HomeMy WebLinkAboutResolution 6159
.
.
I
RESOLUTION 6159
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION ADOPTING THE 2004 FEE SCHEDULE
WHEREAS, revisions and updated to the Fee Schedule are necessary;
and
WHEREAS, each City of Mounds View Department Head has reviewed all
fees relevant to his/her department and recommended changes to the City
Council where necessary; and
WHEREAS, the City Council Reviewed and discussed changes to the
proposed Fee Schedule at its January 5, 2004, Work Session.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of Mounds View does hereby approve the 2004 Fee Schedule, which is attached
to this resolution.
Adopted this 12th day of January, 2004.
~
~erry/Wnke,Jv't&yor
..// ./
ATTEST:
" j (Vl'\l..>~\ t/I'?M_.~~)-"\.."-
James Ericson, Acting City Administrator
(seal)
.
1 y
G~ ()
ieW
.
2004
Fee Schedule
.
Last updated: January 12. 2004.
.
.
.
II
I. ...................Building/Community Dev. Related Fees
a. ....... ....... .............. .................... ....................... .... Valuation Table
b. .. ....... ... ...... ..... .......... ... ....... ..... ...... ........ .................. Surcharges
c..................... General Construction, Home, Building Permits, Misc
Accessory Building/Shed................ ................... ..... ............... ....... ................. ...........
Addition.................................................................................................................... .
Basement................................................................................................................. .
Basic Floor Area...... ..... ...... .......... ... ......... ......................... ....... ........ ......... ...... .........
Deck..........................................................................................................................
Door/Window Installation..... .... .... ..... .... ... ...... .... ... ...................................................
Driveways, Sidewalks, Parking Lots and Patios ......................................................
Electrical Work.................... ....... .... .... ...... ............................... ....... ......... ... ........... ...
Elevators.................................................................................................................. .
Excavating, Grading, Filling............ ... ............... ..... ................ ..... ..............................
Fences..................................................................................................................... .
Fire Alarm System. ...... ......... ......... ......... .... ....... ........ .... ..... .................. ............ ..... ...
Garages................................................................................................................... .
Garbage/Recycling Enclosure..................................................................................
HVAC........................................................................................................................
Mobile Homes...........................................................................................................
Moving Build ings ......................................................................................................
Pipe Fitting................................................................................................................
PI u mbing Work.........................................................................................................
Porch....................................................................................................................... .
Raising, Shoring.......................................................................................................
Refrigeration Work...................................................................................................
Remodeling ..............................................................................................................
Reshingling ...............................................................................................................
Re-siding/Stucco ......................................................................................................
Satellite Dishes.........................................................................................................
S igns/Billboa rds ...................................................................................... ..................
Sprinkling System.. ... ............. ....................... .................................... ......... ...............
Stucco...................................................................................................................... .
Swimming Pools.......................................................................................................
Tank (fuel, gas) Installation/Removal. ............... ............................ ............. ..... .........
Telecommunication Antenna Building Permit Fee ..... .............. ...... ............. ...... .......
Windows... ..... ..... ......... ......... ... ....... .................. ............ ................. ..... .... ........ ..........
Wrecking.................................................................................................................. .
1-10
1
1-2
2-8
.
.
.
III
d. ......................................... Other Inspections/Planning Fees 8-10
Building Inspections .................................................................................................
Code Appeal.............................................................................................................
Comprehensive Plan Amendment.. ......... ......................... ....... ..... ..................... ... ...
Conditional Use Permit................. ..................... .... ....... ......... ..... ...... ..... ...................
Contractor Licenses.................................................................................................
Development/Site Plan Review.. ..... .... ........... .......... ........... .......... .............. ..... ........
Housing Inspection Fees.. ........... ............. ............ ....... ............ ............... ............ ......
Multiple Dwelling Registration/Transfer.... .................. ... ........... ................................
Plan Review Fee ...... ....... ........ ........... .......... .......... .... .... ........ ....... ........ ..... .......... ....
Planned Unit Development/Amendment ........... .......... ........ ............. ................ ........
Reinspection Fees....................................................................................................
