PROCEEDINGS OF THE MOUNDS VIEW
ECONOMIC DEVELOPMENT AUTHORITY
Meeting No. 9
November 14, 1994
Mounds View City Hall
2401 Hwy. 10, Mounds View, MN 55112
CALL TO ORDER
The Economic Development Authority was called to order by President
Linke on November 14, 1994 at 8: 00 p.m.
ROLL CALL
MEMBERS PRESENT: President, Jerry Linke; Vice President, Phyllis
Blanchard; Secretary, Diane Wuori; Commissioners Gary Quick and
Julie Trude; and Executive Director, Samantha Orduno
MEMBERS ABSENT: None
OTHERS PRESENT: Economic Development Coordinator, Cathy Bennett;
• Assistant to City Administrator, Tim Cruikshank; City Consulting
Engineer, Rocky Keene; Community Development Coordinator, Paul
Harrington
APPROVAL OF AGENDA:
MOTION/SECOND: Trude/Wuori to Approve EDA Agenda
VOTE: 5 ayes 0 nays Motion Carried
APPROVAL OF MINUTES:
MOTION/SECOND: Quick/Blanchard to Approve Minutes of
October 10, 1994 EDA Meeting
VOTE: 5 ayes 0 nays Motion Carried
CONSENT AGENDA:
There were no items placed on the Consent Agenda for this meeting.
PUBLIC HEARING:
There were no public hearings scheduled for this meeting.
EDA BUSINESS:
1110
EDA Page 2
• Meeting No. 9 November 14, 1994
A. Consideration of Resolution No. 94-EDA17 Approving
Construction Plans for the Silver Lake Pointe Project
Cathy Bennett, Economic Deve.opment Coordinator, reported that
per Section 3 . 3, Constructign Plan, of Development Assistance
Agreement for the Silver Lake Pointe Project, the Authority
shall approve the Construction Plans if it determines that
they conform to the applicable provisions of the Agreement.
Such Construction Plans mulpt be rejected in writing by the
Authority within ten working days of submission or shall be
deemed to have been approve by the Authority.
The full plans were submitted to the City's building
department on October 31, 1994 and the attached resolution
fulfills the requirement for the Authority to approve the
Construction Plans for the Silver Lake Pointe Project within
the ten working days of submission.
Bennett said she had included a memo for review from Building
Official Rick Jarson which outlines the required changes to
the plans to conform with the City's building codes. She
noted that per Section 3 . 3, approval of the Resolution 94-
• EDA17 does not in any way approve the building permit process
with the City's Building and Engineering Department. The
resolution is to approve the design and configuration of the
project as it was understood in approval of the Development
Assistance Agreement.
Jeff Huggett of MSP Real Estate explained that the project
started back in January or February when he met with Samantha
Orduno, City Administrator, and Paul Harrington, Community
Development Coordinator. Shortly after that, application was
made to the City Council for the tax increment financing and
rezoning approval of the project.
Huggett said their final plan which was approved by the EDA,
was an 83 unit, three-story project with underground parking
of 66 stalls. He stated that they are building 83 units in
the ratio of 50 one-bedroom units and 33 two-bedroom units.
They have achieved 73 underground parking stalls and the same
amount of on-site parking stalls that was previously approved
by the EDA Board.
Another requirement of the EDA was to have a minimum of 59
affordable dwelling units within the project. Huggett stated
that, based on financing that was obtained, 70 affordable
units will be available out of the 83 total. The amount of
brick on the project was another concern of the EDA and
41/1 Huggett said the amount of brick was now at 50% on this
project. He reported that construction plans were submitted
EDA Page 3
• Meeting No. 9 November 14, 1994
through the Minnesota Finance Agency for tax credit financing
and that this project received more tax credits than any other
senior affordable housing project in the State of Minnesota.
Huggett commented that 85 peope had already signed an
interest list to rent in the building and only 83 units were
being built.
At the time the project was started, interest rates were at
9%. Those rates are now in the 10% to 10-1/2% range and
Huggett said the rental rates of the affordable units would
remain around $490 for a onq-bedroom to $590 for a two-bedroom
unit. Market rate units wduld be higher than that.
Huggett commented that numerous wetland issues were brought
up. Those issues have all been resolved and the Rice Creek
Watershed District (RCWD) issued a permit in August.
Skip Sorrensen, the project architect, used an overhead
projector to show the layout of the proposed project. He
pointed out the locations of the new sidewalks and trees to be
planted along the boulevard. The entire site will be sodded
1111 and will have an irrigation system.
The entrance into the underground parking will occur off
Mounds View Drive. That elevation is about 4' lower than the
existing street so there will be a gradual decline going in
with an electronic garage door opener.
Commissioner Trude pointed out an area west of the building.
Sorrensen explained that on April 27, that area was delineated
as a wetland by the surveyor indicating that no encroachment
could be done in the way of filling or building within that
wetland area. Neither the parking lot nor the building
encroaches on that wetland area.
