Loading...
HomeMy WebLinkAboutAgenda Packets - 2013/05/28CITY OF MOUNDS VIEW CITY COUNCIL MEETING AGENDA MOUNDS VIEW CITY HALL TUESDAY, May 28, 2013 7:00 p.m. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL: Flaherty, Gunn, Hull, Meehlhause, Mueller 5. PUBLIC INPUT: Citizens may speak to issues not on tonight's agenda. Before speaking, please give your full name and address for the minutes. Also, please limit your comments to three minutes. 6. SPECIAL ORDER OF BUSINESS A. Presentation of the Spring Lake Park, Blaine, Mounds View Fire Department Audit by Chief Nyle Zikmund t��i�1�1►L9t�1�bi lL1 1��1 A. 7:05pm Public Hearing, Resolution 8106, Consideration of a Conditional Use Permit for an Oversize Garage at 8478 Long Lake Road B. 7:05pm Public Hearing, Introduction and First Reading of Ordinance 879, Amending Title 1100 of the Mounds View Zoning Code to Add Regulations for Cargo Containers C. Continued Public Hearing, Resolution 8093, a Resolution to Consider Approval of an On -Sale Intoxicating Liquor License for Moe's located at 2400 County Highway 10 D. Continued Public Hearing, Resolution 8096, a Resolution to Consider Approval of an Off -Sale Intoxicating Liquor License for ABC Liquor, located at 2840 County Highway 10 E. Resolution 8107 Supporting Council Member Carol Mueller's Application to Serve on the League of MN Cities Board of Directors F. Resolution 8108, Authorizing Stantec Consulting Services Inc. to Perform Professional Engineering Design Services and Prepare Bidding Documents for Area G of the Street and Utility Improvement Program 8. CONSENT AGENDA 9. JUST AND CORRECT CLAIMS 10. APPROVAL OF MINUTES A. April 8, 2013, City Council Minutes 11. REPORTS A. Reports of Mayor and Council B. Reports of Staff 1. Public Works Quarterly Report C. Reports of City Attorney City Council Agenda Tuesday, May 28, 2013 Page 2 12. Next Council Work Session: Next Council Meeting: 13. ADJOURNMENT Monday, June 3, 2013, at 7pm Monday, June 10, 2013, at 7pm of Mounds View Staff Item No: 7A Meeting Date: May 28, 2013 Type of Business: Public Hearing Administrator Review: c;'/VY To: Honorable Mayor and City Council From: Heidi Heller, Planning Associate Item Title/Subject: Public Hearing - Consideration of a Conditional Use Permit for an Oversized Garage at 8478 Long Lake Road; Planning Case CU2013-003 Introduction: The applicant, Allen Hambleton, is requesting approval of a conditional use permit to construct an oversize detached garage on his property at 8478 Long Lake Road. The applicant wants to build a new 22'x56' detached garage (1,232 square feet) behind the existing detached garage. The applicant has submitted plans for a garage larger than what the City Code allows without a planning action. The City limits the size of accessory buildings, whether attached or detached from the house, to a maximum of 952 square feet. Any building larger than 952 square feet must get City approval of a conditional use permit. The garage the applicant is proposing would be 1,232 square feet. The applicant indicates that he wants the extra space to store trailers, snowmobiles, ATV's and a boat, among other things, and then be able to use the existing garage to park his vehicles. He plans to add a driveway leading to the new garage that connects to his current driveway. Requirements: Section 1106.03, Subd. 1: This part of the Code limits the height of an accessory building, the number of accessory buildings, the backyard coverage ratio of accessory buildings and specifies roof style and pitch. A Conditional Use Permit (CUP) is required for garages exceeding 952 square feet. Section 1106.04, Subd. 6: This part of the Code enumerates the conditions for garages exceeding 952 square feet. The garage must be permanent, be uniform in appearance with the home, not exceed 35 feet in width, and not exceed 1,800 square feet of total accessory building area on the lot. Section 1125.01, Subd. 1: The Planning Commission is required to review the possible adverse effects of the requested conditional use. Discussion: The request for a Conditional Use Permit to construct the 1,232 square foot garage satisfies the requirements as stated in Section 1106.03 and 1106.04, Subdivision 6 of the Mounds View Zoning Code. The proposed garage would meet all City setback, height and accessory building coverage requirements. The City Code limits backyard building coverage to 20% of the yard area and this garage would use approximately 8% of the backyard area. The total accessory building square feet with the existing garage and the new garage would be 1,783 square feet which is below the maximum of 1,800 square feet limit. 8478 Long Lake Road CUP Request May 28, 2013 Page 2 The City Code also specifies that the roof for all accessory buildings exceeding 250 square feet, shall match or be similar to the character and style of the roof of the principal structure, and have a pitch or slope of at least 2-12, but no steeper than 12-12. The proposed garage has a 4-12 pitch which does not match the very steep pitch of the house, but is similar to the pitch of the existing detached garage. Over the last several years, one of the conditions for oversize garages has typically been that the garage have a uniform appearance with the house. The Planning Commission discussed this condition and agreed that if the proposed garage had matching shingle and siding colors to the existing house and garage, the metal siding would be acceptable since the garage would not be very visible from the street. CUP Considerations: Chapter 1125 of the Zoning Code requires that the Planning Commission review and address any potential adverse effects of a conditional use that include, but are not limited to, the relationship with the Comprehensive Plan, geographical area involved, potential depreciation, the character of the surrounding area and the demonstrated need for such a use. Staff has addressed each of these potential adverse effects below. Relationship with the Comprehensive Plan. The Comprehensive Plan designates this property as low-density residential, as well as the surrounding area. The Comp Plan encourages the development and maintenance of residential areas to improve the quality, appearance and attractiveness of housing units and residential property in general. With this project, the applicant would be creating more garage space to have more indoor storage for his recreational vehicles. Such additional storage would be a benefit to the property and to the neighborhood. The Geographical Area Involved. The applicant's home is located on Long Lake Road along the north border of the City. There are no homes across the street from the applicant in this area. Depreciation. The proposed garage would benefit the subject property both in a practical sense by providing additional on site, indoor parking and storage, as well as in an economic sense, as the addition would increase the "value" of the property. Increased property values are a benefit to everyone. The Character of the Surrounding Area. The applicant's neighborhood is entirely single-family residential. The homes in this area are a variety of styles, ages and lot sizes. The new garage would be in the backyard, behind the existing 2 -car garage. It would not be obvious from the street but would be visible to the adjacent backyard neighbors. This is a larger property at 100 feet wide and 260 feet deep (0.59 acres), so the oversize garage will only use about 8% of the backyard area. The Demonstrated Need for Such a Use. The applicant is proposing a 1,232 square foot garage that would allow for parking his recreational vehicles and boat inside plus additional storage space, and then be able to use the existing garage to park his daily driving vehicles. 8478 Long Lake Road CUP Request May 28, 2013 Page 3 Planning Commission Action: The Planning Commission reviewed this request on May 15, 2013 and voted 5-0 (Carvelli-Yu and Love absent) to recommend approval with additional conditions. The Commission added that the applicant should install a minimum 6 -foot tall privacy fence along the west side of the backyard and a driveway from the existing driveway to the new garage. Public Comments: Staff has received two phone calls from residents who are immediately adjacent to the applicant's backyard. Both callers indicated they were not in favor of the garage and had almost the same comments: they don't want changes to the neighborhood, they don't like the stuff the applicant has in the yard (trailers and extra window, etc), they don't understand why he needs more than the garage he already has, they don't want to look at a barn, they like the wooded areas, and don't want to lose the use of their backyards. One of the residents indicated they would be attending the City Council meeting. Recommendation: Hold the Public Hearing, then after taking testimony from staff, the applicant and affected neighbors, the Council may take one of the following actions below related to the request. Staff recommends approval of this conditional use permit. 1. Approve the CUP as requested. Staff has prepared Resolution 8106 that approves the conditional use permit if the Council chooses this action. 2. Choose to deny the conditional use permit. If the Council chooses this option, Staff would need direction from the City Council to prepare a resolution of denial with findings of fact to support the denial. 