Rezoning.................................................................................................................. .
Street or Easement Vacation ..... ..... ... ................. .... ......... ......... ............ ........ ...........
Subdivisions............................................................................................................ .
Variance................................................................................................................... .
Wetland Alteration Permit ..... .............. ...... ....... ...... .......... ........ ...... ....... .... .......... .....
Wetland Buffer Permit..............................................................................................
II. ......... Miscellaneous (copies, maps, agendas, etc.)
Apartment/Multiple Dwelling List..... .... ......... .............. ...... ...... ........ ....... ..... .... ..........
Blue Prints/Maps......................................................................................................
Council/Planning Commission Meeting Packets .... ........... ..................... ... ..............
Dog License List... .......... .... ........... ........ ......... ........................ ........... .............. .........
Filing Fee for Public Office.......................................................................................
Insufficient Fund Checks (NSF) ...............................................................................
Mailed Agendas.. ............................................... .... ....... ............ ................ ................
Mailed Minutes..........................................................................................................
Mounds View Business List.... ............................................ ..... ...... ..................... ......
Mu n icipa I Code.........................................................................................................
Notary Pu bl ic ............................................................................................................
Outdoor Sign Usage................ ........ ....... .................. ............. ......... ..........................
Pending Assessment Search. ............... ...................................... ................ .... .........
Photocopies............................................................................................................. .
Picnic Kits.................................................................................................................
Police/Accident Report.............................................................................................
Resident List.............................................................................................................
Sales Tax..................................................................................................................
Special Assessment Search .... ...... ........ ................... ........ .......... ... ........ ..................
Tree Removal......... .......... ..... ....... ..... .............. .................. ....... ................................
Video Tape Copies...................................................................................................
Zoning Code: Photocopy/CD Rom... ....... ..... ... ........ .......... ........ ............ ............ .... ...
III. Police/ Administrative Offenses ....................12-15
I V . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Lice n s e 5
Amusement Centers/ Devises/Rides, Carnivals, Circuses ......................................
Automobile Sales......................................................................................................
Bowling Alley............................................................................................................
Boxing and Wrestling Permit...... .................... ................ .... ...... ......... ............... ........
11-12
15-17
.
.
.
Cigarette and Tobacco ... .......... ...... ....... .............................. ... ................ ........... .... ...
Dog Licenses............................................................................................................
Fireworks................................................................................................................. .
Garbage and Rubbish Hauler License.....................................................................
Gasoline Station License..........................................................................................
Kennel License.........................................................................................................
Liquor Licenses/Investigation Fee............................................................................
PeddlerslTransient Merchant License/Investigation Fee.... ........ ........... ..... ... ..........
Recuperation of Half Way House........... ...... ............... ............... .......... ...... ... ...........
Restaurant License..................................................................................................
Therapeutic Massage/lnvestigation .........................................................................
V............................................................... Room Rental
Mounds View Community Center................................................................
City Hall.....................................................................................................................
Vi.................................. Water, Sewer and Street Fees
Late Payment............................................................................................................
Load Limits Fee........................................................................................................
MIU/MXU ............................ ......................................................................................
Meter Testing............................................................................................................
Park Dedication Fee.................................................................................................
Sewer Availability Charge (SAC)..............................................................................
Sewer Charge. ..........................................................................................................
Sewer Connection/Repair Permit.............................................................................
Service Restoration..................................................................................................
Shut-of and Curb Stop..............................................................................................
Street Light Utility......................................................................................................
Street Opening Permit..............................................................................................
Storm Water Management (SWM).. ............. ........ ..... ..... ......... ............. ..... ........ .......
Surface Water Management .... .... .... ........... .... ............. .......... .......... .... .... ....... .........
Tapping.................................................................................................................... .
Unit Charge...............................................................................................................
Water Charge...........................................................................................................
Water Connection/Repair Permit.............................................................................
Water Disconnect/Reconnect in Spring...................................................................
Water Hydrant Deposit... ................... ....... ............. ...... ................. ......... ........ ...........
Water Meter..............................................................................................................
