Loading...
HomeMy WebLinkAboutResolution 6159 . . I RESOLUTION 6159 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION ADOPTING THE 2004 FEE SCHEDULE WHEREAS, revisions and updated to the Fee Schedule are necessary; and WHEREAS, each City of Mounds View Department Head has reviewed all fees relevant to his/her department and recommended changes to the City Council where necessary; and WHEREAS, the City Council Reviewed and discussed changes to the proposed Fee Schedule at its January 5, 2004, Work Session. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Mounds View does hereby approve the 2004 Fee Schedule, which is attached to this resolution. Adopted this 12th day of January, 2004. ~ ~erry/Wnke,Jv't&yor ..// ./ ATTEST: " j (Vl'\l..>~\ t/I'?M_.~~)-"\.."- James Ericson, Acting City Administrator (seal) . 1 y G~ () ieW . 2004 Fee Schedule . Last updated: January 12. 2004. . . . II I. ...................Building/Community Dev. Related Fees a. ....... ....... .............. .................... ....................... .... Valuation Table b. .. ....... ... ...... ..... .......... ... ....... ..... ...... ........ .................. Surcharges c..................... General Construction, Home, Building Permits, Misc Accessory Building/Shed................ ................... ..... ............... ....... ................. ........... Addition.................................................................................................................... . Basement................................................................................................................. . Basic Floor Area...... ..... ...... .......... ... ......... ......................... ....... ........ ......... ...... ......... Deck.......................................................................................................................... Door/Window Installation..... .... .... ..... .... ... ...... .... ... ................................................... Driveways, Sidewalks, Parking Lots and Patios ...................................................... Electrical Work.................... ....... .... .... ...... ............................... ....... ......... ... ........... ... Elevators.................................................................................................................. . Excavating, Grading, Filling............ ... ............... ..... ................ ..... .............................. Fences..................................................................................................................... . Fire Alarm System. ...... ......... ......... ......... .... ....... ........ .... ..... .................. ............ ..... ... Garages................................................................................................................... . Garbage/Recycling Enclosure.................................................................................. HVAC........................................................................................................................ Mobile Homes........................................................................................................... Moving Build ings ...................................................................................................... Pipe Fitting................................................................................................................ PI u mbing Work......................................................................................................... Porch....................................................................................................................... . Raising, Shoring....................................................................................................... Refrigeration Work................................................................................................... Remodeling .............................................................................................................. Reshingling ............................................................................................................... Re-siding/Stucco ...................................................................................................... Satellite Dishes......................................................................................................... S igns/Billboa rds ...................................................................................... .................. Sprinkling System.. ... ............. ....................... .................................... ......... ............... Stucco...................................................................................................................... . Swimming Pools....................................................................................................... Tank (fuel, gas) Installation/Removal. ............... ............................ ............. ..... ......... Telecommunication Antenna Building Permit Fee ..... .............. ...... ............. ...... ....... Windows... ..... ..... ......... ......... ... ....... .................. ............ ................. ..... .... ........ .......... Wrecking.................................................................................................................. . 1-10 1 1-2 2-8 . . . III d. ......................................... Other Inspections/Planning Fees 8-10 Building Inspections ................................................................................................. Code Appeal............................................................................................................. Comprehensive Plan Amendment.. ......... ......................... ....... ..... ..................... ... ... Conditional Use Permit................. ..................... .... ....... ......... ..... ...... ..... ................... Contractor Licenses................................................................................................. Development/Site Plan Review.. ..... .... ........... .......... ........... .......... .............. ..... ........ Housing Inspection Fees.. ........... ............. ............ ....... ............ ............... ............ ...... Multiple Dwelling Registration/Transfer.... .................. ... ........... ................................ Plan Review Fee ...... ....... ........ ........... .......... .......... .... .... ........ ....... ........ ..... .......... .... Planned Unit Development/Amendment ........... .......... ........ ............. ................ ........ Reinspection Fees.................................................................................................... Rezoning.................................................................................................................. . Street or Easement Vacation ..... ..... ... ................. .... ......... ......... ............ ........ ........... Subdivisions............................................................................................................ . Variance................................................................................................................... . Wetland Alteration Permit ..... .............. ...... ....... ...... .......... ........ ...... ....... .... .......... ..... Wetland Buffer Permit.............................................................................................. II. ......... Miscellaneous (copies, maps, agendas, etc.) Apartment/Multiple Dwelling List..... .... ......... .............. ...... ...... ........ ....... ..... .... .......... Blue Prints/Maps...................................................................................................... Council/Planning Commission Meeting Packets .... ........... ..................... ... .............. Dog License List... .......... .... ........... ........ ......... ........................ ........... .............. ......... Filing Fee for Public Office....................................................................................... Insufficient Fund Checks (NSF) ............................................................................... Mailed Agendas.. ............................................... .... ....... ............ ................ ................ Mailed Minutes.......................................................................................................... Mounds View Business List.... ............................................ ..... ...... ..................... ...... Mu n icipa I Code......................................................................................................... Notary Pu bl ic ............................................................................................................ Outdoor Sign Usage................ ........ ....... .................. ............. ......... .......................... Pending Assessment Search. ............... ...................................... ................ .... ......... Photocopies............................................................................................................. . Picnic Kits................................................................................................................. Police/Accident Report............................................................................................. Resident List............................................................................................................. Sales Tax.................................................................................................................. Special Assessment Search .... ...... ........ ................... ........ .......... ... ........ .................. Tree Removal......... .......... ..... ....... ..... .............. .................. ....... ................................ Video Tape Copies................................................................................................... Zoning Code: Photocopy/CD Rom... ....... ..... ... ........ .......... ........ ............ ............ .... ... III. Police/ Administrative Offenses ....................12-15 I V . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Lice n s e 5 Amusement Centers/ Devises/Rides, Carnivals, Circuses ...................................... Automobile Sales...................................................................................................... Bowling Alley............................................................................................................ Boxing and Wrestling Permit...... .................... ................ .... ...... ......... ............... ........ 11-12 15-17 . . . Cigarette and Tobacco ... .......... ...... ....... .............................. ... ................ ........... .... ... Dog Licenses............................................................................................................ Fireworks................................................................................................................. . Garbage and Rubbish Hauler License..................................................................... Gasoline Station License.......................................................................................... Kennel License......................................................................................................... Liquor Licenses/Investigation Fee............................................................................ PeddlerslTransient Merchant License/Investigation Fee.... ........ ........... ..... ... .......... Recuperation of Half Way House........... ...... ............... ............... .......... ...... ... ........... Restaurant License.................................................................................................. Therapeutic Massage/lnvestigation ......................................................................... V............................................................... Room Rental Mounds View Community Center................................................................ City Hall..................................................................................................................... Vi.................................. Water, Sewer and Street Fees Late Payment............................................................................................................ Load Limits Fee........................................................................................................ MIU/MXU ............................ ...................................................................................... Meter Testing............................................................................................................ Park Dedication Fee................................................................................................. Sewer Availability Charge (SAC).............................................................................. Sewer Charge. .......................................................................................................... Sewer Connection/Repair Permit............................................................................. Service Restoration.................................................................................................. Shut-of and Curb Stop.............................................................................................. Street Light Utility...................................................................................................... Street Opening Permit.............................................................................................. Storm Water Management (SWM).. ............. ........ ..... ..... ......... ............. ..... ........ ....... Surface Water Management .... .... .... ........... .... ............. .......... .......... .... .... ....... ......... Tapping.................................................................................................................... . Unit Charge............................................................................................................... Water Charge........................................................................................................... Water Connection/Repair Permit............................................................................. Water Disconnect/Reconnect in Spring................................................................... Water Hydrant Deposit... ................... ....... ............. ...... ................. ......... ........ ........... Water Meter.............................................................................................................. Water Quality Testing.. ........... ......... ......... ...... ... ......... ..... ..... ........ ............ ...... .......... Utility Bill Assessment Search. ............. ................. ................. ............................... 19-20 20-22 VII. The Bridges........................................................... .23 IV . . . I. BUilDING/COMMUNITY DEVELOPMENT RELATED FEES A. VALUATION TABLE The following Valuation Table shall be used to determine fees for those permits indicated below and in all cases where the work is of such a nature that the permit fees cannot be determined from the schedule established below for such work. The minimum fee for all permits shall be $23.50 unless otherwise specified. $1 to $500 $23.50 for the first $500 $501 to $2,000 $23.50 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 $2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each additional $1,000 or fraction thereof, to an including $50,000 $25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof to an including $50,000 $50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each additional $1,000 or fraction thereof, to and including $100,000 $101,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof. $1,000,001 and up $5608.75 for the first $1,000,000 plus $3.15 for each additional $1 ,000 or fraction thereof. 