Loading...
HomeMy WebLinkAboutResolution 6984S RESOLUTION 6984 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION ADOPTING THE 2007 FEE SCHEDULE WHEREAS, revisions and updates to the Fee Schedule are necessary; and WHEREAS, each City of Mounds View Department Head has reviewed all fees relevant to his/her department and recommended changes to the City Council where necessary; and WHEREAS, the City Council reviewed the Fee Schedule at the November 6, 2006, Work Session; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Mounds View does hereby approve the 2007 Fee Schedule, which is attached to this resolution. Adopted this 11th day of December, 2006. Rob arty, Mayor ATTEST: C'~~'~ ~, urt Ulrich, ity Administrator (seal) • • 2Q07 Fee Schedule Last updated: December 11, 2006 -r ~ ~ .~~~~~ ~JI~ ~~~il ~1~~,~) I ................... Buildin /Communi Dev. Related Fees 9 tY a ..................................................................:.........Valuation Table b ................................................................................. Surcharges c ..................... General Construction, Home, Building Permits, Misc Accessory Building/Shed .......................................................................................... Addition ..................................................................................................................... Basement .................................................................................................................. Basic Floor Area ....................................................................................................... Deck .......................................................................................................................... Door/Window Installation ......................................................................................... Driveways, Sidewalks, Parking Lots and Patios ...................................................... Electrical Work ......................................................................................................... Elevators ................................................................................................................... Excavating, Grading, Filling ...................................................................................... Fences ...................................................................................................................... Fire Alarm System .................................................................................................... Garages .................................................................................................................... Garbage/Recycling Enclosure .................................................................................. HVAC ........................................................................................................................ Mobile Homes ........................................................................................................... Moving Buildings ...................................................................................................... Pipe Fitting ................................................................................................................ • Plumbing Work ......................................................................................................... Porch ........................................................................................................................ Raising, Shoring ....................................................................................:.................. Refrigeration Work ................................................................................................... Remodeling .............................................................................................................. Reshingling ............................................................................................................... Re-siding/Stucco ...................................................................................................... Satellite Dishes ......................................................................................................... Signs/Billboards ........................................................................................................ Sprinkling System ..................................................................................................... Sprinkler Plan Check Fee ......................................................................................... Stucco .......................................................................................................... . ............ Swimming Pools ....................................................................................................... Tank (fuel, gas) Installation/Removal ....................................................................... Tent, Temporary ....................................................................................................... Telecommunication Antenna Building Permit Fee ................................................... Windows ................................................................................................................... Wrecking ................................................................................................................... 