Water Quality Testing.. ........... ......... ......... ...... ... ......... ..... ..... ........ ............ ...... ..........
Utility Bill Assessment Search. ............. ................. ................. ...............................
19-20
20-22
VII. The Bridges........................................................... .23
IV
.
.
.
I. BUilDING/COMMUNITY DEVELOPMENT RELATED FEES
A.
VALUATION TABLE
The following Valuation Table shall be used to determine fees for those permits indicated
below and in all cases where the work is of such a nature that the permit fees cannot be
determined from the schedule established below for such work. The minimum fee for all
permits shall be $23.50 unless otherwise specified.
$1 to $500 $23.50 for the first $500
$501 to $2,000 $23.50 plus $3.05 for each additional $100 or fraction
thereof, to and including $2,000
$2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each additional
$1,000 or fraction thereof, to an including $50,000
$25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each
additional $1,000 or fraction thereof to an including
$50,000
$50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each
additional $1,000 or fraction thereof, to and including
$100,000
$101,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each
additional $1,000 or fraction thereof, to and including
$500,000
$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each
additional $1,000 or fraction thereof.
$1,000,001 and up $5608.75 for the first $1,000,000 plus $3.15 for each
additional $1 ,000 or fraction thereof.
5
.
.
.
B. SURCHARGES
Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is
as follows:
1. Building Surcharge
(For valuation-based permits, the surcharge is as follows)
Valuation of Work Surcharge Computation
$1,000,000 or less .0005 x valuation
$1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000)
$2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000)
$3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000)
$4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000)
Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000)
For fixed-fee permits, the surcharge shall be $.50 per permit (or .0005 of the permit
fee if fee exceeds $1,000).
2. Heating Surcharge
Residential $.50 per permit (or .0005 of the permit fee if fee
exceeds $1,000).
Commercial Use the above table
3. Plumbing Surcharge
$.50 per permit (or .0005 of the permit fee if fee exceeds $1,000).
6
.
.
.
B. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS
BUILDING PERMITS.
(Note: Surcharges Not Included in All Figures Listed below -- See Surcharge
Section in Chapter 1006 for More Information)
Accessory Buildings: Garages & Sheds *(Valuation per sq. ft. used for valuation table)
Attached Garage $20.00 per sq. ft.
Detached Garages & Sheds, > 120 sq. ft. (w/ concrete floor) $ 10.00 per sq. ft.
Detached Garages & Sheds, > 120 sq. ft. (w/ wood floor) $ 6.00 per sq. ft.
Sheds, 120 square feet and less $ 25.00 (flat fee)
Carport $ 10.00 per sq. ft.
Addition *(Valuatian per sq. ft. used for valuation table)
First Floor $63.55
Second Floor $44.49
Addition (mobile home) $22.30
Basement *(Valuation per sq. ft. used for valuation table)
Unfinished $12.86
Semi-finished $17.24
Basic Floor Area $63.55
*(Valuation per sq. ft. used far valuation table)
Deck *(Valuatian per sq. ft. used for valuation table)
Residential $8.00 I
30" and under, not attached (na surcharge) $25 per deck I
- desks on manufactured homes
Demolition $20 plus $2.00 per 1,000 cubic feet or
fraction thereof over 2,000 cubic feet
plus $.50 surcharge
7
.
.
.
8
Door or Window Installation
Using existing window frame No fee
Change Opening Use valuation table
Use Existing Rough opening $20 for first window/door plus $2.50 for each
additional window/door
Bay Window $40.00 plus .50 surcharge I
Driveways, Sidewalks, Parking Lots, Patios; New Installation or Overlay (No Surcharge)
Residential Concrete/Asphalt/Brick: $20 for first 500
square feet plus $2 for each additional 100
square feet or fraction thereof (no surcharge)
Gravel: $10 for first 500 square feet plus $1 for
each additional 100 square feet or fraction
thereof (no surcharge)
Commercial Use valuation table
Electrical Work -- Same as established in the Minnesota State Board of Electricians,
March 1, 1972 Edition of Laws and Regulations Licensing
Electricians and Inspections of Electrical Installations as Amended.