5 . . . B. SURCHARGES Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is as follows: 1. Building Surcharge (For valuation-based permits, the surcharge is as follows) Valuation of Work Surcharge Computation $1,000,000 or less .0005 x valuation $1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000) $2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000) $3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000) $4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000) Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000) For fixed-fee permits, the surcharge shall be $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). 2. Heating Surcharge Residential $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). Commercial Use the above table 3. Plumbing Surcharge $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). 6 . . . B. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS. (Note: Surcharges Not Included in All Figures Listed below -- See Surcharge Section in Chapter 1006 for More Information) Accessory Buildings: Garages & Sheds *(Valuation per sq. ft. used for valuation table) Attached Garage $20.00 per sq. ft. Detached Garages & Sheds, > 120 sq. ft. (w/ concrete floor) $ 10.00 per sq. ft. Detached Garages & Sheds, > 120 sq. ft. (w/ wood floor) $ 6.00 per sq. ft. Sheds, 120 square feet and less $ 25.00 (flat fee) Carport $ 10.00 per sq. ft. Addition *(Valuatian per sq. ft. used for valuation table) First Floor $63.55 Second Floor $44.49 Addition (mobile home) $22.30 Basement *(Valuation per sq. ft. used for valuation table) Unfinished $12.86 Semi-finished $17.24 Basic Floor Area $63.55 *(Valuation per sq. ft. used far valuation table) Deck *(Valuatian per sq. ft. used for valuation table) Residential $8.00 I 30" and under, not attached (na surcharge) $25 per deck I - desks on manufactured homes Demolition $20 plus $2.00 per 1,000 cubic feet or fraction thereof over 2,000 cubic feet plus $.50 surcharge 7 . . . 8 Door or Window Installation Using existing window frame No fee Change Opening Use valuation table Use Existing Rough opening $20 for first window/door plus $2.50 for each additional window/door Bay Window $40.00 plus .50 surcharge I Driveways, Sidewalks, Parking Lots, Patios; New Installation or Overlay (No Surcharge) Residential Concrete/Asphalt/Brick: $20 for first 500 square feet plus $2 for each additional 100 square feet or fraction thereof (no surcharge) Gravel: $10 for first 500 square feet plus $1 for each additional 100 square feet or fraction thereof (no surcharge) Commercial Use valuation table Electrical Work -- Same as established in the Minnesota State Board of Electricians, March 1, 1972 Edition of Laws and Regulations Licensing Electricians and Inspections of Electrical Installations as Amended. Electrical Inspector Bob Clauson (651 )777-7885 Blank Forms $1.50 each Elevators Use valuation table (see surcharge and plan check fee for additional charges). $20, or $4 per 1,000 square feet or fraction Excavating, grading, filling thereof, whichever is greater, plus $.50 surcharge (*Applicant may be responsible for any City engineering costs) Fences (See Chapter 1103) $25 per installation (no surcharge) Fire Alarm Systems $50 . . . Fire Permits Temporary Tent $50 Day Care Fire Inspections $50 Fireplace (these are the estimated value) Brick Single flue (flat value) $2,400 Brick Double (flat value) $3,500 Free Standing wood (flat value) $1 ,200 Heatilator gas $2,400 HVAC (Plus Surcharge) All Commercial HV AC (4 units & 1.5% of contract price plus surcharge at .0005 up) times contract price Residential Air Conditioning $20 plus $3.00 per ton or fraction thereof Furnaces and Air Exchangers $25 plus $5 per 100,000 BTU per hour or fraction thereof Sheet Metal/Duct Work $25 Ventilation Systems $10 for the first fan plus $4 for each additional fan Gas fireplace $25 includes incidental piping Gas, oil piping $20 per unit Gas Meter, Regulator Upgrade $25 Steam, hot water heating $30 plus $5 per 100,000 BTU per hour or fraction thereof over 200,000 BTU per Irrigation Systems (landscaping) $27.00 (plus .50 surcharge) Mobile Homes (See Chapter 1110) Installation $50 per installation (plus $.50 surcharge) Mechanical (Gas hook up) $20 (plus $.50 surcharge) 9 . . . Moving Buildings (See Chapter 1007) Principal Structure $110 per building (plus $.50 surcharge) Accessory Structure (larger than 120 sq. ft.) $50 per building (plus $.50 surcharge) Accessory Structure (120 sq. ft. or less) $25 Plumbing Work - Residential and Commercial (plus $.50 surcharge) (Chapter 1004) Plumbing fixture, devices, Connections $20 plus $7.00 per fixture, device and connection Porch *(Valuation per sq. ft. used for valuation table) Screen only $23.50 Three-Season (wood frame/windows/doors $42.58 Not Heated) Raising, shoring Use valuation table - see surcharge and plan check fee for additional charges Re-shingling Residential Tear off: $40 for first 1,000 square feet plus $3 for each additional 100 square feet or