HomeMy WebLinkAboutResolution 5931
.
.
.
RESOLUTION 5931
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
AUTHORIZING THE ENGINEERING FIRM OF BONESTROO, ROSENE, ANDERLlK, AND
ASSOCIATES (BRAA) TO PROVIDE ENGINEERING SERVICES ASSOCIATED WITH THE
MANUFACTURED HOME PARK ACCESS STUDY
WHEREAS, There are currently two sites: Mounds View Mobile Home Park and Towns
Edge Terrace, which currently do not comply with the City Ordinance 1110.05, subdivision 2a.
"Park Site shall have at least two (2) points of ingress and egress for vehicles"; and
WHEREAS, on November 4, 2002, City Council directed Staff to address this access
issue by conducting a feasibility study outlining the costs and a traffic study to identify possible
traffic impacts; and
WHEREAS, Staff is requesting the assistance of the engineering firm of Bonestroo,
Rosene, Anderlik and Associates (BRAA) to assist the City of Mounds View in addressing the
access issue at two manufactured home parks; and
WHEREAS, BRAA has submitted a proposal letter to perform municipal and traffic
engineering at two manufactured home parks; Mounds View Mobile Park and Towns Edge
Terrace at an estimated cost of $12,500; and
WHEREAS, the cost would be derived from the City's Street Improvement Fund.
NOW, THEREFORE BE IT RESOLVED, THAT the Mounds View City Council does
hereby authorize the engineering firm of Bonestroo, Rosene, Anderlik and Associates (BRAA) to
provide engineering services associated with the Manufactured Home Park Access Study.
.A,TTEST:
Adopted this 13th day of January 2003.
.... ................) /7
.... ,!' '~"/
..' '/'~ ......~/.
(., // ,~/., .' _:.--~;><..,/ ...,
......---....... . r;.,.....-~. .I~ /~-~........ ~....;1""
Je~rLinke,(1\Aay.or-.-/ '..,.,-/
.' , (-....--. ./
(SEAL)
..J CV'VY\...<..l) r1~') C---y.J
James Ericson, Interim City Administrator
Motion by: Marty
Second by: Quick
Linke: Aye
Quick: Aye
Stigney: Aye
Marty: Aye
Gunn: Aye
.
.
.
~ Bonestroo
_ _ Rosene
~ Anderlik &
1 \l1 Associates
Engineers & Architects
Bonestroo. Rosene. Anderlik and Associates. Inc. is an Affirm"tive Action/Equal Opportunity Employer
and Employee Owned
Principals: Ot~o G. Bones-troD, r,E. . Marvin L. Sorvc1i...t. r,E. . Glenn R. Cook. P.E. . Robert G. SCrlJ.'1lcht, P,E .
Jerry A. Bourdcn. rE.
Senior Consultants: Rebert W. Rosene. P.E.. Joseph C. Ar:uerlik. P.E. . Richard E. T~Hrlt'r, PE. . S~san M. EUt'rhn. C P.A
Associate Principals: Keittl A Gordon, P.F. . Robert ;~. rfelerlf'. pro . Rjenard W. ros.ter. I~r . D..:lv:d O. loskQtr:!, r[. .
~.I!':lri< A. H;I.'1~()r', P.!-.. MiChdCI r r~(tdtmann, PF. . Ted K rlf'ld. rE. . Kenneth P Anderson. p.~ . Mark I~ Rolts. PE .
J.).wrc1 A H()nf>li~roo. ,'V1.0.A. . Sidr.t'y E WIlliamson, PE. I..S . ^gnp.... M Ring, M.B.A. A!lan Rick SdlTn!dr. P.E. .
~'t10"'dS W. Peterson. P.E.. Jamc.'i H Mc112nd. ~~I- . Mlle.,; H. Jcn:iN'I, 1-'.1-.. l. Phidljl (j~;!vell;l. Pl.. . DiH1.el J. Edgerton. P.E .
ISPl<.lel Martlrez. ~!:.. I hom.l:i A Sytko. PE. . Sheldon; Johnson. ()i!lc A. Cirovf'. ~l.[. . ; tlOmas A. Uou~har. PE-
r~obert J. i.)evcry. ,....t.
Offices: Sr. Pdul. St. Cloud. Ro:.:nestt'r and WI I 1/TJ.:l r. MN . MilwJukee. WI . c.....l!cagc. iL
\XIebsite: www.lJun~~troo.com
December 20, 2002
Mr. Greg Lee
Director of Public Works
City of Mounds View
2401 Highway 10
Mounds View, MN 55112-1499
RE: Proposal for Engineering Services - Manufactured Housing Parks
Our File No. 435-02-000
Dear Mr. Lee;
It was our pleasure to have met with you to discuss the access issues for two manufactured
housing parks in Mounds View. It is our understanding that each of these two parks, Mounds
View Park and Towns Edge Terrace have only one point of access from the public street system
and that city ordinance requires two. It is the desire of the city to accomplish the necessary
engineering studies for purposes of locating a second access. Such studies will require both
traffic engineering/planning and municipal engineering regarding access feasibility.
We have developed a work seope of the proposed analyses for each park. The tasks associated
with that scope are described in the following portions of this letter. Please note that some tasks,
such as documentation and meetings, will be common to both the traffic and municipal analyses,
while others will be separate. The separate tasks would be performed on a parallel time schedule
to the maximum extent possible to efficiently produce the final results of the study.