3. Table the request. If the City Council needs more information before making a decision or if they decide that there is need for more discussion, the Council can simply move to table the request until such information has been provided. Because of 60 -day requirements, the Council would need to act upon the request as soon as reasonably possible to avoid an inadvertent approval. Respectfully submitted, Q,Hd&4--� Heidi Heller Planning Associate Attachments: 1. Zoning Map 2. Aerial View 3. Site Plan 4.Photos 5. Resolution 8106 Zoning Map -NORTH— COUNTY 8491� 8494 8471 0 8305 8291 8281 - 8271 8310 8485 8321 8290 8474 82900 8280 8285 8273 8325 8280 8270 Z 8346 8475 846 8460 8261 ronty 8251 . Koa 8250 12265 8255 8250 8240 n N 8465 8451 It N 8456 ct g 8441 8300 8255 8455 8444 8443 8431 8260 a 8435 8425 N 8434 N 8250 O 8425 8415 8420 8415 8401 8406 8405 8369 8400 8379 8379 8380 8373 8365 8372 8367 8355 8368 ¢ 8359 8364 8345 8345 8340 8331 8335 8325 8312 8315 8315 8300 8303 8305 8290 8295 8285 8280 8287 8275 8270 0 8281 8265 8260 w 827' 8255 8250 8267 n rn F8240 8261 0 h nh, A1FF Y4849 L E doo a 8484 847 8474 1 8464 8465 84441-1 8445 84341 18433 8424 8414 8425 8404 8415 8390 8405 8384 8395 8370 8385 8360 8375 83501 18355 83401 18.345 8325 8315 f— 8475 8466 8467 8450 8465 8444 8453 8432 8441 8428 8429 8408 8415 _395 8380 8381 8370 8379 8360 8350 8375 8340 8371 8330 8357 8320 8318 8323 8310 0 8305 8291 8281 - 8271 8310 0 O rn tdJ 8321 8290 M 82900 8280 8285 8273 8325 8280 8270 Z 8346 -- 882270 8260 8261 ronty 8251 . Koa 8250 12265 8255 8250 8240 n N too to N � i M It N d. N 8241 ---T``m 8231 Tm g 101 8464 8454 8444 8424 8400 8390 8380 8376 8372 8340 8320 8300 8290 8280 8250 8250 8425 �� 8415 8408 8405 8400 8395 8388 8385 8384 8375 8378 8365 8372 O 8325 8360 8321 8346 0 8315 8340 8305 8330 8295 8310 Y 8273 g 8267 8300 8255 8280 8260 a z i N N N 8250 O * Properties not indicated with a designation are 7-oned R-1, Single Family Residential { . / P> i \ a R , . ƒ i � / P> i \ a R , Example of Proposed Garage Style aj JI) � � '` . t S`' � � MSR _ t� s i � � �� gg �,� �: t, t'�f � � ' ��' � % i i t /' P ��� � �� ti '� t f� ' � � �' t "" ��'^a3 r '� �} �� � t r iN 1 C i � ! - �� �I� J � 3fi a. .osc - � `���"� ��i _ _ y '' P f ,�—t �-z t" a ^,tia` �' RESOLUTION 8106 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION APPROVING A CONDITIONAL USE PERMIT TO ALLOW FOR A 1,232 SQUARE -FOOT GARAGE AT 8478 LONG LAKE ROAD; PLANNING CASE CU2013-003 WHEREAS, property owner Allen Hambleton has applied for a conditional use permit to construct a 1,232 square foot garage; and, WHEREAS, the subject property, located at 8478 Long Lake Road, is zoned R-1, Single Family Residential, and is legally described as follows: Lot 1, Block 1, Balk's Addition, Ramsey County, Minnesota PIN: 06-30-23-12-0124 WHEREAS, the Mounds View Zoning Code conditionally allows garages in excess of 952 square feet in area with a maximum accessory building area not to exceed 1,800 square feet; and, WHEREAS, the proposed garage would be 1,232 square feet, thus requiring City approval of a conditional use permit; and, WHEREAS, the Planning Commission has reviewed the following documents regarding this proposal: 1. Zoning Map 2. Aerial View 3. Site plan 4. Photographic documentation 5. Staff Report NOW, THEREFORE, BE IT RESOLVED that the Mounds View Planning Commission makes the following findings of fact related to the conditional use permit request: 1. The proposed oversized 1,232 square foot garage satisfies the zoning requirements as outlined in Chapters 1104 and 1106 the Zoning Code. 2. The request is consistent with the Mounds View Comprehensive Plan in that the Comprehensive Plan encourages the development and maintenance of residential areas to improve the quality, appearance and attractiveness of housing units and residential property in general. 3. The proposed garage would not be out of place given the character and geography of the surrounding area involved. 4. The proposed garage would not depreciate the neighborhood. 5. The applicant has sufficiently demonstrated that a need exists for the proposed oversized garage. Resolution 8106 Page 2 NOW, THEREFORE, BE IT FURTHER RESOLVED that the Mounds View Planning Commission recommends approval of the conditional use permit for the 1,232 square foot garage, with conditions as follows: 1. The garage shall not be used for commercial purposes, living space or other uses not allowed within the R-1 Single -Family Residential district or by the Zoning Code. Should the use change for which the permit was granted; the conditional use permit shall be considered null and void. 2. The new garage shall have the same roof and siding colors as the existing house and garage, and shall have a similar roof pitch to the existing garage. 3. A minimum of a 6 foot tall privacy fence must be installed and maintained along the west property line in order to screen the garage from the view of the adjacent neighbors. The fence must be installed within 6 months of the final garage inspection date, and must remain in place as long as the second garage exists. 4. A driveway that accesses the new oversize garage and connects to the existing driveway must be installed within 6 months of the final garage inspection date. NOW THEREFORE, BE IT FINALLY RESOLVED that The Conditional Use Permit (CUP) shall become null and void if the work for which the CUP was granted is not completed within one year from the date of approval unless a petition for extension of time in which to complete the work has been granted by the City Council. Adopted this 28th day of May, 2013. Joe Flaherty, Mayor ATTEST: James Ericson, City Administrator (SEAL) MOUNDS VIEW City of Mounds View Staff Report Item No: 7B Meeting Date: May 28, 2013 Type of Business: Public eariqg Administrator Review: To: Honorable Mayor and City Council From: Heidi Heller, Planning Associate Item Title/Subject: Public Hearing — Introduction and First Reading of Ordinance 879, a Code Amendment for Regulating the Use of Cargo Containers; Special Planning Case SP -186-13 Discussion: At the January 2, 2013 Planning Commission meeting, the Commission discussed the use of cargo containers in the City, and agreed with staff that shipping containers are not appropriate as a permanent use in residential districts, but felt that there are situations where these, or other types of portable storage containers (such as PODS), could be allowed temporarily. The Commission supported allowing the containers for short periods of time, but not for permanent use, and also recommended not allowing the existing cargo containers in the City to remain as non -conforming. Staff reviewed this code amendment with the City Council at the March 4, 2013 Worksession, and the Council was supportive of moving forward with this amendment. The Planning Commission continued to review proposed language for a code amendment to add regulations for cargo containers in the City, and has now passed Resolution 978-13 with their recommended language for the Zoning Code. This amendment would not allow cargo containers permanently in any residential districts, but would allow them temporarily (up to 6 months) for residents. The amendment also gives some general regulations for when they are used temporarily, along with requiring any existing cargo containers in the City to be removed within 6 months of the ordinance going into effect. Recommendation: Hold the Public Hearing for the Introduction and First Reading of Ordinance 879, a code amendment adding regulations to the Mounds View Zoning Code for cargo containers. Respectfully submitted. Heidi Heller Planning Associate Attachments: 1. Ordinance 879 ORDINANCE NO. 879 AN ORDINANCE AMENDING CITY CODE TITLE 1100 REGULATING THE USE OF CARGO CONTAINERS IN THE CITY The City of Mounds View ordains: SECTION 1. The City Council of the City of Mounds View hereby amends Chapter 1100, Section 1102.02 of the Mounds View City Code pertaining to "Cargo Containers." 1102.02 Definitions: Subd. 14. CARGO CONTAINER: An article of transport equipment which falls into any of the following categories: a. Originally, specifically or formerly designed for or used in the parking, shipping_ movement transportation or storage of freight articles, goods or commodities and/or, b. Designed for or capable of being (1) mounted or moved on a rail car, or (2) mounted on a chassis or bogie for movement by a truck trailer, or (3) loaded on to a ship: and/or, c. A prefabricated metal structure designed for use as an individual shipping container or a metal structure designed and built for use as an enclosed truck trailer. Subd. 97. PERMANENT: Means a period of time that exceeds six (6) months. Subd.121.TEMPORARY: Means a period of time that does not exceed six (6) months. SECTION 2. The City Council of the City of Mounds View hereby amends Chapter 1103 of the Mounds View City Code pertaining to "General Building Requirements." CHAPTER 1103 GENERAL BUILDING REQUIREMENTS SECTION: 1103.01: Purpose 1103.02: Dwelling Unit Restrictions 1103.03: Platted and Unplatted Property 1103.04: Solar Energy Systems and Structures 1103.05: Wind Generator Systems Ordinance 879 Page 2 1103.06: Accessory Buildings, Uses and Equipment 1103.07: Drainage 1103.08: Fencing, Screening and Landscaping 1103.09: Glare 1103.10: Smoke, Dust and Odors 1103.11: Noise 1103.12: Refuse 1103.13: Storage of Equipment and Materials 1103.14: Liquid or Solid Wastes 1103.15: Toxic or Noxious Matter 1103.16: Explosives 1103.17: Underground Storage Tanks 1103.18: Satellite Dish Antennas 1103.19: Cargo Containers SECTION 3. The City Council of the City of Mounds View hereby amends Chapter 1103 of the Mounds View City Code pertaining to "Cargo Containers." Subd. 1. Permitted Locations and Prohibitions: a. Carqo containers may not be placed stored or used permanently on property zoned for residential use. b. Cargo containers may be placed stored or used for temporary storage on property zoned for residential use Each residential property may use only one carpo container at a time. Subd 2 