fraction thereof (plus .50 surcharge) Overlav: $40 for first 1 ,000 square feet plus $2 for each additional 100 square feet or fraction thereof (plus .50 surcharge) Commercial Use Valuation Table 10 . . . Re-siding I Stucco Residential $40 for first 1 ,000 square feet plus $3 for each additional 100 square feet or fraction thereof (plus .50 surcharge) Soffit/Fascia: $25 per installation Commercial Use Valuation Table Satellite Dishes (See Chapter 1103.18) $25 per installation (plus $.50 surcharge) (excludes mini dish systems) Signs, Billboards (See Chapter 1008) -- No Surcharge Signs up to 100 sq ft. $50 for the first 24 square feet plus $5.00 for each additional 25 square feet or fraction thereof up to 100 square Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10 for each additional 100 square feet or fraction thereof Signs refacing or altering $25 per installation Temporary Signs $30 per 21 day period (Limit 3 permits per year) Sprinkling Systems (Fire Suppression) Sprinkler; Residential $30 plus $4.50 for each ten sprinkler heads or fraction thereof over the ten heads, plus $.50 Sprinkler; Commercial 1.5% of the contract price plus surcharge at .0005 times the contract price Sprinkler Value 1.5% per square foot Stucco See Re-siding Swimming Pools (See Chapter 1009) *(Valuation per sq. ft. used for valuation table) Above ground $6.00 Below ground $20.00 11 . . . Tank Installation (fuel, oil, gas, etc.) $100 per tank Tank Removal (fuel, oil, gas, etc.) $50 per tank Telecommunication Antenna (Building Permit Fee.) $750 plus $.50 surcharge per system installation. For (See Chapter 1126) installations on-city property, fee is 7% of yearly rent to city (plus .50 surcharge) Temporary Office (Mobile home) $50 ($10 annual renewal) Windows See Door/Window Installation Wood burning Stove $25 (plus $.50 surcharge) Wrecking See demolition 12 . . . D. OTHER INSPECTIONS I PLANNING FEES ** Building Inspections Inspections conducted outside of $47/hr. (Minimum charge two hours) normal business hours Inspections for which no fee is $47/hr. (Minimum charge - one half hour) specifically indicated Reinspection Fees $47/hr. Change of Address $100 deposit Comprehensive Plan Amendment $250 Conditional Use Permit R-1 to R-2 $150 All other Districts $325 Contractor Licenses (See Chapter 1001) $50 per Year State License Contractors License Verification Fee $5 per permit (See building procedures) Development/Site Plan Review $125/acre, minimum $125, maximum $750. Housing Inspection Fees (See Chapter 1005) Initial and Follow up Inspection No charge Each Additional Inspection $25/inspection Investigation Fee Equivalent to permit fee (when work commenCE s without an approved permit) Plan Review Fee 65 percent of permit fee for all commercial permits and for residential permits for new dwellings, * Refund Policy: No plan review dwelling additions, garages, garage additi( ns, fee may be refunded after decks, sheds over 216 square feet, and m ajor review has been completed. remodeling. Additional Plan Review Fee requ red by changes, additions or revisions to plans $47 hr. (Minimum charge one half hour) Plan review for outside consultants for plan checking ~nd inspections, or both. Actual costs inclu ing Plan Review Fee, "Similar" administrative and overhead costs. Where all units are the same or similar, each unit after first shall be 25% of original fee. 13 . . . Planned Unit Development (PUD) (See $750 Chapter 1120) PUD Amendment $350 Refund Policy All but $40 of the permit fee can be refundec within 100 days of application if work has no commenced. Rezoning $500 Street or Easement Vacation $250 Subdivisions Minor Subdivision $250 Major Subdivision $500 Text Amendment, Zoning Code $150 Text Amendment, Other City Code $125 Variance R-1 and R-2 $150 All Other Districts $325 Variance (Administrative) $75 (additional $100 if formal variance is I required) - Effective March 1, 2004. Wetland Alteration Permit R-1 and R-2 $150 All Other Districts $400 Wetland Buffer Permit R-1 and R-2 $25 All Other Districts $100 Zoning Letter $25 Returned Check $20 14 . . . ** Please convey that applicants are responsible for all costs incurred associated with the filing, review and processing of development applications. Such fees are to be paid in escrow up front or upon receipt of statement from the City of Mounds View. Fees may include but are not limited to costs for consultants retained by the City, consultant planning services, attorney, and engineer fees. A deposit may also be required to cover costs of public notices, materials and staff time spent in the review, research or preparation of materials associated with this application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant within 30 days after consideration of the application is completed. Payment of park dedication fees is required with subdivision applications. 