Loading...
HomeMy WebLinkAboutAgenda Packets - 1995/07/17 (2) SPECIAL BUDGET WORK SESSION J U LY 17 , 1995 _ 6 : 00 P . M . AGENDA 1 . Parks, Recreation , Forestry and Cable 2. Water Fund 3. Waste Water Fund 4. SWM Due to the time restraints, all other enterprise fund budgets will be presented on August 7, 1995 REQUEST FOR COUNCIL CONSIDERATION Agenda Section: MHOS REPORT Report Number: 1111( AGENDA SESSION DATE Report Date: DISPOSITION Item Description: Administrator's Review/Recommendation: - No comments to supplement this report - Comments attached. Explanation/Summary (attach supplement sheets as necessary.) SUMMARY; Presented herein are the first drafts of the Cable T.V., Surface Water Management, Water, and Wastewater Utility Funds. Each fund's budget will be reviewed briefly. Staff will be present at the July 14, 1995 budget review meeting to answer any questions you may have. CABLE T.V. FUND Cable T.V. activities are presented in two programs: Cable Casting Government Meetings and Cable T.V. Programming. The proposed 1996 budget of$18,543 for Cable Casting Government Meetings is $2,357 lower than 1995 as a result of the resignation of the Cable T.V. Technician and the anticipated hiring of a replacement at a lower wage. A budgeted wage increase of 3% caused the 1996 Cable T.V. Programming budget to increase by $1,585. Total proposed Cable T.V. expenditures for 1996 are $38,643. Estimated 1996 revenues of $44,500 are sufficient to finance proposed expenditures. An excess of revenues over expenditures of $5,857 is projected for 1996. SURFACE WATER MANAGEMENT FUND The proposed budget of the Street Sweeping program of the Surface Water Management Fund is $402 lower than the previous year's budget. Personnel Services has a budgeted increase of 3%, however, materials and supplies and contractual services have been budgeted slightly lower than 1995. The total Street Sweeping budget proposed for 1996 is $13,662. Proposed expenditures for System Maintenance of $94,734 are approximately $18,000 higher than the previous year due to contracted ditch and pond cleaning being scheduled for 1996 and a lower Capital Outlay budget. Contingency of$26,646 has been included. Total proposed expenditures of$108,396 are offset by a like amount of estimated revenues. WATER UTILITY FUND Expenses of the Water Fund are projected to increase by $145,466 in 1996 compared to 1995. Two large increases are beyond staff's control and are major factors in this increase. Projects financed by the xffinalized and have caused depreciation expense to increase to $101,112 from 47,804. R�at • ervice onhe Water Bonds will be $256,208 in 1996, whereas, in 1995 budgeted debt service was $188,908. Pursuant to the Utility Rate Study staff has projected water rates at $1.25 for 1996, an increase of $0.05. Projected 1996 net income is $3,982. WASTEWATER UTILITY FUND Total estimated 1996 expenses of the Wastewater Fund are 7.25% greater than the previous year. This is mostly the consequence of 1996 being the first full year that T.C.A.A.P. is discharging their wastewater into the City's system. At the present time staffs best estimate is that an additional 36.6 million gallons of wastewater per year will be discharged into our system. That would generate an additional $76,544 of revenue for 1996. Pursuant to the Utility Rate Study staff has projected wastewater rates at $45.00 for 1996, an increase of$1.00. Projected 1996 net income is $3,196. 0--m k Donald Brager, Finance ctor DEPARTMENT: Parks, Recreation and Forestry PROGRAM: Park Administration 1995. RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES_ ACTUAL ACTUAL BUDGETED PROPOSED APPRVD Employee Services 17,392.00 18,159.00 18,276.00 17,405.00 Materials & Services .00 .00 •.00. 820.00 Contractual Services 5,980.00 7,870.00 13,126.00 11,337.00 Capital Outlay 0.00 0.00 0.00 0.00 TOTAL 23,372.00 26,029.00 31,402.00 29,562.00 APPROPRIATION PERSONNEL ALLOCATIONS • 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Director .20. .20 .20 - .17 Adm. Asst. .03 .03 .03 • .03 Program Supervisor .10 .10 .10 .10 TOTAL F-T Positions .33 .33 .33 .30 Part time positions: .00 .00 .00 .00 TOTAL FTE'S .33 .33 .33 .30 il CITY nF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND PARK ADMINISTRATION 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $17,392 $18,159 $15,253 $13,653 $14,382 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $0 $0 $0 $0 020 SALARIES, TEMP + PART $0 $0 $0 $0 $0 $0 $0 030 PENSIONS $0 $0 $1,745 $0 $1,745 $0 $0 040 GROUP INSURANCE $0 $0 $975 $0 $975 $0 $0 050 WORKERS COMPENSATION $0 $0 $303 $552 $303 $0 $0 TOTAL PERSONNEL SERVICES $17,392 $18,159 $18,276 $14,205 $17,405 $0 $0 MATERIALS + SUPPLIES 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 $0 $0 122 SUPPLIES, VEHICLE $0 $0 $0 $0 $0 , $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $0 $0 $0 $595 $820 $0 $0 170 MOTOR FUELS & LUBRICAN $0 $0 $0 $0 $0 $0 $0 240 UNIFORMS + CLOTHING $0 $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $0 $0 $0 $595 $820 $0 $0 CONTRACTUAL SERVICES 480 BONDS & INSURANCE $0 $1,295 $3,881 $2,748 $2,692 $0 $0 310 TELEPHONE $0 $0 $0 $0 $0 $0 $0 321 :TRICITY $0 $0 $0 $0 $0 $0 $0 322 (URAL GAS $0 $0 $0 $0 $0 $0 $0 343 PRINTING $0 $0 $600 $0 $600 $0 $0 354 DEBRIS REMOVAL $0 $0 $0 $0 $0 $0 $0 356 SATELLITES $0 $0 $0 $0 $0 $0 $0 361 MEMBERSHIPS $100 $0 $100 $0 $0 $0 $0 362 CONFERENCES $380 $0 $500 $0 $0 $0 $0 363 TRAINING $500 $370 $545 $705 $545 $0 $0 390 GRANTS + SUBSIDIES $5,000 $7,500 $7,500 $0 $7,500 $0 $0 401 RENTAL, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 511 REPAIR, BLDG + GROUNDS $0 $0 $0 $0 $0 $0 $0 513 REPAIRS, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $5,980 $9,165 $13,126 $3,453 $11,337 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 $0 703 EQUIPMENT $0 $0 $0 $0 $0 $0 $0 704 VEHICLES $0 $0 $0 $0. $0 $0 $0 705 CONSTRUCTION $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $0 $0 $0 $0 $0 $0 $0 TOTAL PARKS $23,372 $27,324 $31,402 $18,253 $29,562 $0 $0 2 DEPARTMENT: Parks, Recreation and Forestry PROGRAM: Park Improvements 1.995 RESOURCE ALLOCATIC. N: 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGETED PROPOSED APPRVD Employee Services 32,589.00 36,468.00 37,778.00 37,954.00 Materials & Services .00 .00 .00 .00 Contractual Services .00 .00 .00 .00 Capital Outlay 19,860.00 27,411.00 25,000.00 0.00 TOTAL 52,449.00 63,879.00 63,434.00 37,954.00 APPROPRIATION PERSONNEL:::AL.. 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Director .20 .20 .20 - .20 Worker 1 .25 .25 .25 .25 Worker 2 .25 .25 .25 .25 TOTAL F-T Positions .70 .70 .70 .70 Part time positions: .15 .15 , .15 .15 TOTAL FTE'S .85 .85 .85 .85 3 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND PARKS IMPROVEMENTS 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $32,589 $36,468 •$37,778 $16,196 $27,672 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $433 $500 $0 $0 020 SALARIES, TEMP + PART $0 $0 SO $0 $2,520 $0 $0 030 PENSIONS $0 $0 $0 $2,015 $3,587 SO $0 040 GROUP INSURANCE $0 $0 $0 $1,378 $2,772 $0 $0 050 WORKERS COMPENSATION $0 $0 $0 $223 $903 $0 $0 070 BEEPER TIME SO $0 $0 $322 $0 $0 $0 TOTAL PERSONNEL-SERVICES $32,589- $36,468- $37,-778 --$20 567 - S37-954- ---SO --$0 MATERIALS + SUPPLIES 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 SO $0 122 SUPPLIES, VEHICLE $0 $0 $0 $0 $0 $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $0 $0 $0 $0 $0 $0 $0 170 MOTOR FUELS & LUBRICAN $0 $0 $0 $0 $0 $0 $0 240 UNIFORMS + CLOTHING $0 $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $0 $0 $0 $0 $0 $0 $0 CONTRACTUAL SERVICES 303 OTHER PROF SERVICE $0 $0 $0 $0 $0 $0 $0 3' TELEPHONE $0 $0 $0 $0 $0 $0 $0 3', ELECTRICITY $0 $0 $0 SO $0 $0 $0 322 NATURAL GAS SO $0 $0 $0 $0 $0 $0 354 DEBRIS REMOVAL $0 $0 $0 $0 $0 $0 $0 356 SATELLITES $0 $0 $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $0 $0 $0 362 CONFERENCES $0 $0 $0 $0 .$0 $0 $0 363 TRAINING $0 $0 $0 $0 $0 $0 $0 390 GRANTS + SUBSIDIES $0 $0 $0 $0 $0 $0 $0 401 RENTAL, EQUIPMENT $0 $0 $0 $0 SO $0 $0 511 REPAIR, BLDG + GROUNDS $0 $0 $0 $0 $0 $0 $0 513 REPAIRS, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $0 $0 $0 $0 $0 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 $0 703 EQUIPMENT $19,860 $27,411 $25,656 SO $0 $0 $0 704 VEHICLES $0 $0 $0 $0 $0 $0 $0 705 CONSTRUCTION $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $19,860 $27,411 $25,656 $0 $0 $0 $0 TOTAL PARKS IMPROVEMENTS $52,449 $63,879 $63,434 $20,567 $37,954 $0 $0 li DEPARTMENT: Parks, Recreation and Forestry PROGRAM: General Park Maintenance & Repair 1995 RESOURCE ALLOCATION 1993 1994 1995 I 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGETED PROPOSED APPRVD Employee Services 77,467.00 86,850.00 91,696.00 87,647.00 Materials & Services 22,358.00 41,319.00 23,286.00 27,527.00 Contractual Services 23,832.00 41,984.00 27,200.00 29,858.00 Capital Outlay 10,700.00 3,932.00 88,300.00 0.00 TOTAL 134,357.00 174,085.00 230,482.00 145,029.00 APPROPRIATION PERSONNEL. ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Director .10 .10 .10 - .10 Worker 1 .70 .70 .70 .70 Worker 2 .70 .70 .70 .70 TOTAL F-T Positions 1.50 1.50 1.50 1.50 Part time positions: .85 .85 .85 .85 TOTAL FIT'S 2.35 2.35 >2.35 2.35 j `i r . 5 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND PARKS MAINTENANCE & REPAIR 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $77,467 $83,794 $91,696 $6,336 $51,766 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $1,066 $1,600 $0 $0 020 SALARIES, TEMP + PART $0 $0 $0 $1,042 $14,288 $0 $0 030 PENSIONS $0 $0 $0 $1,031 $7,494 $0 $0 040 GROUP INSURANCE $0 $0 $0 $2,952 $5,940 $0 $0 050 WORKERS COMPENSATION $0 $0 $0 $804 $1,989 $0 $0 070 BEEPER $0 $0 $0 $645 $4,570 $0 $0 TOTAL PERSONNEL-SERVICES $ ;467- S83,794 $91,696 -$-1-3;876 $87647- - $0-- $0-- - MATERIALS + SUPPLIES 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $10,650 $0 $0 122 SUPPLIES, VEHICLE • $0 $0 $0 $0 $4,000 $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $3,050 $0 $0 160 SUPPLIES, OPERATING $23,358 $30,613 $23,286 $5,864 $5,000 $0 $0 170 MOTOR FUELS & LUBRICAN $0 $0 $0 $97 $3,282 $0 $0 240 UNIFORMS + CLOTHING $0 $0 $0 $664 $1,545 $0 $0 TOTAL MATERIALS + SUPPLIES $23,358 $30,613 $23,286 $6,625 $27,527 $0 $0 CONTRACTUAL SERVICES 303 OTHER PROF SERVICE $0 $0 $0 $0 $0 $0 $0 310 EPHONE $0 $0 $0 $770 $3,200 $0 $0 321 .CTRICITY $0 $0 $0 $1,651 $2,196 $0 $0 322 NATURAL GAS $0 $0 $0 $775 $7,000 $0 $0 354 DEBRIS REMOVAL $0 $0 $0 $2,308 $1,750 $0 $0 356 SATELLITES $0 $0 $0 $2,873 $6,817 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $4,800 $0 $0 362 CONFERENCES $0 $0 $0 $0 $0 $0 $0 363 TRAINING $0 $0 $0 $0 $0 $0 $0 390 GRANTS + SUBSIDIES $0 $0 $0 $0 $0 $0 $0 401 RENTAL, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 480 BONDING & INSURANCE $0 $0 $0 $0 $2,692 $0 511 REPAIR, BLDG + GROUNDS $0 $0 $0 $0 $1,400 $0 $0 513 REPAIRS, EQUIPMENT $0 $0 $0 $644 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $23,832 $34,857 $27,200 $9,021 $29,855 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 -$0 $0 $463 $0 $0 $0 703 EQUIPMENT $10,700 $0 $84,368 $0 $0 $0 $0 704 VEHICLES $0 $0 $0 $63,053 $0 $0 $0 705 CONSTRUCTION $0 $3,932 $3,932 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $10,700 $3,932 $88,300 $63,516 $0 $0 $0 TOTAL PARKS $135,357 $153,196 $230,482 $93,038 $145,029 $0 $0 K/ DEPARTMENT: Parks, Recreation and Forestry PROGRAM: Athletic Field Maintenance 1995 RESOURCE ALLOC TION 1993 1994 1995 1996 1996 EXPENDITURES - ACTUAL -- ACTUAL -——BUDGETED- -PROPOS-ED APPRVD— -— Employee Services 6,567.00 7,292.00 7,224.00 1,943.00 . Materials & Services 2,250.00 4,452.00 1,473.00 3,750.00 Contractual Services .00 .00 0.00. 2,692.00 Capital Outlay 0.00 0.00 0.00 0.00 TOTAL 8,817.00 11,744.00 8,697.00 14,385.00 APPROPRIATION PERSONNEL ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Worker 1 .05 .05 .05 .05 . Worker 2 .05 .05 .05 .05 TOTAL F-T Positions .10 .10 .10 .10 Part time positions: .15 .15 .15 .15 TOTAL FTE'S .25 .25 .25 .25 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND ATHLETIC FIELD MAINTENANCE 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $6,567 $7,292 - $7,224 $3,240 $3,298 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $86 $800 $0 $0 020 SALARIES, TEMP + PART $0 $0 $0 $0 $2,800 $0 $0 030 PENSIONS $0 $0 $0 $397 $592 $0 $0 040 GROUP INSURANCE $0 $0 $0 $198 $0 $0 $0 050 WORKERS COMPENSATION $0 $0 $0 $104 $453 $0 $0 TOTAL PERSONNEL SERVICES $6,567 $7,292 $7,224 $4,025 $7,943 $0 $0 MATERIALS + SUPPLIES 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 $0 $0 122 SUPPLIES, VEHICLE $0 $0 $0 $0 $0 $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $5,250 $4,452 $1,473 $3,532 $3,750 $0 $0 170 MOTOR FUELS & LUBRICAN $0 $0 $0 $0 $0 $0 $0 240 UNIFORMS + CLOTHING $0 $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $5,250 $4,452 $1,473 $3,532 $3,750 $0 $0 CONTRACTUAL SERVICES 354 DEBRIS REMOVAL $0 $0 $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $0 $0 $0 3'" CONFERENCES $0 $0 $0 $0 $0 $0 $0 TRAINING $0 $0 $0 $0 $0 $0 $0 390 GRANTS + SUBSIDIES $0 $0 $0 $0 $0 $0 $0 401 RENTAL, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 480 BONDING & INSURANCE $0 $0 $0 $0 $2,692 513 REPAIRS, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $0 $0 $0 $0 $2,692 $0 $0 CAPITAL OUTLAY 703 EQUIPMENT $0 $0 $0 $0 $0 $0 $0 704 VEHICLES $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $0 $0 $0 $0 $0 $0 $0 TOTAL ATHLETIC FIELD MAINT $11,817 $11,744 $8,697 $7,557 $14,385 SO $0 S DEPARTMENT: Parks, Recreation and Forestry PROGRAM: Recreation Programming - 1995 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ____ACTUAL_ __BUDGETED PROPOSED- APP--R-VD -- Employee Services 35,112.00 38,853.00 44,407.00 44,250.00 Materials & Services 321.00 616.00 625.00 500.00 Contractual Services 14,264.00 18,680.00 18,747.00 16,977.00 Capital Outlay 