1-10 1-2 2-8 • d .......................................... Other Inspections/Planning Fees Building Inspections ................................................................................................. • Code Appeal ............................................................................................................. Comprehensive Plan Amendment ........................................................................... Conditional Use Permit ............................................................................................. Contractor Licenses ................................................................................................. Development/Site Plan Review ................................................................................ Housing Inspection Fees .......................................................................................... Multiple Dwelling Registration/Transfer .................................................................... Plan Review Fee ...................................................................................................... Planned Unit Development/Amendment .................................................................. Reinspection Fees .................................................................................................... Rezoning ................................................................................................................... Street or Easement Vacation ................................................................................... Subdivisions ............................................................................................................. Variance .................................................................................................................... Wetland Alteration Permit ........................................................................................ Wetland Buffer Permit .............................................................................................. i II. ,....... Miscellaneous (copies, maps, agendas, etc.) Apartment/Multiple Dwelling List .............................................................................. Blue Prints/Maps ...................................................................................................... Council/Planning Commission Meeting Packets ..................................................... Dog License List ....................................................................................................... Filing Fee for Public Office ....................................................................................... • Insufficient Fund Checks (NSF) ............................................................................... Mailed Agendas ........................................................................................................ Mailed Minutes .......................................................................................................... Mounds View Business List .................................................................:.................... Municipal Code ......................................................................................................... Notary Public ............................................................................................................ Outdoor Sign Usage ................................................................................................. Pending Assessment Search ................................................................................... Photocopies .............................................................................................................. Picnic Kits ................................................................................................................. Police/Accident Report ............................................................................................. Resident List ............................................................................................................. Sales Tax .................................................................................................................. Special Assessment Search .................................................................................... Tree Removal ........................................................................................................... Video Tape Copies ................................................................................................... Zoning Code: Photocopy/CD Rom ........................................................................... III ....................... Police/ Administrative Offenses lV .................................................................... Licenses Amusement Centers/ Devises/Rides, Carnivals, Circuses ...................................... ~ Automobile