HomeMy WebLinkAboutResolution 6984S RESOLUTION 6984
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION ADOPTING THE 2007 FEE SCHEDULE
WHEREAS, revisions and updates to the Fee Schedule are necessary; and
WHEREAS, each City of Mounds View Department Head has reviewed all fees
relevant to his/her department and recommended changes to the City Council where
necessary; and
WHEREAS, the City Council reviewed the Fee Schedule at the November 6, 2006,
Work Session; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Mounds
View does hereby approve the 2007 Fee Schedule, which is attached to this resolution.
Adopted this 11th day of December, 2006.
Rob arty, Mayor
ATTEST:
C'~~'~ ~,
urt Ulrich, ity Administrator
(seal)
•
•
2Q07
Fee Schedule
Last updated: December 11, 2006
-r ~
~ .~~~~~ ~JI~ ~~~il ~1~~,~)
I ................... Buildin /Communi Dev. Related Fees
9 tY
a ..................................................................:.........Valuation Table
b ................................................................................. Surcharges
c ..................... General Construction, Home, Building Permits, Misc
Accessory Building/Shed ..........................................................................................
Addition .....................................................................................................................
Basement ..................................................................................................................
Basic Floor Area .......................................................................................................
Deck ..........................................................................................................................
Door/Window Installation .........................................................................................
Driveways, Sidewalks, Parking Lots and Patios ......................................................
Electrical Work .........................................................................................................
Elevators ...................................................................................................................
Excavating, Grading, Filling ......................................................................................
Fences ......................................................................................................................
Fire Alarm System ....................................................................................................
Garages ....................................................................................................................
Garbage/Recycling Enclosure ..................................................................................
HVAC ........................................................................................................................
Mobile Homes ...........................................................................................................
Moving Buildings ......................................................................................................
Pipe Fitting ................................................................................................................
• Plumbing Work .........................................................................................................
Porch ........................................................................................................................
Raising, Shoring ....................................................................................:..................
Refrigeration Work ...................................................................................................
Remodeling ..............................................................................................................
Reshingling ...............................................................................................................
Re-siding/Stucco ......................................................................................................
Satellite Dishes .........................................................................................................
Signs/Billboards ........................................................................................................
Sprinkling System .....................................................................................................
Sprinkler Plan Check Fee .........................................................................................
Stucco .......................................................................................................... . ............
Swimming Pools .......................................................................................................
Tank (fuel, gas) Installation/Removal .......................................................................
Tent, Temporary .......................................................................................................
Telecommunication Antenna Building Permit Fee ...................................................
Windows ...................................................................................................................
Wrecking ...................................................................................................................
1-10
1-2
2-8
•
d .......................................... Other Inspections/Planning Fees
Building Inspections .................................................................................................
• Code Appeal .............................................................................................................
Comprehensive Plan Amendment ...........................................................................
Conditional Use Permit .............................................................................................
Contractor Licenses .................................................................................................
Development/Site Plan Review ................................................................................
Housing Inspection Fees ..........................................................................................
Multiple Dwelling Registration/Transfer ....................................................................
Plan Review Fee ......................................................................................................
Planned Unit Development/Amendment ..................................................................
Reinspection Fees ....................................................................................................
Rezoning ...................................................................................................................
Street or Easement Vacation ...................................................................................
Subdivisions .............................................................................................................
Variance ....................................................................................................................
Wetland Alteration Permit ........................................................................................
Wetland Buffer Permit ..............................................................................................
i II. ,....... Miscellaneous (copies, maps, agendas, etc.)
Apartment/Multiple Dwelling List ..............................................................................
Blue Prints/Maps ......................................................................................................
Council/Planning Commission Meeting Packets .....................................................
Dog License List .......................................................................................................
Filing Fee for Public Office .......................................................................................
• Insufficient Fund Checks (NSF) ...............................................................................
Mailed Agendas ........................................................................................................
Mailed Minutes ..........................................................................................................
Mounds View Business List .................................................................:....................
Municipal Code .........................................................................................................
Notary Public ............................................................................................................
Outdoor Sign Usage .................................................................................................
Pending Assessment Search ...................................................................................
Photocopies ..............................................................................................................
Picnic Kits .................................................................................................................
Police/Accident Report .............................................................................................
Resident List .............................................................................................................
Sales Tax ..................................................................................................................
Special Assessment Search ....................................................................................
Tree Removal ...........................................................................................................
Video Tape Copies ...................................................................................................
Zoning Code: Photocopy/CD Rom ...........................................................................