Mounds View Park
Task 1 - Conduct Traffic Counts
There are some traffic counts that we would recommend be conducted. The location of these
counts is listed below:
. South end of Montclair Avenue (park access road)
. Raymond Avenue just north of County Road H-2
. Belle Lane east of Quincy Street
Each count, at least 24 hours in duration, should be on a Tuesday, Wednesday, or Thursday. Do
not count during school Christmas vacation time period. Counts should be hourly, by travel
direction. Speed data on the public streets would be beneficial, but would require another count
on Raymond at a location farther north of County Road H-2. It is our understanding that the city
will conduct these traffic counts.
2335 West Highway 36 . St. Paul. MN 55113. 651-636-4600 . Fax: 651-636-1311
.
.
.
Mr. Greg Lee
Mounds View, MN
Manufactured Housing Parks - Proposal
File No. 435-02-000
December 20, 2002
Page 2
Task 2 - Field Reconnaissance
A reconnaissance of the site shall be conducted in order to view existing characteristics and area
surroundings. This would be done from both the traffic engineering and municipal engineering
aspects, and would include investigation of existing storm sewer and drainage patterns.
Task 3 - Traffic Impact Assessment
In review of the site, it is obvious that the location for a second access is at the gated location
that intersects with Raymond Avenue/Belle Lane near the northwest corner of the park. Given
that, we would prepare a traffic assessment of the volume impact on Raymond A venue/Belle
Lane under the scenario of a second access at the aforementioned location. Traffic estimates, as
they affect Raymond A venue/Belle Lane, would be prepared. The impact of such volume
increases would be analyzed using accepted traffic planning criteria.
Task 4 - Preliminary Layout and Estimating
A preliminary layout and design of the proposed connection would be performed. A cost
estimate for use in the feasibility study would be prepared based on the preliminary layout.
Task 5 - Documentation
The results of the traffic assessment and municipal engineering investigations would be provided
in a feasibility report. This would include cost estimates and figures as appropriate.
Task 6 - Meetings
Weare preparing our budget based upon one meeting at the end of the study. This meeting
could be with staff to discuss the study results or could be with the Planning Commission and lor
City Council. We would attend at your direction. Additional meetings could be attended at your
discretion and would be invoiced as an additional service.
Towns Edt!e Terrace Park
Task 1 - Traffic Counts
A 24-hour count, hourly and by direction should be taken at Windsor Way, the existing access
road into the park. It is our understanding that the city will conduct this count.
Task 2 - Field Reconnaissance
A reconnaissance of the site shall be conducted in order to view existing characteristics and area
surroundings. This would be done from both the traffic engineering and municipal engineering
aspects, and would include investigation of existing storm sewer and drainage patterns.
.
Mr. Greg Lee
Mounds View, MN
Manufactured Housing Parks - Proposal
File No. 435-02-000
December 20, 2002
Page 3
Task 3 - Preliminary Survey
Preliminary topographic survey would be performed on the project site using total station
equipment. This would be done at the locations of potential access at both the north end of
Londondary Avenue, and south of existing Windsor Way. The survey would record the
elevation and location of existing structures, trees, and other physical features in the vicinity of
the potential accesses. It would also record the existing ground elevations, as well as the relative
locations of the existing streets to Old Highway 8. The information gathered in the survey would
be necessary to perform a preliminary design and cost estimate for the feasibility study.
Task 4 - Wetland Investigation
The National Wetland Inventory Map indicates the presence of wetlands near the potential
access locations. A wetland estimation would need to be performed as part of the study. This
would include a field delineation of wetlands, and investigation of required mitigation measures
if wetlands will be impacted. For your information and use in scheduling, please be advised that
field delineation must be performed during the growing season, approximately May to October.
. Task 5 - Traffic Impact Assessment
During our meeting, it was agreed that the most logical choice for the second access would be
farther north along Old Highway 8. It was agreed that the city would discuss this access
potential with Ramsey County as such access would pass through County owned property.
Assuming this access potential is acceptable, we would conduct an assessment of the traffic
impacts based upon volume re-assignment. If such access is unacceptable, a location south of
the existing access would be analyzed.
Task 6 - Preliminary Layout and Estimating
A preliminary layout and design of the proposed connection would be performed. A cost
estimate for use in the feasibility study would be prepared based on the preliminary layout.
Task 7 - Documentation
The results of the traffic assessment and municipal engineering investigations would be provided
in a feasibility report. This would include cost estimates and figures as appropriate.
Task 8 - Meetings
.
We are preparing our budget based upon one meeting at the end of the study. This meeting
could be with staff to discuss the study results or could be with the Planning Commission and lor
City Council. We would attend at your direction. Additional meetings could be attended at your
discretion and would be invoiced as an additional service.
.
Mr. Greg Lee
Mounds View, MN
Manufactured Housing Parks - Proposal
File No. 435-02-000
December 20. 2002
Page 4
COST ESTIMATE
The cost to provide the services outlined in the Scope of Work has been estimated, and is
provided below. The total cost is broken down by residential park, and further by the traffic
engineering and municipal engineering activities.
Mounds View Park:
Traffic Engineering
Municipal Engineering
Subtotal
$ 1,850
2.450
$ 4,300
Towns Edge Park:
Traffic Engineering
Municipal Engineering
Subtotal
$ 1,150
7.050
TOTAL
$ 8.200
$12,500
. We appreciate the opportunity to assist you and the citizens of Mounds View on these projects.
Ifthere are any questions or concerns concerning the above, please do not hesitate to contact us.
Sincerely,
BONESTROO ROSENE ANDERLIK & ASSOCIATES, INC.
?:7?~
Joseph R. Rhein, P.E.
Project Manager
~Jl~
Associate Principal
.