The following standards shall apply to all cargo containers: a. Cargo Containers shall not be stacked on one another. b. Cargo containers shall not be used for human habitation or commercial purposes and shall not be provided with refrigeration heating, electricity or plumbing. c. Refuse and debris shall not be stored in against on or, under the cargo container. d. The cargo container may not occupy any required off-street parking spaces or loading/unloading areas or fire lanes in any district e. The cargo container shall not block obstruct or reduce in any manner any required exits windows vent shafts parking spaces and/or access driveways Ordinance 879 Page 3 f. The cargo container shall be placed on an asphalt or concrete surface and be located a minimum of fifteen (15) feet from the edge of the street. g. The cargo container shall be structurally sound stable and in good repair. Any cargo container that becomes unsound unstable or otherwise dangerous shall condition in violation of this section. After notice to the propertV owner, any carpo container stored or kept in such a manner deemed a dangerous condition and a public nuisance as determined by the City may be immediately removed by the City. Any cost or expense associated with the removal shall be the responsibility of the property owner where the cargo container is located. Subd 3 Current Violations — Time to Complv Cargo containers located on residential Property prior to the effective date of this ordinance are considered illegal. All property owners within the City shall have 6 months from the effective date of this ordinance to bring the properties which currently contain carpo containers or accessory storage structures that are in violation of the terms of this Chapter, into full compliance with the provisions of this Chapter. SECTION 4. The City Council of the City of Mounds View hereby amends Chapter 1103 of the Mounds View City Code pertaining to "Accessory Uses." 1106.03: ACCESSORY USES: The following are permitted accessory uses in an R-1 District: Subd. 1. Accessory Buildings A building ori iq Wally constructed for use as an accessory building for the storage of materials and egupment accessary to a primary use located on the rp operty Accessory buildings, which for these purposes shall include garages, tool houses, carports, sheds and similar buildings for storage of domestic supply and noncommercial recreational equipment, whether attached or detached. SECTION 5. In accordance with Section 3.07 of the City Charter, City staff shall have the following summary printed in the official City newspaper in lieu of the complete ordinance: On June 10, 2013, the City Council adopted Ordinance 879 that amendsTitle 1100, Chapters 514 and 1106 of the Mounds View Municipal Code. These amendments will allow massage therapy to be allowed as a home occupation. A printed copy of the ordinance is available for inspection during regular business hours at Mounds View City Hall and is available on line at the City's web site located at www.ci.mounds-view.mn.us. Ordinance 879 Page 4 SECTION 5. This ordinance takes effect 30 days after its publication in the official City newspaper. PUBLIC HEARING, INTRODUCTION AND FIRST READING by the Mounds View City Council this 28th day of May, 2013. SECOND READING AND ADOPTION by the Mounds View City Council this 10th day of June, 2013. PUBLICATION DATE: June 20, 2013 Joe Flaherty, Mayor ATTEST: James Ericson, City Administrator (seal) MOUNDS VIEW City of Mounds View Staff Report Item No: 07C Meeting Date: May 28, 2013 Type of Business: Be� Administrator Review: v" To: Honorable Mayor and City Council From: Desaree Crane, Assistant City Administrator Item Title/Subject: Continued Public Hearing, Resolution 8093, a Resolution to Consider an On Sale Intoxicating Liquor License for Moe's, located at 2400 County Highway 10 Background: In accordance with Chapter 502 of the Mounds View City Code, a public hearing is required for all liquor license renewals. Moe's Liquor License will expire on June 30, 2013. Moe's has not submitted the city liquor license application materials and the applicable fees. Application materials and fees were originally due to the City on May 8, 2013. Staff received a phone call from the owner before the May 13th City Council Meeting requesting an extension to the May 8th deadline. The owner indicated to Staff that liquor license materials and fees would be submitted to the City no later than Friday, May 17, 2013. At the May 13, 2013, City Council Meeting, the City Council postponed the liquor license approval to May 28th, to allow the owner additional time to submit the necessary application materials and fees. Discussion: On May 23, 2013, Staff received another phone call from the owner requesting another extension. Staff indicated to the owner that if the City does not receive the required fees and application materials by Friday, June 7, 2013, then the liquor license will expire. If approval is not made by the City Council at next City Council Meeting on June 10, 2013, then the license cannot be processed by the City and approved by the Minnesota Department of Safety before the June 30, 2013, expiration date. Recommendation: Staff recommends postponing this item to the next City Council Meeting on June 10, 2013. Respectfully submitted, /� i, lw�,P,� 66u Desaree Crane Assistant City Administrator MOUNDS u'iVIEw City of Mounds View staff Report Item No: 07D Meeting Date: May 28 2013 Type of Business CB Administrator RevievY VTL� To: Honorable Mayor and City Council From: Desaree Crane, Assistant City Administrator Item Title/Subject: Continued Public Hearing, Resolution 8096, a Resolution to Consider an Off -Sale Intoxicating Liquor License Renewal for ABC Liquor, located at 2840 County Highway 10 Introduction: In accordance with Chapter 502 of the Mounds View City Code, a public hearing is required for all liquor license renewals. This public hearing was originally scheduled on May 13th, but the public hearing needed to be continued to this meeting because Staff did not receive liquor license application materials before the May 8th deadline. Staff received all required liquor application materials and fees on the afternoon of May 22nd. The owner was notified that the public hearing was postponed to this meeting. ABC Liquor's Off -Sale Intoxicating Liquor License will expire June 30, 2013. Discussion: The notice of this public hearing was sent out to residences within a 350 feet radius, and the Notice of Public Hearing was published in the City's official newspaper. Propertytaxes are current on this property. ABC Liquor has submitted their city liquor license application materials and the applicable fees. The following investigations and inspections have been conducted to determine whether there is cause for the City to deny the above referenced intoxicating liquor license application: Police Inquiry and Investigations (Mounds View Police Department) The Mounds View Police Department is currently planning a compliance check operation before the expiration of this license. Staff recommends this license renewal be contingent on a satisfactory report from the Mounds View Police Department. Staff has submitted a criminal background check to the Minnesota Bureau of Criminal Apprehension, and has not received the criminal background check. This liquor license renewal will be contingent on a satisfactory background check. Utility Billing Inquiry (City of Mounds View) The Finance Department has issued a satisfactory report for ABC Liquor. Item 07D TUESDAY, May 28, 2013 City Council Meeting Page 2 Fire Inspection (City of Mounds View Fire Marshal) The City's Fire Marshal has not inspected this facility. This liquor license renewal will be contingent on a satisfactory fire inspection. Recommendation: Staff recommends approval of this business license contingent on a satisfactory report from the Mounds View Police Department, satisfactory criminal background check, and a satisfactory fire inspection. If this renewal is approved, the time period of this license will be July 1, 2013 to June 30, 2014. Respectfully submitted, Desaree Crane Assistant City Administrator RESOLUTION 8096 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION APPROVING AN OFF -SALE INTOXICATING LIQUOR LICENSE FOR ABC LIQUOR LOCATED AT 2840 COUNTY HIGHWAY 10 WHEREAS, ABC Liquor' Intoxicating Liquor License expires June 30, 2013; and WHEREAS, all City of Mounds View business licenses must be approved by the City Council; and WHEREAS, Staff recommends approval of ABC Liquor's Off -Sale Intoxicating Liquor License for the period of July 1, 2013 to June 30, 2014, contingent on a satisfactory report from the Mounds View Police Department, satisfactory criminal background check, and a satisfactory fire inspection. NOW, THEREFORE, BE IT RESOLVED that the Mounds View City Council does hereby approve an Off -Sale Intoxicating Liquor License for ABC Liquor for the period of July 1, 2013 to June 30, 2014, contingent on a satisfactory report from the Mounds View Police Department, satisfactory criminal background check, and a satisfactory fire inspection. Adopted this 28th day of May, 2013. Joe Flaherty, Mayor ATTEST: James Ericson, City Administrator (seal) Item No: 07E MOUNDS t fE—W yp Meeting Date: May Council Bu 2013 �/1LYY T e of Business: Council Business Administrator Review: City of Mounds View Staff Report To: Honorable Mayor and City Council From: James Ericson, City Administrator Item Title/Subject: Resolution 8107 Supporting Council Member carol Muller's Application to Serve on the League of Minnesota Cities Board of Directors Introduction: The League of Minnesota Cities, founded in 1913, is a membership organization dedicated