Participate Assist Spe(;ra.!.l~s!~,=,!~':.S________~articip,:!:_.__. Shop Drawings Review/Approval Review/Approve -- --. Change Ord:~~.___________ ___ .___ .______. Review Field Drawings l.ead -' Review Payment Requests Review/Approve Periodic On-site Inspections Lead e---- Onu SubstantiCiI Cornplialice Inspect;on LeaD Finallnspeclion Lead -_. Project Scl1edule Monitoring Project Closeout Recore] Dravlings Assist Assist Assist Post Constructio:1 Services Lead Participate ....-.--.---- Participate Participate Participate Participate Review/Approve Participate Review/Approve Participate Participate Par11cipate Participate Leaej Participate Lead "'-'-'--'-'~-'-'-' Participate Lead -- Partic:pate Lead Lead Lead Lead Lead Lead Participate --. Lead Participate Participate Participate Participate Meeting documentation ...----.--" Review meeting minutes, schedule updates ---------...- Respective Documentation Testing Reports Respective documentation Respective documentation Update dated plans as required Respective Documentation Field Observations Notes - estimate of six visits per month- 36 site visits -- Certificate of Substantial Completion Date & paYlTwnt recommendations --.--.--. .------- Certificate of Substantial I Completion Date & Payment Recommendations "----------. 1 Respective documentation -.--- - --.. Final completion documentation ! :a-~~~:yD:~::g:eport-----~ ___..---.J . . . e w Seo, !. 2G05 8:J)AM No,3505 P,2 ~~.err D COPELAND 7h(lt;-I(;/vt~l 5400 NE Main Street, Suite 201 Minneapolis, MN 55421 (763) 572-0505 Fax (763) 572-0175 Sept.. 6, 2005 City of Mounds View 2401 Hwy. 10 Mounds View, Mn, 55112-1499 Attn: Jim Hess Moving: (I:rid~ 2 p.m. start) (1) St. Truck $ 35 per hr. (6) Movers $ 180 per hr. (1) Coordinator$ 50 per hr. (1) Van $ 7 Der hr. @ 5.5 hrs. @ 5.5 hrs. @ 5.5 hrs. @ 5.5 hrs. $ 192.50 $ 990.00 $ 275.00 $ 38.50 Estimated Total............ ... ........ ... ....II..IItIfIl.Jt.~IAI.IlI..t..III.$ 1,496,00 Moving: (Saturday 8 a.m. star!} (1) St. Truck $ 35 per hr. @ 5 hrs. $ 175.00 (7) Movers $210 per hr. @ 5 hrs. $1/050.00 (1) Coordinator$ 50 per hr. @ 5 hrs. $ 250.00 (1) Van $ 7 Der hr. @ 5 hrs. $ 35.00 Estimated Total......... ......................... ............ ..... ..$1,510.00 MovinQ Materials: Bins: $100.00 fee to use of any number of bins- for 1 week. Bin Delivery: $75.00 delivery fee. Includes - Delivery & P/U. Bin Rental: $ 3.00 per Bin/Per day. (If storinu more than 1 week.) Estimated cost.............n...... ............ ................. ..~175.00 Min. packing Materials: Boxes 1.5 cu. Ft. $ 1.00 ea. Tape $ 2.50 ea. labels x X x 200 ct. 6 ct. $1JJO.OO 200. DC) $ 15.00 No CharQe Estimated Cost..... .......... ......... ...... ................. ..$ 115.00 Optional Costs: Storage f. Waste Refuse (1) 30 yd. Dumpster: Deliv. & P/U = $480.00 (1) 40 ft. Dry Van Container = $500 Deliv. & P/U fee & $150 per. mo . One half hour Travel charge per day is included within the bid, . Standard moving insurance included in estimated price. . Please be advised that this is only an ~tirnate. Our filed tariff rates are hourly and you will be responsible for all charges incurred.