III ....................... Police/ Administrative Offenses
lV .................................................................... Licenses
Amusement Centers/ Devises/Rides, Carnivals, Circuses ......................................
~ Automobile Sales ......................................................................................................
• Bowling Alley ............................................................................................................
Boxing and Wrestling Permit ....................................................................................
Cigarette and Tobacco .............................................................................................
Dog Licenses ..................................:.........................................................................
Fireworks ..................................................................................................................
Garbage and Rubbish Hauler License .....................................................................
8-10
11-12
12-15
15-17
~J
Gasoline Station License ..........................................................................................
Kennel License .........................................................................................................
Liquor Licenses/Investigation Fee ............................................................................
Peddlers/Transient Merchant License/Investigation Fee .........................................
Recuperation of Half Way House .............................................................................
Restaurant License ..................................................................................................
Therapeutic Massage/Investigation .........................................................................
V ............................................................... Room Rental
Mounds View Community Center ................................................................
City Hall .....................................................................................................................
VI ................................. Water, Sewer and Street Fees
Late Payment ............................................................................................................
Load Limits Fee ........................................................................................................
MIU/MXU ..................................................................................................................
Meter Testing ..................................................................
..........................................
Park Dedication Fee .................................................................................................
Row Permit Fees ......................................................................................................
Sewer Availability Charge (SAC) ..............................................................................
Sewer Charge ...........................................................................................................
Sewer Connection/Repair Permit .............................................................................
Service Restoration ..................................................................................................
Shut-of and Curb Stop ..............................................................................................
Street Light Utility ......................................................................................................
Street Opening Permit ..............................................................................................
Storm Water Management (SWM) ...........................................................................
Surface Water Management ....................................................................................
Tapping .....................................................................................................................
Unit Charge ...............................................................................................................
Water Charge ...........................................................................................................
Water Connection/Repair Permit .............................................................................
Water Disconnect/Reconnect in Spring ...................................................................
Water Hydrant Deposit .............................................................................................
Water Meter ..............................................................................................................
Water Quality Testing ...............................................................................................
Utility Bill Assessment Search ...............................................................................
19-20
20-22
r]
I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES
• A. VALUATION TABLE
The following Valuation Table shall be used to determine fees for those permits indicated below and in
all cases where the work is of such a nature that the permit fees cannot be determined from the
schedule established below for such work. The minimum fee for all permits shall be $23.50 unless
otherwise specified.
$1 to $500 $23.50 for the first $500
$501 to $2,000 $23.50 plus $3.05 for each additional $100 or fraction
thereof, to and including $2,000
$2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each additional
$1,000 or fraction thereof, to an including $50,000
$25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each
additional $1,000 or fraction thereof to an including
$50,000
$50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each
additional $1,000 or fraction thereof, to and including
$100, 000
$101,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each
additional $1,000 or fraction thereof, to and including
$500, 000
$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each
additional $1,000 or fraction thereof.
$1,000,001 and up $5608.75 for the first $1,000,000 plus $3.15 for each
additional $1,000 or fraction thereof.
•
Specific Valuations
Accessory Buildings: Garages 8~ Sheds
Attached Garage $27.00 per sq. ft.
Detached Garages & Sheds, > 120 sq. ft. (w/ concrete
floor) $14.85 per sq. ft.
Detached Garages & Sheds, > 120 sq. ft. (w/ wood floor) $9.45 per sq. ft.
Carport $13.50 per sq. ft.
Residential-Additions ''
First Floor and basic floor area $78.74 per sq. ft.
Second Floor $61.02 per sq. ft.
Shell Only $44.80 per sq. ft.
Addition (mobile home) $24.98 per sq. ft.
Basement
Unfinished $15.50 per sq. ft.
Rough-In Finish $20.18 per sq. ft.
Finished $26.23
General Remodel $21.06 per sq. ft.
Deck
Residential $9.36 per sq. ft.
Porch
Screen only $27.50 per sq. ft.
Three-Season (wood frame/windows/doors Not Heated) $49.81 per sq. ft.
Swimming` Pools See Chapter 1009)
Above ground -Permanent $10.00 per sq. ft.
Below ground $30.00 per sq. ft.
C~
B. SURCHARGES
Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is as follows:
1. Building Surcharge
(For valuation-based permits, the surcharge is as follows)
Valuation of Work Surcharge Computation
$1,000,000 or less .0005 x valuation
$1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000)
$2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000)
$3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000)
$4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000)
Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000)
For fixed-fee permits, the surcharge shall be $.50 per permit (or .0005 of the permit
fee if fee exceeds $1,000).