to promoting excellence in local government. The League serves its more than 800 member cities through advocacy, education and training, policy development, risk management, and other services. The League Board is made up of elected and appointed member city officials. Board members have set expectations for collective and individual Board service through the League's Governance Handbook. Members and officers are elected at the League's Annual Conference based on a slate of candidates recommended by a Nominating Committee. Discussion: Council Member Carol Mueller has submitted an application to serve on the League Board. Applications submitted by elected officials are often accompanied by letters of recommendation and resolutions by the governing body in support of the application. Serving on the LMC Board of Directors is both an honor and responsibility. One of the League's strengths has always been its broad and diverse membership. The ability to serve members' needs and exhibit leadership by anticipating and proactively addressing city challenges hinges on a Board of Directors that is representative, responsible, strategic, and visionary. These same characteristics can be said to describe Council Member Mueller. Recommendation: The Mounds View City Council hereby recognizes and appreciates the contributions made by Council Member Carol Mueller and wholeheartedly supports her efforts to serve on the League of Minnesota Cities Board of Directors by approving attached Resolution 8107. Respectfully submitted, J James Ericson City Administrator RESOLUTION NO. 8107 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION SUPPORTING THE APPLICATION OF COUNCIL MEMBER CAROL MUELLER TO SERVE ON THE LEAGUE OF MINNESOTA CITIES BOARD OF DIRECTORS WHEREAS, the League of MN Cities represents the City of Mounds View and more than 800 other member municipalities across the state of Minnesota; and, WHEREAS, the League is governed by a Board of appointed and elected officials from its member municipalities; and, WHEREAS, the League will be appointing new members to the Board at its annual meeting in June; and, WHEREAS, candidates selected to serve on the Board should be representative, responsible, strategic, and visionary; and, WHEREAS, Council Member Carol Mueller has submitted an application to serve on the League Board; and, WHEREAS, in consideration of her years of dedicated volunteer and elected service to community, Council Member Mueller would be an ideal candidate to serve on the League Board in representation of Mounds View and all cities throughout the state of Minnesota. NOW, THEREFORE BE IT RESOLVED THAT the Mounds View City Council endorses, supports and approves Council Member Mueller's efforts to serve on the League of MN Board of Directors and recommends a copy of this resolution be forwarded to the Nominating Committee for their due consideration Adopted this 28th day of May, 2013. Joe Flaherty, Mayor ATTEST: James Ericson, City Administrator (seal) Item No: 7F Meeting Date: May 28 2013 MOT T* D j fE pT Type of Business: Council Busi ss UI S v 1.�Y AdministratorReview:, City of Mounds View Staff Report NEENt- To: Honorable Mayor and City Council From: Nick DeBar, Public Works Director Item Title/Subject: Resolution 8108, Authorizing Stantec Consulting Services Inc. to Perform Professional Engineering Design Services and Prepare Bidding Documents for Area G of the Street and Utility Improvement Program Background: The City is in the process of reconstructing 26 miles of City -owned streets and associated underground utilities as part of the Streets and Utilities Improvement Program (Program). The Program includes design standards, a financing plan, a prioritization/implementation (staging) plan, and a communication plan for implementing reconstruction over a 9 -year period (2009-2018) with an estimated program cost of $28 million. The next project area scheduled for construction next year is Area G (see attached Program map). Area G contains 1.8 miles of streets and is located in the north/northeast part of the city and includes Ardan Avenue (Red Oak to Long Lake Road), Sunnyside Road and Greenwood Drive (Ardan to Long Lake Road), and Eastwood Road (Sherwood to Long Lake Road). The adjacent properties consist of entirely single-family housing and one church. Ardan Avenue is the only non- standard street in this area due to municipal state aid status and pedestrian/bicycle accommodations. Discussion: Public Works engineering staff has solicited a fee estimate proposal from Stantec for professional engineering services for Area G as follows: Design Fee $ 94,000 Bid Fee $ 6,000 Construction Fee $150,000 Total Project Fee $ 250,000 (13.9% of $1.8M estimated construction cost for Area G) Stantec's fee proposal is based upon a defined scope of work and schedule to accommodate construction in 2014. Stantec (formerly Bonestroo) has successfully performed all engineering services for the design, bid, and construction phases of the Program thus far. In 2011, for Area E, engineering staff solicited competitive fee proposals from another firm that acquired engineering staff from Stantec who were familiar with Mounds View projects and City expectations. However, Stantec's fee was $30,000+ less than their competitors were, and the City retained Stantec. Stantec maintains many of the same key personnel that have been integral with the street projects, including design engineers, stormwater engineers, land surveyors, and construction personnel. City engineering staff has developed good working relationships with Stantec personnel and have been extremely satisfied with their performance. In addition, Stantec's fees are typically below the Council authorized amounts including the most recent Area E fee which is currently tracking approximately $150,000 below the authorized amount. Compensation for Stantec will be on hourly basis plus reimbursable expenses with an estimated maximum fee of $94,000 for the design phase. If approved, staff anticipates that the Council will consider authorizing engineering services for the bid phase after bidding documents are complete and for the construction phase after public bids have been received. Res. 8108, Auth. Stantec to Perform Engr. Design and Prepare Bidding Documents for Area G Page 2 A geotechnical and environmental evaluation of subsurface conditions is customarily performed for any project with land disturbing activities. These evaluations provide recommendations to be incorporated into the engineering design of pavements, utilities, and infiltration basins. Public Works recommends authorizing up to $10,000 for this work. If authorized, City engineering staff will solicit fee proposals from qualified firm(s) and oversee the work. Discussion of a Combined Area G/H Project: The original schedule for reconstructing the 25.9 miles of streets included in the Program was to occur over 18 years. This schedule was revised to nine project areas (A-1) over ten years (including construction) which was the schedule adopted by the Council for the Program. This adopted schedule was modified when Area C (2.7 miles) was accelerated and included with Area B (1.4 miles). This decision was made since Area B was smaller in length and monies were available to fund the combined projects and construction could occur simultaneous on the two areas since they were located in different parts of the city. This 4.1 mile project was substantially completed in one summer. There has been some discussion about accelerating Area H (2.4 miles) with Area G (1.8 miles) due to their proximity to one another. A combined G/H project would be 4.2 miles in length — similar to the 4.1 mile B/C project. However, there are some different constraints from B/C that need to be considered into any decision for a combined G/H project. The following summarizes these constraints. 1. Unlike Areas B and C, Areas G & H are located adjacent to each other and separated by Red Oak Drive. A combined G/H project would disrupt the entire northern part of the city with construction focused in one location — with or without simultaneous work crews going. In addition, the block lengths (distance between intersecting roads) are much greater in G and H than B and C. Not having as many intersecting streets will reduce options for phasing and have a much greater impact on accessibility to properties by property owners. 2. There are many known drainage issues in Areas G & H but many unknowns in the best ways to address these issues. Public Works has received many calls over the years on the inadequacies of drainage and storm sewer capacity in Areas G & H. Trunk storm sewers exist in easements and located in side and back yards of residential parcels. This will result in removing fences, gardens, sheds, and anything else property owners have constructed over the trunk lines — resulting in much more coordination and time spent by Public Works compared to previous projects. 3. There may be some construction cost savings by combining two projects into one. Larger work quantities typically lower unit prices, however, this is noticeably less when the project is already big enough to warrant those lower unit prices. A 1.8 mile street and utility project is a large project by itself and will warrant lower unit prices. The total mobilization costs of two separate projects may exceed one combined project, but mobilization is commonly calculated as a percentage of total project construction costs. Therefore if unit prices are already negligible by the scope of a single project, the mobilization may also be negligible. 