Sales ...................................................................................................... • Bowling Alley ............................................................................................................ Boxing and Wrestling Permit .................................................................................... Cigarette and Tobacco ............................................................................................. Dog Licenses ..................................:......................................................................... Fireworks .................................................................................................................. Garbage and Rubbish Hauler License ..................................................................... 8-10 11-12 12-15 15-17 ~J Gasoline Station License .......................................................................................... Kennel License ......................................................................................................... Liquor Licenses/Investigation Fee ............................................................................ Peddlers/Transient Merchant License/Investigation Fee ......................................... Recuperation of Half Way House ............................................................................. Restaurant License .................................................................................................. Therapeutic Massage/Investigation ......................................................................... V ............................................................... Room Rental Mounds View Community Center ................................................................ City Hall ..................................................................................................................... VI ................................. Water, Sewer and Street Fees Late Payment ............................................................................................................ Load Limits Fee ........................................................................................................ MIU/MXU .................................................................................................................. Meter Testing .................................................................. .......................................... Park Dedication Fee ................................................................................................. Row Permit Fees ...................................................................................................... Sewer Availability Charge (SAC) .............................................................................. Sewer Charge ........................................................................................................... Sewer Connection/Repair Permit ............................................................................. Service Restoration .................................................................................................. Shut-of and Curb Stop .............................................................................................. Street Light Utility ...................................................................................................... Street Opening Permit .............................................................................................. Storm Water Management (SWM) ........................................................................... Surface Water Management .................................................................................... Tapping ..................................................................................................................... Unit Charge ............................................................................................................... Water Charge ........................................................................................................... Water Connection/Repair Permit ............................................................................. Water Disconnect/Reconnect in Spring ................................................................... Water Hydrant Deposit ............................................................................................. Water Meter .............................................................................................................. Water Quality Testing ............................................................................................... Utility Bill Assessment Search ............................................................................... 