Electrical Inspector Bob Clauson (651 )777-7885
Blank Forms $1.50 each
Elevators Use valuation table (see surcharge and plan
check fee for additional charges).
$20, or $4 per 1,000 square feet or fraction
Excavating, grading, filling thereof, whichever is greater, plus $.50
surcharge
(*Applicant may be responsible for any City
engineering costs)
Fences (See Chapter 1103) $25 per installation (no surcharge)
Fire Alarm Systems $50
.
.
.
Fire Permits
Temporary Tent $50
Day Care Fire Inspections $50
Fireplace (these are the estimated value)
Brick Single flue (flat value) $2,400
Brick Double (flat value) $3,500
Free Standing wood (flat value) $1 ,200
Heatilator gas $2,400
HVAC (Plus Surcharge)
All Commercial HV AC (4 units & 1.5% of contract price plus surcharge at .0005
up) times contract price
Residential Air Conditioning $20 plus $3.00 per ton or fraction thereof
Furnaces and Air Exchangers $25 plus $5 per 100,000 BTU per hour or
fraction thereof
Sheet Metal/Duct Work $25
Ventilation Systems $10 for the first fan plus $4 for each additional
fan
Gas fireplace $25 includes incidental piping
Gas, oil piping $20 per unit
Gas Meter, Regulator Upgrade $25
Steam, hot water heating $30 plus $5 per 100,000 BTU per hour or
fraction thereof over 200,000 BTU per
Irrigation Systems (landscaping) $27.00 (plus .50 surcharge)
Mobile Homes (See Chapter 1110)
Installation $50 per installation (plus $.50 surcharge)
Mechanical (Gas hook up) $20 (plus $.50 surcharge)
9
.
.
.
Moving Buildings (See Chapter 1007)
Principal Structure $110 per building (plus $.50
surcharge)
Accessory Structure (larger than 120 sq. ft.) $50 per building (plus $.50
surcharge)
Accessory Structure (120 sq. ft. or less) $25
Plumbing Work - Residential and Commercial (plus $.50 surcharge) (Chapter 1004)
Plumbing fixture, devices, Connections $20 plus $7.00 per fixture,
device and connection
Porch *(Valuation per sq. ft. used for valuation table)
Screen only $23.50
Three-Season (wood frame/windows/doors $42.58
Not Heated)
Raising, shoring Use valuation table - see
surcharge and plan check fee
for additional charges
Re-shingling
Residential Tear off: $40 for first 1,000 square feet
plus $3 for each additional 100 square feet
or fraction thereof (plus .50 surcharge)
Overlav: $40 for first 1 ,000 square feet
plus $2 for each additional 100 square feet
or fraction thereof (plus .50 surcharge)
Commercial Use Valuation Table
10
.
.
.
Re-siding I Stucco
Residential $40 for first 1 ,000 square feet plus $3 for
each additional 100 square feet or
fraction thereof (plus .50 surcharge)
Soffit/Fascia: $25 per installation
Commercial Use Valuation Table
Satellite Dishes (See Chapter 1103.18) $25 per installation (plus $.50 surcharge)
(excludes mini dish systems)
Signs, Billboards (See Chapter 1008) -- No Surcharge
Signs up to 100 sq ft. $50 for the first 24 square feet plus $5.00
for each additional 25 square feet or
fraction thereof up to 100 square
Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10
for each additional 100 square feet or
fraction thereof
Signs refacing or altering $25 per installation
Temporary Signs $30 per 21 day period (Limit 3 permits per
year)
Sprinkling Systems (Fire Suppression)
Sprinkler; Residential $30 plus $4.50 for each ten sprinkler
heads or fraction thereof over the ten
heads, plus $.50
Sprinkler; Commercial 1.5% of the contract price plus
surcharge at .0005 times the contract
price
Sprinkler Value 1.5% per square foot
Stucco See Re-siding
Swimming Pools (See Chapter 1009) *(Valuation per sq. ft. used for valuation table)
Above ground $6.00
Below ground $20.00
11
.
.
.