Trude questioned exactly what area would be sodded. Sorrensen
explained that the sodded area would occur all the way to the
edge of the property line on three sides and about two-thirds
of the way on the north side of the site. There will be tree
plantings along the wetland area as well.
Huggett explained that one of the requirements of the Rice
Creek Watershed District was that the wetland area be improved
and upgraded.
Sorrensen pointed out the driveway location coming into the
garage off Mounds View Drive, and indicated the overhead
4111
garage door is 16' wide. A staging area will be provided
outside the garage door for the weekly pick up of refuse
EDA Page 4
1111 Meeting No. 9 November 14, 1994
containers. There is heat and 24-hour lighting provided in
the underground parking. He went over the structural details
of the garage and said there would be ample space for
handicapped parking stalls located near the main elevator
lobby. .�
Sorrensen said that one of the features being provided in the
lower level is a carwash bay. There will also be custodial
maintenance, mechanical and electrical rooms located on the
lower level. Adjacent to the elevator lobby will be the trash
compactor area where the trash chute comes down. This trash
room has been resized for disposable refuse and recycling
containers. There will be a trash chute and recycling bins
located on each floor and larger bins located in the trash
room.
Sorrensen felt that not more than 80% of the tenants would
have vehicles once they moved into this building, and the 73
parking stalls would be adequate.
Secretary Diane Wuori expressed concern regarding the number
of underground parking stalls, citing the poor public
1111 transportation in the area.
Sorrensen described the security system, which will have a
communications phone in the lobby to be used to contact the
tenant, allowing entrance to the building. He explained that
the building will be prewired for future security television
monitors at the garage door and at the main entrance. It will
also be prewired for a future emergency generator in the
building.
Sorrensen pointed out the features of a typical one-bedroom
unit stating that all units will comply with the Federal Fair
Housing Act, Minnesota State Handicap Code and the American
Disabilities Act. Each one-bedroom unit will have an air
conditioner in the bedroom. Every unit will have a pantry and
kitchen, dishwasher, exhaust hood, electric range and
refrigerator. There will be a storage room with adjustable
shelving on the wall and a coat rack in each dwelling. Some
of the bathrooms will have bathtubs and some will have
showers. The dimensions of a typical one-bedroom is 13 ' x
13'1/2 ' with a walk-in closet. He then pointed out the
features of a typical two-bedroom unit, noting there will be
an air conditioner in the bedroom and living room.
Sorrensen stated that miniblinds, carpet, sheet vinyl, all
cabinetry, plumbing fixtures, phone and television jacks in
4110
the bedrooms will be provided in each unit. The only thing
the tenants will have to furnish is their own possessions and
4111
EDA Page 5
Meeting No. 9 November 14, 1994
telephone. There will be sound proofing between each dwelling
unit and the floors. Fire-stopping material will be put in
the gypsum floors between the garage level and the first and
second floors. The windows will be vinyl with low E argon
glass.
Sorrensen said the exterior of the building will feature bay
windows along the two wings of the building with accent brick.
The main entrance canopy going into the building will connect
from the lobby all the way out to the main turnaround. There
will be power assisted entrance hardware on the main lobby
doors. Rain gutters will be located near the entrances.
There is a complete area drain that goes across the entrance
of the garage. That water will be taken inside the building
to a sump where it will be pumped up into the retention pond.
There is also a complete drain tile system at the lower level
tied into sumps to the retention pond.
Sorrensen explained design elements of the building such as
the solarium, management offices and mail room. The community
room on the first floor will have seating capacity of nearly
100, with a residential-type kitchen rather than an
4111 institutional-type kitchen. There will be laundry rooms on
each floor in the center of the building. An ornamental open
staircase will go from the first floor up to the second floor.
A health and beauty room will be located on the second floor
for a barber shop or salon. There will be a television lounge
directly across from that. The third floor will have a
library room facing south with outside windows. It will have
built-in book shelves.
Charlie Melcher, engineer for the project, explained the
wetland issues. He pointed out an area of . 05 acres that was
a man-made wetland created less than ten years ago. Although
the RCWD approved an exemption for this area, the developer
was asked to mitigate 3 , 170 square feet of an area located
north of the building. The RCWD also wanted the existing
wetland enhanced either by excavation, removing the soil all
together, or by pushing the soil out to the boundaries to form
a berm. This project was accepted and approved along with the
3 , 170 square feet that was mitigated and a permit was received
in August.
Melcher said the high water table of the area was 906.2 and
the garage slab was at 906. Their solution to the problem,
which was agreeable to Steve Woods of RCWD and the Mounds View
Consulting Engineer, was to fully waterproof the boundaries of
4111 the walls, to provide an exterior drainage system which
connected it to the sumps. There will also be an undergrade
system which would take under-slab water to the sumps to be
EDA Page 6
. Meeting No. 9 November 14, 1994
pumped out through the weir and into the wetland. In
Melcher's opinion, if there were to be a hundred-year storm
back to back or even three in a row, this project would not
obtain substantial water to the point there would be wet
slabs. If there was water coming in and under the slab, it
would be pumped out at a greater rate than it would be coming
in. The building itself is well above the 908.2 elevation the
City required. The drainage pond met the RCWD's requirement
for the release rate of the proposed increase in runoff due to
this project.