4. There may also be some engineering consulting cost savings by combining two projects into one. This savings primarily comes from eliminating the duplicating efforts in the public bidding process (e.g., only one plan/specification set is needed). However, the project bid phase is typically only between $5,000 and $10,000 compared to the total project engineering fees of $250,000 to $500,000. The vast majority of engineering costs for projects reside in the design and construction phases. The costs associated with these services are linear to time spent designing and overseeing construction. This time will not be drastically different if the same work is done in one project compared to two. 5. Public Works engineering staff time is heavily influenced by the street projects. Larger projects demand larger amounts of time coordinating with consultants and property owners. There has been no increase in city engineering staffing levels since the Program began and this additional demand has exceeded the work load that staff can reasonably handle. The Streets and Utilities Committee discussed and evaluated a combined Area G/H Project at their March 2013 meeting and unanimously recommended having separate construction projects for the two areas. Res. 8108, Auth. Stantec to Perform Engr. Design and Prepare Bidding Documents for Area G Page 3 Recommendation: Public Works and the Streets and Utilities Committee recommend constructing Area G and H as separate projects in different years. Staff further recommends that the City Council adopt the attached resolution authorizing Stantec to perform engineering design services and prepare bidding documents for Area G of the Street and Utility Improvement Program. Doing so will allow the project to stay on course for construction next year. Funding for these services have been budgeted for 2013 under TIF District #1 (Acct. 410-4650-7050) for $441,311. It should be noted that this budgeted amount included a combined Area G/H expenditure, however, a prorated portion (based on mileage) for Area G would equate to $189,133. Respectfully ubmitted, Nick DeBar - Public Works Director Attachments: • Resolution 8108 • Street & Utility Improvement Program Map RESOLUTION 8108 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA AUTHORIZING STANTEC CONSULTING SERVICES INC. TO PERFORM ENGINEERING DESIGN SERVICES AND PREPARE BIDDING DOCUMENTS FOR AREA G OF THE STREET AND UTILITY IMPROVEMENT PROGRAM WHEREAS, on October 22, 2007 the City Council adopted Resolution 7176 establishing the Street and Utility Improvement Program (Program), which includes nine Street and Utility Improvement Project areas identified as Areas A through I totaling 25.9 miles of streets; and WHEREAS, Areas A through F have been constructed or are under construction and total 17.4 miles of the Program; and WHEREAS, Area G of the Program is the next project area to be constructed and is programmed for a 2014 construction season; and WHEREAS, Stantec Consulting Services Inc. (formerly known as "Bonestroo") has provided professional engineering services for all projects completed in the Program to date on behalf of the City; and WHEREAS, Stantec Consulting Services Inc. has provided a fee proposal to perform engineering design services and prepare bidding documents for the Area G project, and Public Works engineering staff recommends Stantec to perform these services. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds View, Ramsey County, Minnesota as follows: 1. Stantec Consulting Services Inc. is authorized to perform engineering design services and prepare bidding documents for Area G of the Street and Utility Improvement Program (City Project No. 2013-002). Compensation will be on an hourly basis plus reimbursable expenses with an estimated maximum fee of $94,000. 2. The Director of Public Works is authorized and directed, for and on behalf of the City, to execute and enter into a professional services agreement with Stantec for said services. 3. The Director of Public Works is authorized and directed, for and on behalf of the City, to execute and enter into a professional services agreement with a qualified geotechnical engineering firm to perform geotechnical and environmental evaluation services for the Area G design phase for a maximum fee of $10,000. 4. Payment for the above said services shall be paid for from Account 410-4650-7050. Adopted this 28th day of May, 2013. Joe Flaherty, Mayor ATTEST: James Ericson, City Administrator (SEAL) H n B L A I N E V G Proposed STREET & Till UTILITY �I PROGRAM BLAI N E 0 Ty W N EW BRI G HTO N Possible Street Reconstruction Projects Miles/Rating Year Miles/Rating Year y_�,{} 3.0 / 27 2009 3.0 / 46 2013 Mi—M— E 1.4 / 42* "'8 2010 1.8 / 49+' 2014 PUBLIC WORKS 2.7/30 2010 2.4/47 ti 2015 2.3 / 43 2011 3.3 / 49 2016 STREET MAP 4.0 / 43 2012 ---- City Street Maintenance Other Than Total Reconstruction County or Private Streets ( This map for planning purposes only * Priority given to areas that were previously studied. Date: Sept. 25, 2007 ** Priority given to areas where trunk utilities are planned. Rev. July 21, 2010 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA APPROVING JUST AND CORRECT CLAIMS AGAINST CITY FUNDS WHEREAS, the City of Mounds View, pursuant to Minnesota Statute 412.141, has full authority over the financial affairs of the City and; WHEREAS, the City Council has reviewed the claim numbers: 17580 through 17589 in the amount of $ 55,926.32 132731 through 132790 in the amount of $ 153,962.54 TOTAL AMOUNT OF CLAIMS PRESENTED $ 209,888.86 And has found said claims to be just and correct; It was moved that the City Council of Mounds View hereby approve the attached list of claims dated 5/29/2013 by the vote ayes nays. L ("� Finance Director 5/14/2013 10:22 AM DIRECT PAYABLES CHECK REGISTER REGULAR CHECKS: 7 1Jr PAGE: 1 HANDWRITTEN CHECKS: PACKET: 01058 PYRL 05/16/13 - 8 0 0.00 DRAFTS: 0 0.00 VOID CHECKS: VENDOR SET: 01 City of Mounds View 0 0.00 CORRECTIONS: 0 0.00 BANK TOTALS: BANK: PYBNK Western Bank - CHECK CHECK CHECK CHECK VENDOR ------------------------------------------------------------------------------------------------------------------------------------ I.D. NAME TYPE DATE DISCOUNT AMOUNT NO# AMOUNT A3035 AFLAC 1-51020130516 RD103 AFLAC R 5/16/2013 156.10 017580 1-52020130516 RD103 AFLAC R 5/16/2013 9.97 017580 166.07 F6553 Assurant Employee Benefits 1-61020130516 #4041989-1 R 5/16/2013 738.06 017581 738.06 M6321 MN Benefit Association 1-60020130516 MNBF Ins R 5/16/2013 15.78 017582 15.78 M7152 MN Child Support Payment Center 1-99520130516 Case #0015244278 KIRK LEITCH R 5/16/2013 1,079.08 017583 1,079.08 P9250 Public Employees Retirement Ass I-00120130516 PERA 643400 R 5/16/2013 8,901.08 017584 I-00220130516 PERP 643400 R 5/16/2013 14,117.57 017584 I-01020130516 DCP 643400 R 5/16/2013 147.50 017584 23,166.15 *VOID* 017585 VOID CHECK V 5/16/2013 017585 **VOID** *VOID* 017586 VOID CHECK V 5/16/2013 017586 **VOID** 80896 MN Child Support Payment Ctr. 1-99820130516 Case #14080268 DARRELL MEYER R 5/16/2013 331.37 017587 331.37 54107 Secure Benefits Systems Corp. I-50020130516 Flex Medical R 5/16/2013 233.15 017588 I-50320130516 Flex Daycare R 5/16/2013 187.00 017588 420.15 ** B AN K TO T A L S ** NO# DISCOUNTS REGULAR CHECKS: 7 0.00 HANDWRITTEN CHECKS: 0 0.00 PRE -WRITE CHECKS: 0 0.00 DRAFTS: 0 0.00 VOID CHECKS: 2 0.00 NON CHECKS: 0 0.00 CORRECTIONS: 0 0.00 BANK TOTALS: 9 0.00 CHECK AMT TOTAL APPLIED 25,916.66 25,916.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25,916.66 25,916.66 5/22/2013 9:02 AM NOR DISCOUNTS DIRECT PAYABLES CHECK REGISTER TOTAL APPLIED REGULAR CHECKS: r PAGE: 1 PACKET: 01061 JUNE HEALTH INS -0 0.00 0.00 0.00 PRE -WRITE CHECKS: 0 VENDOR SET: 01 City of Mounds View DRAFTS: 0 0.00 0.00 0.00 VOID CHECKS: BANK: PYBNK Western Bank 0.00 NON CHECKS: 0 0.00 0.00 0.00 CORRECTIONS: - 0 0.00 0.00 CHECK CHECK 1 0.00 CHECK CHECK VENDOR -------------------------------------------------------------------------------------------------------------------------------- I.D. NAME TYPE DATE DISCOUNT AMOUNT NO# AMOUNT P7015 Preferred One I-131370382 Preferred One R 5/22/2013 9,722.53 017589 I-131370383 Preferred One R 5/22/2013 7,181.52 017589 I-131372139 Preferred One R 5/22/2013 2,333.36 017589 I-131372141 Preferred One R 5/22/2013 10,772.25 017589 30,009.66 •• B A N K T O T A L S *+ NOR DISCOUNTS CHECK AMT TOTAL APPLIED REGULAR CHECKS: 1 0.00 30,009.66 30,009.66 HANDWRITTEN CHECKS: -0 0.00 0.00 0.00 PRE -WRITE CHECKS: 0 0.00 0.00 0.00 DRAFTS: 0 0.00 0.00 0.00 VOID CHECKS: 0 0.00 0.00 0.00 NON CHECKS: 0 0.00 0.00 0.00 CORRECTIONS: - 0 0.00 0.00 0.00 BANK TOTALS: 1 0.00 30,009.66 30,009.66 05-23-2013 09:50 AM C O U N C I L R E P O R T �jj(CI PAGE: 1 DEPARTMENT FUND VENDOR NAME DATE DESCRIPTION AMOUNT NON -DEPARTMENTAL GENERAL FUND Dean Lykke 5/22/13 Refund Rental Conversion 275.00 KLM Engineering, Inc. 5/08/13 Sprint 4G Mods 3,000.00 TOTAL: 3,275.00 Advisory Commissions GENERAL FUND Timesaver Off Site Secretarial, Inc. 5/13/13 Planning Comm Mtg May 1 160.95 TOTAL: 160.95 City Administrator GENERAL FUND MN City/County Mgmt . Assn. 5/21/13 Membership 120.00 Sprint 5/18/13 City Administrator 58.99 TOTAL: 178.99 Finance GENERAL FUND MMKR & Co., P.A. 4/30/13 Final Billing 2012 Audit 2,853.00 TOTAL: -_--- 2,853-.00 Central Services GENERAL FUND Kennedy & Graven, Chartered 5/16/13 Telecommunications 322.00 5/16/13 Grill Employment Matters 140.00 5/16/13 Legal Claim:Brooke Bass 135.00 5/16/13 Administration 2,089.34 5/16/13 Finance Dept 36.00 5/16/13 PW 96.00 _ City of Roseville 5/02/13 IT Services May 3,897.41 5/02/13 Monthly Phone Bill May 491.40 S & T Office Products, Inc. 5/06/13 PW Office Supplies 38.82 5/07/13 Office Supplies 37.40 5/09/13 PD And CH Office Supplies 392.45 5/09/13 Office Supplies 216.19 5/17/13 CH Office Supplies 70.38 Sun Newspapers 5/16/13 Long