0.00 1,200.00 0.00 500.00 TOTAL 49,758.00 54,933.00 63,779.00 62,227.00 APPROPRIATION PERSONNEL ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Director .10 .10 .10 - .10 Adm. Asst. .10 .10 .10 .10 Program Supervisor .10 .10 .10 .10 TOTAL F-T Positions .30 .30 .30 .30 Part time positions:. .00 .00 .00 .00 TOTAL FTE'S .30 .30 .30 .30 CITY ^c MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND REC PROGRAMMING 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $35,112 $17,286 $12,836 $2,150 $13,088 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $0 $0 $0 $0 020 SALARIES, TEMP + PART $0 $21,567 $26,061 $4,766 $26,061 $0 $0 030 PENSIONS $0 $0 $3,358 $541 $3,358 $0 $0 040 GROUP INSURANCE $0 $0 $1,188 $493 $975 $0 $0 050 WORKERS COMPENSATION $0 $0 $964 $170 $768 $0 $0 TOTAL PERSONNEL SERVICES $35,112 $38,853 $44,407 $8,120 $44,250 $0 $0 MATERIALS + SUPPLIES 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 $0 $0 122 SUPPLIES, VEHICLE $0 $0 $0 $0 $0 $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $382 $616 $625 $661 $500 $0 $0 170 MOTOR FUELS & LUBRICAN $0 $0 $0 $0 $0 $0 $0 240 UNIFORMS + CLOTHING $0 $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $382 $616 $625 $661 $500 $0 $0 CONTRACTUAL SERVICES 480 BONDING + INSURANCE $0 $0 $4,250 $2,421 $2,692 $0 $0 310 TELEPHONE $0 $0 $0 $0 $0 $0 $0 32T ECTRICITY $0 $0 $400 $38 $520 $0 $0 322 NATURAL GAS $0 $0 $0 $0 SO $0 $0 342 ADVETISING $0 $0 $60 $0 $300 $0 $0 354 DEBRIS REMOVAL SO $0 $0 $0 $0 $0 $0 356 SATELLITES $0 $0 $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $500 $775 $220 $760 $0 $0 362 CONFERENCES $0 $1,711 $2,435 $0 $1,995 $0 $0 363 TRAINING $0 $624 $1,060 $504 $810 $0 $0 380 MILEAGE $0 $195 $67 $13 $200 $0 $0 390 GRANTS + SUBSIDIES $0 $8,224 $9,700 $0 $9,700 $0 $0 401 RENTAL, EQUIPMENT $0 $454 $0 $0 $0 $0 $0 513 REPAIRS, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $18,264 $11,708 $18,747 $3,196 $16,977 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 $0 703 EQUIPMENT $0 $3,227 $0 $0 $500 $0 $0 704 VEHICLES $0 $0 $0 $0 $0 $0 $0 705 CONSTRUCTION $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $0 $3,227 $0 $0 $500 $0 $0 TOTAL REC PROGRAMMING $53,758 $54,404 $63,779 $11,977 $62,227 $0 $0 ( 0 • DEPARTMENT: Parks, Recreation and Forestry PROGRAM: Sales and Marketing 1995 RESOURCE ALLOCATION 1993 - 1994 —1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGETED PROPOSED APPRVD Employee Services 7,514.00 8,634.00 9,650.00 9,022.00 Materials & Services 6,870.00 3,087.00 2,981.00 3,191.00 Contractual Services 11,063.00 14,112.00 13,519.00 18,526.00 Capital Outlay 7,750.00 0.00 4,628.00 500.00 ITOTAL 33,197.00 25,833.00 30,778.00 31,239.00 APPROPRIATION PERSONNEL ALLOCATIONS .. ..... ............ ..... .......... ..................... ....... ............................... • 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Adm. Asst. .10 .10 .10 . .10 Program Supervisor .10 .10 .10 .10 - TOTAL F-T Positions .20 .20 .20 .20 Part time positions: .00 .00 .00 .00 TOTAL FTE'S .20 .20 .20 .20 1i . CITU ^F MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND RECREATION - SALES & MARKETING 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $7,514 $8,634 $8,634 $408 $7,497 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $0 $0 $0 $0 020 SALARIES, TEMP + PART $0 $0 $0 $0 $0 $0 $0 030 PENSIONS $0 $0 $710 $49 $910 $0 $0 040 GROUP INSURANCE $0 $0 $250 $296 $579 $0 $0 050 WORKERS COMPENSATION $0 $0 $56 $30 $36 $0 $0 TOTAL PERSONNEL SERVICES $7,514 $8,634 $9,650 $783 $9,022 $0 $0 MATERIALS + SUPPLIES 122 SUPPLIES, VEHICLE $0 $0 $0 $0 $0 $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $6,870 $3,162 $2,981 $918 $3,191 $0 $0 TOTAL MATERIALS + SUPPLIES $6,870 $3,162 $2,981 $918 $3,191 $0 $0 CONTRACTUAL SERVICES 310 TELEPHONE $0 $0 $0 $0 $0 $0 $0 321 ELECTRICITY $0 $0 $0 $0 $0 $0 $0 330 POSTAGE $0 $3,046 $3,061 $1,073 $5,700 $0 $0 342 ADVERTISEMENTS $0 $311 $0 $0 $0 $0 $0 343 ^RINTING $0 $11,494 $10,418 $7,449 $11,800 $0 $0 361! MBERSHIPS $0 $40 $40 $0 $40 $0 $0 362 CONFERENCES $0 $0 $0 $0 $0 $0 $0 363 TRAINING $0 $0 $0 $0 $0 $0 $0 390 GRANTS + SUBSIDIES $0 $0 $0 $0 $0 $0 $0 401 RENTAL, EQUIPMENT $0 $0 $0 $0 $486 $0 $0 513 REPAIRS, EQUIPMENT $0 $0 $0 $0 $500 $0 $0 TOTAL CONTRACTUAL SERVICES $11,063 $14,891 $13,519 $8,522 $18,526 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 $0 703 EQUIPMENT " $7,750 $0 $4,628 $5,271 $500 $0 $0 704 VEHICLES $0 $0 $0 $0 $0 $0 $0 705 CONSTRUCTION $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $7,750 $0 $4,628 $5,271 $500 $0 $0 TOTAL RECREATION - $33,197 ,$26,687 $30,778 $15,494 $31,239 $0 $0 SALES & MARKETING I2 DEPARTMENT: Parks, Recreation and Forestry PROGRAM: Tree Disease Control 1995 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL_ ACTUAL _BUDGETED--PROPOSED--APP-RVD Employee Services 8,297.00 ' 9,024.00 11,356.00 11,682.00 Materials & Services 110.00 110.00 80.00 80.00 Contractual Services 18,579.00 20,665.00 13,500.00 13,500.00 Capital Outlay 0.00 0.00 0.00 TOTAL 26,986.00 29,799.00 24,936.00 25,262.00 APPROPRIATION PERSONNEL.ALLOCATIONS 1993 1994 1995 . 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions-Adm. Asst. .03 .03 .03 .03 TOTAL F-T Positions .03 .03 .03 .03 Part time positions: Forester .13 .13 .13 .13 TOTAL FTE'S .16 .16 .16 .16 13 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND FORESTRY - TREE DISEASE CONTROL 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $8,297 $924 41,100 $1,099 $1,122 $0 $0 020 SALARIES, TEMP + PART $0 $8,100 $10,000 $4,306 $10,300 $0 $0 030 PENSIONS $0 $0 $133 $126 $136 $0 $0 040 GROUP INSURANCE $0 $0 $119 $60 $119 $0 $0 050 WORKERS COMPENSATION $0 $0 $5 $0 $5 SO $0 0?? INSURANCE $0 $0 $0 $0 $0 SO $0 TOTAL PERSONNEL SERVICES $8,297 $9,024 $11,357 $5,591 $11,682 $0 $O MATERIALS + SUPPLIES 114 MICS OFFICE SUPPLIES $0 $0 $0 $0 $0 $0 $0 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $110 $0 $80 $0 $80 $0 $0 210 BOOKS + PERIODICALS $0 $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $110 $0 $80 $0 $80 $0 $0 CONTRACTUAL SERVICES 330 POSTAGE $0 $0 $0 $0 $0 $0 $0 352 TREE REMOVAL $18,569 $11,585 $13,500 $0 $13,500 $0 $0 361 MEMBERSHIPS $10 $15 $0 $0 $0 $0 $0 363 \INING $0 $0 $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $18,579 $11,600 $13,500 $0 $13,500 $0 $0 CAPITAL OUTLAY 703 EQUIPMENT $0 $0 $0 $0 $0 $0 $0 704 VEHICLES $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $0 $0 $0 $0 $0 $0 $0 TOTAL FORESTRY - $26,986 $20,624 $24,937 $5,591 $25,262 $0 $0 TREE DISEASE CONTROL 14 DEPARTMENT: Parks, Recreation and Forestry PROGRAM: ReforestationBeautification . . ... . .. .. . .... ... . . . 1995 RESOURCE ALLOCATION 1 i 1994 1995 1996 1996 FXPFNDITLJ_RFS _ 1993 BUDGET— BUDGETED PROPOSED-- APPRVD Employee Services 12,791.00 12,450.00 12,033.00 12,349.00 Materials & Services 3,520.00 4,550.00 3,960.00 3,960.00 Contractual Services .00 .00 .00 2,500.00 Capital Outlay 0.00 0.00 0.00 I TOTAL 16,311.00 17,000.00 15,993.00 18,809.00 APPROPRIATION PERSONNEL LLO C TIONS.... 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED Full Time Positions-Director .03 .03 .03 .03 TOTAL F-T Positions Part time positions: Forester .12 .12 .12 .12 TOTAL FTE'S .15 .15 .15 .15 15 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND FORESTRY - REFORESTATION/ BEAUTIFICATION 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $12,791 $4,350 • $1,645 $2,595 $1,677 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $0 $0 $0 $0 020 SALARIES, TEMP + PART $0 $8,100 $10,000 $4,306 $10,300 $0 $0 030 PENSIONS $0 $0 $200 $308 $203 $0 $0 040 GROUP INSURANCE $0 $0 $119 $60 $119 $0 SO 050 WORKERS COMPENSATION $0 $0 $69 $12 $50 $0 $0 TOTAL PERSONNEL SERVICES $12,791 $12,450 $12,033 $7,281 $12,349 $0 $0 MATERIALS + SUPPLIES 160 SUPPLIES, OPERATING $3,520 $10,430 $3,960 $10 $3,960 $0 $0 TOTAL MATERIALS + SUPPLIES $3,520 $10,430 $3,960 $10 $3,960 $0 $0 CONTRACTUAL SERVICES 390 GRANTS & SUBSIDIES $0 $0 $0 $0 $2,500 $0 $0 TOTAL CONTRACTUAL SERVICES $0 $0 $0 $0 $2,500 $0 $0 CAPITAL OUTLAY 702. BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 $0 EQUIPMENT $0 $0 $0 $0 $0 $0 $0 ,... VEHICLES $0 $0 $0 $0 $0 $0 $0 705 CONSTRUCTION $0 $0 $0 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $0 $0 $0 $0 $0 $0 $0 TOTAL FORESTRY - REFORESTAT $16,311 $22,880 $15,993 $7,291 $18,809 $0 $0 W DEPARTMENT: Parks. Recreation and Forestry PROGRAM: Cable Casting Gov't Meeting -1995 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 I EXPENDITURES ACTUAL ACTUALB—UDC ttD —PROPOSED——APPRVD Employee Services I 10,760.00 10,760.00 12,500.00 10,143.00 i 1 Materials & Services .1 900.00 900.00 . 900.00 900.00 Contractual Services 7,500.00 7,500.00 7,946.00 7,500.00 Capital Outlay .00 .00 .00 .00 TOTAL 19,160.00 I 19,160.00 21,416.00 1 18,543.00 APPROPRIATION I PERSONNEL 14LLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUD Gi✓ihD PROPOSED APPROVED FT Positions Tech/Prod .25 .25 .25 .25 2 Tech. Asst. .10 .10 .10 • • .10 TOTAL F-T Positions .35 1 35 .35f .35 ' Part time positions: 1 I i ITOTAL li-rm,'S 1 .35 1 .35 1 .35 1 .35 • I-1 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND CABLE CASTING - CITY MEETINGS 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $10,760 $12,168 • $0 SO SO SO SO 011 OVERTIME, REGULAR SO SO • SO SO SO SO 020 SALARIES, TEMP + PART SO $O $10,410 $2,668 $8,308 SO SO 030 PENSIONS SO SO $1,060 $304 $904 SO 040 GROUP INSURANCE SO SO $990 4460 SO SO 98 050 WORKERS COMPENSATION Sp SO $110 $20 5$ SO SO 598 50 Sp TOTAL PERSONNEL SERVICES $10,760 $12,168 $12,570 $3,452 $10,143 SO SO MATERIAIS + SUPPLIES 121 SUPPLIES, BLDGS & GRND SO SO SO SO 122 SUPPLIES, VEHICLE - SO SO SO SO 123 SUPPLYES, EQUIPMENT SO S0 SO SO SO SO 50 SO $0 SO SO 50 SO 160 SUPPLIES, OPERATING $900 $640 $900 $309 $900 SO SO 170 MOTOR FUELS & LUBRICAN SO SO SO SO SO SO 240 UNIFORMS + CLOTHING $0 $0 SO $0 SO � 50 SO TOTAL MATERIALS + SUPPLIES 5900 5640 $900 $309 $900 Sp SO CONTRACTUAL SEERVICES 303 FRANCHISE FEES $7,500 $7,870 $7,500 $7,506 $7,500 SO Sp 310 TELEPHONE SO SO SO SO 3 ELECTRICITY SO SO 30 SO SO 3 MEMBERSHIPS SO SO SO SO SO SO SO SO • SO SO SO SO 362 CONFERENCES SO SO SO SO 363 TRAINING SO SO SO SO SO SO SO SO SO SO 390 GRANTS + SUBSIDIES 401 RENTAL, EQUIPMENT SO $0 SO 50 SO SO SO 513 REPAIRS, EQUIPMENT S0 SO SO SO SO SO $0 $0 SO 50 SO SO $0 SO TOTAL CONTRACTUAL SERVICES $7,500 $7,870 57,500 $7,506 $7,500 SO SO CAPITAL OUTLAY . 702 BUILDINGS & STRUCTURES $0 SO SO 703 EQUIPMENT SO -$5,052 Sp SO SO SO SO 704 VEHICLES SO SO SO SO 705 CONSTRUCTION - SO SO SO S0 SO SO SO SO SO SO SO SO SO SO TOTAL CAPITAL OUTLAY SO $5,052 SO SO SO SO SO TOTAL CABLE CASTING - $19,160 $25,730 $20,970 $11,267 $18,543 SO PUBLIC INFORMATION Sp \8 , J CITY OF MOUNDS VIEW 1996 BUDGETED REVENUES 270 CABLE T V FUND 1993 1994 1995 1996 ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED PROPOSED OTHER REVENUES 3691 FRANCHISE FEES $40,599 $42,702 $40,830 $42,700 3850 APPROP. OF FUND BALANCE $0 $0 $0 $0 3901 INVESTMENT INTEREST $1,309 $1,952 $0 $1,800 3931 DONATIONS/GRANTS $5,000 $6,598 $0 $0 3991 OTHER REVENUE $0 $0 $0 $0 TOTAL OTHER REVENUES $46,908 $51,252 $40,830 $44,500 TOTAL CABLE T V FUND $46.908 $51,252 $40.830 $44,500 4p 1. t9 DEPARTMENT: Parks. Recreation and Forestry PROGRAM: Cable Casting Gov't Meeting 1995 `RESOURCE ALLOCATION 1993 1994 1995 1996 1996 I EXPENDITURES ACTUAL ACTUAL BUDGETED PROPOSED APPRVD Employee Services 10,760.00 10,760.00 12,500.00 10,143.00 Materials & Services 900.00 900.00 900.00 900.00 Contractual Services 7,500.00 7,500.00 7,946.00 7,500.00 Capital Outlay .00 .00 .00 .00 TOTAL I 19,160.00 19,160.00 21,416.00 18,543.00 APPROPRIATION I. PERSONNEL ALLOCATIONS ` I I 1993 1994 1995 1996 1996 I' POSITION ACTUAL ACTUAL BUDGETED PROPOSED APPROVED FT Positions Tech/Prod .25 .25 .25 .25 2 Tech. Asst. .10 .10 .10 • .10 TOTAL F-T Positions .35 .35 .35 .35 Part time positions: TOTAL FIT'S .35 .35 .35 .35 2O CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND CABLE CASTING - CITY MEETINGS 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $10,760 $12,168 • $0 $0 $0 $0 $0 011 OVERTIME, REGULAR $0 $0 $0 $0 $0 $0 $0 020 SALARIES, TEMP + PART $0 $0 $10,410 $2,668 $8,308 $0 $0 030 PENSIONS $0 $0 $1,060 $304 $904 $0 - $0 040 GROUP INSURANCE SO $0 $990 $460 $833 $0 $0 050 WORKERS COMPENSATION $0 SO $110 $20 $98 $0 $0 TOTAL PERSONNEL SERVICES $10,760 $12,168 $12,570 $3,452 $10,143 $0 SO MATERIALS + SUPPLIES - 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 $0 $0 122 SUPPLIES, VEHICLE - $0 $0 $0 $0 SO $0 $0 123 SUPPLIES, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 160 SUPPLIES, OPERATING $900 $640 $900 $309 $900 $0 $0 170 MOTOR FUELS & LUBRICAN $0 $0 $0 $0 $0 $0 S0 240 UNIFORMS + CLOTHING $0 $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $900 $640 $900 $309 $900 $0 $0 CONTRACTUAL SERVICES 303 FRANCHISE FEES $7,500 $7,870 $7,500 $7,506 $7,500 $0 $0 310 TELEPHONE $0 $0 $0 $0 $0 $0 $0 ?' ELECTRICITY $O $0 $0 SO $0 $0 $0 3 MEMBERSHIPS $0 $0 $0 SO $0 $0 $0 362 CONFERENCES $0 $0 $0 $0 $0 $0 $0 363 TRAINING $0 $0 $0 $0 $0 $0 $0 390 GRANTS + SUBSIDIES $0 $0 $0 $0 $0 $0 $0 401 RENTAL, EQUIPMENT $0 $0 $0 $O $0 $0 $0 513 REPAIRS, EQUIPMENT $0 $0 $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $7,500 $7,870 $7,500 $7,506 $7,500 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 $0 703 EQUIPMENT $0 $5,052 $0 $0 $0 $0 $0 704 VEHICLES $0 $0 $0 $0 $0 $0 $0 705 CONSTRUCTION $0 $0 $0 $0 $0 SO $0 TOTAL CAPITAL OUTLAY $0 $5,052 $0 $0 SO $0 $0 TOTAL CABLE CASTING - $19,160 $25,730 $20,970 $11,267 $18,543 $0 $0 PUBLIC INFORMATION 21 DEPAR' ENT: Parks. Recreation and Forestry PROGRAM: Cable TV Programming 1 995 RESOURCE ALLOCATION 1 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGETED PROPOSED APPRVD Employee Services 9,178.00 10,570.00 11,014.00 11,699.00 Materials & Services 900.00 900.00 900.00 900.00 Contractual Services 7,500.00 9,250.00 