HomeMy WebLinkAboutResolution 5694
.
.
.
. .
RESOLUTION NO. 5694
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION AMENDING THE 2002 FEE SCHEDULE
Whereas, revisions and updates to the Fee Schedule are necessary, and
Whereas, the Public Works and Community Development Departments
have recommended some additional changes to the 2002 Fee Schedule.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of Mounds View does hereby adopt the changes reflected in the attached
portions of the 2002 Fee Schedule.
Adopted this 28th day of January, 2002.
'~~
Richard Sonterre, Mayor
ATTEST:
/' y~jl~ '-1--11/LU.1'-
Kathleen F. Miller, City Administrator
SEAL
Motion by: Thomas
Second by:Marty
Sonterre Aye
Quick Absent
Stigney Aye
Marty Aye
Thomas Aye
.
.
.
VI.
WA TER, SEWER, STREET AND OTHER FEES
Late Payment 10% of bill
Load Limits Permit Fee $20Ientry/truck
Meter Testing (Chapter 906) $50 (free if meter is faulty)
MIU/MXU Cost (New Construction Only) $105 plus tax/$125 plusJax I
Park Dedication Fee
Residential Dwelling units/acre
0.0 -2.0 $100/acre
2.1-3.0 $150/acre
3.1-4.1 $200/acre
4.1-5.0 $250/acre
Over 5.0 10% of land subdivision
Com mercia I/i nd ustria I 10% of land subdivision
Sewer Availability Charge (SAC) $1?,-100 (effective 1/1[9200 per Metro Wastel
Control Commission).
.
.
.
Water Connection/Repair Permit
An after hours. iIJspectiol'1m9ta Wc:iter anq/or
In~2-ectiQns s~.wer c9nn~9ti()n9rJep9ir WUI be .9harg~qc:i ~a
callout. A callout is defined as a minimum 0
.. ............................ ............................... .............. ....... ....................... ................ .......
two hours pc:iyat 9n~Clnd one-hClJr(1m~) tin} ~s
th~ employe~~$ base p~Y-rat~,
Service less than 4 inches $25 (no surcharge)
Service 4 inches or greater $50 (no surcharge)
Water Disconnect/Reconnect in Spring $25
Water Hydrant Deposit $500
Water used from hydrant: $1.45/1,000 gallons
Meter Deposit, 2- 3": $500 I
C. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING
PERMITS. Surcharges Not Included in All Figures Listed below (See
Surcharge Section for More Information): (Chapter 1006)
I
Accessory Buildings: Garages & Sheds *(Valuation per sq. ft. used for valuation table)
Attached Garage $ 15.00 per sq. ft.
Detached Garages & Sheds, > 120 sq. ft. $ 10.00 per sq. ft.
(with concrete floor)
Detached Garages & Sheds, > 120 sq. ft. $ 6.00 per sq. ft.
(with wood floor)
Sheds, 120 square feet and less $ 25.00 (flat fee)
, I
-. mm 12QJ?qft.9rlJng~r NQpermit ne~ged
Carport $ 1 0.00 per sq. ft.
. . .
.
.
.
GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS.
Surcharges Not Included in All Figures Listed below (See Surcharge Section for
More Information): (Chapter 1006)
I
Door or Window Installation
Using existing window frame No fee
Change Opening Use valuation table
Use Existing Rough opening butchanging--winoowframes $20 for fi~t window/do
plus $2.5 for each
additional window/door
o