19-20 20-22 r] I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES • A. VALUATION TABLE The following Valuation Table shall be used to determine fees for those permits indicated below and in all cases where the work is of such a nature that the permit fees cannot be determined from the schedule established below for such work. The minimum fee for all permits shall be $23.50 unless otherwise specified. $1 to $500 $23.50 for the first $500 $501 to $2,000 $23.50 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 $2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each additional $1,000 or fraction thereof, to an including $50,000 $25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof to an including $50,000 $50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each additional $1,000 or fraction thereof, to and including $100, 000 $101,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500, 000 $500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof. $1,000,001 and up $5608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof. • Specific Valuations Accessory Buildings: Garages 8~ Sheds Attached Garage $27.00 per sq. ft. Detached Garages & Sheds, > 120 sq. ft. (w/ concrete floor) $14.85 per sq. ft. Detached Garages & Sheds, > 120 sq. ft. (w/ wood floor) $9.45 per sq. ft. Carport $13.50 per sq. ft. Residential-Additions '' First Floor and basic floor area $78.74 per sq. ft. Second Floor $61.02 per sq. ft. Shell Only $44.80 per sq. ft. Addition (mobile home) $24.98 per sq. ft. Basement Unfinished $15.50 per sq. ft. Rough-In Finish $20.18 per sq. ft. Finished $26.23 General Remodel $21.06 per sq. ft. Deck Residential $9.36 per sq. ft. Porch Screen only $27.50 per sq. ft. Three-Season (wood frame/windows/doors Not Heated) $49.81 per sq. ft. Swimming` Pools See Chapter 1009) Above ground -Permanent $10.00 per sq. ft. Below ground $30.00 per sq. ft. C~ B. SURCHARGES Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is as follows: 1. Building Surcharge (For valuation-based permits, the surcharge is as follows) Valuation of Work Surcharge Computation $1,000,000 or less .0005 x valuation $1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000) $2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000) $3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000) $4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000) Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000) For fixed-fee permits, the surcharge shall be $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). 2. Heating Surcharge Residential $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). Commercial Use the above table 3. Plumbing Surcharge $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). • C. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS. (Note: Surcharges Not Included in All Figures Listed below -- See Surcharge Section in Chapter 1006 ~or More Information) Accessory Buildings Use valuation table Residential Additions Use valuation table Residential Remodels Use valuation table Deck 30" and under $25 (no surcharge) Demolition and Wrecking $20 plus $2.00 per 1,000 cubic feet or fraction thereof over 2,000 cubic feet plus $.50 surcharge Door or Window Installation Change Opening $40 for first windows/door plus $12.50 for each additional window/door (plus $.50 surcharge) Use Existing Rough opening $20 for first window/door plus $2.50 for each additional window/door (plus $.50 surcharge) Egress Basement Window $50 for first window $25 for each additional window (plus $.50 surcharge) Driveways, Sidewalks, Parking Lots, Patios; New. Installation or Overlay (No Surcharge) Residential Concrete/AsphaltlBrick: $20 for first 500 square feet plus $2 for each additional 100 square feet or fraction thereof (no surcharge) R-1 or R-2 Overlay or Seal Coating with no expansion, no permit Gravel*: $20 (no surcharge) needed. * See zoning code for gravel limitations. Commercial Use valuation table Electrical Work -- Same as established in he Minnesota State Board of Electricians, March 1, 1972 Edition of Laws and Regulations Licensing Electricians and Inspections of Electrical Installations as Amended. Electrical Inspector Brian Nelson (763) 434-4s53 Blank Electrical Request Forms $1.50 each (cash only,goes to Inspector} Elevators Use valuation table 1 Fences/Retaining Wall (under 4') Retaining Wall (over 4') $25 per installation (no surcharge) $35 (plus .50 surcharge) Fire Permits Fire Alarm Systems Fireworks Sales Temporary Tent Tank Installation (fuel, oil, gas, etc.) Tank Removal (fuel, oil, gas, etc.) $50 $350 (business selling only fireworks) $100 (business selling fireworks & other retail) $50 $100 per tank (no surcharge) $50 per tank (no surcharge) Fireplaces Wood burning Stove (Building Permit $25 plus .50 surcharge Gas Fireplace (Mechanical Permit) $25 plus .50 surcharge VAC .