7,946.00 7,500.00 Capital Outlay .00 .00 .00 .00 TOTAL 17,578.00 20,720.00 19,414.00 20,099.00 APPROPRIATION PERSO EL ALLOCATIONS I1993 1994 1995 1996 1996 POSI ACTUAL ACTUAL BUDGETED PROPOSED APPROVED TION FT Positions Director .03. .03. .03 .03 Admin. Asst. .03 .03 .03 .03 f TOTAL F-T Positions .06 .06 .06 .06 Part time positions: Cable Tech. .25 .25 .25 .25 Sr. Operator TOTAL FTE'S .31 .31 .31 I .31 2/ CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL - 1996 EXPENDITURES 100- GENERAL FUND CABLE CASTING - PUBLIC INFO 1993 1994 1995 YEAR TO DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED DATE REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $9,178 $10,570 _ $2,746 $2,775 $2,799 SO $0 011 OVERTIME, REGULAR $0 $0 $0 SO SO $0 $O 020 SALARIES, TEMP + PART $0 $0 $5,884 $2,335 $6,611 $0 $0 030 PENSIONS SO $0 $1,045 $602 $1,114 $0 $0 040 GROUP INSURANCE SO $0 $1,228 $561 $1,072 SO $0 050 WORKERS COMPENSATION $0 $0 $110 $35 $103 SO $0 TOTAL PERSONNEL SERVICES $9,178 $10,570 $11,013 $6,308 $11,699 $0 SO MATERIALS + SUPPLIES 121 SUPPLIES, BLDGS & GRND $0 $0 $0 $0 $0 SO $0 122 SUPPLIES, VEHICLE - $0 $0 SO $0 $0 $0 $0 123 SUPPLIES, EQUIPMENT SO $0 SO SO SO $0 $0 160 SUPPLIES, OPERATING $900 $640 $900 $28 $900 $0 $0 170 MOTOR FUELS & LUBRICAN $0 SO $0 $0 $0 $0 $0 240 UNIFORMS + CLOTHING SO $0 $0 $0 $0 $0 $0 TOTAL MATERIALS + SUPPLIES $900 $640 $900 $28 $900 SO $0 CONTRACTUAL SERVICES • 303 FRANCHISE FEES $7,500 $7,870 $7,500 $7,506 $7,500 $0 $0 310 TELEPHONE $0 SO $0 $0 $0 SO SO 3?' ELECTRICITY $0 $0 SO SO $0 SO $O 3t ,MEMBERSHIPS $0 $0 $0 SO SO $0 $0 362 CONFERENCES $0 $0 $0 $0 $0 $0 SO 363 TRAINING $O $0 $0 $0 $0 $0 $0 390 GRANTS + SUBSIDIES $0 SO $0 SO $0 $0 SO 401 RENTAL, EQUIPMENT $O SO SO $0 SO SO SO 513 REPAIRS, EQUIPMENT $O SO SO $0 $0 S0 $0 TOTAL CONTRACTUAL SERVICES $7,500 $7,870 $7,500 $7,506 $7,500 $0 $0 CAPITAL OUTLAY 702 BUILDINGS & STRUCTURES $0 $0 $0 $0 $0 $0 SO 703 EQUIPMENT $0 $5,052 $3,000 SO $0 SO $0 704 VEHICLES $0 SO $0 $0 $0 SO $0 705 CONSTRUCTION SO SO $0 SO $0 SO SO TOTAL CAPITAL OUTLAY $0 $5,052 $3,000 $0 $0 $0 $0 TOTAL CABLE CASTING - $17,578 $24,132 $22,413 $13,842 $20,099 $0 SO PUBLIC INFORMATION 23 WATER FUND INCOME STATEMENT 1993 1994 1995 1996 ACTUAL ACTUAL BUDGET PROPOSED REVENUE: SALES & USE FEES $446,103 $510,762 $515,112 $547,225 PENALTIES & INTEREST $8,266 $8,153 $7,739 $7,678 CONNECT-ION-FEES $200 - $0 $500 - $500 PERMITS $260 $0 $300 $0 INVESTMENT INCOME $87,185 $103,100 $54,409 $88,749 METER SALES $6,475 $0 $5,950 $5,950 OTHER REVENUE $2,326 $32,263 $1,836 $32,000 TRANSFERS IN $0 $0 $0 $0 APPR. OF RETAINED EARNINGS $0 $0 $168,712 $218,708 TOTAL REVENUES $550,815 $654,278 $754,558 $900,810 EXPENSES: OPERATIONS $450,767 $472,711 $455,184 $487,108 DEPRECIATION $140,338 $201,898 $47,804 $101,112 CAPITAL OUTLAY $6,052 $14,738 $44,466 $37,400 DEBT SERVICE $103,906 $239,563 $188,908 $256,208 CONTINGENCY $0 $0 $15,000 $15,000 MAINTENANCE ALLOWANCE $0 $0 $0 $0 DESIG. FOR MAINTENANCE $0 $0 $0 $0 TOTAL EXPENSES $701,063 $928,910 $751,362 $896,828 NET INCOME (LOSS) 1$150,248) 1$274,632) $3,196 $3,982 29- DEPARTMENT: WATER PROGRAM: BILLING SERVICES 1995 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services 75,595 70,079 92,379 27,435 Materials & Services 17 225 225 Contractual Services 15,770 16,535 18,915 20,803 Capital Outlay 500 Debt Service 185,953 146,191 188,908 256,208 Transfers 113,569 118,580 90,197 92,605 TOTAL APPROPRIATION $390,904 $351,385 $391,124 $397,276 PERSONNEL ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Utility Accountant .50 .50 .50 .50 Accounting Clerk .25 .25 .25 .25 P/W Director .33 .33 .33 Engr. Technician .50 .50 .50 Planner .05 .05 .05 Secretary .50 .50 .50 TOTAL FTES: 2.13 2.13 2.13 0.75 2-5 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL- 1996 EXPENDITURES 700-4120 WATER UTILITY BILLING SERVICES 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $59,995 $56,768 $73,907 $28,300 $22,244 $0 $0 011 OVERTIME, REGULAR $0 $57 $0 $90 $0 $0 $0 030 PENSIONS $6,784 $6,423 $8,771 $3,360 $2,500 $0 $0 040 GROUP INSURANCE $7,253 $5,847 $8,447 $3,972 $2,586 $0 $0 050 WORKERS COMPENSATION $1,563 $984 $1,254 $220 $105 $0 $0 TOTALPERSONNEL SERVICES $75,595 $70,079 $92,379 $35,942 $27,435 $0 $0 MATERIALS + SUPPLIES 160 SUPPLIES, OPERATING $17 $0 $225 $60 $225 $0 $0 TOTAL MATERIALS+ SUPPLIES $17 $0 $225 $60 $225 $0 $0 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $3,695 $4,531 $5,125 $105 $5,363 $0 $0 304 PROGRAM INSTRUCTORS $4,047 $4,211 $4,095 $0 $4,325 $0 $0 330 POSTAGE $2,620 $2,898 $2,790 $1,320 $3,351 $0 $0 343 PRINTING $2,038 $1,036 $3,082 $0 $4,654 $0 $0 361 MEMBERSHIPS $60 $0 $66 $0 $0 $0 $0 363 TRAINING $918 $1,522 $1,000 $1,332 $500 $0 $0 513 REPAIRS, EQUIPMENT $2,392 $2,337 $2,757 $1,660 $2,610 $0 $0 TOTAL CONTRACTUAL SERVICES $15,770 $16,535 $18,915 $4,417 $20,803 $0 $0 CAPITAL OUTLAY 703 EQUIPMENT $0 $0 $500 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $0 $0 $500 $0 $0 $0 $0 DEBT SERVICE 801 PRINCIPAL $0 $0 $8,000 $0 $80,000 $0 $0 802 INTEREST $185,953 $145,755 $180,158 $0 $175,458 $0 $0 803 PAYING AGENT FEES $0 $436 $750 $0 $750 $0 $0 TOTAL DEBT SERVICE $185,953 $146,191 $188,908 $0 $256,208 $0 $0 MISC DISBURSEMENTS 990 TRANSFERS OUT $113,569 $118,580 $90,197 $0 $92,605 $0 $0 TOTAL MISC DISBURSEMENTS $113,569 $118,580 $90,197 $0 $92,605 $0 $0 TOTAL BILLING SERVICES $390.904 $351.385 $391,124 $40.419 $397.276 $0_ DEPARTMENT: WATER PROGRAM: INFRASTRUCTURE & EQUIPMENT MAINTENANCE 1996 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services $76635 $80806 $85946 $158679 $ Materials & Services $19092 $15757 $14140 $24288 $ Contractual Services $32164 $32457 $34268 $50967 $ Contingency $0 $0 $15000 $15000 $ Depreciation $140338 $43169 $47804 $101112 $ Capital Outlay $0 $28341 $40266 , $32900 $ TOTAL APPROPRIATION $268229 $200530 $237424 $387446 $ PERSONNEL ALLOCATIONS ONO. mom 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Operators 1.4 1.4 1.4 1.73 Director of PW .33 Engineering Tech .33 Department Secretary .33 City Planner .05 Total F-T Positions: 1.4 1.4 1.4 2.77 P-T Positions: Seasonals .5 .5 .5 .5 TOTAL FTES 1.9 1.9 1.9 3.27 27 CITY OF MOUNDS VIEW PUBLIC WORKS BUDGET DETAIL-1996 EXPENDITURES 07/13/95 700-4123 WATER PROGRAM: INFRASTUCTURE&EQ.MAINTENANCE 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES,REGULAR $50,290 $49,670 $56,670 $17,503 $117,414 011 OVERTIME,REGULAR $3,393 $3,225 $3,850 $1,132 $4,258 020 SALARIES,TEMP/PART-TIME $8,961 $7,306 $7,772 $0 $7,772 030 PENSIONS $6,940 $8,082 $8,284 $2,308 $15,619 040 GROUP INSURANCE $5,151 $9,227 $6,864 $2,382 $10,243 050 WORKERS COMPENSATION $1,900 $3,296 $2,506 $441 $3,373 060 UNEMPLOYMENT COMP $0 $0 $0 $0 $0 TOTAL PERSONNEL SERVICES $76,635 $80,806 $85,946 $23,766 $158,679 MATERIALS+SUPPLIES 121-SUPPLIES7BLDGS+GRNDS -- --$2;93-1 $1-794 --$1;500 - $0 $1,750 122 SUPPLIES,VEHICLE $348 $254 $725 $264 $725 123 SUPPLIES,EQUIPMENT $753 $985 $1,125 $279 $1,125 124 SUPPLIES,STREETS $3,496 $5,834 $600 $27 $10,850 125 SUPPLIES,UTILITIES $7,283 $3,821 $6,275 $748 $5,575 126 SUPPLIES,TRAFFIC CONTROL $319 $321 $200 $0 $200 160 SUPPLIES,OPERATING $1,904 $619 $1,575 $1,047 $1,525 170 MOTOR FUELS+LUBRICANT $1,134 $1,426 $1,343 $0 $1,708 240 UNIFORMS+CLOTHING $924 $703 $797 $634 $830 TOTAL MATERIALS+SUPPLIES $19,092 $15,757 $14,140 $2,999 $24,288 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $0 $184 $1,750 $52 $2,050 310 COMMUNICATIONS-TELEPHONE $1,611 $2,159 $1,680 $661 $1,718 321 ELECTRICITY $0 $0 $0 $0 $0 322 NATURAL GAS $7,728 $6,440 $7,772 $2,546 $7,174 330 POSTAGE $0 $0 $0 $0 $0 341 LEGAL NOTICES $0 $0 $0 $0 $0 342 ADVERTISEMENTS $0 $0 $0 $0 $0 361 MEMBERSHIPS $227 $330 $200 $373 $320 363 TRAINING $1,825 $1,433 $1,550 $592 $2,780 380 MILEAGE $0 $0 $0 $0 $0 401 RENTAL,EQUIPMENT $1,356 $1,459 $1,250 $331 $1,275 480 INSURANCE $16,879 $16,573 $17,816 $3,741 $17,850 511 REP.,BLDGS+GROUNDS $0 $0 $0 $0 $0 513 REPAIRS,EQUIPMENT $866 $2,079 $500 $37 $1,050 514 REPAIRS,STREETS $0 $0 $0 $0 $0 515 REPAIRS,UTILITIES $1,672 $1,800 $1,750 $560 $1,750 516 SYSTEM REPAIRS/MAINTENANCE $15,000 TOTAL CONTRACTUAL SERVICES $32,164 $32,457 $34,268 $8,893 $50,967 CAPITAL OUTLAY 703 EQUIPMENT $0 $28,341 $40,266 $39,372 $37,400 705 CONSTRUCTION $0 $0 $0 $11,973 $0 795 DEPRECIATION EXPENSE $140,338 $43,169 $47,804 $0 $101,112 TOTAL CAPITAL $140,338 $71,510 $88,070 $51,345 $138,512 MISC DISBURSEMENTS 910 CONTINGENCY $0 $0 $15,000 $0 $15,000 TOTAL MISC DISBERSMENTS $0 $0 $15,000 $0 $15,000 GRAND TOTAL $268,229 $200,530 $237,424 $87,003 $387,446 $0 $0 23 DEPARTMENT: WATER . PROGRAM: WATER PRODUCTION 1996 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services $23845 $25805 $27020 $26204 $ Materials & Services $18012 $16070 $17142 $18402 $ Contractual Services $69810 $73853 $60000 $67500 $ Capital Outlay $0 $0 $3700 $ $ TOTAL APPROPRIATION $111667 $115728 $107862 $112106 $ PERSONNEL ALLOCATIONS POSITION 1993 1994 1995 1996 1996 ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Operators .6 .6 .6 Total F-T Positions: .6 .6 .6 P-T Positions: TOTAL FITS .6 .6 .6 21 CITY OF MOUNDS VIEW PUBLIC WORKS BUDGET DETAIL-1996 EXPENDITURES 06/28/95 700-4125 WATER PROGRAM: WATER PRODUCTION 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES,REGULAR $18,751 $18,656 $19,692 $10,135 $19,989 011 OVERTIME,REGULAR $1,454 $1,515 $1,650 $485 $1,000 020 SALARIES,TEMP/PART-TIME $0 $0 $0 $0 $0 030 PENSIONS , $1,754 $2,447 $2,589 $1,315 $2,546 040 GROUP INSURANCE $1,324 $2,226 $2,376 $886 $1,820 050 WORKERS COMPENSATION $562 $961 $713 $309 $849 060 UNEMPLOYMENT COMP $0 $0 $0 $0 $0 TOTAL PERSONNEL SERVICES $23,845 $25,805 $27,020 $13,130 $26,204 MATERIALS+SUPPLIES 121-SUPPLIES LDGS-+GRNDS $0 $0 $0 ---$0 $0 122 SUPPLIES,VEHICLE $0 $0 $0 $0 $0 123 SUPPLIES.EQUIPMENT $0 $0 $0 $0 $0 124 SUPPLIES,STREETS $0 $0 $0 $0 $0 125 SUPPLIES,UTILITIES $0 $0 $0 $0 $0 126 SUPPLIES,TRAFFIC CONTROL $0 $0 $0 $0 $0 160 SUPPLIES,OPERATING $15,575 $13,941 $14,700 $3,412 $15,620 170 MOTOR FUELS+LUBRICANT $2,041 $1,426 $2,082 $0 $2,182 240 UNIFORMS+CLOTHING $396 $703 $360 $0 $600 TOTAL MATERIALS+SUPPLIES $18,012 $16,070 $17,142 $3,412 $13,402 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $5.423 $5,105 $5,750 $3,056 $6,550 310 COMMUNICATIONS-TELEPHONE $0 $0 $0 $0 $0 321 ELECTRICITY $63,912 $68,748 $53,300 $18,535 $55,750 322 NATURAL GAS $0 $0 $0 $0 $0 330 POSTAGE $0 $0 $0 $0 $0 341 PUBLIC EDUCATION $0 $0 $0 $0 $5,000 342 ADVERTISEMENTS $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $0 363 TRAINING $475 $0 $950 $300 $200 380 MILEAGE $0 $0 $0 $0 $0 401 RENTAL.EQUIPMENT $0 $0 $0 $0 $0 511 REP.,BLDGS+GROUNDS $0 $0 $0 $0 $0 513 REPAIRS,EQUIPMENT $0 $0 $0 $0 $0 514 REPAIRS.STREETS $0 $0 $0 $0 $0 515 REPAIRS,UTILITIES $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $69,810 $73,853 $60,000 $21,891 $67,500 CAPITAL OUTLAY 703 EQUIPMENT $0 $0 $3,700 $2,369 $0 GRAND TOTAL $111,667 $115,728 $107,862 $40.802 $112,106 • 30 WASTEWATER FUND INCOME STATEMENT 1993 1994 1995 1996 ACTUAL ACTUAL BUDGET PROPOSED REVENUE: SALES & USE FEES $1,005,237 $998,530 $1,017,984 $1,051,020 PENALTIES & INTEREST $15,498 $14,655 $14,489 $14,655 CONNECTIONFEES - $400 - -$1700 - $600 $1,000- PERMITS $0 $0 $250 $464 INVESTMENT INCOME $29,053 $33,005 $19,732 $33,901 METER SALES $0 $0 $0 $0 OTHER REVENUE $35,541 $43,096 $32,578 $92,896 TRANSFERS IN $0 $0 $31,193 $0 APPR. OF RETAINED EARNINGS $0 $0 $0 $0 TOTAL REVENUES $1,085,729 $1,090,986 $1 ,116,826 $1 ,193,936 EXPENSES: OPERATIONS $884,347 $909,649 $1,025,637 $1,111 ,398 DEPRECIATION $30,092 $38,159 $30,092 $30,092 CAPITAL OUTLAY $174,490 $35,756 $39,466 $34,250 DEBT SERVICE $0 $0 $0 $0 CONTINGENCY $0 $0 $15,000 $15,000 MAINTENANCE ALLOWANCE $0 $0 $0 $0 DESIG. FOR MAINTENANCE $0 $0 $0 $0 TOTAL EXPENSES $1,088,929 $983,564 $1,110,195 $1 ,190,740 NET INCOME (LOSS) L$3,200) $107,422 $6,631 $3,196 DEPARTMENT: WASTEWATER PROGRAM: BILLING SERVICES 1995 RESOVRZIE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services 82,786 66,917 92,378 27,435 Materials & Services 4 225 225 Contractual Services 566,199 602,340 712,490 756,381 Capital Outlay 3,093 500 Debt Service Transfers 91,731 95,650 66,120 67,565 TOTAL APPROPRIATION $743,813 $764,907 $871,713 $851,606 i. PERSONNEL: ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Utility Accountant .50 .50 .50 .50 Accounting Clerk .25 .25 .25 .25 P/W Director .33 .33 .33 Engr. Technician .50 .50 .50 Planner .05 .05 .05 Secretary .50 .50 .50 TOTAL FTE'S: 2.13 2.13 2.13 .75 32 CITY OF MOUNDS VIEW DEPARTMENTAL BUDGET DETAIL- 1996 EXPENDITURES 730-4120 WASTEWATER UTILITY BILLING SERVICES 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES, REGULAR $68,086 $54,125 $73,905 $28,219 $22,244 $0 $0 011 OVERTIME, REGULAR $0 $56 $0 $90 $0 $0 $0 030 PENSIONS $6,481 $5,909 $8,771 $3,061 $2,500 $0 $0 040 GROUP INSURANCE $6,656 $5,843 $8,448 $3,950 $2,586 $0 $0 Q50 WORKERS COMPENSATION $1,563 $984 $1,254 $221 $105 $0 TOTAL PERSONNEL SERVICES $82,786 $66,917 $92,378 $35,541 $27,435 $0 $0 MATERIALS + SUPPLIES 160 SUPPLIES,OPERATING $4 $0 $225 $0 $225 $0 $0 TOTAL MATERIALS + SUPPLIES $4 $0 $225 $0 $225 $0 $0 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $3,689 $4,466 $5,125 $0 $5,363 $0 $0 323 METRO WASTE CONT COMM $556,607 $594,241 $699,743 $349,872 $742,099 $0 $0 330 POSTAGE $1,243 $1,498 $1,417 $852 $1,876 $0 $0 343 PRINTING $2,038 $16 $2,382 $0 $3,933 $0 $0 361 MEMBERSHIPS $60 $0 $66 $0 $0 $0 $0 363 TRAINING $230 $0 $1,000 $0 $500 $0 $0 513 REPAIRS, EQUIPMENT $2,332 $2,119 $2,757 $1,450 $2,610 $0 $0 TOTAL CONTRACTUAL SERVICES $566,199 $602,340 $712,490 $352,174 $756,381 $0 $0 CAPITAL OUTLAY 703 EQUIPMENT $3,093 $0 $500 $0 $0 $0 $0 TOTAL CAPITAL OUTLAY $3,093 $0 $500 $0 $0 $0 $0 MISC DISBURSEMENTS 990 TRANSFERS OUT $91,731 $95,650 $66,120 $0 $67,565 $0 $0 TOTAL MISC DISBURSEMENTS $91,731 $95,650 $66,120 $0 $67,565 $0 $0 TOTAL BILLING SERVICES $743.813 $764.907 $871.713 $387,715 $851,606 $0 33 DEPARTMENT: WASTEWATER PROGRAM: INFRASTRUCTURE & EQUIPMENT MAINTENANCE 199 RESOURCE ALLOCATION :i 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services $28414 $33894 $45423 $120300— $ Materials & Services $8305 $10496 $7236 $8540 $ Contractual Services $21377 $26224 $24176 $51186 $ Contingency $15000 $3464 $15000 $15000 $ Depreciation $133442 $133442 $30092 $38159 $ Capital Outlay $0 $32780 $33966 $31900 $ TOTAL APPROPRIATION $221717 $240300 $155893 $265085 $ PERSONNEI.ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Operators .6 .6 1 1 Director of PW .33 Engineering Tech .33 Department Secretary .33 City Planner .05 Total F-T Positions: .6 .6 1 2.38 Total Positions: (1) Seasonal .25 .25 .25 .25 TOTAL FTES .85 .85 1.25 2.63 39- CITY OF MOUNDS VIEW PUBLIC WORKS BUDGET DETAIL-1996 EXPENDITURES 07/13/95 730-4123 WASTEWATER PROGRAM: INFRASTRUCTURE&EQ.MAINTENANCE 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES,REGULAR $18,424 $21,079 $30,122 $9,936 $90,906 011 OVERTIME,REGULAR $2,232 $1,815 $1,950 $588 $4,040 020 SALARIES,TEMP/PART-TIME $2,341 $3,752 $3,886 $0 $3,886 030 PENSIONS $2,505 $2,743 $3,879 $1,326 $11,417 040 GROUP INSURANCE $1,640 $2,593 $3,696 $1,245 $7,853 050 WORKERS COMPENSATION $1,272 $1,912 $1,890 $334 $2,198 060 UNEMPLOYMENT COMP $0 $0 $0 $0 $0 TOTAL PERSONNEL SERVICES $28,414 $33,894 $45,423 $13,429 $120,300 MATERIALS+SUPPLIES 121 S11P_PLIES,BLDGS+GRNDS $255 $319 $300 $0 $300 122 SUPPLIES,VEHICLE $0 $0 $0 $0 $0- 123 SUPPLIES,EQUIPMENT $1,443 $4,358 $1,900 $502 $3,000 124 SUPPLIES,STREETS $0 $373 $550 $0 $550 125 SUPPLIES,UTILITIES $536 $1,265 $1,500 $827 $1,600 126 SUPPLIES,TRAFFIC CONTROL $319 $321 $300 $246 $300 160 SUPPLIES,OPERATING $5,339 $3,130 $2,300 $0 $2,400 170 MOTOR FUELS+LUBRICANT $0 $0 $0 $0 $0 240 UNIFORMS+CLOTHING $413 $730 $386 $472 $390 TOTAL MATERIALS+SUPPLIES $8,305 $10,496 $7,236 $2,047 $8,540 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $168 $447 $375 $28 $375 310 COMMUNICATIONS-TELEPHONE $890 $1,186 $1,335 $237 $1,622 321 ELECTRICITY $1,008 $1,045 $1,135 $306 $1,144 322 NATURAL GAS $0 $0 $0 $0 $0 330 POSTAGE $0 $0 $0 $0 $0 341 LEGAL NOTICES $0 $0 $0 $0 $0 342 ADVERTISEMENTS $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $70 363 TRAINING $339 $320 $750 $0 $1,850 380 MILEAGE $0 $0 $0 $0 $0 401 RENTAL,EQUIPMENT $1,078 $1,142 $1,250 $197 $1,260 480 INSURANCE $16,879 $16,753 $17,816 $4,456 $17,850 511 REP.,BLDGS+GROUNDS $0 $0 $0 $0 $0 513 REPAIRS,EQUIPMENT $690 $3,393 $515 $357 $515 514 REPAIRS,STREETS $0 $0 $0 $0 $0 515 REPAIRS,UTILITIES $325 $1,938 $1,000 $3,207 $1,500 516 SYSTEM REPAIRS/MAINTENANCE $0 $25,000 TOTAL CONTRACTUAL SERVICES $21,377 $26,224 $24,176 $8,788 $51,186 CAPITAL OUTLAY 703 EQUIPMENT $0 $32,780 $33,966 $33,113 $31,900 795 DEPRECIATION EXPENSE $133,442 $133,442 $30,092 $0 $38,159 TOTAL CAPITAL OUTLAY $133,442 $166,222 $64,058 $33,113 $70,059 MISC DISBURSEMENTS 904 COLLECTION-OTHER AGENCIES $0 $0 $0 $0 $0 910 CONTINGENCY $15,000 $3,464 $15,000 $0 $15,000 TOTAL MISC DISBURSEMENTS $15,000 $3,464 $15,000 $0 $15,000 GRAND TOTAL $206,538 $240,300 $155,893 $57,377 $265,085 35 DEPARTMENT: WAS'1'EWA'I ER PROGRAM: UNDERGROUND INSPECTION 1996 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services $57810 $65956 $67818 $67115 $ Materials & Services $5284 $7709 $6671 $9551 $ Contractual Services $3143 $1631 $3100 $3100 $ Capital Outlay $0 $1110 $5000 $2350 $ TOTAL APPROPRIATION $66237 $76406 $82589 $82116 $ PERSONNEL:ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Operators 1.4 1.4 1.4 Total F-T Positions: 1.4 1.4 1.4 P-T Positions: (1) Seasonal .25 .25 .25 TOTAL ETES 1.65 1.65 1.65 CITY OF MOUNDS VIEW PUBLIC WORKS BUDGET DETAIL-1995 EXPENDITURES 06/14/95 730-4126 WASTEWATER PROGRAM: UNDERGROUND INSPECTION 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES,REGULAR $37,490 $42,894 $45,034 $17,407 $46,640 011 OVERTIME,REGULAR $5,208 $4,235 $4,550 $857 $4,760 020 SALARIES,TEMP/PART-TIME $2,341 $3,752 $3,886 $0 $3,886 030 PENSIONS . $5,098 $5,582 $6,015 $2,309 $6,235 040 GROUP INSURANCE $5,098 $5,534 $5.544 $2,170 $3,333 050 WORKERS COMPENSATION $2,575 $3,959 $2,789 $490 $2,261 060 UNEMPLOYMENT COMP $0 $0 $0 $0 $0 TOTAL PERSONNEL SERVICES $57,810 $65,956 $67,813 $23,233 $67,115 MATERIALS+SUPPLIES ----------------- 121-SUPPLIES BLDGS+GRNDS - $0 $0 -$0 $0- $0 122 SUPPLIES,VEHICLE $187 $817 $600 $0 $730 123 SUPPLIES,EQUIPMENT $260 $871 $500 $0 $600 124 SUPPLIES,STREETS $0 $0 $0 $0 $0 125 SUPPLIES,UTILITIES $0 $0 $0 $0 $0 126 SUPPLIES,TRAFFIC CONTROL $0 $0 $0 $0 $0 160 SUPPLIES,OPERATING $1,876 $513 $1,250 $17 $1,400 170 MOTOR FUELS+LUBRICANT $1,996 $4,778 $3,508 $27 $5,993 240 UNIFORMS+CLOTHING $965 $730 $813 $152 $828 TOTAL MATERIALS+SUPPLIES $5,284 $7,709 $6,671 $196 $9,551 CONTRACTUAL SERVICES ------------ 303 OTHER PROFESSIONAL SERV $622 $447 $1,000 $305 $1,000 310 COMMUNICATIONS-TELEPHONE $0 $0 $0 $0 $0 321 ELECTRICITY $0 $0 $0 $0 $0 322 NATURAL GAS $0 $0 $0 $0 $0 330 POSTAGE $0 $0 $0 $0 $0 341 LEGAL NOTICES $0 $0 $0 $0 $0 342 ADVERTISEMENTS $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $0 363 TRAINING $830 $450 $1,300 $435 $1,300 380 MILEAGE 50 $0 $0 $0 $0 401 RENTAL,EQUIPMENT $0 $0 $0 $0 $0 511 REP.,BLDGS+GROUNDS $0 $0 $0 $0 $0 513 REPAIRS.EQUIPMENT $1,691 $734 $800 $2,179 $800 514 REPAIRS.STREETS $0 $0 $0 $0 $0 515 REPAIRS,UTILITIES $0 $0 $0 SO $0 TOTAL CONTRACTUAL SERVICES $3,143 $1,631 $3,100 $2,919 $3,100 CAPITAL OUTLAY 703 EQUIPMENT $0 $1,110 $5,000 $0 $2,350 GRAND TOTAL $66,237 $76,406 $82,589 $26,348 $82,116 37 CITY OF MOUNDS VIEW 1996 BUDGETED REVENUES 420 SURFACE WATER MANAGEMENT FUND 1993 1994 1995 1996 ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED PROPOSED CHARGES FOR SERVICES 3470 USER FEES $0 $97,808 $114,808 $97,808 3472 CONNECTION CHARGES $808 $25,191 $5,000 $10,000 3473 PENALTIES $0 $588 $0 $588 TOTAL CHARGES FOR SERVICES $808 $123,587 $119,808 $108,396 OTHER REVENUES 3901 INTEREST INCOME $5,887 $7,633 $3,000 $8,500 3850 APPROPRIATION - FUND BALANCE $0 $0 $0 $0 3961 TRANSFERS $0 $0 $0 $0 3991 OTHER REVENUE $0 $50 $0 $0 TOTAL OTHER REVENUES $5,887 $7,683 $3,000 $8,500 TOTAL SURFACE WATER MGT FUND $6,695 $131,270 $122,808 $108,396 3g DEPARTMENT: SURFACE WATER MANAGEMENT PROGRAM: SYSTEM MAINTENANCE ................................ 1996 RESOURC ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services $6009 $6426 $7827 $8048 $ Materials & Services $1269 $2012 $1773 $3165 $ Contractual Services $6924 $2504 $10145 $35275 $ Capital Outlay $10563 $3810 $30666 $21600 $ Contingency $0 $0 $28183 $26646 $ TOTAL APPROPRIATION $24765 $14752 $50411 $94734 $ PERSONNEL ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Maintenance Employee .17 .17 .17 .17 Total F-T Positions: .17 .17 .17 .17 P-T Positions: TOTAL FTES .17 .17 .17 .17 31 CITY OF MOUNDS VIEW PUBLIC WORKS BUDGET DETAIL-1996 EXPENDITURES 07/13/95 420-4122 SURFACE WATER MANAGEMENT PROGRAM:SYSTEM MAINTENANCE . 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED YTD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES,REGULAR $4,246 $4,334 $5,361 $3,975 $5,550 011 OVERTIME,REGULAR $217 $500 $750 $189 $900 020 SALARIES,TEMP/PART-TIME $0 $0 $0 $0 $0 030 PENSIONS $528 $526 $741 $364 $871 040 GROUP INSURANCE $518 $620 $660 $210 $414 050 WORKERS COMPENSATION $446 $446 $315 $55 $313 060 UNEMPLOYMENT COMP _ $0 $0 $0 $0 $0 TOTAL PERSONNEL SERVICES $5,955 $6,426 $7,827 $4,793 $8,048 MATERIALS-+S1JPPLtES 121 SUPPLIES,BLDGS+GRNDS $0 $0 $0 $0 $0 122 SUPPLIES,VEHICLE $0 $0 $0 $0 $0 123 SUPPLIES,EQUIPMENT $0 $584 $250 $0 $400 124 SUPPLIES,STREETS $0 $133 $125 $0 $150 125 SUPPLIES,UTILITIES $0 $0 $0 $0 $0 126 SUPPLIES,TRAFFIC CONTROL $0 $0 $0 $0 $0 160 SUPPLIES,OPERATING $1,184 $991 $500 $26 $1,000 170 MOTOR FUELS+LUBRICANT $0 $0 $780 $0 $1,275 240 UNIFORMS+CLOTHING $85 $304 $118 $206 $340 TOTAL MATERIALS+SUPPLIES $1,269 $2,012 $1,773 $232 $3,165 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $6,659 $2,364 $10,000 $38 $10,000 310 COMMUNICATIONS-TELEPHONE $0 $0 $0 $0 $0 321 ELECTRICITY $0 $0 $0 $0 $0 322 NATURAL GAS $0 $0 $0 $0 $0 330 POSTAGE $0 $0 $0 $0 $0 341 LEGAL NOTICES $0 $0 $0 $0 $0 342 ADVERTISEMENTS $0 $0 $0 $0 $0 361 MEMBERSHIPS $0 $0 $0 $0 $0 363 TRAINING $265 $0 $0 $0 $200 380 MILEAGE $0 $0 $75 $0 $0 401 RENTAL,EQUIPMENT $0 $140 $70 $53 $75 511 REP.,BLDGS+GROUNDS $0 $0 $0 $0 $0 513 REPAIRS,EQUIPMENT $0 $0 $0 $0 $0 514 REPAIRS,STREETS $0 $0 $0 $0 $0 515 REPAIRS,UTILITIES $0 $0 $0 $0 $25,000 TOTAL CONTRACTUAL SERVICES $6,924 $2,504 $10,145 $91 $35,275 CAPITAL OUTLAY 703 EQUIPMENT $10,563 $3,810 $30,666 $23,000 $21,600 MISE DISBURSEMENTS 910 CONTINGENCY $0 $0 $28,183 $0 $26,646 990 TRANSFER OUT $0 $0 $0 $0 $0 TOTAL MISC DISBURSEMENTS $0 $0 $28,183 $0 $26,646 GRAND TOTAL $24,711 $14,752 $78,594 $28,116 $94,734 I..° DEPARTMENT: SURFACE WATER MANAGMENT PROGRAM: STREET SWEEPING • • 1,996 RESOURCE ALLOCATION 1993 1994 1995 1996 1996 EXPENDITURES ACTUAL ACTUAL BUDGET EST. APPR'D Employee Services $5955 $6596 $7612 $8055 $ Materials & Services $2772 $1181 $4442 $4312 $ Contractual Services $0 $91 $1270 $1295 $ Capital Outlay $0 $0 $0 $0 $ TOTAL APPROPRIATION $8727 $7868 $13324 $13662 $ • PERSONNEL ALLOCATIONS 1993 1994 1995 1996 1996 POSITION ACTUAL ACTUAL BUDGET EST. APPROVED F-T Positions: Maintenance Employee .17 .17 .17 .17 Total F-T Positions: .17 .17 .17 .17 P-T Positions: TOTAL VIES .17 .17 .17 .17 41 CITY OF MOUNDS VIEW PUBLIC WORKS BUDGET DETAIL-1996 EXPENDITURES 06/14/95 420-4124 SURFACE WATER MANAGEMENT PROGRAM:STREET SWEEPING 1993 1994 1995 1995 DEPARTMENT TEAM COUNCIL ITEM DESCRIPTION ACTUAL ACTUAL BUDGETED TYD REQUESTS REQUESTS APPROVES PERSONNEL SERVICES 010 SALARIES,REGULAR $4,246.00 $4,334.00 $5,361 $2,975 $5,550 011 OVERTIME,REGULAR • $217 $750 $750 $500 $900 020 SALARIES,TEMP/PART-TIME $0 $0 $0 $0 $0 030 PENSIONS $528 $528 $526 $587 $871 040 GROUP INSURANCE $518 $620 $660 $210 $414 050 WORKERS COMPENSATION $446 $364 $315 $55 $320 060 UNEMPLOYMENT COMP $0 $0 $0 $0 $0 TOTAL PERSONNEL SERVICES $5,955 $6,596 $7,612 $4,327 $8,055 MA i ER1ACS+SUPPLIES 121 SUPPLIES,BLDGS+GRNDS $0 $0 $0 $0 $0 122 SUPPLIES,VEHICLE $0 $0 $0 $0 $0 123 SUPPLIES,EQUIPMENT $0 $164 $600 $0 $600 124 SUPPLIES,STREETS $0 $0 $0 $0 $0 125 SUPPLIES,UTILITIES $0 $0 $0 $0 $0 126 SUPPLIES,TRAFFIC CONTROL $0 $0 $0 $0 $0 160 SUPPLIES,OPERATING $2,347 $713 $2,912 $26 $2,325 170 MOTOR FUELS+LUBRICANT $0 $0 $837 $0 $1,087 240 UNIFORMS+CLOTHING $425 $304 $93 $207 $300 TOTAL MATERIALS+SUPPLIES $2,772 $1,181 $4,442 $232 $4,312 CONTRACTUAL SERVICES 303 OTHER PROFESSIONAL SERV $0 $0 $0 $38 $0 310 COMMUNICATIONS-TELEPHONE $0 $0 $0 $0 $0 321 ELECTRICITY $0 $0 $0 $0 $0 322 NATURAL GAS $0 $0 $0 $0 $0 330 POSTAGE $0 $0 $0 $0 $0 341 LEGAL NOTICES $0 $0 $0 $0 $0 342 ADVERTISEMENTS $0 $0 $0 $0 $0 357 DISPOSAL $0 $0 $500 $0 $500 363 TRAINING $0 $91 $550• $0 $625 380 MILEAGE $0 $0 $75 $75 $100 401 RENTAL,EQUIPMENT $0 $0 $145 $53 $70 511 REP.,BLDGS+GROUNDS $0 $0 $0 $0 $0 513 REPAIRS,EQUIPMENT $0 $0 $0 $0 $0 514 REPAIRS,STREETS $0 $0 $0 $0 $0 515 REPAIRS,UTILITIES $0 $0 $0 $0 $0 TOTAL CONTRACTUAL SERVICES $0 $91 $1,270 $166 $1,295 CAPITAL OUTLAY 703 EQUIPMENT $0 $0 $0 $0 $0 GRAND TOTAL $8,727 $7,868 $13,324 $4,724 $13,662 1995 LONG TERM FTNANCIALP LAN THIRD DRAFT JULY 17 , 1995 Long Term Financial Plan Years 1996-2000 Purpose: To provide a reasonable estimate of the operational_and capitaLcosts of the municipal government services and programs for a 5 years period What the LTFP is: A plan, A framework, A map What it is not: A written in stone itemization of what will be Staffing Projections 1996-2000 1996 1997 1998 1999 2000 -0- **Seasonal P.W. F-T P.W. -0- -0- *Eliminate Admin. Intern *Reinstate Asst to City Admin. **Increase hours of Admin Clerk ""Additional Police Officer **F-T Parks Maintenance ** Positions moved to 1997 from 1996 Capital Equipment Program General Fund 1995 1996 1997 1998 1999 2000 $322,257 $144,425 $393,745 $182,400 $168,485 $170,(23,-1 Non General Fund - Enterprise Funds • Water Fund 1995 1996 1997 1998 1999 2000 $39,716 $32,900 $42,450 $5,300 $57,285 $5,600 Waste Water Fund 1995 1996 1997 1998 1999 2000 $41,216 $34,250 $19,700 -0- $55,835 -0- SWM Fund 1995 1996 1997 1998 1999 2000. $71,366 $46,600 -0- $25,000 $25,000 $25,000 Street Light Utility 1995 1996 1997 1998 1999 2000 - $7,500 $2,500 $5,000 $5,000 $2,500 $2,500 Park Improvement Fund 1995 1996 1997 1998 1999 2000 $12,500 $118,000 $65,500 $109,000 $90,000 $60,000 1995 CAPITAL IMPROVEMENT PLAN YEARS 1996-2000 CAPITAL IMPROVEMENT PLAN The City has two components of the Capital Improvement Plan: 1. Capital Equipment Program 2 . Capital Improvement Program Capital Equipment Program The Capital Equipment Program consists of the type, quantity and operational usage of equipment that the City estimates it will need in the future to: 1. Replace current equipment that has served its useful life, 2 . Acquire equipment that is necessary to effectively and efficiently maintain or enhance current or projected service levels within the City; and 3 . Maintain safety requirements and industry standards for maximum efficiency. It is estimated that in 1996 the General Fund will fund a total of $144, 425 in capital equipment acquisitions. The acquisitions for 1997 have been reduced substantially because of a Council imposed levy freeze for 1997. Because many of the acquisitions will be delayed until 1997 or beyond, subsequent years reflect a dramatic increase in capital equipment expenditures. It must be noted that the Capital Equipment Program is an estimate of future needs. It is recognized that all acquisitions are revenue sensitive and dependent on the projected revenue stream for any given year. It must also be noted that not all capital equipment needs can be anticipated. Some capital equipment needs may service at any time during the five year cycle and require current or next year funding to meet a required or desired service need. Capital Improvement Program This is a new program this year for the Long Term Financial Plan. The purpose is to detail the capital projects that are anticipated during the next five years, listing estimated costs and funding sources. It must be noted that some of the anticipated infrastructure projects are not included in this program due to the on-going work on the City's Pavement Management Program. As that Program is completed, the capital projects relating to infrastructure projects will be included in next year's LTFP. 1995 CAPITAL EQUIPMENT PROGRAM YEARS 1996-2000 69 Financing Sources for 1996 General Fund Capital Outlay include the following: • Silver Lake Woods Project Fund, $110 , 000 . If actual expenditures for 1995 street maintenance and sealcoating equal the $125, 000 budgeted, and if actual expenditures for 1996 street maintenance and sealcoating equal $110, 000, the fund will have been depleted by the end of 1996 . A new source of funding for street maintenance and sealcoating will then need to be found for 1997 and future years . • Special Projects Fund, $99 , 064 . Interest income of $69, 236 is projected for 1996, and in 1994 actual interest income exceeded projected interest income by $29, 828 . • Vehicle & Equipment Fund, $0 . 