2. Heating Surcharge
Residential $.50 per permit (or .0005 of the permit fee if fee
exceeds $1,000).
Commercial Use the above table
3. Plumbing Surcharge
$.50 per permit (or .0005 of the permit fee if fee exceeds $1,000).
•
C. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS.
(Note: Surcharges Not Included in All Figures Listed below -- See Surcharge Section in Chapter 1006
~or More Information)
Accessory Buildings Use valuation table
Residential Additions Use valuation table
Residential Remodels Use valuation table
Deck 30" and under $25 (no surcharge)
Demolition and Wrecking $20 plus $2.00 per 1,000 cubic feet or fraction
thereof over 2,000 cubic feet plus $.50
surcharge
Door or Window Installation
Change Opening $40 for first windows/door plus $12.50 for each
additional window/door (plus $.50 surcharge)
Use Existing Rough opening $20 for first window/door plus $2.50 for each
additional window/door (plus $.50 surcharge)
Egress Basement Window $50 for first window $25 for each additional
window (plus $.50 surcharge)
Driveways, Sidewalks, Parking Lots, Patios; New. Installation or Overlay (No Surcharge)
Residential Concrete/AsphaltlBrick: $20 for first 500
square feet plus $2 for each additional 100
square feet or fraction thereof (no surcharge)
R-1 or R-2 Overlay or Seal Coating
with no expansion, no permit Gravel*: $20 (no surcharge)
needed. * See zoning code for gravel limitations.
Commercial Use valuation table
Electrical Work -- Same as established in he Minnesota State Board of Electricians,
March 1, 1972 Edition of Laws and Regulations Licensing
Electricians and Inspections of Electrical Installations as Amended.
Electrical Inspector Brian Nelson (763) 434-4s53
Blank Electrical Request Forms $1.50 each (cash only,goes to Inspector}
Elevators Use valuation table
1
Fences/Retaining Wall (under 4')
Retaining Wall (over 4') $25 per installation (no surcharge)
$35 (plus .50 surcharge)
Fire Permits
Fire Alarm Systems
Fireworks Sales
Temporary Tent
Tank Installation (fuel, oil, gas, etc.)
Tank Removal (fuel, oil, gas, etc.) $50
$350 (business selling only fireworks)
$100 (business selling fireworks & other retail)
$50
$100 per tank (no surcharge)
$50 per tank (no surcharge)
Fireplaces
Wood burning Stove (Building
Permit $25 plus .50 surcharge
Gas Fireplace (Mechanical Permit) $25 plus .50 surcharge
VAC .(Plus Surcharge)
Commercial HVAC 1.5% of contract price plus surcharge at .0005
times contract price
Residential
Air Conditioning $30 per unit
Furnaces $40 per unit -New
$30 -Replacement
Air Exchanger $25 per unit
Sheet Metal /Duct Work $25
Ventilation Systems $10 for the first fan plus $4 for each additional
Gas fireplace $25 (includes incidental piping)
Gas, oil piping $25 per unit
Gas Meter, Regulator Upgrade $25
Steam, hot water heating $40 per unit
rrigation Systems (landscaping) $27.00 (plus .50 surcharge)
C7
Mobile Homes (see Chapter 11.10)
Installation $50 per installation (plus $.50 surcharge)
Mechanical (Gas hook up) $25 (plus $.50 surcharge)
Moving Buildings (See Chapter 1007)
Principal Structure $175 per building (plus $.50
surcharge)
Accessory Structure (larger than 400sq. ft.) $50 per building (plus $.50
surcharge)
Accessory Structure (400sq. ft. or less) $25
Plumbing Work - {Chapter 1004)
Residential -Plumbing fixture, devices, $20 plus $7.00 per fixture (plus $.50
Connections surcharge)
Residential -Fixture Replacement (same $15 or 5% of value whichever is
opening) or Repair greater up to $27 (plus $.50
surcharge)
Commercial (4 units and up)
1.5% of contract price plus surcharge
at .0005 times contract price
Porch Use valuation table
Raising, shoring Use valuation table
Re-shingling
Residential $20 for this first 500 square feet plus $3
for each additional 100 square feet or
• Buildings under 120 square feet do fraction thereof (plus .50 surcharge)
not require a permit
Commercial Use Valuation Table
Re-siding !-Stucco
Residential $20 for the first 500 square feet plus $3
for each additional 100 square feet or
• Buildings under 120 square feet do fraction thereof (plus .50 surcharge}
not require a permit
Soffit/Fascia: $25 per installation ius
• Soffit/Fascia only (fee not required if .50 surcharge)
included with siding permit)
Re-siding !`Stucco
Satellite Dishes (See Chapter 1103.18)
• (no permit required for mini dish systems) $25 per installation (plus $.50
surcharge)
Sheds (120 square feet and less) $ 25 (no surcharge)