15 . . . II. MISCELLANEOUS FEES (Copies, Agendas, Maps, Minutes, etc.) Annual Financial Report $25 Adopted Annual Budget $25 Apartment/Multiple Dwelling List $5 Blue Prints I Maps, Up to 11 x 17 Blue Line $2 Colored map $5 Blue Prints / Maps, Up to 24 x 36 Blue line $5 Colored map $10 Capital Improvement Plan $25 Certified Copies $5 plus photocopy fee Dog License List $.25 per page Filing Fee for Public Office $20 Insufficient Funds (NSF) checks $30 Long Term Financial Plan $25 Mailed / Faxed Agendas City Council $60/year Planning Commission $54/year Special Meeting $25/year Work Session $45/year Mailed Minutes City Council $150/year Planning Commission $144/year 16 . . . Mailed Meeting Packets City Council $250/year Planning Commission $175/year Work Session $200/year Mounds View Business List $.25 per page Municipal Code $200 Notary Public $1 plus copy chargH Outdoor Sign Usage (City Hall) $25 (2 wI3ek maximum) Photocopies $2.00 for the first page and $.25 each additional sheet Sales Tax 6.5%, maps, copies Sign Code Chapter $5 Special Assessments Search $10 Tree Removal See City Forester Video Tape Copies $25 Zoning Code Photocopy $50 Zoning Code CD Rom $15 17 . . . III. POLICE/ADMINISTRATIVE OFFENSES Crime Free Multi Housing Participant No charge Driver License Record (MN) Resident: No charge Non-Resident: $3 Driver License Record (Out of state) $6 Fingerprint Cards $15 for first card/$5 for each add'l card Police/Accident Reports $2/page for the first page & .25 for each additional page Police Reports Research $50/hr for research, plus $2 for the first page and .25 for additional pages Certified Copy of Report $5 for certification and $2/page for the first page & .25 for additional pages Color Printed Copy $2.00/page 35mm Standard Photos $1.00/print Cassette or Video tape $25.00 Electronic copies to Digital Media $15.00 per disc Impound Vehicle Storage Fee $15.00 per day ADMINISTRATIVE OFFENSES 30' Stop Sign $15 Alcohol in public $50 Animals $25 Bldg. And Fire Code $100 Blocking Driveways $100 Expired Plates/Registration $25 Fire hydrant $25 Fire Lane $25 Fireworks $100 18 . . . Garbage Dumping $100 Handicap Zone $200 House Numbers $25 Housing Code/Streets $100 Junk Vehicles $50 Junk & Debris $50 Keys in Ignition $20 Loads limits $100 Loitering $25 Loud Parties/Noise $50 Other Illegal Parking $15 Park Ordinance $25 Plate/Tab missing $20 Public Nuisances $100 Regulated Business Activity (Zoning) $100 Seat Belts $25 Signs $100 Snowbirds $25 Snowmobiles $25 Speed, Stop Sign, Semaphore or unsafe lane $40 use violations Tobacco Penalties, Sale to Minors: Administrative Penalties for Businesses 1 st Offense $150 2nd Offense within 24 months $400 3rd Offense within 24 months $500 19 . . . 20 Tobacco Penalties, Sale to Minors: Administrative Penalties for Individuals 1 st Offense: $100 Subsequent Offenses $50 per offense Tobacco Penalties: Possession by Minors 2nd Offense for possession or use $50 Trespass $25 Truck parking $25 Wetlands $100 Zoning $100 . . . IV. LICENSES (All licenses subject to a 100/0 late fee where applicable.) Amusement Devices and Centers (Chapter $15 per location plus $15 per machine 506) (MN Stat. 449.15) Automobile Sales (Chapter 510) $150/year Amusement Rides, Carnivals, Circuses $125 for first day plus $20 for each (Chapter 506) additional day Bowling Alleys (Chapter 507) $20/alley/year Boxing and Wrestling Processing Fee Regulated by the State of Minnesota Cigarette and Tobacco License Fee (Chapter $150/year 512) Dog Licenses (decreased by 50% after one year) Spayed or neutered $7/2 years Unspayed or Unneutered $13/2 years Duplicate tags $2 Fireworks Sales License $750 Garbage and Rubbish Hauler (Chapter 603) $75 plus $20 per vehicle/year Gasoline Stations (Chapter 509) $60 plus $10 per pump Kennel (Chapter 701 ) Residential $30/year Commercial $50/year 21 . . . 22 Liquor Licenses (Chapter 502, 503) On-Sale without Cabaret $.65 per square foot for that space which is used primarily as bar area and $.53 per square foot for that space which is issued primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 On-Sale with Cabaret $.65 per square foot for that space which is used primarily as bar area and $.53 per square foot for that space which is issued primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 (Resolution No. 4629) Temporary Liquor License Fee $35/event; .$10 Investigation Fee if applicant does not hold license within Mounds View On-Sale Wine $800/year Off-Sale Intoxicating $200/year Bottle Club $330/year On-Sale Malt Liquor/3.2 Beer $1,000/year Off-Sale Malt Liquor/3.2 Beer $100/year Set Ups $330/year Club $330/year Investigation Fee: Wine/General Liquor Single Person $300/$350 Partnership $365/$385 Corporation $400/$450 . . . 23 Multiple Dwelling License (Chapter 1005) $6/Unit with minimum of $40/bu ild i ng/yea r Multiple Dwelling License Transfer $25 Pawn Shops (Chapter 515) Non-Refundable Application Fee $500 (includes cost of investigation) New Manager Investigation Fee $150 Annual License $10,000 Billable Transaction Fee $1.50 per transaction Performance Bond $10,000 Peddlers I Transient Merchants I Solicitors (Chapter 504) Permits $60/day $100/month $500/year I nvestigation fee $1 0 investi~Jation fee for new peddler I.D. Card $2.50/person Recuperation or Half Way House (Chapter 511) Less than 10 beds $33/year 10-49 beds $55/year 50-99 beds $82/year Over 100 beds $110/year Restaurants -- Class A (occupancy load greater than 100) (Chapter 505) Operating 16 hours/day or less $275 Operating more than 16 hours/day $550 . . . Restaurants -- Class B (occupancy load of 100 or less) Operation 16 hours/day or less $165/year Operating more than 16 hours/day $330/year Tattoo and Body Piercing License /Investigation Fee Enterprise