00 . Capital Outlay presently proposed for 1996 does not include the replacement of any vehicles or equipment on the fund' s schedule. • Fund Balance, $8 , 750 . The actual purchase of squad cars is on a continuous schedule of one car one year and two the next . Duringthe year one car is purchased, one and one-half squad cars are budgeted, and an amount equal to one-half car is placed in Fund Balance . The next year, when two cars are purchased, an Appropriation of Fund Balance, equal to one-half car, is made for the purchase of squad cars that year. This has the effect of evening out the budgeting of squad cars to one and one-half cars per year. For 1996 the Appropriation of Fund Balance for squad cars is $8 , 750 . • Property taxes, Other Revenue, $72 , 617 . For the 1995 Budget $72 , 617 from this source was used for Capital Outlay. That amount could be budgeted again for 1996, or a lessor amount, or zero, could be budgeted, given anticipated budget constraints for 1996 . - CITY OF MOUNDS VIEW 13—Jul-95 REVISED 1995 LONG TERM FINANCIAL PLAN Administrative Services SOURCE DEPART./PROJECT DESCRIPTION RATIONALE 1996 1997 1998 1999 2000 OF FUNDS ADMINISTRATIVE SERVICES — Office of City Administrator PERSONNEL COMPUTERS REPLACE OUTDATED EQUIPMENT GENERAL FUND Administrator(100%) 2 5(1) 3,000 Intern(40%) 1,200 1,200 Admin Sec(40%) 1,200 —Adtnin Aide(25%) 750: LASER PRINTER REPLACE OUTDATED EQUIPMENT GENERAL FUND Administrator(100%) 1,500 Intern(40%) 600 Admin Sec(40%) .1,000 Admin Aide(25%) 375 300 ADMINISTRATIVE SERVICES — Public Information INTERGOVERNMENTAL INFORMATION IMPROVE EFFICIENCY 2 3,000 3,000 3,000 3,000 GENERAL FUND INTERCHANGE(FREENET) COMPUTERIZED INFORMATION IMPROVE EFFICIENCY 3,000 3,000 3,000 3,000 GENERAL FUND (FT FCTRONIC INFORMATION CENTERS COMPUTERS REPLACE OUTDATED EQUIPMENT-:;:: ;:::;::;;:; GENERAL FUND Intern(10%) 300 Admin Sec(5%) 150 LASER PRINTER REPLACE OUTDATED EQUIPMENT GENERAL FUND Intern(10%) 150 Admin Sec(5%) • 75 COLORED PRINTER IMPROVE EFFICIENCY 500: ADMINISTRATIVE SERVICES — MIS COMPUTER SYSTEM UPGRADES IMPROVE EFFICIENCY 12,500` 12,500 12,500 12,500 12,500 GENERAL FUND INTERACTIVE COMMUNICATION IMPROVE COMMUNICATIONS 15,000 GENERAL FUND COUNCIL COMPUTERS IMPROVE EFFICIENCY 25,000 GENERAL FUND CENTRAL FILE SYSTEM IMPROVE EFFICIENCY20,000 GENERAL FUND COMPUTERS REPLACE OUTDATED EQUIPMENT- ;:.;;._ Intern(5%) 150 Admin Sec(5%) 150 LASER PRINTER REPLACE OUTDATED EQUIPMENTI--:'::: GENERAL FUND Intern(5%) 75 GENERAL FUND Admin Sec(5%) 75 GENERAL FUND • ADMINISTRATIVE SERVICES — Central Services DIRECT INWARD DIAL IMPROVE COMMUNICATIONS • 2,500 UPGRADE TELEPHONES—FINANCE IMPROVE COMMUNICATIONS 800 VOICE MAIL IMPROVE COMMUNICATIONS 15,000 WATER HEATER REPLACE OUTDATED EQUIPMENT 500 GENERAL FUND FAX MACHINE REPLACE OUTDATED EQUIPMENT 2,500 GENERAL FUND HVAC REPLACE OUTDATED EQUIPMENT 25000: 2.5,000 25,000 25,000 GENERAL FUND - ROOF REPAIR—CITY HALL REPLACE OUTDATED EQUIPMENT 25,000 25,W0 25,000 GENERAL FUND COMPUTERSREPLACE OUTDATED EQUIPMENT Intern(20%) 600 Admin Sec(5%) 150 Admin Aide(15%) • 450' V(h CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN Economic Development SOURCE DEPART./PROJECT DESCRIPTION RATIONALE 1996 1997 1998 1999 2000 OF FUNDS ECONOMIC DEVELOPMENT— Business Retention&Development LASER PRINTER 25% REPLACE OUTDATED EQUIPMENT .,,.375> 150 TIF FUNDS PENTIUM COMPUTER 25% REPLACE OUTDATED EQUIPMENT ..',..:i.'.,-'.'::::150: TIF FUNDS ECONOMIC DEVELOPMENT— Marketing COMPUTER-UPGRADE UPGAADE/IMPROvl Er11C:IENCY '.:; 3,000 3000 TIF- IIS LASER PRINTER REPLACE OUTDATED EQUIPMENT 1,500 TIF FUNDS PENTIUM COMPUTER 10% REPLACE OUTDATED EQUIPMENT >: :<:'300:: TIF FUNDS LASER PRINTER 10% REPLACE OUTDATED EQUIPMENT 1;150' 375 TIF FUNDS SUBTOTAL PRIORITY 1 ;,1,575 3,000 0 0 3,525 SUBTOTAL PRIORITY 2 0>: 0 0 1,500 0 SUBTOTAL PRIORITY 3 0:': 0 0 0 0 TOTAL ECONOMIC DEVELOPMENT $1 57 $3,000 $0 $1,500 $3,525 ' CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN GENERAL FUND Community Development SOURCE DEPART./PROJECT DESCRIPTION RATIONALE 1996 1997 1998 1999 2000 OF FUNDS COMMUNITY DEVELOPMENT—Planning PC COMPUTER REPLACEMENT 3,500 GENERAL FUND LASER PRINTER REPLACEMENT 2,000 GENERAL FUND SURVEY EQUIPMENT-1/2 IMPROVE EFFICIENCY 3,000 GENERAL FUND COMMUNITY DEVELOPMENT—Inspections LASER PRINTER REPLACEMENT 2,500 GENERAL FUND PC COMPUTER REPLACEMENT 3,500 GENERAL FUND COMMUNITY DEVELOPMENT—Housing PC COMPUTER REPLACEMENT 3,000 GENERAL FUND LASER PRINTER REPLACEMENT 2,500 GENERAL FUND COMMUNITY DEVELOPMENT— Engineering CAD,GIS UPDATES REPLACEMENT 11)00 1,200 1,200 1,500 1,500 GENERAL FUND SURVEY EQUIPMENT-1/2 IMPROVE EFFICIENCY 3,000 GENERAL FUND SUBTOTAL PRIORITY 1000; 6200 1,200 7,500 7,500 SUBTOTAL PRIORITY 2 0 6,000 0 0 0 TOTAL COMMUNITY DEVELOPMENT $1,000: $12200 $1,200 $7,500 $7,500 �/ 2 CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN Public Works SOURCE DEPART./PROJECT DESCRIPTION RATIONALE :::--1996::::',: 1997 1998 1999 2000 OF FUNDS • PUBLIC WORKS — Fleet Services HEATING SYSTEM IMPROVE EFFICIENCY 10300:: GEN/WAT/SEW PICKUP TRUCK VEHICLE PROGRAM 5,835 GEN/WAT/SEW PRESSURE WASHER REPLACEMENT 2,000 GEN/WAT/SEW RADIO DESK REMOTE IMPROVE EFFICIENCY 850 GENERAL FUND COMPUTER REPLACEMENT 5,000 GENERAL FUND DUMP TRUCK WITH SNOW EQUIPMENT IMPROVE EFFICIENCY 28800 GEN/WAT/SEW PUBLIC WORKS ENTRY IMPROVE EFFICIENCY/SAFETY 25,000 GEN/VAT/SEW/SW/ PUBLIC WORKS — Streets DUMP TRUCK W/SNOW EQUIPMENT IMPROVE EFFICIENCY 21600: GEN/WAT/SEW SANDER CONTROLS SAFETY 6700<- 6,800 GENERAL FUND PICKUP TRUCK W/PLOW VEHICLE PROGRAM 22,000 GENERAL FUND LOCATOR IMPROVE EFFICIENCY 1,000 GENERAL FUND ASPHALT ROLLER IMPROVE EFFICIENCY 11,700 GEN/WAT/SEW HEAT LANCE IMPROVE EFFICIENCY 1,500 GENERAL FUND CRACK FILLING MACHINE IMPROVE EFFICIENCY 25000 GENERAL FUND LIQUID CHLORIDE TANK IMPROVE EFFICIENCY 3500: GENERAL FUND ................... ................... .................. .................. .................. ................. .................. SUBTOTAL PRIORITY 1 ';;42;100:: 55,800 22,000 5,835 0 SUBTOTAL PRIORITY 2 0: 26,000 0 0 0 SUBTOTAL PRIORITY 3 0` 850 0 25,000 0 TOTAL PUBLIC WORKS $42,100: $82,650 $22,000 $30435 $0 11K. CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN Recreation SOURCE DEPART./PROJECT DESCRIPTION RATIONALE 1996: 1997 1998 1999 2 ii s OF FUNDS RECREATION—Administration PC COMPUTER IMPROVE EFFICIENCY $3000 4,000 GENERAL FUND COMPUTER UPGRADES IMPROVE EFFICIENCY 1,500 GENERAL FUND (3)OFFICE CHAIRS REPLACE OUTMODED EQUIPMENT 1,500 GENERAL FUND RECREATION=Programming PRINTER IMPROVE EFFICIENCY 500 GENERAL FUND LEAGUE SOFTWARE IMPROVE EFFICIENCY 2,500 GENERAL FUND FACILITY MNGMT UPGRADE REPLACE OUTMODED EQUIPMENT _. 3,900 GENERAL FUND RECREATION—Communications COLORED PRINTER IMPROVE EFFICIENCY 500: GENERAL FUND PC COMPUTER-12 REPLACE OUTMODED EQUIPMENT,..;.. ,% 2,000 GENERAL FUND SUBTOTAL PRIORITY 1 500.` 4,500 3,900 1,500 1,500 SUBTOTAL PRIORITY 2 ,.:0 3,000 4,000 0 0 SUBTOTAL PRIORITY 3 0 0 0 0 0 TOTAL RECREATION S1000% $7,500 $7,900 $1,500 $1>500 TOTAL GENERAL FUND 144,425 393,745 182,400 168,485 176,250 g° r. ; CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN Wastewater SOURCE DEPART./PROJECT DESCRIPTION RATIONALE ..: 1997 1998 1999 2000 OF FUNDS WASTEWATER HEATING SYSTEM IMPROVE EFFICIENCY 10300' GEN/WAT/SEW PICK-UP TRUCK VEHICLE PROGRAM 5,835 GEN/WAT/SEW LOCATOR IMPROVE EFFICIENCY 1,000 SEWER ASPHALT ROLLER REPLACE OUTDATED EQUIP 11,700 GEN/WAT/SEW TRACTION UNIT FOR CAMERA IMPROVE EFFICIENCY 5000 SEWER DUMP TRUCK W/SNOW EQUIP IMPROVE EFFICIENCY 2160Q GEN/WAT/SEW AIR BLOWER IMPROVE EFFICIENCY 2,350: SEWER LATERAL CAMERA CUSTOMER SERVICE 25,000 SEWER PRESSURE WASHER REPLACE OUTDATED EQUIP 2,000 GEN/WAT/SEW PUBLIC WORKS ENTRY - EFFICIENCY,SAFETY 25,000 GEN/WAT/SEW/SWI TOTAL WASTEWATER FUND 534250; $19,700 $0 $55,835 $0 CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN Street Light Utility .................. SOURCE ................ DEPART./PROJECT DESCRIPTION RATIONALE 1996 1997 1998 1999 2000 OF FUNDS STREET LIGHT UTILITY ................... ................ ................... .................. ................... .................. .................. .................. ................. .................. ................. LIGHTS BY PETITION CUSTOMER REQUEST 2,500 STREET LIGHT FUI 10 STREETLIGHTS IMPROVE LIGHTING 5,000 STREET LIGHT FUI TOTAL-STREET—LIGHT UM-LITT-FUND ; Soto: SSr:s CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN ransportation SOURCE DEPART./PROJECT DESCRIPTION RATIONALE 1996 1997 1998 1999 2000 OF FUNDS TRANSPORTATION ** PED BRIDGE CONSTRUCTION SAFETY&ACCESSIBILITY 120006: TIF PED BRIDGE INSP SAFETY&ACCESSIBILITY >< 30 Doo: TIF ** SILVER LAKE ROAD TRAIL SAFETY&ACCESSIBILITY miinocw ISTEA/SWM TRAIL H2 SAFETY&ACCESSIBILITY 50,000 GENERAL FUND ON—STREET BIKEIANES SAFETY&-ACCESSIBILITY ;= 3,000 GENERAL-FUND ** TRAILWAYS SAFETY&ACCESSIBILITY 20,000 20,000 20,000 20,000 GENERAL FUND 1997 MARKS THE END OF OUR ANNUAL PARK DEDICATION FROM THE EVEREST DEVELOPMENT. ••:SEEKING GRANT FUNDING SUBTOTAL PRIORITY 1 <450,000-- 73,000 20,000 20,000 20,000 SUBTOTAL PRIORITY 2 0` 0 0 0 0 SUBTOTAL PRIORITY 3 0= 0 0 0 0 TOTAL TRANSPORTATION $450,000 $73000 $20,000 $20,000 $20,000 e-(e mow% CITY OF MOUNDS VIEW 1995 LONG TERM FINANCIAL PLAN Golf Course ................ SOURCE . ............ ..... DEPART/PROJECT DESCRIPTION RATIONALE 1996 1997 1998 1999 2000 OF FUNDS • GOLF COURSE TREES SCREENING 10000: 5,000 5,000 5,000 5,000 GOLF FUND RAIN SHELTERS(2) IMPROVE EFFICIENCY 6,000 GOLF FUND PAVE CART PATHS DECREASE MAINTENANCE 20,000 GOLF FUND RESTROOM STRUCTURE CUSTOMER CONVENIENCE 15,000 15,000 GOLF FUND PRACTICE RANGE LEARNING CENTER IMPROVE EFFICIENCY 3,000:: 10,000 GOLF FUND RANGE LIGHTING IMPROVE EFFICIENCY 13,000 20,000 GOLF FUND CLUB HOUSE CABLE TV CONNECTION CUSTOMERSERVICE 5,500'. GOLF FUND COMPUTER FOR LEAGUES IMPROVE EFFICIENCY 2,500 GOLF FUND DEC CREST BEAUTTIFICATION 2,500 GOLF FUND TOTAL GOLF COURSE FUND $is,5oo $49,000 $30,000 $5,000 $40,000 ...... ... ...... 1995 CAPITAL IMPROVEMENT PROGRAM YEARS 1996-2000 nc O O o o Q g O 0 _ 0 O ci 1.0 0 0 _ 0 to o LL' pO ini r 6- ® 8 aC e) N Cii LU— CD ® (fl CO Ts i e7 •-•i IA U as as _c ai -1Caa) ca C .4.) O. I- v •,i Uzt , C t 0 i— E Cr) , Q LL a 0, a) z3 u) —1 < a) C C 1-- —ca�°-o[ ' 0 . E 77 ; E o a) W . U O _Z 0. C OI Z ca W O O n1 O _ N 2Z O S 0 7. 5 O I m as °)! 0- Lu O m Ci) -15 E � > 0 CV c o � O �' C/) CC �' o a ❑ n. O E • o cor O O U W0 0 O O 0 a) C Q b4 f} > ' U Li o ci) CVC W F— a v • E > co - m U 0 E-- a c 0 co CD 0 O U w o C C rW W / U o W C� 00 00 D Q CD ` m U"O O Z Wift 69 Ca a. N _a ai a = U W ca 3 7 5 CC Q .o o .cra t" p O • p w n- a °" Q 0 ZI w CC Cli CO Z Z Z ON Z C QI 0 z f- U I-- a U 1-- C.) E-- a) a) 1— F-- U Lu � U LL W W o c W LU O 0 U) OI 0 a. > 0 0 0 0 0 0 o $ 8 g z,,, r 00 0 E-i eq oo C)I— UO h o _l N N O ti O 8 g E a a O 5 0 w � g023 I— -o I"' N Jfli uz -0 r OEC W g U C z a •= 0 z0 � z E o 0) E N Q r N W_ W O V N Q > O N .. U N W o cocco a) 0 -(3 W N 0 o � � cc > >_ � '- - Le C '- N 0 cif - (n 0 2 < 0 Q = O 0 0 N OQ C.9 = 0 E cc co 0 0 QCO O 0) N a' U U = 0 rn N c Q 5 I— C3 Q z w U OC z U< H CC w p < z Z0 Cil C5 I= Z w CO 2 z (f) o cc 2 Z H ° I 0 L=L C C 0 U 0 CL V 0 0 w 0 0 ELU w -2 -2 ( LU LU 0 0 w Co O O c O O 0- 0- 0 � 0- 0 0 00-- 0- oo = o o C I o E 0000? o ton :n o ® 0® ' CV K @� ra Cl) ctf 0 O m U ics F— E-- .0 8 cn O a Q c) �:FA C tl1Z a 7.0 0 Z a 0 O o ., 111 .4-ai ol o W cm C Cif) CC CDCh x .§ CIa. cy) as C ,E Z21- a U E T MMIMI d U p —I arc a) -a a 2 L.Q I— 0 ' ` } N L >L . — H Cmrn o a- Q �n U a) 0 a) (n T N EOQU w ULU Yo CC a o L = Q z V a 2 O r-- . T Lii 45 "- E o W H a) i75 li v = cc EW-- 0 T:).. c LL as WCL 0 w < m N z �—� J 2 Z o Q. Z O I U - - la- O U, C v) U U I- a- U U U L.L. U U W W 2 LL Ili U l W W cc a.. a CZ -) d CL CD a a 0) _ 0 C 5 u, O c-• O Q a o 0 0 0 0 O � ) On a• -C—Q CL to 0000 00 N C a) �.. O OO O E9 o of ctS a O O 0 0 V N N (I) CI) a U °a1 I— O ,a V+ ' U c u) w c al a) O O --, .-' O Q _ c a) u- .— c cis I... C a) i Q. ti= �, as > Q i J a) 73 E ' '0 ci) a a) 7) a `1c� w OF - cl) oZ 0 .c =� a to ° a i45 O V o a) 4(15 p„ O }, E Z a) O 0 as O O- O I-- > U vJ N N E o El-- Zr- 2a; c ` � 0co W as C MI 0 0 .07C c O W W 0 Q a) CO o a O O L a) p) o 1.6 a E N 0,1 .c a) oa 0 0 a) c 0 Q. 0 as U c a) .a o o c c .� ZCT, Q -- L QO C) N 3 a) L ms EQ — 0 a) C 0 7) U Y as } o � �"' Y 2 as } O 3 C L LU J � CL. C m O 0 a! Q) N C Q' OQ V a) 7 cp as Cl) r Y V ili _ — �' y- w _ a) U � � ° ocr E 75 —I L 0 13 C C U 0cu 3 p c)7 O o 0 QC) aa) a CC (14 0) i 'C C > N C)O N C D CO O .