Signs {Zoning Permit, no surcharge) , Billboards {Building Permi#, surcharge) (See
Chapter 1008) --
Signs up to 100 sq ft. $50 for the first 24 square feet plus $5.00 for
each additional 25 square feet or fraction thereof
up to 100 square
Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10 for
each additional 100 square feet or fraction
thereof
Signs refacing or altering $25 per installation
Temporary Signs $30 per 21 day period (Limit 3 permits per year)
Billboards $200 per billboard
Sprinkling Systems (Fire Suppression]
Sprinkler; Residential $30 plus $4.50 for each ten sprinkler heads or
fraction thereof over the ten heads, plus $.50
Sprinkler; Commercial 1.5% of the contract price plus surcharge at
.0005 times the contract price
Sprinkler Plan Check Fee 65% of permit fee (for new construction or 20
heads or more only)
Swimming Pools
Above ground -Permanent Use Valuation Table
Temporary (52" high or less) $25.00 (plus .50 surcharge)
Telecommunication Antenna
(Building Permit Fee, see also
Cha ter 1124) $750 plus $.50 surcharge per system installation.
For installations on-city property, fee is 7% of
yearly rent to city (plus .50 surcharge)
Temporary Office (Mobile home) $50 ($10 annual renewal)
indows See Door/Window Installation
Wood burning Stove $25 (plus $.50 surcharge)
i
D. OTHER INSPECTIONS /PLANNING FEES
Applicants are responsible for all costs incurred associated with the filing, review and processing of
development applications. Such fees are to be paid in escrow up front or upon receipt of statement from
the City of Mounds View. Fees may include but are not limited to costs for consultants retained by the
City, consultant planning services, attorney, and engineer fees. A deposit may also be required to cover
costs of public notices, materials and staff time spent in the review, research or preparation of materials
associated with this application. The applicant shall be responsible for all reasonable incurred costs in
excess of the initial deposit amount. Any portion of the deposit not spent or encumbered shall be
refunded to the applicant within 30 days after consideration of the application is completed. Payment of
park dedication fees is required with subdivision applications. Application fees are not refundable.
Building Inspections
Inspections conducted outside of
normal business hours $47/hr. (Minimum charge two hours)
Inspections for which no fee is
specifically indicated $47/hr. (Minimum charge -one half hour)
Reinspection Fees $47/hr.
Change of Address $150
omprehensive Plan Amendment $500
Conditional Use Permit (CUP)
R-1 to R-2 $150
All other Districts $350
CUP Amendment Same as CUP Fee
Contractor Licenses (See Chapter
1001) $50 per Year State License
Contractors License Verification
Fee $5 per permit (See building procedures)
DevelopmentlSite Plan Review $375
Housing Inspection Fees (See Chapter 1012)
Initial and Follow up Inspection No charge
Each Additional Inspection $25/inspection
nterium Use Permit (IUP) $375
IUP Amendment $375
r
1.
Investigation Fee Equivalent to permit fee (when work
commences without an approved permit)
ark Dedication Fee (See Ord 745) Up to 10% of fair market land value
Plan Review Fee 65 percent of permit fee for all commercial
permits and for residential permits for new
* Refund Policy: No plan dwellings, dwelling additions, garages, garage
review fee may be refunded additions, decks, sheds over 216 square feet,
after review has been and major remodeling. Additional Plan Review
completed. Fee required by changes, additions or revisions
to plans $47/ hr. (Minimum charge one half hour)
Plan review for outside consultants for plan
checking and inspections, or both. Actual costs
including administrative and overhead costs.
Plan Review Fee, "Similar" .Where all units are the same or similar, each unit
after first shall be 25% of original fee.
Planned Unit Development (PUD) $750
(See Chapter 1120)
PUD Amendment $375
Refund Policy All but $40 of the permit fee can be refunded
within 100 days of application if work has not
commenced.
Rezoning $500
Street or Easement Vacation $250
Subdivisions
Minor Subdivision $275
Major Subdivision $500
Text Amendment, Zoning Code $250
Text Amendment, Other City Code $150
Variance
R-1, R-2 (Administrative) $75 (additional $100 if formal variance is
required)
R-1 and R-2 (Formal) $150
All Other Districts $375
i
Wetland BufferPermit
R-1 and R-2 $25
All Other Districts $100
Wetland Alteration Permit.