Lake Road 38.94 5/19/13 Ordinance 879 54.50 TOTAL: 8,055.B3 Community Development GENERAL FUND Sprint 5/18/13 Code Card 39.99 Verizon Wireless 5/10/13 Code Enforcement 40.01 5/10/13 Comm. Development 65.96 TOTAL: 145.96 Police GENERAL FUND Aspen Mills 4/30/13 Navy Pants L. Meyer 89.90 5/09/13 Uniform, Brian Schultes 665.32 Holiday 5/18/13 Fuel 3,504.24 MN Bureau of Criminal Apprehension 4/30/13 4/11 to 4/12/13 100.00 Office of Enterprise Technology 4/30/13 Language Line 8.75 City of Roseville 5/02/13 IT Services May 200.00 City of St. Paul 5/13/13 Radio Service & Maintenanc 65.35 Verizon Wireless 5/10/13 Police Dept 254.49 TOTAL: 4,888.05 Fire GENERAL FUND Spring Lake Park Fire Department 5/13/13 Fire Protection Service, 0 24,058.42 TOTAL: 24,058.42 Park Maintenance GENERAL FUND Beisswenger's Do It Best 5/09/13 PW #442 Supplies 9.84 Central Turf & Irrigation Supply, Inc. 5/08/13 PVC Supply 251.78 5/13/13 Different PVC Supply 91.48 .5/13/13 PVC Supply 3.60 5/13/13 PVC Supply 21.00 5/15/13 PVC Supply 118.59 5/15/13 PVC 1.49 05-23-2013 09:50 AM C O U N C I L R E P O R T PAGE: 2 DEPARTMENT FUND VENDOR NAME DATE DESCRIPTION AMOUNT Davis Equipment Corporation 5/02/13 Filter 26.09 5/02/13 Tailpipe, Clamp 124.26 5/08/13 PW Supplies 129.91 Dept. of Employment & Economic Develop 5/03/13 B.Geisbauer Unemployment 290.85 Doug's Power Equipment 5/03/13 Blades 51.62 5/03/13 Gas Spring Assemby, Cable 65.76 5/06/13 Throttle Control Knob, Cli 1.83 5/07/13 Throttle Cable 14.71 G & K Services - St. Paul 5/03/13 Mats & Towels 5.31 5/03/13 Uniforms & Clothing 6.11 5/10/13 Mats & Towels 5.31 5/10/13 Uniforms & Clothing 6.11 Menards 5/14/13 Padlock, Purple Primer 59.70 Peter Szurek 5/10/13 Clothing Allowance 35.00 TOTAL: 1,320.35 Public Works Admin GENERAL FUND Steve Dazenski 5/03/13 Steve Dazenski, Clothes - 30.00 Don Peterson 4/24/13 Clothing Allowance 40.00 TOTAL: 70.00 Bldg/Grnds Maintenance GENERAL FUND Beisswenger's Do It Best 5/10/13 Gypsum, New Lawn Start 24.56 Clean Tech 5/09/13 Janitorial Service June 1,272.88 Delegard Tool Co. 5/03/13 Standby Generator 121.92 Factory Motor Parts Co. 5/03/13 City Hall Generator Batter 35.80 - Fedora Market 4/30/13 Soap, PW Shop 8.54 G & K Services - St. Paul 5/03/13 Mats & Towels 1.33 5/03/13 Uniforms & Clothing 1.53 5/10/13 Mats & Towels _ 1.33 5/10/13 Uniforms & Clothing 1.53 Walters Recycling & Refuse Inc. 5/10/13 Recyling Service 537.50 Wil-Kil 4/24/13 Pest Control 45.96 4/24/13 Pest Control 41.41 TOTAL: 2,022.69 Veh/Equip Maintenance GENERAL FUND Batteries Plus 5/14/13 PW #139 Batteries 24.52 Boyer Truck Parts 5/09/13 Lube Filter Stock 42.45 5/09/13 PW 0480 Battery 218.03 Davis Equipment Corporation 5/06/13 PW #440 815.67 Factory Motor Parts Co. 5/13/13 PW #480 Air Prmyrs 30.90 5/14/13 orange Antifreeze Stock 124.66 G & K Services - St. Paul 5/03/13 Mats & Towels 3.19 5/03/13 Uniforms & Clothing 3.66 5/10/13 Mats & Towels 3.19 5/10/13 Uniforms & Clothing 3.66 Grainger 5/09/13 Glass Bead Blast Media 65.75 Harmon Autoglass - Hopkins 5/06/13 Staff #507 Windshield Repa 61.25 5/06/13 Parks #404 Windshield Repa 61.25 5/06/13 PW 4138 Windshield Repair 61.25 TOTAL: 1,519.43 Street Pavement Mgmt GENERAL FUND Beisswenger's Do It Best 5/07/13 String Line for Street Dep 4.70 Timothy Fredberg 5/03/13 Timothy Fredberg, Clothes 50.00 G & K Services - St. Paul 5/03/13 Mats & Towels 5.31 5/03/13 Uniforms & Clothing 6.11 5/10/13 Mats & Towels 5.31 5/10/13 Uniforms & Clothing 6.11 05-23-2013 09:50 AM C O U N C I L R E P O R T PAGE: 3 DEPARTMENT FUND VENDOR NAME DATE DESCRIPTION AMOUNT City of St. Paul 5/13/13 Asphalt Mix 759.45 Tri State Bobcat 5/10/13 Broom Be. 14.60 TOTAL: 851.59 Snow & Ice Control GENERAL FUND Factory Motor Parts Co. 5/08/13 PW #124 Air Prmyrs 48.79 G & K Services - St. Paul 5/03/13 Mats & Towels 5.84 5/03/13 Uniforms & Clothing 6.72 5/10/13 Mats & Towels 5.84 5/10/13 Uniforms & Clothing 6.72 Bruce Meehan 4/24/13 Clotihng Allowance 30.00 TOTAL: 103.91 Street Sign Maintenanc GENERAL FUND Timothy Fredberg 5/03/13 Timothy Fredberg, Clothes 20.00 G & K Services - St. Paul 5/03/13 Mats & Towels 2.13 5/03/13 Uniforms & Clothing 2.44 5/10/13 Mats & Towels 2.13 5/10/13 Uniforms & Clothing 2.44 TOTAL: 29.14 Convention/Visitor Bur GENERAL FUND City of Blaine 5/10/13 April Hotel Tax Days Inn 1,935.39 5/10/13 April Hotel Motel Tax Skyl 303.95 TOTAL: 2,239.34 Police Forfeiture Driver & Vehicle Services Div. 5/22/13 Forfeiture Re£ Case 120007 21.50 TOTAL: 21.50 Economic Development Econ Dev Authority Kennedy & Graven, Chartered 5/16/13 Parcel Acquisition 266.00 MMKR & Co., P.A. 4/30/13 Final Billing 2012 Audit 1,426.50 TOTAL: 1,692.50 Recreation Community Center 0 Clean Tech 5/09/13 Janitorial Service June 469.18 G & K Services - St. Paul 5/03/13 Mats & Towels 3.98 5/03/13 Uniforms & Clothing 4.58 5/10/13 Mats & Towels 3.98 5/10/13 Uniforms & Clothing 4.58 Grainger 3/12/13 Water Saving Closet Kit 267.30 3/12/13 Water Saving Closet Kit 104.82 3/12/13 Solenoid Valve Replacement 379.BB John Hughes 4/24/13 Clothing Allowance 30.00 Northern Sanitary Supply 5/07/13 Community Ctr Supplies 248.28 Rosenquist Construction, Inc. 4/24/13 Roof Leaked Kitchen by Sin 320.00 City of Roseville 5/02/13 IT Services May 100.00 Walters Recycling & Refuse Inc. 5/10/13 Recyling Service 247.50 Wil-Kil 4/24/13 Pest Control - 58.25 TOTAL: 2,242.33 Banquet Center Community Center 0 MMKR & Co., P.A. 4/30/13 Final Billing 2012 Audit 237.75 TOTAL: 237.75 YMCA Community Center 0 MMKR & Co., P.A. 4/30/13 Final Billing 2012 Audit 713.25 TOTAL: 713.25 Administration Water MMKR & Co., P.A. 4/30/13 Final Billing 2012 Audit 2,139.75 TOTAL: 2,139.75 Utility Distribution Water Ferguson Waterworks #2516 4/30/13 Hydrant Meter Assembly 1,356.97 05-23-2013 09:50 AM C 0 U N C I L R E P O R T PAGE: 4 DEPARTMENT FUND VENDOR NAME DATE DESCRIPTION AMOUNT G & K Services - St. Paul 5/03/13 Mats & Towels 10.09 5/03/13 Uniforms & Clothing 11.60 5/10/13 Mats & Towels 10.09 - 5/10/13 Uniforms & Clothing 11.60 Highway Technologies 5/09/13 County Road I Patch 231.66 Inspec Inc 5/15/13 2013 2MG Reservoir Pre -Des 960.00 Larose, Inc. 5/10/13 Water Treatment Plant #1 2,066.20 Midwest Asphalt Corporation 5/01/13 Dump Charge 837.00 5/13/13 Min. Dump Charge 25.00 Dave Perkins Contracting, Inc. 4/30/13 5243 Skiba Drive 3,085.00 5/01/13 2510 Ridge Lane 5,135.00 5/01/13 2621 Ridge Lane 4,195.00 - 5/03/13 5206 Rainbow Lane 3,310.00 Water Conservation Service, Inc. 4/29/13 7644 Greenfield, 5250 Skib 530.24 TOTAL: 21,775.45 Water Production Water Instrumental Research, Inc. 4/29/13 Water Testing April 80.00 Metro Council Environmental Service 5/20/13 Permit Fee 325.00 5/20/13 Permit Fee 325.00 5/20/13 Permit Fee 325.00 TOTAL: 1,055.00 Administration Wastewater IMfKR & Co., P.A. 4/30/13 Final Billing 2012 Audit 2,139.75 TOTAL: 2,139.75 Utility Distrbution Wastewater Fastenal Company 4/24/13 Utility Knife 12.49 Ferguson Waterworks #2516 5/01/13 Gas Tank Calibrate Gas Mon 801.56 Flexible Pipe Tool Company 5/03/13 Labor, Video Cable, Slip R 180.00 G & K Services - St. Paul 5/03/13 Mats & Towels 10.09 5/03/13 Uniforms & Clothing 11.60 5/10/13 Mats & Towels 10.09 5/10/13 Uniforms & Clothing 11.60 Grainger 5/09/13 For Groveland Lift Station 1,049.25 Metro Council Environmental Service 5/03/13 Wastewater Service June 68,022.21 MN Dept of Health 5/13/13 Water Supply System Operat 23.00 Ramsey County 5/21/13 Fleet Suppot Fee 15.60 TOTAL: 70,147.49 Surface Water Surface Water G & K Services - St. Paul 5/03/13 Mats S Towels 5.05 5/03/13 Uniforms & Clothing 5.80 5/10/13 Mats & Towels 5.05 5/10/13 Uniforms & Clothing 5.80 TOTAL: 21.70 Street Cleaning Surface Water G & K Services - St. Paul 5/03/13 Mats & Towels 0.81 5/03/13 Uniforms & Clothing 0.90 5/10/13 Mats & Towels 0.81 5/10/13 Uniforms & Clothing 0.90 TOTAL: 3.42 05-23-2013 09:50 AM C O U N C I L R E P O R T PAGE: 5 DEPARTMENT FUND VENDOR NAME DATE DESCRIPTION AMOUNT -------- ======= FUND TOTALS ------------ --- 100 GENERAL FUND 51,772.65 225 Forfeiture 21.50 230 Econ Dev Authority 1,692.50 252 Community Center Oper. 3,193.33 700 Water 24,970.20 730 Wastewater 72,287.24 745 Surface Water 25.12 GRAND TOTAL: 153,962.54 TOTAL PAGES: 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 PROCEEDINGS OF THE MOUNDS VIEW CITY COUNCIL CITY OF MOUNDS VIEW RAMSEY COUNTY, MINNESOTA Regular Meeting April 8, 2013 Mounds View City Hall 2401 Highway 10, Mounds View, MN 55112 7:00 P.M. 1. MEETING IS CALLED TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL: Gunn, Hull, Meehlhause, Mueller NOT PRESENT: Flaherty. 4. APPROVAL OF AGENDA A. Monday, April 8, 2013, City Council Agenda. MOTION/SECOND: Gunn/Hull. To Approve the Monday, April 8, 2013, agenda as amended removing Item 8B from the Agenda. Ayes — 4 Nays — 0 Motion carried. 5. PUBLIC INPUT None. 6. SPECIAL ORDER OF BUSINESS None. 7. COUNCIL BUSINESS A. Resolution 8083, Appointing the 2012 Mounds View Citizen of the Year. City Administrator Ericson indicated the City of Mounds View recognizes a resident or business owner on a yearly basis for their contributions to the community. The award seeks to honor highly effective residents or community leaders. The City received two nominations for this award and the Council recormnended designating Dr. Greg Belting as the 2012 Mounds View Citizen of the Year. Staff recommended the Council approve the resolution noting the award would be presented to Dr. Belting at the upcoming Town Hall meeting scheduled for April 29°i. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Mounds View City Council April 8, 2013 Regular Meeting Page 2 MOTION/SECOND: Gunn/Hull. To Waive the Reading and Resolution 8083, Appointing the 2012 Mounds View Citizen of the Year. Acting Mayor Mueller was pleased with the nominations for 2012 and congratulated Dr. Belting on his contributions to the community. Ayes — 4 Nays — 0 Motion carried. B. Resolution 8082, Adopting a Calendar for the Preparation of the 2014 Budget. Finance Director Beer requested the Council adopt a calendar for preparation of the 2014 budget as was required within the City's Charter. He noted that June 3rd would begin the budgeting process, with the preliminary budget and levy adopted on August 26th. Utility rates would be adopted for 2014 on November 11`11. He explained the Truth and Taxation Hearing was scheduled for November 25t11 and the 2014 budget would be adopted on December 9t11. Staff recommended the Council adopt the calendar as presented. MOTION/SECOND: Hull/Meehlhause. To Waive the Reading and Adopt Resolution 8082, Adopting a Calendar for the Preparation of the 2014 Budget. Ayes — 4 Nays — 0 Motion carried. C. Resolution 8086, Appointing Richard Daher to the Park, Recreation and Forestry Commission. 27 City Administrator Ericson indicated in January the Council amended the City Code to expand 28 the membership of the Park, Recreation and Forestry Commission from seven members to nine. 29 He stated this expansion allowed for an open seat and Staff was recommending the appointment 30 of Richard Daher to the Parks, Recreation and Forestry Commission. Staff recommended the 31 term for Mr. Daher expire at the end of 2013 to allow for the seats to remain evenly staggered. 32 33 Council Member Meehlhause noted he met Richard Daher last fall while campaigning. Mr. 34 Daher expressed an interested in becoming more involved in the community. At that time, 35 Council Member Meelrlhause recormnended Mr. Daher consider serving on a Commission. He 36 requested the Council support the appointment. 37 38 MOTION/SECOND: Meehlhause/Hull. To Waive the Reading and Adopt Resolution 8086, 39 Appointing Richard Daher to the Park, Recreation and Forestry Commission. 40 41 Acting Mayor Mueller thanked Council Member Meehlhause for reaching out to Mr. Daher and 42 for encouraging him to serve the community in this capacity. 43 44 Ayes — 4 Nays — 0 Motion carried. 45 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Mounds View City Council April 8, 2013 Regular Meeting Page 3 D. Resolution 8084, Approving Services Agreement between the State of Minnesota Second Judicial District and Mounds View Police Department for Implementation and Purchase of an Electric Citation Interface System. Police Chief Kinney requested the Council consider approving a services agreement between the State of Minnesota Second Judicial District and the Mounds View Police Department for implementation and purchase of an electronic citation interface system. He indicated this system would assist the department in electronically printing and transmitting citations. He commented the Law Enforcement Technology Group program came in with a lower bid that would cost approximately $27,252 for the purchase of the system, software licensing, and maintenance support. Police Chief Kinney noted the City would have $10,000 available from the State of Minnesota to assist in offsetting this expense. This reduction would lead to a final expense of $17,252, which was below the $20,000 budgeted for 2013. Council Member Meehlhause questioned if this was a mandated purchase. Police Chief Kinney indicated that State was mandating that all agencies move to an electronic filing program by 2014. Council Member Meehlhause asked if the Chief had investigated both vendors prior to making a recommendation to Council. Police Chief Kinney stated he had considered both vendors and noted that LETG was a local company that reportedly provided better customer service. He explained that in the future, LETG could be used for the department's entire records management system. Acting Mayor Mueller inquired how the new system would be incorporated into the department's squad cars. Police Chief Kinney indicated that each marked squad car would have a printer device installed and software added to their laptop. He explained that data could then be transferred into the City's data management system and then onto the Ramsey County courts. He noted this would be a much more efficient way for the City to manage information. Council Member Meehlhause questioned how quickly the information would pass from the City of Mounds View Police Department to the Ramsey County courts system. Police Chief Kinney anticipated that information would be transferred on the next business day. He stated he would learn more after the system was brought online. MOTION/SECOND: Mueller/Gunn. To Waive the Reading and Adopt Resolution 8084, Approving Services Agreement between the State of Minnesota Second Judicial District and Mounds View Police Department for Implementation and Purchase of an Electric Citation Interface System. Ayes — 4 Nays — 0 Motion carried. 8. CONSENT AGENDA A. Resolution 8081, Authorizing Insurance Policies for the Year January 2013 through December 2013. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Mounds View City Council April 8, 2013 Regular Meeting Page 4 r r .�.Syy• NOW MOTION/SECOND: Gunn/Meehlhause. To Approve Consent Agenda Item 8A. Ayes — 4 9. JUST AND CORRECT CLAIMS Nays — 0 Motion carried. Finance Director Beer answered the Council's questions related to claims. MOTION/SECOND: Gunn/Meehlhause. To Approve the Just and Correct Claims as presented. Ayes — 4 Nays — 0 Motion carried. 10. APPROVAL OF MINUTES None. 11. REPORTS A. Reports of Mayor and Council. Council Member Meehlhause noted the Mounds View Business Council would meet on Wednesday, April 101h at 7:30 a.m. at the Community Center. Council Member Gunn indicated the Irondale Winter Color Guard received a Gold Medal for their performance at the Northstar Circuit State Championships in Osseo, Minnesota this past weekend. She explained the group also received a Sportsmanship Award. Several other awards were handed out for solo and ensemble performances, and Anna Green received a scholarship at the event. The Irondale Winter Color Guard would be participating in the Mad Dash World Competition in Dayton, Ohio this weekend. Council Member Gunn explained the Irondale Winter Drumlin participated in the Minnesota Percussion Competition in St. Cloud this past weekend where they received a 1" Place in their class. The group also received the crowd pleaser award. She encouraged the community to catch a drumlin performance this Friday, April 12'11 at the hondale High School Gym at 7:30 p.m. Council Member Gunn noted the Irondale Robotics team would be holding a fundraiser at Zero Gravity this Friday. Funds raised would assist the team in making their way to Nationals in St. Louis, Missouri. Acting Mayor Mueller reported Devin Schmidt and his team at CTV put together a wonderful cable piece on the Pirates of Penzance production from last summer. This production was submitted and received an Achievement Award for Best of the Midwest Video Festival. She congratulated Vanessa VanAlstine and the entire CTV staff for this accomplishment. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Mounds View City Council April 8, 2013 Regular Meeting Page 5 Acting Mayor Mueller stated there would be a public informational meeting for Area F of the Street and Utility Improvement Program on April 15, 2013 at the Mounds View Community Center at 6:00 p.m. Acting Mayor Mueller reported that on Saturday, April 13, 2013, the Spring Fling would be held from 10:00 a.m, to 12:00 p.m. at the Mounds View Community Center. City Administrator Ericson discussed the activities associated with or this event and invited the entire community to attend. B. Reports of Staff. 1. Town Hall Meeting Agenda. City Administrator Ericson indicated the Town Hall meeting would be held on April 291h at 6:00 p.m. He reviewed the proposed agenda and asked for comments from the Council. The Council supported the agenda as presented. City Administrator Ericson explained the City would be holding a Closed Session on the emergency management plan on May 6th prior to the work session meeting. Police Chief Kinney noted a representative from Ramsey County would be likely present at this Closed Session meeting. C. Reports of City Attorney. City Attorney Riggs had nothing additional to report. 12. Next Council Work Session: Monday, May 6, 2013, at 7:00 p.m. Next Council Meeting: Monday, April 22, 2013, at 7:00 p.m. Town Hall Meeting: Monday, April 29, 2013, at 6:00 p.m. 13. ADJOURNMENT The meeting was adjourned at 7:42 p.m. Transcribed by: Heidi Guenther TimeSaver Off Site Secretarial, Inc. MoUrms ViEw of Mounds View Staff To: Honorable Mayor and City Council From: Nick DeBar, Public Works Director Item Title/Subject: Public Works 2013 Quarter 1 Report Item No: 11B1 Meeting Date: May 28, 2013 Type of Business: Reports Administrator Review: The following is an executive summary of the Public Works Department's activities from January through March 2013. Operation & Maintenance (O&M) Division The O&M Division is busy with snow plowing, preventative maintenance, and infrastructure improvement activities during the first quarter of the year. There were 28 after-hours callout events during first quarter (not including after-hours snow plowing events). The most common call -out continues to be private sewer service back-ups. In addition, the following are a synopsis of major activities performed by the O&M Division during first quarter 2013. Drinking Water 85,042,000 gallons water pumped & treated • 30 total coliform bacteria samples tested 5 water main breaks • 11 water service breaks 96 Gopher State One Call locate tickets Sanitary Sewer • 48,825 feet sanitary sewer trunk cleaned 1,614 feet sanitary sewer trunk televised/inspected • 125 feet storm sewer cleaned