-. a) as -a a ) r �-+ U C O O a Iw- 3 0 C a LLL _C a) 73 •C -a Z Q 2 as a) C c 2 H LL CD al c C U Q Z C VI v a Z O O_ > Q . a) a) o 0 I- r-+ U.1 Q J • O N Z17: W }.- E a as Fes- 0Z O 0 Z cj O0 .cn — Z f" P UI 0' C/) 0 ti I— U 0' U U 0 c •- U U • 2 w LU ac LL wI W 0 2 a f w w a O 0 uv17-) U) OI O c C O 0 E a. a a � El a. o a- ¢f a a lc 0 ! 0 0 o .o o0 o o 0 o 0 00000l d a) 0 0 69. 0 iii F-' CO- 0) c1—al E O O 8 0 U Vi Cl) 1--• -J0) C tC LL9 a *-.7: Q - L 0 OCS CD > .- 0 o -c O E to es ¢ L_ E J cn Q _Wa ac W 0 j Z C M Z »•-o 0 -- o > WWO -a a ' > N c C Q ,C cn cc O� L. o C:1 a Q, �, Z 2 T _C O YCU 0 0.. _ 0 J Q 0.. 0 ¢ 0 oC O . 03 } 0ti W p } 0 • p OQ v E a u m 05 E � E cn a) . > .QTs ft o_ o .n c IL/ a a, c� 0 000 cn Z = ®_ (� O E L_ cn O �n `n 3 CDD-C a) N (D N N C 0)CC a) 4. n. ca :C (tC (.. U' � N N a) a. .5 73 2 Z iii N ,07 (ten _o asc 73 o W I tm c� a 2 U) c Z U) W ¢ _c a) o a) C) Q CL F- o 0 -0 C N u' �I Q z - II 0 ee 0 0 Z 0 0 p U a) L.1.1 Q O Z J a � cn Z .- a 2 _ zi N of a a c (a Z �--_ p) 0 �t > Fa- ® c N cn > cn U ci I- H aI U F' 1— c c o F- F- C LLI Lu U H � � � 0 c 0 � � opC 0 w N 0 O! L- 0 O � El1 ¢ ._ a a 0 - a a.+ o CO 0_ a al ic tz o c o a) o E o v0) o000I 0 oas d O dodoI O `t N o 0 0 co- LU Cii 465 I— I O O a 0 0 cU J 0 Q U w O 0 CC Q O (2 0. +, +L.. cn c 0 i-- N U U C � U Q) E ¢ - Q. J O Z ._ .0 N ._ ¢ CO Q c 5 ~ W J - O JOW H Z °' 0) �- . _ L 2Z 0 ., W RI i o0 O L Q 0 0 111 WWp 3Y L' N '> � _a as tO _ T TD - a) v c.) o) c3aa, Oa Z +- M - Cll a) 0c id 0 LU o V D a ›- N co - W a) a) >- cm 0 a: a Q LL E- x o m a) o a) 'a -cn T o .0 u) w _ 1'�LU ¢ 0 'L V U ~ o � a - o al ¢ z C.) oa_ � a cn N cc -T3 *� i0 a) 0. .Q P Z r LU C N I E a w H C5 § cU M cc I— a) a) C U. D Q Z l a_s as 3 c Z 0�o 0 LU LU Cl) Z Z J CD Li.i z I— o P a H Z O p z u) Q O Z t- O P U U I- 0 UI— a. 0 I— o 0 0 LU LU EE U- w O -, U H -, -W, 0 o0 CO N 0 0 c 0 0 CC CC0. o - a. a a.. 0 CL fa) a a. CL 0 0000 0 00000l d Cl) CO 0 69. (1) N c - 0 0 N OS 0 69 Cn I- to. 0 V °� W c U -) o O JO }' Th c 06 03 Cr ri 0 o - Q 17, Q- Q g C.� }- t-- a _..1U w O_ OZ W a Z � G. o o1 III Z �„_, o0 Z a W c j 0 O U O a) W >Lu O �' ' rn 0I ° 0) 0 CL o 0-3 co z21- O a 0 gil 0 O -i arc .ca a Q a) W o Li. a I 0 m 0) C) a Q UI r a) O C E cn r UU 0 _ E E , _- 0 V 0 3 COI) co a 0 a135 s c Z m t� a. a iii Z tu U u.i Q U U v U.. ? Q Z > 0 -0 0 O0 CZ LL a. a cc a C C F- m U) Z a i- z1 O 0 z ° a 2 O a I- I- a U U H = I- U W W E LL W W 0 W W j v 0 0 O) tO 0 O O o -, a CC a a 0 a a l 0 E o 0 0 0 0I O 00001 0 O as E 0 0 0 0 0 LS _c..-. O L? Ltd 0 EH 2 Cl) .— co, In u, O fn g U 44- 49- I- O Q 4) O E 05 w c -c Ci 0 -t O 0 J VO c 06 a CC v ' 1— + a) Q. CN ® C ¢ - a. Q v a) c 5 I- H a D J U W O- Oz 0 a) uO I a)f2 <J _ 3 Z Lp� 0 0 Z I'— - a 0 0 N Z () O al 0) I5W a) a) 'vim-'. G 0 L O) W W 5 a)) E `� a, 0 `_` O N a 0) V+ CC to CO U co Q Oo 0 0 DG. 0) 0O OO - 0 O Z 2 r 2 o Ts C M — o� cO _I CC �' �' c a GTi 09 U ›-CO W C N. q) co cm LLa a _o ? ' .c CO a, 0) m O Q L m R N T i I-0 w O N c V V co O ami L- 0 0 CC 0 j V 0 C ° o -a Cl) co 0 o CC �- rn aa) Z a E a-0 E ct7 C7 a) ci)0. 0 z ti.i o F- >;� w 15 as - a.. 0 z a O as 4.- 'u) = CC H ❑ -a cts c u. Q Z c 0 0 0 ❑ 0 W 0 0_ o u_ as Q C'3 !- C�3 Z w m U) Z U) 1- a w Z 1-- E m i Z O 0 Z O a 0 Z 1- 1- U Cl)) 0 t- Q F- F- a U F- Hco 1- I- C.) w CC 0 w "1 -, 0 oo 0C Cl)LU 0 a "- 0 0 a a CI -2 a ate. 0 a a O 0 0 0 69-CJ 00000 O 0 0 0 0 0I 0 cti 00000 0 cj H 0 0 0 0 N N 0 0 s9- ki I— wO ccn c n ° U a) oE O E °" �'a amici co UcU J a) E Q o i 72t F-- al-J O W U. I— OZ 0 Wa azod z � ca 2z U G .al O ILI W ° C ° O > N ma) a c 0 0 O 0 a) 0 O U cn ai > 2 N 69. a a a. a) ) 5 T a) .1.-3' a) ii0 a W U O >. O 0 Q m a0 O 0 I— U O a 0 Q w on o 1- 0 O N w Tti �) CL ° 0 CC .0E -,0 c ! 0 E > U a 0 oZ 0) ° a) Z T" U) Ca w C cn p H CU a3 al U = a) I— 0 as Lii 5 U. .— Q Z as R) t c c cZ a WI Lil CD 0cn P a- I— Q. Z H 0 H 00 0 U) 00 I- t- F- f- 1-- Ili 0 U w UZ 0 V LU 0 LLI 0 0 0 U N 0 OZ 0 0 0 O CI) a cc o -3i a aU- 0 a a C j a. ca. a as o cn• en 0000 0 o 0 0 000 0 c > — ` cal o 0o. E c ' 0 r O o f- 4) - w� C - 1-- c6 a) 0 O 0 0 C �S O +. U 0 a. cs 0 -.1 n E Q Q O - a) -- ....._73_m-,0- C�- C 5 4:r.— < I— < a 1vw0 I- (1)0 Z '' 5 E0 cU W a a) ZCI. V Eo :E �, c C( `Za :417 as c O 0 O al 5 C O = U W W O Z2r .2a, a) .0 co) 15 0 . as .-I i. O U cno o � W co } �"_ >: �' oo.. }, >- N. 0 Q 3 cn w cm o L 0 F- E0 T. cn = c cn CC N. 1- Q .� ca c7) I- CC a- a) O a w I. a. I- o = U w ca as .c N c = w D < Z n E a a� Z 0 0 as a xo CO cc 0 CL _c w a cQ Z Z w w 2 Z ) g m 1- z O 0 Z a Z P 0 a U ) O ( 0 I- U a. U w w t UUw Uw U w a a 0 aJ a a a PC/ PO W W Pi H o o rr m c, c-, (D CD tzi tzi n rr C) C) H H CT' CD m 1-ii Pii e4 U PO Pd 0 1-3 1C1 m ~' 4 4 H n 0 In 4 % H rr C) H fid 0 H H z ti ZH a W H zyIA rr v tl tzi W m m m � i ¢ n- Fr tr li 4 Pi m t 0 m H IV p3 I-I H � e4 i-o Q m m w Q k< - orro m ' Lc, W co 11 1-3 n • I-, W K W 1--, W 0 0 m �+�, co C) w wcs) ot3' 0 Pi O a y !"d O Mizial OA W m0 0 m rr tcl Hi 7:1 H rr tr •• O W �' 0 h Il 0 H ED ED rir r�r rn O C *N4 14 • H- 11 t:::, til tM1 O m 4H- �I w n MV P) co CD 0 NC Z H Pi rr NO Lo P.Lo 0 b 0 r p zoco H C) t� bo 1-3 N o H Ir Oy r� Pi N 0 hi N H- ¢ I- H O -- b r Cl) W ILI Pi 0 1-3 pi 4 li En H-IA L=J H- rt m HC1 N- �R o0 E W W H o 0 m 0 0 Lo LO o 0 o 0 0 0 0 0 o 0 0 f. 1995 LONG TERM FINANCIAL PLAN REVENUE/EXPENDITURE PROJECTIONS (1996-2000) /Ds' Presented herein are the first drafts of 1996 Estimated General Fund Revenues and the 1996 General Fund Expenditure Budgets . Budget preparers worked very hard to develop a budget which would meet Council' s goal of no property tax increases for 1996 and yet provide services to the City' s Stakeholders . I believe that you will be pleased with the results . Estimated revenues for 1996 are $3, 501, 489, an increase over 1995 revenues of 1 . 5% . As per Council direction the property tax levy is the same amount as levied in 1995 . Licenses and Permits revenues are estimated to increase 15 . 35% over 1995 estimates . That projection is based upon historical averages . Revenues in 1994 were inflated due to C.G. Hill and Multi-Tech in the Business Park and the Silver Lake Point project . Fines & Forfeits are expected to increase by 4 . 7%. Intergovernmental revenues are based upon estimates received from AMM and the LMC and will increase by 1% . Other Revenues are projected to increase by 3 . 3%, primarily because of increased interest income. Interest rates have increased in 1995 and most economists believe rates will be stable for some time . General Fund Expenditures total $3 ,478, 459 for 1996, an increase of 8/10 of 1% over the 1996 Budget . Budgets in the Departments are lean and have modest increases, or in some cases decreases . Capital Outlay items have been kept to a minimum. Staff will be present at the June 26, 1995 Special Budget Work Session to review departmental budgets in detail . It should be noted that the first draft expenditure budget is $23 , 030 under estimated revenues . In other words, Staff is submitting a first draft budget which has excess revenues of $23 , 030 . ° 9 Long Term Financial Plan Revenue Assumptions - General Fund 06/01/95 1994 Percent of 1995 Percent of Assump % Budget Total Budget Total Increase Taxes 1 $1,459,501 I 46.4%1 $1,502,6641 43.6%1 1 1 Licenses & Permits I 105,3241 3.3% 87,9451 2.5% 3.0%' 1 1 1 1 Fines & Forfeits I 41,1491 1.3% 1 44,7261 1.3% I 1.0% Intergovernmental Aid 1 1,082,345 i 34.4%' 1,137,565 i 33.0% 1.5% I Fees & Charges I 17,3661 0.6% i 7,162! 0.2% 2.0% i 1 1 fFranchisc-Feed 12531-21 4-0'/o 1 152,341-1 4.4% 3.0% Transfers I 261,6371 8.3% 431,4141 12.5%1 3.0%1 Other Revenue I 53,6761 1.7%r 85,4321 2.5% 3.0% 1 1 Total Revenue I $3,146,310 , 100.0% $3,449,2491 100.0% Expenditure Assumptions - General Fund 06/01/95 1994 Percent of 1995 Percent of Assump % Budget Total Budget Total Increase Personnel Services $1,977,4661 62.9% $2,128,761 1 61.7%' 3.0% 1 Materials & Supplies 156,6841 5.0% 148,6211 4.3% 1 3.0% 'Contractual Services 712,1811 22.6% 709,532! 20.6% 3.0% Capital Outlay I 228,9171 7.3% 322,2571 9.3% 1 3.0% 1 i I Miscellaneous ! 71,0621 2.3% I 140,078' 4.1% I 3.0% 1 Ii 1 - TOTAL I $3,146,3101 100.0% $3,449,2491. 100.0%1 3.0% Misc includes contingency, comp worth adj, and transfers to other funds - 118 . Long Term Financial Plan Revenue Projections.- General Fund 06/01/95 1995 1996 1997 1998 1999 2000 Taxes $1,502,664 $1,502,6641 $1,566,0401 $1,631,588 $1,699,3761 $1,769,476 I Licenses & Permits I 87,945 90,583 93,301 96,100 98,983 101,952 Fines & Forfeits I 44,726 45,173 45,625 46,081 46,542 47,007 I f Intergovernmental Aid 1 1,137,5651 1,154,6281 1,171,9481 1,189,527 1,207,370 1,225,481 I Fee & Charges 7,1621 7,305 7,451 7,6001 7,752 7,907 r Franchise Fees 1 152,341 156,911 161,619 166,467 171,461 1 176,605 Transfers 1 431,414 444,3561 457,687 471,418 485,5601 500,1271 I Other Revenue 85,432 87,995 90,6351 93,354 96,154 99,039 Total Revenue $3,449,249 $3,489,617 $3,594,306,1 $3,702,135 $3,813,1991 $3,927,595 Tax Increase - Inflation _ $0 $63,3761 $65,547 $67,788 $70,100 Expenditure Projections - General Fund 06/01/95 1995 1996 1997 1998 1999 2000 Personnel Services $2,128,7611 $2,192,624' $2,258,403 $2,326,155 $2,395,939 $2,467,817 I Materials & Supplies 1 148,621 153,080 157,672 162,402 167,274 172,292 I Contractual Services 709,532 730,818 752,7421 775,325 ' 798,585 822,542 1 I Capital Outlay 1 322,2571 268,8161 276,880 285,1871 293,7421 302,554 I 1 I I Miscellaneous 140,078 144,2801 148,609 153,067 157,659 162,389 1 I I Total Expenditures $3,449,2491 $3,489,617 I $3,594,3061 $3,702,1351 $3,813,199 I $3,927,595 / 1 / .ong Term Financial Plan Revenue & Expenditure Projections Inflation Adjustment Only 1995 1996 1997 1998 1999 2000 Revenues ► $3,449,2491 $3,489,6171 $3,594,3061 $3,702,1351 $3,813,199 $3,927,595 I I I I Expenditures i $3,449,249 $3,489,617 $3,594,306 $3,702,135 $3,813,199 $3,927,595 Levy increase I $0 $63,3761 $65,547 $67,788 $70,1001 • % Levy increase I 0.00% 3.98% 3.96% 3.94% 3.92% Incr Tax Avge Home I I $2.71 I $21.08, $15.091 $18.451 $18.28 _%Tax Incr Avge Home I 1.00%1 7.72%, 5:1_3'%_1 5.97_%_ 5.58% New Programs Parks worker $41,529 $42,677 $43,856 $45,072 $46,4241 Forestry worker $5,164 $5,782 $5,955 $6,134 Police officer $40,441 $44,780 $49,876 $56,715 $58,416_ Maintenance worker j $42,597 $44,301 $46,073 $47,9161 $49,353 Admin Aide 1 1 $25,090► $25,843 $26,6181 $27,417 I $28,240 1 Volunteer coord i 1 $40,0001 $41,2001 $42,436 I $43,7091 $45,020 1 Total new Programs I $189,657 $203,965 $214,641 $226,784 $233,588 Inflation Adjustment+ New Programs Total Expenditures 1 $3,449,2491 $3,679,274 $3,798,271 $3,916,7761 $4,039,983 $4,161,183 f Levy Incr - New Programs I $189,6581 $14,308 $10,676 $12,1431 $6,804 Levy Incr - Inflation I I $0' $63,376 $65,547 $67,7881 $70,100 1 Total Levy Increase I $189,658 $77,684 $76,223 $79,931 $76,904 1 1 1 % Levy Increase I I 11.90% 4.36%1 4.10% 4.13% 3.81% 1 I i 1 1 Tax Incr Avge Home I I $47.511 $8.201 $23.50 $19.181 - $20.69 I I I I I I 1% Tax Incr Avge Home ! 17.58% 1 2.58%1 7.21%1 5.49%1 5.61%1 IF Long Term Financial Plan Revenue Projections - General Fund 06/01/95 No Franchise Fee 1998 - 2000 1995 1996 1997 1998 1999 2000 Taxes I $1,502,664f $1,502,664 $1,566,0401 $1,798,055) $1,870,837 $1,946,081 Licenses & Permits 1- 87,945 r 90,583 93,301 96,100 98,983 101,952 Fines & Forfeits 44,726 45,625 46,081 46,542 47,007 Intergovernmental Aid 1,137,565 1,154,628 1,171,948 1,189,527 1,207,370 1,225,481 Fee & Charges 7,162 7,305 7,451 7,600 7,752 7,907 Franchise Fees 152,341 1_56,911 1_61,619_ 0 0_ 0I F Transfers 431,414 444,356 457,687 471,4181 485,560 500,127 Other Revenue 85,432 87,995 90,635 93,354 96,154 99,039 Total Revenue $3,449,249 $3,489,617 $3,594,306 $3,702,135 $3,813,199 $3,927,595 Tax Increase - Inflation $0 $63,376 I $232,015 $72,782 $75,244 Expenditure Projections - General Fund 06/01/95 No Franchise Fee 1998 - 2000 • 1995 1996 1997 1998 1999 2000 Personnel Services $2,128,761 $2,192,624 $2,258,403 $2,326,155 $2,395,939 $2,467,817 Materials & Supplies 148,621 153,080 157,67211 162,402 167,274 172,292 I Contractual Services 1 709,532 730,818 752,742 775,325 798,585 822,542 j I Capital Outlay 322,257 268,816 276,880 285,187 293,742 302,554 Miscellaneous 140,078 144,280 148,609. 