R-1 and R-2 $150
All Other Districts $300
Zoning Letter $25
•
•
tl. MISCELLANEOUS FEES (Copies, Agendas, Maps, Minutes, etc.)
nnual Financial Report $25
Adopted Annual Budget $25
Apartment/Multiple Dwelling List $5
Blue Prints /Maps, Up to 11 x 17
Colored map $5
Blue Prints /Maps, Up to 24 x 36
Blue line $5
Colored map $10
Capital Improvement Plan $25
Certified Copies $5 plus photocopy fee of .25 per page
Dog License List $.25 per page
Filing Fee for Public Office See Mounds View City Charter
nsufficient Funds (NSF) checks
(returned or NSF checks) $30
Long Term Financial Plan $25
Mailed Agendas
City Council $60/year
Planning Commission $54/year
Special Meeting $25/year
Work Session $45/year
Mailed Minutes
City Council $150/year
Planning Commission $144/year
Mailed Meeting Packets
City Council $250/year
Planning Commission $175/year
Work Session $200/year
Mounds View Business List $.25 per page
Municipal Code $200
Notary Public $2 plus copy charge
Outdoor Sign Usage (City Hall) $25 (2 week maximum)
Photocopies $.25 per sheet
Sales Tax 6.5%, maps, copies
Sign Code Chapter $5
Pending Assessments Search $10
Tree Removal See City Forester
Video Tape/ DVD Copies $15
Zoning Code Photocopy $50
Zoning Code CD Rom $15
•
III. POLICE/ADMINISTRATIVE OFFENSES
~_
Crime Free Multi Housing Participant No charge
Driver License Record (MN) Resident: No charge
Non-Resident: $3
Driver License Record (Out of state) $6
Fingerprint Cards $15 for first card/$5 for each add'I card
Police/Accident Reports .25 for each page
Police Reports Research $50/hr for research, plus $2 for the first
page and .25 for additional pages
Certified Copy of Report $5 for certification and .25 each page
Color Printed Copy $2.00/page
35mm Standard Photos $1.00/print
Cassette or Video tape $25.00
Electronic copies to Digital Media $15.00 per disc
mpound Vehicle Storage Fee $15.00 per day
ADMINISTRATIVE OFFENSES
30' Stop Sign $15
Alcohol in public $50
Animals $25
Bldg. And Fire Code $100
Blocking Driveways $100
Expired Plates/Registration $25
Fire hydrant $25
Fire Lane $25
Fireworks $100
Garbage Dumping $100
Handicap Zone $200
House Numbers $25
Housing CodelStreets $100
Junk Vehicles $50
Junk & Debris $50
Keys in Ignition $20
Loads limits $100
Loitering $25
Other Illegal Parking $15
Park Ordinance $25
Plate/Tab missing $20
Public Nuisances $100
Regulated Business Activity (Zoning) $100
Seat Belts $25
igns $100
Snowbirds $25
Snowmobiles $25
Speed, Stop Sign, Semaphore or
unsafe lane use violations $40
..Loud Parties/Noise
Mufflers, Stereos and other Violations
of State and City Noise Codes $50
Tobacco Penalties, Sale to .Minors; Administrative Pena ties for Businesses
1St Offense $150
2"d Offense within 24 months $400
3~d Offense within 24 months $500
!'