Tank Installation (fuel, oil, gas, etc.) $100 per tank
Tank Removal (fuel, oil, gas, etc.) $50 per tank
Telecommunication Antenna (Building Permit Fee.) $750 plus $.50
surcharge per system installation. For
(See Chapter 1126) installations on-city property, fee is 7% of
yearly rent to city (plus .50 surcharge)
Temporary Office (Mobile home) $50 ($10 annual renewal)
Windows See Door/Window Installation
Wood burning Stove $25 (plus $.50 surcharge)
Wrecking See demolition
12
.
.
.
D. OTHER INSPECTIONS I PLANNING FEES **
Building Inspections
Inspections conducted outside of $47/hr. (Minimum charge two hours)
normal business hours
Inspections for which no fee is $47/hr. (Minimum charge - one half hour)
specifically indicated
Reinspection Fees $47/hr.
Change of Address $100 deposit
Comprehensive Plan Amendment $250
Conditional Use Permit
R-1 to R-2 $150
All other Districts $325
Contractor Licenses (See Chapter 1001) $50 per Year State License
Contractors License Verification Fee $5 per permit (See building procedures)
Development/Site Plan Review $125/acre, minimum $125, maximum $750.
Housing Inspection Fees (See Chapter 1005)
Initial and Follow up Inspection No charge
Each Additional Inspection $25/inspection
Investigation Fee Equivalent to permit fee (when work commenCE s
without an approved permit)
Plan Review Fee 65 percent of permit fee for all commercial permits
and for residential permits for new dwellings,
* Refund Policy: No plan review dwelling additions, garages, garage additi( ns,
fee may be refunded after decks, sheds over 216 square feet, and m ajor
review has been completed. remodeling. Additional Plan Review Fee requ red
by changes, additions or revisions to plans $47 hr.
(Minimum charge one half hour) Plan review for
outside consultants for plan checking ~nd
inspections, or both. Actual costs inclu ing
Plan Review Fee, "Similar" administrative and overhead costs.
Where all units are the same or similar, each unit
after first shall be 25% of original fee.
13
.
.
.
Planned Unit Development (PUD) (See $750
Chapter 1120)
PUD Amendment $350
Refund Policy All but $40 of the permit fee can be refundec
within 100 days of application if work has no
commenced.
Rezoning $500
Street or Easement Vacation $250
Subdivisions
Minor Subdivision $250
Major Subdivision $500
Text Amendment, Zoning Code $150
Text Amendment, Other City Code $125
Variance
R-1 and R-2 $150
All Other Districts $325
Variance (Administrative) $75 (additional $100 if formal variance is I
required) - Effective March 1, 2004.
Wetland Alteration Permit
R-1 and R-2 $150
All Other Districts $400
Wetland Buffer Permit
R-1 and R-2 $25
All Other Districts $100
Zoning Letter $25
Returned Check $20
14
.
.
.
** Please convey that applicants are responsible for all costs incurred associated
with the filing, review and processing of development applications. Such fees are
to be paid in escrow up front or upon receipt of statement from the City of Mounds
View. Fees may include but are not limited to costs for consultants retained by the
City, consultant planning services, attorney, and engineer fees. A deposit may also
be required to cover costs of public notices, materials and staff time spent in the
review, research or preparation of materials associated with this application. The
applicant shall be responsible for all reasonable incurred costs in excess of the
initial deposit amount. Any portion of the deposit not spent or encumbered shall be
refunded to the applicant within 30 days after consideration of the application is
completed. Payment of park dedication fees is required with subdivision
applications.
15
.
.
.
II. MISCELLANEOUS FEES (Copies, Agendas, Maps, Minutes, etc.)
Annual Financial Report $25
Adopted Annual Budget $25
Apartment/Multiple Dwelling List $5
Blue Prints I Maps, Up to 11 x 17
Blue Line $2
Colored map $5
Blue Prints / Maps, Up to 24 x 36
Blue line $5
Colored map $10
Capital Improvement Plan $25
Certified Copies $5 plus photocopy fee
Dog License List $.25 per page
Filing Fee for Public Office $20
Insufficient Funds (NSF) checks $30
Long Term Financial Plan $25
Mailed / Faxed Agendas
City Council $60/year
Planning Commission $54/year
Special Meeting $25/year
Work Session $45/year
Mailed Minutes
City Council $150/year
Planning Commission $144/year
16
.