Streets and Trails • 27 snow plowing or ice control events 4,910 street miles plowed 480 plow truck hours 288 tons of salt applied 405 trail and sidewalk miles maintained Parks and Facilities 51 days of ice rink maintenance at 3 parks • 64 days of shelter maintenance at 4 parks comprehensive preventative maintenance and repair of 7 mowers and utility carts, chain saws, line trimmers, and leaf blowers installed new chair rail in event center Fleet Maintenance 11 squad and 3 staff cars maintained and repaired 3 snow plow trucks, 1 televising van, and 10 pickups maintained and repaired Trainin 144 continuing education hours for wastewater operator certification (6 persons) 48 continuing education hours for water operator certification (2 persons) Public Works 2013 Quarter 1 Report Page 2 Administration/Engineering (A/E) Division The A/E Division of Public Works is busy with project management, record keeping, contracting, and asset management activities during the first quarter of the year. The following is a synopsis of the major activities performed by the three-person A/E Division during first quarter 2013. Permits Issued 13 Right-of-way (generated $5,460 in permit fees) 10 water service repair 3 sewer service repair Personnel Revised Stormwater Maint. Worker position description Brett Brisbois reassigned to Stormwater Maintenance Worker vacancy • Revised Seasonal Maint. Worker position description Revised Drinking Water Maint. Worker position description Engineering/Architectural Consulting Services Stantec: Bid Phase for 2013 Street & Utility Improvement Project - Area F ($6,000) Stantec: Construction Phase for 2013 Street & Utility Improvement Project - Area F ($270,000) City Council and Advisory Groups 12 City Council staff reports and 11 resolutions 3 Park & Rec. & Forestry Cmsn. meetings (Jan., Feb., Mar.) 1 Streets and Utilities Committee meeting (Mar.) 1 YMCA Advisory Group meeting (Feb.) Miscellaneous 1-35W Managed Lane Study Technical Advisory Committee Pavement Management Program Capital Improvement Program Approx. 1,250+ phone calls (A/E only) Capital Improvement Projects Although no to little construction was occurring during the first quarter, Public Works was very busy planning, reviewing, managing, and closing out various current and proposed projects — the following are notable ones. 2013 Street & Utility Improvement Project—Area F `11_ Ms""""` " _ . "' Public Works coordinated the final design and bidding phases with the City's consultant, Stantec. Bidding documents were approved in February and a bid opening occurred on March 21. Six bid proposals were received that ranged from $3,122,034.01 to $ 3,465,514, with the low bid awarded to Northwest Asphalt, Inc. of Shakopee, Minnesota. Northwest Asphalt has been the successful bidder for Areas BIC, D, E, and now F. 2012 Water Tower Reconditioning Proiect The construction work for reconditioning the water tower was accepted by the Council and final payment authorized to Odland Protective Coatings of Rockford, Minnesota in January. The final construction cost was $448,650 with one change order issued for a credit to the City for $1,150 related to the paint used on the logo. The final construction costs were $46,150 below the budgeted amount of $494,800. KLM Engineering assisted Public Works with daily construction inspection and acceptance testing. 2012 Reroofing of Community Center and Water Treatment Plant No. 1 Construction work for reroofing of the Community Center and WTP No. 1 was accepted by the Council and final payment was authorized to Rosenquist Construction, Inc. of Minneapolis. The final construction cost was $273,210 broken down by $228,210 for the Community Center and $45,000 for WTP No. 1. One change order was issued for $6,210 related to additional insulation on the Community Public Works 2013 Quarter 1 Report Page 3 Center to promote better drainage. Inspec provided inspection services during construction for $14,000. The final project cost (including inspection fees) was $287,210, which is $12,790 below the authorized budget amount of $300,000. Building Automation System Improvements to Community Center A new building automation system (BAS) was installed at the Community Center to operate and control the Heating, Ventilation, and Air Conditioning (HVAC) components. Trane provided a cost proposal to furnish and install a non-proprietary system for $21,605 plus applicable taxes, which included demolition of the antiquated Barber Coleman system, programming, graphics, trends, alarms, start-up, commissioning, and 16 hours of on-site training. The new BAS began service in March with no additional costs being incurred. Expenditure Summary Below is a budget versus actual expenditure summary table for all Public Works related accounts for January through March 2013. All funds are tracking below budget or below that expected at this time. nanarar Funds r1nM $ 1.139.729 $ 46.985 $ 80.315 $ 89.788 $ 217.088 $ 217.088 19.0% DepannentlDivision Budget Amount January February Actual Amounts March QI Q1 YTD % YTD Budget Parks and Forestry (100-4300) $ 395,995 $ 11,514 $ 15,742 $ 22,341 $ 49,598 $ 49,598 12.51A Parks (100-4360) $ 317,495 $ 11,370 $ 15,742 $ 22,341 $ 49,453 $ 49,453 15.6% Forestry (100-4380) $ 78,500 $ 144 $ - $ - $ 144 $ 144 0.2% Public Works (100.4400) $ 743,734 $ 35,471 $ 64,573 $ 67,447 $ 167,491 $ 167,491 22.5% Public Works Administration(100-4410) $ 130,769 $ 7,605 $ 9,617 $ 10,308 $ 27,530 $ 27,530 21.1% Buildings & Grounds Maintenance (100-4460) $ 133,298 $ 3,313 $ 11,042 1 $ 13,839 $ 28,193 $ 28,193 21.2% Vehicle& EquipmentMaintenance(100-4465) $ 102,562 $ 6,491 $ 15,229 $ 7,159 $ 28,879 $ 28,879 28.2% Street PavementManagement(100-4470) $ 211,550 $ 10,156 $ 13,234 $ 14,103 $ 37,492 $ 37,492 17.7% Street Snow & lee Centel (100-4472) $ 126,037 $ 5,943 $ 13,072 $ 19,234 $ 38,249 $ 38,249 30.3% StreetSign Maintenance (100-4475) $ 39,518 $ 1,964 $ 2,379 $ 2,805 $ 7,147 $ 7,147 18.1% A q AAA 4QA Q 17Q 079 A 133163 . 948.999 $ 561.163 $ 561.163 16.50/ DeparlmentlDivision Budget Amount January T February Actual Armunts March Q1 YTD % YTD Budget Drinking Water (700) $ 1,249,595 $ 20,640 $ 33,279 $ 76,422 $ 130,341 $ 130,341 10.40/6 Drinking Water - Infra. & Equip. Maint (700-4823) $ 1,104,362 $ 15,502 $ 25,214 $ 63,523 $ 104,239 $ 104,239 9.4% Drinking Water- Water Producton(700-4825) $ 145,233 $ 5,138 $ 8,065 $ 12,899 $ 26,102 $ 26,102 18.0% Wastewater (730) $ 1,683,512 $ 152,858 $ 85,461 $ 148,598 $ 386,918 $ 386,918 23.0% Wastewater- Infra. & Equip. Maint (700-4823) $ 1,683,512 $ 152,858 $ 85,461 $ 148,598 $ 386,918 $ 386,918 1 23.0% Street Lighting (740) $ 93,009 $ 219 $ 7,911 $ 8,418 1 $ 16,548 $ 16,548 17.8% Stormwater(745) $ 382,380 $ 5,354 $ 6,511 $ 15,491 $ 27,356 $ 27,356 7.2% Slormwaler- System Maintenance (245-4415) $ 335,156 $ 4,616 $ 5,650 $ 14,176 $ 24,442 $ 24,442 7.3% Storrrwabr- Street Cleaning (245-4417) $ 47,224 $ 738 $ 862 $ 1,314 $ 2,914 $ 2,914 6.2% Special Revenue Funds $ 88,583 $ 3,980 $ 6,429 $ 8,915 $ 19,323 $ 19,323 21.8% Budget Actual Armunb % YTD Depar6rentlDivision Amount January I FebruaryMarch Q1 YTD Budget Community Center (252) $ 88,583 $ 3,980 $ 6,429 $ 8,915 $ 19,323 $ 19,323 21.8% Community Center - Building Overhead (252-4350) $ 88,583 $ 3,980 1 $ 6,429 $ 8,915 $ 19,323 1 $ 19,323 21.8% spectfully sad, Nick DeBar - Public Works Director H A R T E R E DI 470 U.S. Bank Plaza 200 South Sixth Street Minneapolis MN 55402-1458 (612) 337-9300 telephone (612)337-9310 fax littp://Nvww.kennedy-graven.com Affirmative Action, Equal Opportunity Employer SCOTT J. RIGGS Attorney at Law Direct Dial (612) 337-9260 Email: sriggs@keiinedy-graveii.com MEMORANDUM Date: May 23, 2013 To: James Ericson, City Administrator From: Scott J. Riggs, City Attorney Re: Mounds View Project Status Report CITY: MU125-11: Administration. General discussions with staff regarding various City matters. Matters are presently pending. MU210-54 City Code Updates. Work on updating City Code. Consult with City staff regarding same. Matter is presently pending. MU210-179: General Street Improvement Projects. Review contracts and provide comments regarding 2013 Street Improvement Project. Matter is presently pending. MU210-189: Coventry Senior Living_ Project. Review additional items necessary to finalize and record the plat. Revise instruction letter to title company. Review Development Agreement. Matter is presently pending. MU210-202: Health Care Facility Revenue Note (Apple Tree Dental). Project remains in the middle of the process for issuing tax exempt 501(c)(3) conduit revenue bonds for Apple Tree Dental Clinic. At this point, public hearings have been conducted and the project is on hold until the Borrower negotiates a deal with a bank. Matter is presently pending. 423146v1 SJR MU125-11 Jim Ericson May 23, 2013 Page 2 MU210-208: Parcel Acquisition. Review documents and consult with City staff regarding same. Draft Purchase Agreement and Resolution Authorizing Purchase and forward to City staff. Begin drafting closing documents. Matter is presently pending. MU210-210: Legal Claim Regarding Brooke Bass. Review Notice and consult with City staff regarding same. Matter has been tendered to the League of Minnesota Cities Insurance Trust. Matter is presently pending. MU210-211: Legal Claim Regarding Johanna Beth McDonough. Review Notice and consult with City staff regarding same. Matter has been tendered to the League of Minnesota Cities Insurance Trust. Matter is presently pending. MU210-212: Legal Claim Regarding Samantha Orduno. Review Notice and consult with City staff regarding same. Matter has been tendered to the League of Minnesota Cities Insurance Trust. Matter is presently pending. SJR:jms 423146vl SJRMU125-11