L
r
L
C7
•
Tobacco Penalties, Sale to Minors: Administrative Penalties for Individuals
1St Offense: $100
Subsequent Offenses $50 per offense
Tobacco Penalties: Possession by Minors
2"d Offense for possession or use $50
Trespass $25
Truck parking $25
Wetlands $100
Zoning $100
IV. LICENSES (All licenses subject to a 10% late fee where applicable.)
Amusement Devices and Centers (Chapter
506) $15 per location plus $15 per machine
(MN Stat. 449.15)
Automobile Sales (Chapter 510) $158.00/year
Amusement Rides, Carnivals, Circuses
(Chapter 506) $130 for first day plus $20 for each
additional day
Bowling Alleys (Chapter 507) $21/alley/year
Boxing and Wrestling Processing Fee Regulated by the State of Minnesota
Cigarette and Tobacco License Fee (Chapter
512) $158.00/year
Dog. Licenses (decreased by 50°Io after one year)
Spayed or neutered $7/2 years
Unsprayed or Unneutered $13/2 years
Duplicate tags $2
Garbage and Rubbish Hauler (Chapter 603) $78 plus $21 per vehicle/year
Gasoline Stations (Chapter 509) $63 plus $11 per pump
LJ
Kennel. (Chapter 701 }
' Residential $31 /year
Commercial $52/year
Liquor Licenses (Chapter 502, 503}
On-Sale without Cabaret $.65 per square foot for that space
which is used primarily as bar area and
$.53 per square foot for that space
which is issued primarily as dining area
with a minimum fee of $3,000 and a
maximum fee of $10,000
On-Sale with Cabaret $.65 per square foot for that space
which is used- primarily as bar area and
$.53 per square foot for that space
which is issued primarily as dining area
with a minimum fee of $3,000 and a
maximum fee of $10,000 (Resolution
No. 4629)
Temporary Liquor License Fee $35/event; $10 Investigation Fee if
applicant does not hold license within
Mounds View
On-Sale Wine $800/year
Off-Sale Intoxicating $200/year
Bottle Club $330/year
On-Sale Malt Liquor/3.2 Beer $1,000/year
Off-Sale Malt Liquor/3.2 Beer $100/year
Set Ups $330/year
Club $330/year
Investigation Fee:.. WinelGeneral Liquor
Single Person $300/$350
Partnership $365/$385
Corporation $400/$450
~_
Multiple Dwelling License (Chapter 1012)
License fee discounts:
• Certification Level C
• Certification Level B
• Certification Level A $8 per unit with minimum of $50 per
building per year.
20% fee reduction
33% fee reduction
50% fee reduction
Multiple Dwelling License Transfer $25
Pawn. Shops (Chapter 515)
Non-Refundable Application Fee
(includes cost of investigation) $500
New Manager Investigation Fee $150
Annual License $10,000
Billable Transaction Fee $1.50 per transaction
Performance Bond $10,000
Peddlers /Transient Merchants /Solicitors .(Chapter 504)
Permits $60/day
$200/month
$500/year
Investigation fee $10 investigation fee for new peddler
I.D. Card $5.00/person
Recuperation or Hatf Way House (Chapter 511)
Less than 10 beds $33/year
10-49 beds $55/year
50-99 beds $82/year
Over 100 beds $110/year
Restaurants -- C ass A (occupancy .load greater than 100) (Chapter :505)
Operating 16 hours/day or less $275
Operating more than16 hours/day $550
-___
Restaurants -- Class B occupancy load of 100 or less)
Operation 16 hours/day or less $165/year
Operating .more than 16 hours/day $330/year
Tattoo and Body Piercing License /Investigation .Fee
Enterprise License License Fee $250
Investigation Fee $100
Specialist License License Fee $100
Investigation Fee $100
Temporary License $100
Therapeutic Massage License Fee/investigation {Chapter 514)
Enterprise License $250
Therapist License $100
Individual Investigation Fee $100
Partnership /Corporation {nvestigation
Fee $350
•
COMMUNITY CENTER 8~ RECREATION FEES
r
L
ounds View Banquet and. Conference Center -Basic Services
'Class I: School District 621, Mounds View Scouts,'Lions and 4-H, Mounds View Area
Athletic Associations (w/10% roster MV residents)
Class II: .Mounds View Residents, Mounds View Religious Groups (w/Mounds View
Address), Local Political Groups and Mounds View Non-Profits (w/Mounds
View Address).:..
Class .III: Mounds View City Employees, Non-local School Districts, Non-local Non-
profit Groups.
Class iV: .All For-Profit Groups, Non-local Religious Groups, Non-resident
individuals/private agencies, businesses/vendors, and Colleges and
Universities.