153,0671 157,659 162,389 ' 1 Total Expenditures 1 $3,449,249 I $3,489,617 I $3,594,306 $3,702,1351 $3,813,199 $3,927,595 I 7/3 1995 Long Term Financial Plan Years 1996-2000 Table of Contents Introduction 1 Public Service Program: Legislative Services City Council 2-3 Advisory Commission 4-5 Administrative Services Office of City Administrator 6-7 Human Resources 8-9 Public Information 9-10 Central Services 10-12 Management of Info Services 12-13 Economic Development Business Retention and Recruitment 14-15 Marketing 15-17 Street Light Utility 17-18 Finance 21-26 Community Development 27-30 Police 31-38 Public Works 39-40 Parks, Recreation and Forestry 49-56 Capital Improvement Plan 66-67 Capital Equipment Plan 68-89 Capital Improvement Plan 90-107A Long Term Revenue Program 108-114 ................................................................................................................................................................................... INTRODUCTION The 1995 Long Term Financial Plan, pipe ared in compliance with Section 7.05 of the Home Rule Charter for the City of Mounds View is designed to provide a 5 year plan to meet the service level and capital improvement needs of the City. The plan is comprised of three components: A. Public Service Program B. Capital Improvement Plan C. Capital Budget D. Long Term Revenue Program In 1995, the City converted from a line item budget format to a program/performance based budget format. Under the old format, services were described under departments. The new format describes services based on the specific service program. Within this document, each program has summarized each of the four components of the Long Term Financial Plan. 1 1 . LEGISLATIVE SERVICES Consists of two service programs: City Council and Advisory Commissions. Ir CCOUNCIL A. PUBLIC SERVICE PROGRAM The Public Service Program, as outlined in Section 7.05, Subdivision 2 of the Home Rule Charter, is to be: "...a continuing five-year plan for all public services estimating future needs for the public health, safety and welfare of the City. It shall measure the needs and objectives for each City Department, the standard of services described, and the impact of such service on the annual operating budget." City Council Program Function. and Service Standards As per City Charter, the ultimate authority for the administration operations of the City is the responsibility of the City Council. The City Council is comprised of five elected officials, the mayor and four Councilmembers, serving non-consecutive terms. It is the responsibility of the City Council to develop public policy thereby determining and guiding the future direction of the City. Every year, the City Council, together with City Staff, conduct a Strategic Planning Session to develop short and long range goals for the future of City programs and services. In July of 1993, the City Council initiated a community-wide visioning process known as FOCUS 2000. A nine month process, FOCUS 2000 resulted in a community- driven long range plan for the future of Mounds View, concentrating on the areas of: 2 IIs ADVISORY COMMISSIONS A. PUBLIC SERVICE PROGRAM Advisory Commissions/ Task Forces Program. Function and. Service Standards Advisory Commissions are created by the City Council and under the Council's specific direction, explore topics that may impact City policy. The Planning Commission has additional statutory responsibilities and authority whose primary function is to serve in an advisory capacity to the Council. The City has 4 advisory commissions: o Planning Commission o Economic Development Commission o Parks and Recreation Commission o Cable Commission Two task forces, the Golf Course Task Force and the Senior Center Task Force, were specific direction had been fulfilled to advise the City Council on the progress of the golf course sunsetted in 1995. Each year, at the Strategic Planning Session, the Five Year Goal Plan which lists the goals and action steps to be achieved in 5 years are updated to incorporate the recommendations of the FOCUS 2000 Issue Project Teams. The revised goals and action steps represent the City's implementation plan for the FOCUS 2000 recommendations. 4 III. OFFICE OF THE CLERK-ADMINISTRATOR Administrative Services. Program Function and Service Standards A. PUBLIC SERVICE PROGRAM Administrative Services consists of the following programs: o Office of the Clerk-Administrator o Human Resources o Public Information o Central Services o MIS The Clerk-Administrator is responsible for the day-to-day administrative operations of the City and implementation of all City policy adopted by the City Council or mandated by the County, State or Federal law. PROGRAM OBJECTIVE • Maintain positive relations with Legislative representatives and remain actively involved in Legislative matters that may impact the City. • Implement designated FOCUS 2000 recommendations in accordance with the Council approved Implementation Plan • Efficiently manage the City's services, operations and programs to provide the stakeholders of the City with quality services. • Efficiently and effectively implement Council policy, government requirements, mandates and laws. 6 IV. HUMAN RESOURCES A. PUBLIC SERVICE PROGRAM Human Resources Program Function -and-Settee-Standards This Program is responsible for personnel services including training for City staff, advertisements for employment opportunities, complying with the Affirmative Action Plan and providing a safe work environment by developing a safety plan and implementing it to minimize losses. Staffing for this Program include a percentage of costs for the Administration Clerk and Assistant to the City Administrator. PROGRAM OBJECTIVE * Maintain personnel files in accordance with the relevant Federal, State and Local Laws * Provide training and professional growth opportunities for staff * Recruit and maintain quality employees * Provide competitive compensation program for employees based on performance standards and maintain compliance with Pay Equity Law. BUDGET IMPACT Personnel: The position of Assistant to the City Administrator will remain unfilled in 1996. It is anticipated that in 1997 the position will once again be filled and the position of 8 information as possible to keep them informed and encourage them to participate in activities throughout the community. The Focus 2000 Issue Project Teams indicated they wanted more information from City Hall and it is the goal of this Program to do so. In addition, when people think of Mounds View, the City wants them to think of it as one of the top ten cities in the metropolitan area in which to live, work. BUDGET- IMPACT Personnel: Staffing for this Program includes a percentage of the Administration Secretary/Deputy Clerk, a percentage of the Administrative Intern and 25% of the Administrative Assistant in Parks and Recreation. It is anticipated that the Administrative Intern position will be replaced in 1997 with the reinstituted for the Assistant to the City Administrator position. B. CAPITAL IMPROVEMENT PLAN Funding for all equipment acquisitions is through the General Fund. C. CAPITAL BUDGET Funding for all equipment acquisitions is through the General Fund. • • 1ft. CENTRAL SERVICES A. PUBLIC SERVICE PROGRAM Central Services Program Function and Service Standards efficient The Central Services Program of Administrative Services provides for thefficient management, maintenance and operation of the City Hall building and office operations. 10 C. CAPITAL BUDGET All funding for Capital Equipment and improvements will be made through General Fund. VI. MANAGEMENT INFORMATION SERVICES (MIS) A. P LIC_S-ERV10E P QGRAM MIS Coordination Program Function and Service Standards This Program is responsible for information systems such as computer hardware and software applications and efficient processing of information as well as a coordinated records retention program that is accurate and efficient. PROGRAM OBJECTIVE One of the on-going priorities of the City Council is to maintain the City's commitment to remain up-to-date with new computer and communications technology. Maintaining the City's ability to quickly, accurately and effectively process, record and communicate information as well as provide timely, safe and efficient service in the day-to-day municipal operations is vital to the safety and well-being of all the residents of Mounds View. BUDGET IMPACT Personnel: Staffing of this Program include the Computer Consultant, 5% of the Assistant to the City Administrator (unfilled position in 1996) and 5% of the Administrative Secretary/Deputy Clerk. It is anticipated that consultant costs will increase in 1996 due to the lack of in- house expertise. 12 IX. ECONOMIC DEVELOPMENT A. PUBLIC SERVICE PROGRAM Economic Development Program Function and Service Standards Business Retention and Recruitment The Economic Development Coordinator's position is responsible for the City's economic development and re/development activities. Under the Business Retention and Recruitment, the economic development coordinator, will continue to assist in the stimulation of business growth and diversification by exploring and expanding funding mechanisms which support and sustain quality job opportunities for Mounds View residents. PROGRAM OBJECTIVE The Economic Development Coordinator provides the following under the Business Retention and Recruitment Program. • Education and exploration on funding mechanisms that are available to the local businesses for business expansion and attraction. • Coordination of redevelopment activities in relation to the City's main corridors • Developing positive relationships with local businesses and act as the City liaison for the businesses • Managing development funds and advocating the legislation regarding the use of development funds. • Responding and actively initiating proposals to attract and retain quality businesses 14 marketing activities of the City. With the approval of a marketing program in 1995, the necessary steps to implement and fund the program throughout the next few years will be a challenge. The Economic Development Coordinator will be responsible for coordinating activities of the Citizen/Business Marketing Task Force including the development and implementation of improved communication and marketing materials, promotional campaigns and image enhancement tools. In addition, the City and their activities will be proactively marketed through the submission of press releases, community recognition awards and group presentations. PROGRAM OBJECTIVE • Continually communicate with Mounds View businesses through the Business Association and Business Beat Newsletter. • Coordinate the publication of Marketing and Communication materials. • Monitor the Mounds View Marketing Program to include Buy Mounds View First Campaign, Good News Campaign, Welcome Banners, Monument Sign, Upgraded Entrance Sign and New Resident Welcoming Program. • Coordinate Fundraising activities to raise money for the marketing activities. • Evaluate the effectiveness of the Mounds View Marketing Program. • Develop programs to highlight successful projects as a direct result of Mounds View's Housing Rehabilitation Efforts. . Submit press releases and coordinate press opportunities regarding the activities in Mounds View and distribute throughout the Region. BUDGET IMPACT Personnel: 1997 F-T Administrative Aide $3,000 (10% of Personnel Costs) It is anticipated that the marketing activities will increase over the next year with the implementation of an aggressive marketing program for the City of Mounds View generating the need for a part time administrative aide to focus on these activities. It is estimated that approximately 10% of the F-T Administrative Aide would be dedicated to these activities. 16 Install additional streetlights as petitioned by residents. BUDGET IMPACT . .................. ......................... . ...... . ....... Personnel: Staffing includes 5% of the Administrative Intern. No other staffing allotments are anticipated. B. CAPITAL IMPROVEMENT PLAN Refer to page C. CAPITAL BUDGET Capital expenditures scheduled for this program will consist of adding 10 new streetlights each year for 3 years in accordance with the proactive streethght installation program. Additional lights may be installed as requested by residents through the petitioning process. 18 1 . FINANCE I l • FINANCE The Finance Department, headed by the Finance Director, who also serves as Treasurer, coordinates the financial activities of the City. Currently, department activities include the following: 1. Oversee the financial planning activities of the City. • Coordinate the preparation of the Long-Term Financial Plan. • Direct and coordinate preparation of the annual budget with close involvement and input from the Department Heads and Clerk-Administrator. 2. Perform all City accounting and financial reporting activities. • Prepare and control accounts payable. • Receive and manage all municipal revenues. • Prepare and control payroll. • Utility billing preparation and collection. 3. Prepare monthly financial reports, the annual financial statements, and assist auditors in the conduct of their annual audit of City financial records. 4. Invest temporarily idle City funds to maximize return on available resources. 5. Manage the City's insurance programs and evaluate and recommend modifications to ensure maximum protection at minimum cost. 6. Oversee the debt management program of the City. 7. Oversee the City's general purchasing program. In recent years external factors have caused a reprioritization of the duties and responsibilities of the Finance Department. Economic considerations, i.e., the economy and State's "fiscal crisis", have brought about an increasing emphasis upon financial reporting. New, generally-accepted accounting standards and reporting requirements mandated by the State of Minnesota, have and will continue to promote greater disclosure and understanding of City finances by bond rating services, State and Federal agencies, the general public, and other readers of City financial statements. The City has met this challenge by incorporating new reporting requirements into the City's Financial Reports and by participating in the Certificate for Excellence in Financial Reporting Program of the Government Finance Officers Association of the United States and Canada. improving the City's Comprehensive Annual Financial Report. To achieve this goal several objectives were established. These objectives are outlined in the following paragraphs. The first objective was the implementation of a Fixed Asset Accounting System. Such a system enables the city to properly inventory and account for its investment in equipment, vehicles, and buildings and structures. In 1988 Staff inventoried existing items. After the inventory was completed it was entered onto the fixed asset accounting system. A second objective was to obtain a Certificate of Achievement for Excellence in Financial Reporting for the City from the Government Finance Officers Association of the United States and Canada (GFOA). This Certificate is given to those government units whose financial reports are prepared in accordance with generally accepted accounting principles as promulgated by the Governmental Accounting Standards Board. In order to receive this - Certificate the fixed asset accounting system described in the preceding paragraph was implemented and various practical tables, listing ten years of data, have been prepared. The City's comprehensive annual financial reports for the years ended December 31, 1988, 1989, 1990, 1991, and 1992 were submitted to the GFOA and the City was awarded a Certificate of Achievement for Excellence in Financial Reporting. During 1993 2,078 Certificates were awarded to governmental units throughout the United States. Of these, 90 were awarded to governmental units in Minnesota. The Certificate is valid for one year only. Staff has submitted the 1993 Comprehensive Annual Financial Report to GFOA for consideration for a Certificate in 1994. Staffing No new staffing position is projected for the next five years. Five Year Projected Capital Expenditures 1996 - • Replacement of the Utility Accountant's personal computer is proposed. Estimated cost: $2,750. • The average life of a computer system is three to five years. The computer system which performs all of the City's accounting functions was purchased in 1989. Therefore, staff proposes the purchase of a new computer system in 1996. Computoservice, Inc., the fir that our accounting software is licensed from, has proposed an IBM RS6000 system. Processing benchmarks on the utility billing system indicate that the new system will process bills fifteen (15) times faster than our present system. The estimated cost is $20,000. It is proposed that the cost be shared by the General (50%), Water (25%) and Sewer (25%). a-� • Various software packages enhance productivity of the Department and also improve output of the Comprehensive Annual Financial Report and the Budget Book. These packages are for graphics and presentations. In addition, upgrades of the department's existing software are periodically announced. Estimated cost: $1,500. • Replacement of an existing high speed printer, used for production of accounts payable checks and financial reports is proposed. Estimated cost $9,000. 