.
.
Mailed Meeting Packets
City Council $250/year
Planning Commission $175/year
Work Session $200/year
Mounds View Business List $.25 per page
Municipal Code $200
Notary Public $1 plus copy chargH
Outdoor Sign Usage (City Hall) $25 (2 wI3ek maximum)
Photocopies $2.00 for the first page and $.25 each additional
sheet
Sales Tax 6.5%, maps, copies
Sign Code Chapter $5
Special Assessments Search $10
Tree Removal See City Forester
Video Tape Copies $25
Zoning Code Photocopy $50
Zoning Code CD Rom $15
17
.
.
.
III. POLICE/ADMINISTRATIVE OFFENSES
Crime Free Multi Housing Participant No charge
Driver License Record (MN) Resident: No charge
Non-Resident: $3
Driver License Record (Out of state) $6
Fingerprint Cards $15 for first card/$5 for each add'l card
Police/Accident Reports $2/page for the first page & .25 for each
additional page
Police Reports Research $50/hr for research, plus $2 for the first
page and .25 for additional pages
Certified Copy of Report $5 for certification and $2/page for the
first page & .25 for additional pages
Color Printed Copy $2.00/page
35mm Standard Photos $1.00/print
Cassette or Video tape $25.00
Electronic copies to Digital Media $15.00 per disc
Impound Vehicle Storage Fee $15.00 per day
ADMINISTRATIVE OFFENSES
30' Stop Sign $15
Alcohol in public $50
Animals $25
Bldg. And Fire Code $100
Blocking Driveways $100
Expired Plates/Registration $25
Fire hydrant $25
Fire Lane $25
Fireworks $100
18
.
.
.
Garbage Dumping $100
Handicap Zone $200
House Numbers $25
Housing Code/Streets $100
Junk Vehicles $50
Junk & Debris $50
Keys in Ignition $20
Loads limits $100
Loitering $25
Loud Parties/Noise $50
Other Illegal Parking $15
Park Ordinance $25
Plate/Tab missing $20
Public Nuisances $100
Regulated Business Activity (Zoning) $100
Seat Belts $25
Signs $100
Snowbirds $25
Snowmobiles $25
Speed, Stop Sign, Semaphore or unsafe lane $40
use violations
Tobacco Penalties, Sale to Minors: Administrative Penalties for Businesses
1 st Offense $150
2nd Offense within 24 months $400
3rd Offense within 24 months $500
19
.
.
.
20
Tobacco Penalties, Sale to Minors: Administrative Penalties for Individuals
1 st Offense: $100
Subsequent Offenses $50 per offense
Tobacco Penalties: Possession by Minors
2nd Offense for possession or use $50
Trespass $25
Truck parking $25
Wetlands $100
Zoning $100
.
.
.
IV. LICENSES (All licenses subject to a 100/0 late fee where applicable.)
Amusement Devices and Centers (Chapter $15 per location plus $15 per machine
506) (MN Stat. 449.15)
Automobile Sales (Chapter 510) $150/year
Amusement Rides, Carnivals, Circuses $125 for first day plus $20 for each
(Chapter 506) additional day
Bowling Alleys (Chapter 507) $20/alley/year
Boxing and Wrestling Processing Fee Regulated by the State of Minnesota
Cigarette and Tobacco License Fee (Chapter $150/year
512)
Dog Licenses (decreased by 50% after one year)
Spayed or neutered $7/2 years
Unspayed or Unneutered $13/2 years
Duplicate tags $2
Fireworks Sales License $750
Garbage and Rubbish Hauler (Chapter 603) $75 plus $20 per vehicle/year
Gasoline Stations (Chapter 509) $60 plus $10 per pump
Kennel (Chapter 701 )
Residential $30/year
Commercial $50/year
21
.
.
.