Melcher furnished to the EDA copies of a report from
Huntingdon that showed an engineering review of the area. He
also furnished copies of a hydrologic review from Rocky Keene,
Consulting Engineer for the City. Melcher noted that, at the
request of Mr. Keene, revisions were made to the proposed
contours of the pond.
Trude expressed her concern for rain and ice building up at
the garage entrance.
Melcher explained that there would be a 1' wide by 12' long
catch basin leading into the water drainage system to be
pumped out. He also explained the elevations and water
drainage of the project area.
President Linke remarked that any approval given at this
meeting does not preclude the approvals that are necessary by
the engineers and the building officials. He stated that what
is being considered for approval by the EDA is the layout of
the building. Linke explained that, basically, EDA's review
has gone from preliminary to final drawings with no review in
between.
Trude stressed that she wants this building to be good quality
because it will serve the people of the community for a long
time.
Linke asked Rocky Keene, City Consulting Engineer, if he had
any concerns regarding this project. Keene said he didn't
feel there would be a problem with surface water going into
the building. He also mentioned that the wetland issues were
under the jurisdiction of the RCWD.
Melcher explained the types of vegetation that will be planted
in the wetland area.
411/ Wuori said there were nice pussy willows growing in that
wetland now and it would be a shame to replace them with
something different. Keene questioned the practicality of
EDA Page 7
. Meeting No. 9 November 14, 1994
enhancing a wetland and replanting it when the vegetation
already growing there is so nice.
Commissioner Quick remarked that, to his recollection, the
wetland did not exist until County Road I was built and the
owner of the property excavated it. He said the wetland
appears man-made.
Paul Harrington, Community Development Coordinator, commented
that the maps used by the City to determine buildable property
do not show a wetland area at this location and that RCWD
raised the issue of the wetland.
Cathy Bennett said that this approval would not take any
precedence to the building approval. The project is still
required to go through the process.
Linke explained that the EDA must determine whether the
developers actually did what they said they would at the
preliminary hearing and consider approval of the layouts.
Executive Director Samantha Orduno said that it was made clear
1111 to Jeff Huggett and other members of the development team that
this project would be under close scrutiny, particularly with
respect to drainage problems. It was also made clear this
would be a viable development, that there would not be a
situation where there would be water in that underground
garage. Orduno felt that the development team has complied.
She also felt they were aware of the City's concerns as well
as the concerns of the RCWD and local residents. The items
that the developer said they would provide are now on record
and the City will definitely hold them accountable.
Keene explained the 10: 1 side slope recommendation for the
retention pond. He cited the safety factor since this area is
located in a residential district. He also addressed the
minimum building elevation criteria, and was satisfied with
that.
Keene said he had talked to a RCWD engineer and was told there
was no high water elevation in the wetland located to the west
of the project.
Keene discussed the subject of retention ponding. It is the
philosophy of the City to do nothing about a retention pond
when it turns green. The pond has been built for one purpose-
-to remove the sedimentation.
S
Keene referred to a letter he had written to Paul Harrington
dated November 11, 1994 , in which seven recommendations were
EDA Page 8
Meeting No. 9 November 14, 1994
made. He briefly commented on those recommendations,
indicating that the issues had been resolved by the developer.
Keene stated that this area was identified as a drainage study
area in the Local Water Management Plan to address the kinds
of issues being discussed at this meeting. The purpose of the
Local Water Management Plan is to find out what kinds of
wetlands the residents want in this area.
Trude expressed concern about water going into the garage
level of the building.
Keene explained that the elevation of County Road I is such
that it is lower than any accessible point into the building
so water is not going to flow toward this building. Regarding
the groundwater issue, the sump pumps may run a fair amount of
time during certain periods, but Keene felt they would keep
the garage dry.
MOTION/SECOND: Quick/Wuori to Adopt Resolution No. 94-EDA17
Trude asked if there was a portion of the Development
4111 Agreement that would still allow for the review of other plans
concerning this project.
Orduno explained that, once the Construction Plans are
approved, any requirements remaining in regards to the
building permit would then be up to the building officials.
Trude asked if there should be any building contingencies put
on the project.
Linke explained that the contingencies are the building codes.
VOTE: 5 ayes 0 nays Motion Carried
REPORTS
1. Report of President Linke: No report.
2 . Report of Vice President Blanchard: No report.
3 . Report of Secretary Wuori: No report.
4 . a. Report of Commissioner Quick: No report.
b. Report of Commissioner Trude: -No report.
4111 5. Report of Executive Director Orduno: No report.
EDA Page 9
410 Meeting No. 9 November 14, 1994
ADJOURNMENT
There being no further business before this Authority, President
Linke adjourned the meeting at 9: 47 p.m.
Respectfully submitted,
J d Riser
R condi, g Secretary