Loading...
HomeMy WebLinkAboutResolution 6088 . . . RESOLUTION NO. 6088 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA AWARDING THE CONSTRUCTION CONTRACT FOR THE COUNTY ROAD SIDEWALK PROJECT AND AUTHORIZING THE MAYOR AND CITY ADMINISTRATOR TO EXECUTE SAID CONTRACT WHEREAS, pursuant to Resolution No. 6078 adopted by the City Council on August 25, 2003 sealed bids were received and tabulated on September 4, 2003, at 10:00 a.m. for the County Road H Sidewalk Project; and WHEREAS, the low responsive and responsible bid was received from Ti-Zack Concrete Incorporated with a base bid of $149,877.50, an alternate bid of $234,037.10 equaling a sum total of $383,914.60; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds View, Ramsey County, Minnesota as follows: 1. That the (Base or Total) bid of Ti-Zack Concrete Incorporated in the amount of ($149,877.50 or $383,914.60) for the County Road H Sidewalk Project is the lowest responsive bid. 2. That a contract to perform said work is awarded to Ti-Zack Concrete Incorporated and that the Mayor and City Administrator are hereby authorized and directed to enter into a contract with said bidder. 3. The Public Works Department is authorized and directed to return the deposit made for said bids, except the deposit of the successful bidder, which shall be retained until a contract has been signed. Adopted this 8th day of September 2003. ATTEST: ".... " (SEAL) . . . September 4, 2003 RE: City of Mounds View, Minnesota County Road H Sidewalk Improvements City Project No. 2003-001 SEH Project No. A- MOUND0302.00 Honorable Mayor and City Council City of Mounds View 2401 Highway 10 Mounds View, MN 55112-1429 Dear Mayor and Council Members: On September 4, 2003, at 10:00 a.m., 4 bids were received for the above-referenced project. The project consists of the construction of a 6 ~-foot concrete sidewalk along the north side of County Road H, from Edgewood Drive on the east to the west city limits. Included in the project were retaining walls, hydrant relocations and restoration. The bids were set up with a Base Bid, which included all work to construct the improvements from Edgewood Drive to Knollwood Drive, and an Alternate Bid which included the segment from Knollwood Drive to the west city limits. The low bid was submitted by Ti-Zack Concrete, Inc. from Le Center, Minnesota. A summary of the bid results is shown below. 1 Ti-Zack Concrete, Inc. 2 Thomas & Sons Const., Inc. 3 O'Malley Const. 4 Standard Sidewalk Base Bid $149,877.50 214,878.99 216,597.25 210,681.50 $183,501.00 Alternate Bid $234,037.10 419,757.00 360,204.28 296,85TOO $294,022.00 Engineer's Estimate Denotes corrected figure The base bid represents approximately 4,800 linear feet of sidewalk. The alternate bid is for approximately 1,500 linear feet. The reason for the high cost for the alternate bid, is the work required near Spring Creek. Organic soils were found in this area from soil borings that we took. These soils and the need to maintain the construction within the existing right of way required the need for sheetpiling, guardrail, railings and special storm sewer needs to extend the existing culvert. Based on the low bid, these "extra" items increased the sidewalk project in the alternate bid, by approximately $126,400. Three addendums were prepared for this project and sent to all plan holders. The second addendum included a new Bid Fonn that was listed as being on "Yellow" paper, when in fact the Bid FornI was on "Pink", The third addendum infornIed the contractors to submit their bid on the correct color of the Bid Form sent out with Addendum 2, and extended the completion date for the project. The Bid Form has a place for acknowledgement of addendum(s). The low bidder acknowledged the first 2 addendums, but not the third. Since the bid was submitted on the correct form, this failure to acknowledge the Third Addendum could be considered an irregularity in the bid. The City Attorney should be contacted for his opinion. A tabulation of the bid is attached for your review. Base Bid plus Alternate $383,914,60 634,635.99 576,801.53 507,538.50 $477,523,00 . . . We have not had experience with Ti-Zack Concrete, so we contacted the references supplied. Based on my discussions with the references and information provided by the contractor, we have determined that they have (1) have a sufficient understanding of the project and equipment to perform the construction for which it bid; and (2) according to their bonding agent they presently have the financial ability to complete the project bid. SEH makes no representation or warranty as to the actual financial viability of the contractor or its ability to complete its work. The City has four options for consideration of award. The first option would be to reject all bids. The second option would be to award the base bid only, and the third would be to award the base bid plus the alternate. A fourth option would be to consider the award of the Base Bid plus the alternate bid, and work with the low bidder to eliminate the sidewalk and sheet piling in the area of Spring Creek. This option would provide a sidewalk along County Road H for all but approximately 100 feet at Spring Creek. If the Council does decide to award the project, we recommend the project be awarded to Ti- Zack Concrete, Inc. in the amount of $149,877.50 for the Base Bid alone, and $383,914.60 for the base bid plus alternate. Again, if the fourth option is the Council preference, the Contract Amount would be reduced from the $383,914.60,by a Change Order. Sincerely, Barry F. Peters, PE Project Manager nm Attachment \ \muski e\masterfiles \2003 \ci ty counci l\resolutions\608 8 .doc