22
Liquor Licenses (Chapter 502, 503)
On-Sale without Cabaret $.65 per square foot for that space
which is used primarily as bar area and
$.53 per square foot for that space
which is issued primarily as dining area
with a minimum fee of $3,000 and a
maximum fee of $10,000
On-Sale with Cabaret $.65 per square foot for that space
which is used primarily as bar area and
$.53 per square foot for that space
which is issued primarily as dining area
with a minimum fee of $3,000 and a
maximum fee of $10,000 (Resolution
No. 4629)
Temporary Liquor License Fee $35/event; .$10 Investigation Fee if
applicant does not hold license within
Mounds View
On-Sale Wine $800/year
Off-Sale Intoxicating $200/year
Bottle Club $330/year
On-Sale Malt Liquor/3.2 Beer $1,000/year
Off-Sale Malt Liquor/3.2 Beer $100/year
Set Ups $330/year
Club $330/year
Investigation Fee: Wine/General Liquor
Single Person $300/$350
Partnership $365/$385
Corporation $400/$450
.
.
.
23
Multiple Dwelling License (Chapter 1005) $6/Unit with minimum of
$40/bu ild i ng/yea r
Multiple Dwelling License Transfer $25
Pawn Shops (Chapter 515)
Non-Refundable Application Fee $500
(includes cost of investigation)
New Manager Investigation Fee $150
Annual License $10,000
Billable Transaction Fee $1.50 per transaction
Performance Bond $10,000
Peddlers I Transient Merchants I Solicitors (Chapter 504)
Permits $60/day
$100/month
$500/year
I nvestigation fee $1 0 investi~Jation fee for new peddler
I.D. Card $2.50/person
Recuperation or Half Way House (Chapter 511)
Less than 10 beds $33/year
10-49 beds $55/year
50-99 beds $82/year
Over 100 beds $110/year
Restaurants -- Class A (occupancy load greater than 100) (Chapter 505)
Operating 16 hours/day or less $275
Operating more than 16 hours/day $550
.
.
.
Restaurants -- Class B (occupancy load of 100 or less)
Operation 16 hours/day or less $165/year
Operating more than 16 hours/day $330/year
Tattoo and Body Piercing License /Investigation Fee
Enterprise License License Fee $250
I nvestigatiol1 Fee $1 00
Specialist License License Fee $100
Investigation Fee $100
Temporary License $100
Therapeutic Massage License Fee/l nvestigation (Chapter 514)
Enterprise License $75
Therapist License $35
Individual Investigation Fee $50
Partnership / Corporation Investigation $350
Fee
24
.
.
.
V. MOUNDS VIEW COMMUNITY CENTER
Mounds View Banquet and Conference Center - Basic Services
Banquet and Conference Center Rental Refer to MVBC Mgr: Mermaid
Sales and Catering 763-746-2134
Full room (up to 330 guests)
Half room (up to 150 guests)
1/3 room (up to 75 guests)
Break-out Room Rentals are
Available
Damage Deposit $250 (will be returned within 48
hours after the event)
Gym Rental Refer to MVCC Room Policies
Open Gym Refer to MVCC Room Policies
Athletic Field Rental $10 per event (YMCA and ISD
#621 are exempt from this fee.
Park Shelter Rental $50 clean-up deposit and $50 key
deposit plus $20 fee for residents
or $50 fee for non-residents.
Community Room Rental $1 O/hr Resident
$15/hr Non-Resident
$30/hr Corporation
$25 deposit required to bring in
food. No charge for community
organization meetings.
25
.
.
.
CITY HALL ROOM RENTAL
City Hall
The following organizations are
recognized by the Mounds View City
Council as being allowed to hold
organizational meetings at City Hall:
TOPS, Lions, Quilters, Sunnyside School
Reading Group, Irondale Hockey, Ramsey
County Charter Commission and Scout &
Campfire Groups. The use of space in
City Hall will be free of charge for these
organizations. All other organizations are
encouraged to contact the Mounds View
Community Center regarding room rental.
26
.
.
.