License License Fee $250 I nvestigatiol1 Fee $1 00 Specialist License License Fee $100 Investigation Fee $100 Temporary License $100 Therapeutic Massage License Fee/l nvestigation (Chapter 514) Enterprise License $75 Therapist License $35 Individual Investigation Fee $50 Partnership / Corporation Investigation $350 Fee 24 . . . V. MOUNDS VIEW COMMUNITY CENTER Mounds View Banquet and Conference Center - Basic Services Banquet and Conference Center Rental Refer to MVBC Mgr: Mermaid Sales and Catering 763-746-2134 Full room (up to 330 guests) Half room (up to 150 guests) 1/3 room (up to 75 guests) Break-out Room Rentals are Available Damage Deposit $250 (will be returned within 48 hours after the event) Gym Rental Refer to MVCC Room Policies Open Gym Refer to MVCC Room Policies Athletic Field Rental $10 per event (YMCA and ISD #621 are exempt from this fee. Park Shelter Rental $50 clean-up deposit and $50 key deposit plus $20 fee for residents or $50 fee for non-residents. Community Room Rental $1 O/hr Resident $15/hr Non-Resident $30/hr Corporation $25 deposit required to bring in food. No charge for community organization meetings. 25 . . . CITY HALL ROOM RENTAL City Hall The following organizations are recognized by the Mounds View City Council as being allowed to hold organizational meetings at City Hall: TOPS, Lions, Quilters, Sunnyside School Reading Group, Irondale Hockey, Ramsey County Charter Commission and Scout & Campfire Groups. The use of space in City Hall will be free of charge for these organizations. All other organizations are encouraged to contact the Mounds View Community Center regarding room rental. 26 . . . VI. WATER, SEWER, STREET AND OTHER FEES Late Payment 10% of bill Load Limits Permit Fee $20/entry/truck Meter Testing (Chapter 906) $50 (free if meter is faulty) MIU/MXU Cost (New Construction $105 plus tax/$125 plus tax Only) Park Dedication Fee (Chapter 1204) Residential Subdivision (Less 5% Market value of land -- cash dedication than one acre) Residential Subdivision (One 10% Market value of land -- cash dedication acre or more) Commercial & Industrial 10% Market value of land -- cash dedication Subdivisions Sewer Availability Charge (SAC) $1350 (effective 1/1/04 per Metro Waste Control Commission). Sewer Charge $47per REC (Billed quarterly. Effective January 1, 1999 per Ordinance 623.) Sewer Connection/Repair Permit $25 (no surcharge) Service Restoration $75 between 7:00 a.m. and 3:30 p.m., M- F;$100 between 3:30-5:30 p.m., M-F; No restoration after 5:30 p.m. or on weekends or holidays. Shut-Off and Curb Stop cost plus 10% for handling and sales tax Street Light Utility - User Fees (Chapter 904) Residential (includes single $3.25 per unit per quarter family homes, duplexes, four- plexes, condominium and town homes) Commercial/I ndustrial $16.25 per acre per quarter Institutional/Charitable $16.25 per acre per quarter Apartments $14.37 per acre per quarter 27 . . . 28 Street Opening Permit $20 plus $500 to $700 per opening (check with Public Works/Community Development Department for exact amount) Storm Water Management (SWM) (Chapter 908) - New Construction R-1 $202 per lot R-2 989 per acre R-3, R-4, R-O $1 ,429 per acre B-1, B-2, B-3, B-4 $1,429 per acre 1-1, PUD $1,996 per acre Storm Water Management - Utility Fees R1, R2 Single & Two Family $5.50 per quarter Residential R-3 Medium Density Residential $30.06 per quarter R-4, R-5, RO High Density $36.47 per quarter/acre Residential Mobile Homes and Residential Office B-1, B-2, B-3, B-4 Neighborhood $46.77 per quarter/acre Business Limited Business, Highway Business, Regional Business 1-1 Industrial $36.47 per quarter/acre PUD Planned Unit Development $41.53 per quarter CRP Conservancy, Recreation $5.09 per quarter and Presentation School/Church, Public, Private $16.79 per quarter Tapping (water or sewer) City does not perform this service Unit Charge (Sewer) $100 per new structure Water Availability Charge (WAC) Residential $275/unit Commercial/lndustrial larger of $900/acre or $224/36,000 Gallons of Water Consumption of Water . . . 29 Water Charge $1.45/1,000 gallons (Effective January 1, 1999 per Ordinance 623). Water Connection/Repair Permit Inspection An after hours inspection of a water and/or sewer connection or repair will be charged as a callout. A callout is defined as a minimum of two hours pay at one and one-half (1 %) times the employee's base pay rate. Service less than 4 inches $25 (no surcharge) Service 4 inches or greater $50 (no surcharge) Water Disconnect/Reconnect in Spring $25 Water Hydrant Deposit $500 Water used from hydrant: $1.45/1,000 gallons Meter Deposit, 2- 3": $500 5/8" Meter Deposit: $100 Wrench Deposit: $100 Hose Deposit: $100 per hose Adapters: $100 deposit Water Meter $100 plus tax Water Quality Testing Charge $1.43 per quarter (MNC - per connection) Utility Bill Assessment Search $10 . . . VII. The Bridges Green Fee (Weekday) $15 Green Fee (Weekend) $16 Juniors 17 and under $3 off Senior 58 and older $2 off Golf Cars Weekdays before noon $12 Weekdays after noon $14 Weekends and Holidays (Friday $14 noon - Sunday) Pull Carts $2 Range balls One token $5 (small bucket) Two tokens $8 (large bucket) Three tokens $10 Uumbo bucket) Golf instruction 45 minute lesson (Class A Pro) $50 30 minute lesson (Master Pro) $50 30