(Plus Surcharge) Commercial HVAC 1.5% of contract price plus surcharge at .0005 times contract price Residential Air Conditioning $30 per unit Furnaces $40 per unit -New $30 -Replacement Air Exchanger $25 per unit Sheet Metal /Duct Work $25 Ventilation Systems $10 for the first fan plus $4 for each additional Gas fireplace $25 (includes incidental piping) Gas, oil piping $25 per unit Gas Meter, Regulator Upgrade $25 Steam, hot water heating $40 per unit rrigation Systems (landscaping) $27.00 (plus .50 surcharge) C7 Mobile Homes (see Chapter 11.10) Installation $50 per installation (plus $.50 surcharge) Mechanical (Gas hook up) $25 (plus $.50 surcharge) Moving Buildings (See Chapter 1007) Principal Structure $175 per building (plus $.50 surcharge) Accessory Structure (larger than 400sq. ft.) $50 per building (plus $.50 surcharge) Accessory Structure (400sq. ft. or less) $25 Plumbing Work - {Chapter 1004) Residential -Plumbing fixture, devices, $20 plus $7.00 per fixture (plus $.50 Connections surcharge) Residential -Fixture Replacement (same $15 or 5% of value whichever is opening) or Repair greater up to $27 (plus $.50 surcharge) Commercial (4 units and up) 1.5% of contract price plus surcharge at .0005 times contract price Porch Use valuation table Raising, shoring Use valuation table Re-shingling Residential $20 for this first 500 square feet plus $3 for each additional 100 square feet or • Buildings under 120 square feet do fraction thereof (plus .50 surcharge) not require a permit Commercial Use Valuation Table Re-siding !-Stucco Residential $20 for the first 500 square feet plus $3 for each additional 100 square feet or • Buildings under 120 square feet do fraction thereof (plus .50 surcharge} not require a permit Soffit/Fascia: $25 per installation ius • Soffit/Fascia only (fee not required if .50 surcharge) included with siding permit) Re-siding !`Stucco Satellite Dishes (See Chapter 1103.18) • (no permit required for mini dish systems) $25 per installation (plus $.50 surcharge) Sheds (120 square feet and less) $ 25 (no surcharge) Signs {Zoning Permit, no surcharge) , Billboards {Building Permi#, surcharge) (See Chapter 1008) -- Signs up to 100 sq ft. $50 for the first 24 square feet plus $5.00 for each additional 25 square feet or fraction thereof up to 100 square Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10 for each additional 100 square feet or fraction thereof Signs refacing or altering $25 per installation Temporary Signs $30 per 21 day period (Limit 3 permits per year) Billboards $200 per billboard Sprinkling Systems (Fire Suppression] Sprinkler; Residential $30 plus $4.50 for each ten sprinkler heads or fraction thereof over the ten heads, plus $.50 Sprinkler; Commercial 1.5% of the contract price plus surcharge at .0005 times the contract price Sprinkler Plan Check Fee 65% of permit fee (for new construction or 20 heads or more only) Swimming Pools Above ground -Permanent Use Valuation Table Temporary (52" high or less) $25.00 (plus .50 surcharge) Telecommunication Antenna (Building Permit Fee, see also Cha ter 1124) $750 plus $.50 surcharge per system installation. For installations on-city property, fee is 7% of yearly rent to city (plus .50 surcharge) Temporary Office (Mobile home) $50 ($10 annual renewal) indows See Door/Window Installation Wood burning Stove $25 (plus $.50 surcharge) i D. OTHER INSPECTIONS /PLANNING FEES Applicants are responsible for all costs incurred associated with the filing, review and processing of development applications. Such fees are to be paid in escrow up front or upon receipt of statement from the City of Mounds View. Fees may include but are not limited to costs for consultants retained by the City, consultant planning services, attorney, and engineer fees. A deposit may also be required to cover costs of public notices, materials and staff time spent in the review, research or preparation of materials associated with this application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant within 30 days after consideration of the application is completed. Payment of park dedication fees is required with subdivision applications. Application fees are not refundable. Building Inspections Inspections conducted outside of normal business hours $47/hr. (Minimum charge two hours) Inspections for which no fee is specifically indicated $47/hr. (Minimum charge -one half hour) Reinspection Fees $47/hr. Change of Address $150 omprehensive Plan Amendment $500 Conditional Use Permit (CUP) R-1 to R-2 $150 All other Districts $350 CUP Amendment Same as CUP Fee Contractor Licenses (See Chapter 1001) $50 per Year State License Contractors License Verification Fee $5 per permit (See building procedures) DevelopmentlSite Plan Review $375 Housing Inspection Fees (See Chapter 1012) Initial and Follow up Inspection No charge Each Additional Inspection $25/inspection nterium Use Permit (IUP) $375 IUP Amendment $375 r 1. Investigation Fee Equivalent to permit fee (when work commences without an approved permit) ark Dedication Fee (See Ord 745) Up to 10% of fair market land value Plan Review Fee 65 percent of permit fee for all commercial permits and for residential permits for new * Refund Policy: No plan dwellings, dwelling additions, garages, garage review fee may be refunded additions, decks, sheds over 216 square feet, after review has been and major remodeling. Additional Plan Review completed. Fee required by changes, additions or revisions to plans $47/ hr. (Minimum charge one half hour) Plan review for outside consultants for plan checking and inspections, or both. Actual costs including administrative and overhead costs. Plan Review Fee, "Similar" .Where all units are the same or similar, each unit after first shall be 25% of original fee. Planned Unit Development (PUD) $750 (See Chapter 1120) PUD Amendment $375 Refund Policy All but $40 of the permit fee can be refunded within 100 days of application if work