VI. WATER, SEWER, STREET AND OTHER FEES
Late Payment 10% of bill
Load Limits Permit Fee $20/entry/truck
Meter Testing (Chapter 906) $50 (free if meter is faulty)
MIU/MXU Cost (New Construction $105 plus tax/$125 plus tax
Only)
Park Dedication Fee (Chapter 1204)
Residential Subdivision (Less 5% Market value of land -- cash dedication
than one acre)
Residential Subdivision (One 10% Market value of land -- cash dedication
acre or more)
Commercial & Industrial 10% Market value of land -- cash dedication
Subdivisions
Sewer Availability Charge (SAC) $1350 (effective 1/1/04 per Metro Waste
Control Commission).
Sewer Charge $47per REC (Billed quarterly. Effective
January 1, 1999 per Ordinance 623.)
Sewer Connection/Repair Permit $25 (no surcharge)
Service Restoration $75 between 7:00 a.m. and 3:30 p.m., M-
F;$100 between 3:30-5:30 p.m., M-F; No
restoration after 5:30 p.m. or on weekends or
holidays.
Shut-Off and Curb Stop cost plus 10% for handling and sales tax
Street Light Utility - User Fees (Chapter 904)
Residential (includes single $3.25 per unit per quarter
family homes, duplexes, four-
plexes, condominium and
town homes)
Commercial/I ndustrial $16.25 per acre per quarter
Institutional/Charitable $16.25 per acre per quarter
Apartments $14.37 per acre per quarter
27
.
.
.
28
Street Opening Permit $20 plus $500 to $700 per opening (check
with Public Works/Community Development
Department for exact amount)
Storm Water Management (SWM) (Chapter 908) - New Construction
R-1 $202 per lot
R-2 989 per acre
R-3, R-4, R-O $1 ,429 per acre
B-1, B-2, B-3, B-4 $1,429 per acre
1-1, PUD $1,996 per acre
Storm Water Management - Utility Fees
R1, R2 Single & Two Family $5.50 per quarter
Residential
R-3 Medium Density Residential $30.06 per quarter
R-4, R-5, RO High Density $36.47 per quarter/acre
Residential Mobile Homes and
Residential Office
B-1, B-2, B-3, B-4 Neighborhood $46.77 per quarter/acre
Business Limited Business,
Highway Business, Regional
Business
1-1 Industrial $36.47 per quarter/acre
PUD Planned Unit Development $41.53 per quarter
CRP Conservancy, Recreation $5.09 per quarter
and Presentation
School/Church, Public, Private $16.79 per quarter
Tapping (water or sewer) City does not perform this service
Unit Charge (Sewer) $100 per new structure
Water Availability Charge (WAC)
Residential $275/unit
Commercial/lndustrial larger of $900/acre or $224/36,000 Gallons of
Water Consumption of Water
.
.
.
29
Water Charge $1.45/1,000 gallons (Effective January 1,
1999 per Ordinance 623).
Water Connection/Repair Permit
Inspection An after hours inspection of a water and/or
sewer connection or repair will be charged as
a callout. A callout is defined as a minimum
of two hours pay at one and one-half (1 %)
times the employee's base pay rate.
Service less than 4 inches $25 (no surcharge)
Service 4 inches or greater $50 (no surcharge)
Water Disconnect/Reconnect in Spring $25
Water Hydrant Deposit $500
Water used from hydrant: $1.45/1,000 gallons
Meter Deposit, 2- 3": $500
5/8" Meter Deposit: $100
Wrench Deposit: $100
Hose Deposit: $100 per hose
Adapters: $100 deposit
Water Meter $100 plus tax
Water Quality Testing Charge $1.43 per quarter (MNC - per connection)
Utility Bill Assessment Search $10
.
.
.
VII. The Bridges
Green Fee (Weekday) $15
Green Fee (Weekend) $16
Juniors 17 and under $3 off
Senior 58 and older $2 off
Golf Cars
Weekdays before noon $12
Weekdays after noon $14
Weekends and Holidays (Friday $14
noon - Sunday)
Pull Carts $2
Range balls
One token $5 (small bucket)
Two tokens $8 (large bucket)
Three tokens $10 Uumbo bucket)
Golf instruction
45 minute lesson (Class A Pro) $50
30 minute lesson (Master Pro) $50
30