Banquet and Conference Center Rental
Event Center 1/6 (Seats 50) Class I
1 hour: Exempt*
4 hour block over 1 hour: $15*
Hourly over 1 or 4 hours: $10*
Class II
1 hour: $15*
4 hour block over 1 hour: $50*
Hourly over 1 or 4 hours: $15*
Class III
1 hour: $20
4 hour block over 1 hour: $75
Hourly over 1 or 4 hours: $20
Class IV
1 hour: $25
4 hour black over 1 hour: $90
Hourly over 1 or 4 hours: $25
Event Center 1 /3 (Seats 100) Class I
1 hour: Exempt*
4 hour block over 1 hour: $25*
Hourly over 1 or 4 hours: $15*
Class II
1 hour: $25*
4 hour block over 1 hour: $75*
Hourly over 1 or 4 hours: $25*
r
r
Class III
1 hour: $35
4 hour block over 1 hour: $100
Hourly over 1 or 4 hours: $35
Full Event Center (Seats 400)
Kitchen
(To be used by Licensed Caterer
Only)
Class IV
1 hour: $42
4 hour black over 1 hour: $120
Hourly over 1 or 4 hours: $42
Class I
1 hour: Exempt*
4 hour block over 1 hour: $75*
Hourly over 1 or 4 hours: $25*
Class II
1 hour: $75*
4 hour block over 1 hour: $225*
Hourly over 1 or 4 hours: $75*
Class III
1 hour: $105
4 hour block over 1 hour: $300
Hourly over 1 or 4 hours: $105
Class IV
1 hour: $125
4 hour black over 1 hour: $360
Hourly over 1 or 4 hours: $125
Class I
1 hour: Exempt'`
4 hour block over 1 hour: $25*
Hourly over 1 or 4 hours: $15*
Class II
1 hour: $25*
4 hour block over 1 hour: $75*
Hourly over 1 or 4 hours: $25*
Class III
1 hour: $35
4 hour block over 1 hour: $100
Hourly over 1 or 4 hours: $35
Class IV
1 hour: $42
4 hour black over 1 hour: $120
Hourly over 1 or 4 hours: $42
''Class I excludes set up services in Event Center or
additional set-up in multi-purpose rooms and pvmnasium
"'`For multi-purpose rooms and gymnasium rentals if
fhe MVCC is not otherwise open, the permit holder will
be charged an additional $15/hour for a staff fee
Multi-Purpose Rooms A and B
(Seating up to 10-20) Class I
Hourly Rate (1 hr min.): $15
4-6 Hours: $50
Class II
Hourly Rate (1 hr min.): $20
4-6 Hours: $75
Class III
Hourly Rate (1 hr min.): $25
4-6 Hours: $90
Class IV
Hourly Rate (1 hr min.): $30
4-6 Hours: $105
Multi-Purpose Room C and Youth
Room (Seating up to 30-40) Class I
Hourly Rate (1 hr min.): $35
6 -8 Hours: $200
Class II
Hourly Rate (1 hr min.): $50
6-8 Hours: $270
Class III
Hourly Rate (1 hr min.): $60
6-8 Hours: $320
Class IV
Hourly Rate (1 hr min.}; $70
6-8 Hours: $370
ther Charges Overhead Projectors: $10/day
N & VCR: $15/day
Microphone (single): $15/day
Microphone (multiple): $45/day
Screen: $35fda
Gym Renta{
Full Gym (Up to 4 hours -hourly rate) Class I: $30
Class II: $35
Class III: $40
Class IV: $50
Full Gym (Hourly Rate Exceeding 4
Hours) Class I: $60
Class II: $70
Class III: $80
Class IV: $90
Half Gym (Up to 4 Hours -hourly
rate) Class I: $20
Class II: $25
Class III: $30
Class IV: $40
Half Gym (Hourly Rate Exceeding 4
hours) Class I: $40
Class If: $50
Class III: $60
Class IV: $70
ounds View Athletic Fields
Fees Based Upon an Individual
Event/Game/Practice. Reservations for
Classes ll, lll, IV will begin on March 1St. Field
Reservations maybe limited depending upon
the number of teams and fields available. The
MV YMCA & Parks Maintenance Staff will set a
seasonal field use policy to determine fields
available, appropriate age groups, dates, and
times available and fields available.
$100 per Field per Day
Tournaments (If Field Maintenance is required during
tournaments, an additional $30 per
hour with atwo-hour minimum will be
charged.
Baseball & Softball Fields (Youth Only)
Hillview Class I: 1 time block free per/wk
Groveland $5 per add'I time block
Oakwood Class !I: $5 per time block
Greenfield Class III: $10 per time block
City Hall Class IV: Not applicable
i
Softball Fields (Adults or Youth) Class I: 1 time block free per/wk
City Hall $5 per add'I time block
Silverview Class II: $5 per time block
Class II I: $15 per time block
Class IV: $30 per time bock
Soccer Fields (Youth Only) Class I: 1 time block free per/wk
Silverview $5 per add'I time block
Groveland Class 11: $5 per time block
Oakwood Class III: $10 per time block
Class IV : Not Applicable
Lighting Fee for Softball Fields Class I: $20 per time block
Class I I: $30 per time block
Class III: $40 per time block
Class IV: $40 per time block
Park Shelter Rental
Class I
(see appendix for Classifications) 4 hours: $15
Full day: $30
Cfass II
$100 Refundable Damage Deposit 4 hours: $30
Required Fulf day: $60
$50 Service Fee will be Charged to Cfass III
Groups of 50 or more 4 hours: $45
Full day: $90
Class IV
4 hours: $60
Full day: $120
Silverview and City Hall Picnic Shelters
Class I
4 hours: $30
Full Day: $60
$100 Refundable Damage Deposit
Required Cfass 11
4 hours: $45
0 Service Fee will be Charged to Full day: $90
Groups of 50 or more
Class III
4 hours: $60
Full day: $120
Class IV
4 hours: $75
Full daY: $150
WATER, SEWER, STREET AND OTHER FEES
Late Payment 10°l0 of bill
Load Limits Permit Fee $25/entryitruck
Right of Way Permit Fees Yearly Registration Fee: $25.00
Excavation Permit Fee: $125.00
Obstruction Permit Fee: $50.00
Permit Extension: $25.00
ROW Security Fee: Subject to the Discretion
of the Public Works Director.