has not commenced. Rezoning $500 Street or Easement Vacation $250 Subdivisions Minor Subdivision $275 Major Subdivision $500 Text Amendment, Zoning Code $250 Text Amendment, Other City Code $150 Variance R-1, R-2 (Administrative) $75 (additional $100 if formal variance is required) R-1 and R-2 (Formal) $150 All Other Districts $375 i Wetland BufferPermit R-1 and R-2 $25 All Other Districts $100 Wetland Alteration Permit. R-1 and R-2 $150 All Other Districts $300 Zoning Letter $25 • • tl. MISCELLANEOUS FEES (Copies, Agendas, Maps, Minutes, etc.) nnual Financial Report $25 Adopted Annual Budget $25 Apartment/Multiple Dwelling List $5 Blue Prints /Maps, Up to 11 x 17 Colored map $5 Blue Prints /Maps, Up to 24 x 36 Blue line $5 Colored map $10 Capital Improvement Plan $25 Certified Copies $5 plus photocopy fee of .25 per page Dog License List $.25 per page Filing Fee for Public Office See Mounds View City Charter nsufficient Funds (NSF) checks (returned or NSF checks) $30 Long Term Financial Plan $25 Mailed Agendas City Council $60/year Planning Commission $54/year Special Meeting $25/year Work Session $45/year Mailed Minutes City Council $150/year Planning Commission $144/year Mailed Meeting Packets City Council $250/year Planning Commission $175/year Work Session $200/year Mounds View Business List $.25 per page Municipal Code $200 Notary Public $2 plus copy charge Outdoor Sign Usage (City Hall) $25 (2 week maximum) Photocopies $.25 per sheet Sales Tax 6.5%, maps, copies Sign Code Chapter $5 Pending Assessments Search $10 Tree Removal See City Forester Video Tape/ DVD Copies $15 Zoning Code Photocopy $50 Zoning Code CD Rom $15 • III. POLICE/ADMINISTRATIVE OFFENSES ~_ Crime Free Multi Housing Participant No charge Driver License Record (MN) Resident: No charge Non-Resident: $3 Driver License Record (Out of state) $6 Fingerprint Cards $15 for first card/$5 for each add'I card Police/Accident Reports .25 for each page Police Reports Research $50/hr for research, plus $2 for the first page and .25 for additional pages Certified Copy of Report $5 for certification and .25 each page Color Printed Copy $2.00/page 35mm Standard Photos $1.00/print Cassette or Video tape $25.00 Electronic copies to Digital Media $15.00 per disc mpound Vehicle Storage Fee $15.00 per day ADMINISTRATIVE OFFENSES 30' Stop Sign $15 Alcohol in public $50 Animals $25 Bldg. And Fire Code $100 Blocking Driveways $100 Expired Plates/Registration $25 Fire hydrant $25 Fire Lane $25 Fireworks $100 Garbage Dumping $100 Handicap Zone $200 House Numbers $25 Housing CodelStreets $100 Junk Vehicles $50 Junk & Debris $50 Keys in Ignition $20 Loads limits $100 Loitering $25 Other Illegal Parking $15 Park Ordinance $25 Plate/Tab missing $20 Public Nuisances $100 Regulated Business Activity (Zoning) $100 Seat Belts $25 igns $100 Snowbirds $25 Snowmobiles $25 Speed, Stop Sign, Semaphore or unsafe lane use violations $40 ..Loud Parties/Noise Mufflers, Stereos and other Violations of State and City Noise Codes $50 Tobacco Penalties, Sale to .Minors; Administrative Pena ties for Businesses 1St Offense $150 2"d Offense within 24 months $400 3~d Offense within 24 months $500 !' L r L C7 • Tobacco Penalties, Sale to Minors: Administrative Penalties for Individuals 1St Offense: $100 Subsequent Offenses $50 per offense Tobacco Penalties: Possession by Minors 2"d Offense for possession or use $50 Trespass $25 Truck parking $25 Wetlands $100 Zoning $100 IV. LICENSES (All licenses subject to a 10% late fee where applicable.) Amusement Devices and Centers (Chapter 506) $15 per location plus $15 per machine (MN Stat. 449.15) Automobile Sales (Chapter 510) $158.00/year Amusement Rides, Carnivals, Circuses (Chapter 506) $130 for first day plus $20 for each additional day Bowling Alleys (Chapter 507) $21/alley/year Boxing and Wrestling Processing Fee Regulated by the State of Minnesota Cigarette and Tobacco License Fee (Chapter 512) $158.00/year Dog. Licenses (decreased by 50°Io after one year) Spayed or neutered $7/2 years Unsprayed or Unneutered $13/2 years Duplicate tags $2 Garbage and Rubbish Hauler (Chapter 603) $78 plus $21 per vehicle/year Gasoline Stations (Chapter 509) $63 plus $11 per pump LJ Kennel. (Chapter 701 } ' Residential $31 /year Commercial $52/year Liquor Licenses (Chapter 502, 503} On-Sale without Cabaret $.65 per square foot for that space which is used primarily as bar area and $.53 per square foot for that space which is issued primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 On-Sale with Cabaret $.65 per square foot for that space which is used- primarily as bar area and $.53 per square foot for that space which is issued primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 (Resolution No. 4629) Temporary Liquor License Fee $35/event; $10 Investigation Fee if applicant does not hold license within Mounds View On-Sale Wine $800/year Off-Sale Intoxicating $200/year Bottle Club $330/year On-Sale Malt Liquor/3.2 Beer $1,000/year Off-Sale Malt Liquor/3.2 Beer $100/year Set Ups $330/year Club $330/year Investigation Fee:.. WinelGeneral Liquor Single Person $300/$350 Partnership $365/$385 Corporation $400/$450 ~_ Multiple Dwelling License (Chapter 1012) License fee discounts: • Certification Level C • Certification Level B • Certification Level A $8 per unit with minimum of $50 per building per year. 20% fee reduction 33% fee reduction 50% fee reduction Multiple Dwelling License Transfer $25 Pawn. Shops (Chapter 515) Non-Refundable Application Fee (includes cost of investigation) $500 New Manager Investigation Fee $150 Annual License $10,000 Billable Transaction Fee $1.50 per transaction Performance Bond $10,000 Peddlers /Transient Merchants /Solicitors .