HomeMy WebLinkAboutCOMMISSION_MINUTES_1982-09-23 • I
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
•
STATE OF MINNESOTA
September 23 , 1982
Mounds View City Hall
Council Chambers
6 :30 p.m.
CALL TO ORDER: The meeting was called to order by Chairperson
Wayne Burmeister at 6 : 36 p .m.
ROLL CALL: Commissioners present - Chairperson Burmeister,
Commissioners Bowman, Dennehy, Silvis , Weflin
and Wermager.
Commissioners absent - Commissioner Letendre
Councilmember absent - Councilmember Doty had
an excused absence due to family vacation.
Staff present - Parks and Recreation Director
Anderson and Program Supervisor Saarion
Vistors present - Mayor McCarty, Marilyn Eibs of
Abiding Savior Church, Schmitt and Gary Quick of
the Groveland Park Foundation.
• APPROVAL OF MINUTES : A motion was made by Commissioner Silvis , seconded
by Commissioner Wermager to approve the August 26 ,
1982 Park and Recreation Commission meeting minutes
as presented by staff. Motion was passed unanimously.
6 ayes
0 nayes
CHAIRMAN' S REPORT: There was no Chairman ' s report. Chairperson
Burmeister indicated that he had no report at this
time.
COUNCILMEMBER' S REPORT: Councilmember Doty was not in attendance due to an
excused absence so no report was provided. It should
be noted at this time that Mayor McCarty did attend
the meeting in the absence of Councilman Doty.
REVIEW OF RED OAK
PLAYGROUND EQUIPMENT : Staff presented a report which outlined the current
status of the playground equipment at Red Oak Ele-
mentary School and requested direction from the
Commission as to the future relocation of the equip-
ment. The equipment had been requested by a number
of agencies including the City of Mounds View Parks
and Recreation Commission, Abiding Savior Lutheran
411 Church and the Lakeside Park Commission. Following
a great deal of discussion regarding the most log-
ical and fair way to distribute the requested
equipment, a motion was made by Chairperson Burmeister,
seconded by Commissioner Bowman directing staff to
retain ownership for the City of Mounds View of the
- 2 -
the whirl , swings , large slide and the circular
climber which were to be placed at Lambert Park
during the Spring of 1983 . The motion passed
• unanimously.
6 ayes
0 nayes
A motion was then made by Commissioner Bowman to
donate the small arch climber and large "bug"
climber to the Abiding Savior Lutheran Church for
use in their Daycare Program. Motion passed unan-
imously .
nan-
imously .
6 ayes
0 nayes
A final motion was made by Commissioner Bowman
and seconded by Commissioner Dennehy to donate
the arch climbers and chin up bars to the Lakeside
Park Commission . The motion passed unanimously.
6 ayes
0 nayes
A motion was then made by Commissioner Silvis ,
seconded by Commissioner Wermager to donate the
smaller of the two slides to the Northside Christian
Center. The motion passed unanimously .
6 ayes
• 0 nayes
It was further noted by staff that it was the under-
standing of the commission that all of the equipment
would be moved at the individual party ' s own expense
and that all liability for removal of equipment
would be borne by each of the respective new owners .
RECREATION PROGRAM
UPDATE : Program Supervisor Saarion provided an overview of
the upcoming fall recreation programs including the
youth soccer program, flag football program and the
extended new day programs being offered at Edgewood
Community Center . Specific pre-school programs that
were being proposed to be offered at Edgewood included
parent/tot swimming, Movin ' , Music & Me , craft and
storybook hour and the teeny tumbler gymnastics pro-
gram for pre-school children .
LAKESIDE PARK UPDATE : Commissioner Bowman provided a brief history of the
vandalism that had occurred on September 12 to the
Lakeside Park shelter building . She indicated that
the building was fully insured through the City ' s
insurance carrier and that the issue had been referred
to staff for a speedy and efficient handling. The
• estimated damage to the building seemed to be in the
range of $3 ,000 - $5 ,000 .
Commissioner Bowman also stated that the Lakeside
Park Commission held their regularly scheduled
meeting on Tuesday, September 14 to close out their
year and stated that it had been a very successful
year from both a monetary and supervisory standpoint.
- 3 -
PARK SHELTER BUILDING
UPDATE : Staff distributed a memo which outlined the progress
• to date regarding the potential purchase of park
shelter buildings from the Elk River School District .
It appeared that the buildings were still available
and the City Council had agreed to allocate $24 ,000
to purchase and complete the three park shelter
buildings . Staff gave a brief overview of the
• buildings which include a 24' x 32 ' structure with
a forced air heating system, two doors , completely
panelled, light fixtures, central air conditioning
and carpeting. The Park Commission accepted the
report as presented by staff and further directed
staff to continue pursuing the purchase of the new
park shelter buildings .
In addition, staff reviewed the potential location
of the new buildings, reviewing the problems concern-
ing the existing park plans as compared to the pro-
posed new plans . Following the discussion, motion
was made by Commissioner Silvis , seconded by Com-
missioner Wermager to relocate the park shelter
buildings at Woodcrest and Hillview Parks as per
the master plan and further directed staff to meet
with the Groveland Park residents to determine the
best location for the Groveland Park shelter building.
The motion passed unanimously.
• 6 ayes
0 nayes
LVIEW OF POLICY RE : USE Staff reviewed a report with the Park Commission
OF OUTSIDE 'AGENCIES FOR which outlined the current use of outside agencies
PROVIDING RECREATIONAL for recreational programs as well as a potential
PROGRAM SERVICES : policy to assist with the hiring of outside firms
in the future . After reviewing the policy as pre-
sented by staff, the Parks and Recreation Commission
referred the issue back to staff for further research
and review with potential agencies that it might
effect.
ADJOURNMENT: A motion was made by Commissioner Silvis , seconded
by Commissioner Bowman to adjourn the meeting at
9 : 15 p .m.
oto. y d.mitted,
r
411111I�'
ce K. . n
BKA/sll