Excavating, grading, filling $20, plus $4 per 1,000 square feet or fraction
thereof, plus $.50 surcharge
(*Applicant may be responsible for any City
engineering costs)
Sewer .Fees
Availability Charge (SAC) $1,675 (effective 1/1/ 07per Metropolitan
Council Environmental Services - MCES).
Sewer Charge
Service Charge per Residential Equivalent
Residential Rates Connection $21.58 per Quarter plus Usage
Rate Based on Metered Water Usage $1.72
per 1,000 gallons
Commercial, Industrial, Pubic Service charge per residential equivalent
Buildings, and Church Rates connection $47 per quarter
Sewer Connection/Repair Permit $25 (no surcharge)
Unit Charge $100 per new structure
Service Restoration $75 between 7:00 a.m. and 3:30 p.m., M-
F;$100 between 3:30-5:30 p.m., M-F; No
restoration after 5:30 p.m. or on weekends or
holidays.
Shut-Off and Curb Stop cost plus 10% for handling plus safes tax
i
Street Light Utiility -User Fees (Chapter 904)
Residential (includes single
family homes, duplexes, four-
plexes, condominium and town
homes) $3.25 per unit per quarter
Commercial/industrial $16.25 per acre per quarter
Institutional/Charitable $16.25 per acre per quarter
Apartments $14.37 per acre per quarter
Street Opening Permit $125 permit fee plus $1000 Security Fee
•
•
Storm Water Mar+agement (SWM) (Chapter 908) -New Construction
R-1 $202 per lot
R-2 989 per acre
R-3, R-4, R-0 $1,429 per acre
B-1, B-2, B-3, B-4 $1,429 per acre
I-1, PUD $1,996 per acre
'`Storm Water Management -Utility Fees
R1, R2 Single & Two Family Residential $7.50 per quarter per unit
R-3 Medium Density Residential $40.99 per quarter
R-4, R-5, RO High Density Residential
Mobile Homes and Residential Office $49.72 per quarter/acre
B-1, B-2, B-3, B-4 Neighborhood
Business Limited Business, Highway
Business, Regional Business $63.78 per quarter/acre
I-1 Industrial $49.72 per quarter/acre
PUD Planned Unit Development $56.39per quarter/acre
CRP Conservancy, Recreation and
Presentation $6.94 per quarter
School/Church, Public, Private $22.89 per quarter
Water Availability Charge (WAC)
Residential $400/unit
Commercial/Industrial $1,000/acre of developable area
(minimum $1,000)
Water Charge $1.50 per 1,000 gallons
Tapping (water or sewer) City does not perform this service
•
Water Connection/Repair Permit
Inspection
. An after hours inspection of a water and/or
sewer connection or repair will be charged
as a callout. A callout is defined as a
minimum of two hours pay at one and one-
half (1 '/2) times the employee's base pay
rate.
Service less than 4 inches $30 (no surcharge)
Service 4 inches or greater $50 (no surcharge)
Water Disconnect or Reconnect $25
Water Hydrant Fees
Deposit $1, 000
Water used from hydrant: $1.50 per 1,000 gallons
Meter Deposit, 2- 3": $500
5/8" Meter Deposit: $100
Wrench Deposit: $100
Hose Deposit: $100 per hose
Adapters: $100 deposit
Water Meter $90 cost plus sales tax
Meter Testing (Chapter 906) $50 (Free if meter is faulty)
MIU Telephone Remote Reading Device $105 cost plus sales tax
MXU Radio Remote Reading Device $110 cost plus sales tax
Water Quality Testing Charge $1.43 per quarter (MNC -per connection)
Water Service Line Repair Fee $4.Q0 per quarter
Utility Bill Assessment Search $10
i
r
L
•