(Chapter 504) Permits $60/day $200/month $500/year Investigation fee $10 investigation fee for new peddler I.D. Card $5.00/person Recuperation or Hatf Way House (Chapter 511) Less than 10 beds $33/year 10-49 beds $55/year 50-99 beds $82/year Over 100 beds $110/year Restaurants -- C ass A (occupancy .load greater than 100) (Chapter :505) Operating 16 hours/day or less $275 Operating more than16 hours/day $550 -___ Restaurants -- Class B occupancy load of 100 or less) Operation 16 hours/day or less $165/year Operating .more than 16 hours/day $330/year Tattoo and Body Piercing License /Investigation .Fee Enterprise License License Fee $250 Investigation Fee $100 Specialist License License Fee $100 Investigation Fee $100 Temporary License $100 Therapeutic Massage License Fee/investigation {Chapter 514) Enterprise License $250 Therapist License $100 Individual Investigation Fee $100 Partnership /Corporation {nvestigation Fee $350 • COMMUNITY CENTER 8~ RECREATION FEES r L ounds View Banquet and. Conference Center -Basic Services 'Class I: School District 621, Mounds View Scouts,'Lions and 4-H, Mounds View Area Athletic Associations (w/10% roster MV residents) Class II: .Mounds View Residents, Mounds View Religious Groups (w/Mounds View Address), Local Political Groups and Mounds View Non-Profits (w/Mounds View Address).:.. Class .III: Mounds View City Employees, Non-local School Districts, Non-local Non- profit Groups. Class iV: .All For-Profit Groups, Non-local Religious Groups, Non-resident individuals/private agencies, businesses/vendors, and Colleges and Universities. Banquet and Conference Center Rental Event Center 1/6 (Seats 50) Class I 1 hour: Exempt* 4 hour block over 1 hour: $15* Hourly over 1 or 4 hours: $10* Class II 1 hour: $15* 4 hour block over 1 hour: $50* Hourly over 1 or 4 hours: $15* Class III 1 hour: $20 4 hour block over 1 hour: $75 Hourly over 1 or 4 hours: $20 Class IV 1 hour: $25 4 hour black over 1 hour: $90 Hourly over 1 or 4 hours: $25 Event Center 1 /3 (Seats 100) Class I 1 hour: Exempt* 4 hour block over 1 hour: $25* Hourly over 1 or 4 hours: $15* Class II 1 hour: $25* 4 hour block over 1 hour: $75* Hourly over 1 or 4 hours: $25* r r Class III 1 hour: $35 4 hour block over 1 hour: $100 Hourly over 1 or 4 hours: $35 Full Event Center (Seats 400) Kitchen (To be used by Licensed Caterer Only) Class IV 1 hour: $42 4 hour black over 1 hour: $120 Hourly over 1 or 4 hours: $42 Class I 1 hour: Exempt* 4 hour block over 1 hour: $75* Hourly over 1 or 4 hours: $25* Class II 1 hour: $75* 4 hour block over 1 hour: $225* Hourly over 1 or 4 hours: $75* Class III 1 hour: $105 4 hour block over 1 hour: $300 Hourly over 1 or 4 hours: $105 Class IV 1 hour: $125 4 hour black over 1 hour: $360 Hourly over 1 or 4 hours: $125 Class I 1 hour: Exempt'` 4 hour block over 1 hour: $25* Hourly over 1 or 4 hours: $15* Class II 1 hour: $25* 4 hour block over 1 hour: $75* Hourly over 1 or 4 hours: $25* Class III 1 hour: $35 4 hour block over 1 hour: $100 Hourly over 1 or 4 hours: $35 Class IV 1 hour: $42 4 hour black over 1 hour: $120 Hourly over 1 or 4 hours: $42 ''Class I excludes set up services in Event Center or additional set-up in multi-purpose rooms and pvmnasium "'`For multi-purpose rooms and gymnasium rentals if fhe MVCC is not otherwise open, the permit holder will be charged an additional $15/hour for a staff fee Multi-Purpose Rooms A and B (Seating up to 10-20) Class I Hourly Rate (1 hr min.): $15 4-6 Hours: $50 Class II Hourly Rate (1 hr min.): $20 4-6 Hours: $75 Class III Hourly Rate (1 hr min.): $25 4-6 Hours: $90 Class IV Hourly Rate (1 hr min.): $30 4-6 Hours: $105 Multi-Purpose Room C and Youth Room (Seating up to 30-40) Class I Hourly Rate (1 hr min.): $35 6 -8 Hours: $200 Class II Hourly Rate (1 hr min.): $50 6-8 Hours: $270 Class III Hourly Rate (1 hr min.): $60 6-8 Hours: $320 Class IV Hourly Rate (1 hr min.}; $70 6-8 Hours: $370 ther Charges Overhead Projectors: $10/day N & VCR: $15/day Microphone (single): $15/day Microphone (multiple): $45/day Screen: $35fda Gym Renta{ Full Gym (Up to 4 hours -hourly rate) Class I: $30 Class II: $35 Class III: $40 Class IV: $50 Full Gym (Hourly Rate Exceeding 4 Hours) Class I: $60 Class II: $70 Class III: $80 Class IV: $90 Half Gym (Up to 4 Hours -hourly rate) Class I: $20 Class II: $25 Class III: $30 Class IV: $40 Half Gym (Hourly Rate Exceeding 4 hours) Class I: $40 Class If: $50 Class III: $60 Class IV: $70 ounds View Athletic Fields Fees Based Upon an Individual Event/Game/Practice. Reservations for Classes ll, lll, IV will begin on March 1St. Field Reservations maybe limited depending upon the number of teams and fields available. The MV YMCA & Parks Maintenance Staff will set a seasonal field use policy to determine fields available, appropriate age groups, dates, and times available and fields available. $100 per Field per Day Tournaments (If Field Maintenance is required during tournaments, an additional $30 per hour with atwo-hour minimum will be charged. Baseball & Softball Fields (Youth Only) Hillview Class I: 1 time block free per/wk Groveland $5 per add'I time block Oakwood Class !I: $5 per time block Greenfield Class III: $10 per time block City Hall Class IV: Not applicable i Softball Fields (Adults or Youth) Class I: 1 time block free per/wk City Hall $5 per add'I time block Silverview Class II: $5 per time block Class II I: $15 per time block Class IV: $30 per time bock Soccer Fields (Youth Only) Class I: 1 time block free per/wk Silverview $5 per add'I time block Groveland Class 11: $5 per time block Oakwood Class III: $10 per time block Class IV : Not Applicable Lighting Fee for Softball Fields Class I: $20 per time block Class I I: $30 per time block Class III: $40 per time block Class IV: $40 per time block Park Shelter Rental Class I (see appendix for Classifications) 4 hours: $15 Full day: $30 Cfass II $100 Refundable Damage Deposit 4 hours: $30 Required Fulf day: $60 $50 Service Fee will be Charged to Cfass III Groups of 50 or more 4 hours: $45 Full day: $90 Class IV 4 hours: $60 Full day: $120 Silverview and City Hall Picnic Shelters Class I 4 hours: $30 Full Day: $60 $100 Refundable Damage Deposit Required Cfass 11 4 hours: $45 0 Service Fee will be Charged to Full day: $90 Groups of 50 or more Class III 4 hours: $60 Full day: $120 Class IV 4 hours: $75 Full daY: $150 WATER, SEWER, STREET AND OTHER FEES Late Payment 10°l0 of bill Load Limits Permit Fee $25/entryitruck Right of Way Permit Fees Yearly Registration Fee: $25.00 Excavation Permit Fee: $125.00 Obstruction Permit Fee: $50.00 Permit Extension: $25.00 ROW Security Fee: Subject to the Discretion of the Public Works Director. Excavating, grading, filling $20, plus $4 per 1,000 square feet or fraction thereof, plus $.50 surcharge (*Applicant may be responsible for any City engineering costs) Sewer .Fees Availability Charge (SAC) $1,675 (effective 1/1/ 07per Metropolitan Council Environmental Services - MCES). Sewer Charge Service Charge per Residential Equivalent Residential Rates Connection $21.58 per Quarter plus Usage Rate Based on Metered Water Usage $1.72 per 1,000 gallons Commercial, Industrial, Pubic Service charge per residential equivalent Buildings, and Church Rates connection $47 per quarter Sewer Connection/Repair Permit $25 (no surcharge) Unit Charge $100 per new structure Service Restoration $75 between 7:00 a.m. and 3:30 p.m., M- F;$100 between 3:30-5:30 p.m., M-F; No restoration after 5:30 p.m. or on weekends or holidays. Shut-Off and Curb Stop cost plus 10% for handling plus safes tax i Street Light Utiility -User Fees (Chapter 904) Residential (includes single family homes, duplexes, four- plexes, condominium and town homes) $3.25 per unit per quarter Commercial/industrial $16.25 per acre per quarter Institutional/Charitable $16.25 per acre per quarter Apartments $14.37 per acre per quarter Street Opening Permit $125 permit fee plus $1000 Security Fee • • Storm Water Mar+agement (SWM) (Chapter 908) -New Construction R-1 $202 per lot R-2 989 per acre R-3, R-4, R-0 $1,429 per acre B-1, B-2, B-3, B-4 $1,429 per acre I-1, PUD $1,996 per acre '`Storm Water Management -Utility Fees R1, R2 Single & Two Family Residential $7.50 per quarter per unit R-3 Medium Density Residential $40.99 per quarter R-4, R-5, RO High Density Residential Mobile Homes and Residential Office $49.72 per quarter/acre B-1, B-2, B-3, B-4 Neighborhood Business Limited Business, Highway Business, Regional Business $63.78 per quarter/acre I-1 Industrial $49.72 per quarter/acre PUD Planned Unit Development $56.39per quarter/acre CRP Conservancy, Recreation and Presentation $6.94 per quarter School/Church, Public, Private $22.89 per quarter Water Availability Charge (WAC) Residential $400/unit Commercial/Industrial $1,000/acre of developable area (minimum $1,000) Water Charge $1.50 per 1,000 gallons Tapping (water or sewer) City does not perform this service • Water Connection/Repair Permit Inspection . An after hours inspection of a water and/or sewer connection or repair will be charged as a callout. A callout is defined as a minimum of two hours pay at one and one- half (1 '/2) times the employee's base pay rate. Service less than 4 inches $30 (no surcharge) Service 4 inches or greater $50 (no surcharge) Water Disconnect or Reconnect $25 Water Hydrant Fees Deposit $1, 000 Water used from hydrant: $1.50 per 1,000 gallons Meter Deposit, 2- 3": $500 5/8" Meter Deposit: $100 Wrench Deposit: $100 Hose Deposit: $100 per hose Adapters: $100 deposit Water Meter $90 cost plus sales tax Meter Testing (Chapter 906) $50 (Free if meter is faulty) MIU Telephone Remote Reading Device $105 cost plus sales tax MXU Radio Remote Reading Device $110 cost plus sales tax Water Quality Testing Charge $1.43 per quarter (MNC -per connection) Water Service Line Repair Fee $4.Q0 per quarter Utility Bill Assessment Search $10 i r L •