1999 • Replacement of the Payroll Clerk's personal computer is proposed. Estimated cost $3,750. • Various software packages enhance productivity of the Department and also improve output of the Comprehensive Annual Financial Report and the Budget Book. These packages are for graphics and presentations. In addition, upgrades of the department's existing software are periodically announced. Estimated cost: $2,000. 2000 • Replacement of the Utility Accountant's personal computer is proposed. Estimated cost $4,125. • Replacement of laser printer of the Finance Director is proposed. Estimated cost: $2,000. • Various software packages enhance productivity of the Department and also improve output of the Comprehensive Annual Financial Report and the Budget Book. These packages are for graphics and presentations. In addition, upgrades of the department's existing software are periodically announced. Estimated cost: $2,225. • Replacement of a forms burster is proposed. Estimated cost $5,495. COMMUNITY DEVELOPMENT a7 LONG TERM FINANCIAL PLAN COMMUNITY DEVELOPMENT The Community Development Department, currently consisting of the Community Development Coordinator, Engineering Aide, Building Inspector, Planning Associate/Code Enforcement Officer, Housing Inspector and Department Secretary, has as its focus the administrative application of land use and building regulations as adopted by the Municipal Code. The main goal of the Department is to ensure that development within the City is accomplished in accordance with the requirements spelled out in various City Codes as well as planning and providing for a conducive living and working habitat for Mounds View' s resident population. In 1996 and beyond, the Department will continue to provide quality services to the City, including: a. Planning and Zoning Review, zoning code enforcement, development review, planning and zoning code review. b. Building inspection, fire inspection, housing inspection and plan review. c. Recycling coordination and reporting, educational activities to reduce solid waste disposal problems and incentives for recycling. d. Implementation of zoning and sign code regulations including issuance of permits and enforcement of violations; also including enforcement of public nuisance codes related to land use. e. Housing rehabilitation program administration - including grant administration, rental inspection and promotion 1996 - 2000 GOALS 1996 * Finalize updates to Zoning and Sign chapters of the Mounds View Municipal Code. * Begin implementation of recommendations contained in the Housing Stock Analysis Report. * Enhance the rental housing inspection program by increasing the number of inspections provided. * Establish Multi-Family Managers Coalition. * Work on development of program for the amortization of non- oc conforming land uses. * Continue to provide timely, quality customer service. * Input targeted infrastructure data on Geographic Information System (GIS) . 1997 * Continue efforts at rehabilitating identified inadequate Housing Stock within the City. * Increase the number of rental housing inspections to include all units within the City. * Complete input of all relevant Infrastructure data on Geographic Information System. * Develop timeframe for total amortization of all non- conforming land uses within City. 1998 * Explore possibilities of subdivision of remaining oversized residential properties within City. * Begin review of Zoning and Sign chapters of the Municipal Code to ensure they are meeting the needs of the City as a whole. 1999 * Complete review of Zoning and Sign chapters of the Municipal Code. 2000 * Conduct analysis of the impact of the first 5 years of the Housing Rehabilitation Program. Staffing Projections Following the completion of the Housing Stock Analysis in March of 1995, the City Council took the final step towards housing rehabilitation in the City by hiring a full-time Housing Inspector to implement the programs and recommendations outlined in the study. With this hire, the Community Development Department appears to have all service areas - Planning, Housing, Code Enforcement, Building Inspection and Engineering - provided for. No additional Staff is anticipated to be needed in the near future. CAPITAL EXPENDITURES i 1996 * $1, 000 - Updates for CAD/GIS system to ensure continued full utilization of software. 1997 * $6, 000 - Total Station Survey Equipment to begin utilizing in-house Staff for City surveying needs. * $1,200 - Updates for CAD/GIS system to ensure continued full utilization of software. 1998 * $1,200 - Updates for CAD/GIS system to ensure continued full utilization of software. 1999 * $3 ,500 - Personal Computer for Community Development Coordinator to replace outdated equipment. * $2 ,500 - Laser Printer for Housing Inspector to replace outdated equipment. * $1, 500 - Updates for CAD/GIS system to ensure continued full utilization of software. 2000 * $3 , 500 - Personal Computer for Department Secretary to replace outdated equipment. * $2 , 500 - Laser Printer for Department Secretary to replace outdated equipment. * $1,500 - Updates for CAD/GIS system to ensure continued full utilization of software. I POLICE C. POLICE The objective of the Police Department is to provide basic Police Service, preserve the peace, and protect the public by enforcing State and Local laws. In doing so, the Department's role is to enforce the law in a fair and impartial manner, recognizing boththe statutory and judicial limitations of . Police authority and the constitutional rights of all persons. Basic services provided by the Police Department include: a. Prevention of Crime Involving the community in programs such as Operation Identification and Block Watch. Instilling in the community a sense of concern for crime problems and law enforcement needs to help combat the problems. b. Deterrence of Crime Routine patrolling of the City streets, parks, and business areas reduces crime because ' criminals feel immediate apprehension would be imminent. In the course of routine patrol officers investigate behavior which reasonably appears to be criminally directed. c. Apprehension of Offenders g. Animal Control/Nuisance Abatement The Community Service Officer and Officers of the Department enforce the animal control and nuisance ordinances. The Department impounds dogs and other animals and interacts with residents to maintain the health and safety of the community. h. School Liaison/Youth Counseling The Department's Investigators and other officers of the Department work closely with school officials, probation officers, human services and other agencies to aid in the health, safety and welfare of the community's youth. i. Emergency Services The Department assists in coordinating and planning with other agencies procedures used in the event of a major disaster or hazardous materials incident. Rendering aid to the injured, providing security and coordinating support groups is a responsibility and a duty that the Department is prepared for. Consideration should be given to upgrading our emergency/weather system. The new golf course is not adequately covered at this time. Purchasing a siren should be a consideration in 1996. The Police Department provides police services to the community year around, twenty-four hours per day. At the present time, the Department employs: Chief, Lieutenant, FAST grant. Under this grant the federal government will provide up to 75 % of an officers salary for a period of three years. This officer would work solely on community oriented policing programs. Programs such as block watch, operation I.D, business security and multi-housing associations would be expanded. In 1995, all squads were equipped and are utilizing mobile data terminals. Increase cost will be realized with the use of this equipment. New technology and officer safety should be considered to upgrade squad cars with safety back seats and video cameras. Our current computer system has been in place since 1986. Updates to hardware and software of this system should be anticipated. The police station was expanded and remodeled in 1995. Some new furniture, work stations and computers were purchased and installed. We will continue to upgrade equipment, furniture, and add a video security system to improve efficiency and to keep up with technology. With an increase in population and a commercial and business district rapidly growing, police activity is increasing. Cutbacks in police services may be realized if revenues remain constant. Services such as unlocking car ' doors, property damage accidents, and vacation house checks may be in jeopardy unless additional resources are found. It will be the Police Department's goal to maintain police services within the resources available. Police Departments in Ramsey County are and will continue ue to discuss and study the possibilities of consolidation of services. Discussions will continue with the school district 1997 GOALS INCLUDE: • Initiate Crime Free Multi-Housing Program • Appoint and train "Crime Prevention Specialist" 1998 GOALS INCLUDE: • Expanded Bike Safety Programs with possible bike patrols 1999 GOALS INCLUDE: • Expand Community Service Office Program 2000 GOALS INCLUDE: • Purchase new computer system PUBLIC WORKS 39 • PUBLIC WORKS DEPARTMENT 1996 Long Term Financial Plan The Public Works Department is responsible for the planning, construction, operation, and maintenance of the City' s infrastructure . For budget purposes, the department is split into 5 divisions . These are Street Maintenance, Water Operations, Sewer Operations , Surface Water Management, and Fleet Services . The major areas of services provided by the department are as follows : a. Maintenance of 56 city vehicles and other city equipment . b . Maintenance of City Hall and City Shop facilities including parking lots and equipment . c . Snow and Ice Control, Patching and Sweeping of 35 . 8 miles of streets under the City' s jurisdiction. d. Installation and maintenance of traffic signs under City • jurisdiction; currently there are over 1, 450 traffic signs . e . Operation and maintenance of 6 municipal wells; including chlorination and fluoridation of water for disinfection and health benefits . f . Operation and maintenance of three filtration plants for removal of iron and manganese. g. Maintenance of approximately 251, 000 feet of watermains, over 1000 valves, and 402 hydrants in the water distribution system h. Operation and maintenance of the sanitary sewer collection system, consisting of 2 lift stations, approximately 235 , 000 feet of sewer mains and over 900 manholes . 1995 -1999 PUBLIC WORKS GOALS The current goals of the department are improving the efficient delivery of service through more productive equipment, improved. work scheduling, preventive maintenance programs and appropriate • response to maintenance needs . Specific objectives for 1996 are as follows : * Continue review of highway and County Rcad turnback proposals . . * Enhance employee knowledge and productivity through training in computer technology and provision of efficient equipment and tools . 1999 Goals * Install five (5) valves in the city' s water distribution system. * Clean and televise 1/5 of the city' s sanitary sewer system. * Clean the remaining half of the Woodcrest storm sewer system. * Evaluate the City' s pavement condition. * Perform the recommended preventative maintenance procedures in in accordance with—the Pavement Management Program. 2000 Goals * Install five (5) valves in the city' s water distribution system. * Clean and televise 1/5 of the city' s sanitary sewer system. * Perform the recommended preventative maintenance procedures in in accordance with the Pavement Management Program. STAFFING LEVEL PROJECTIONS During the last couple of years staff has completed a few cuestionnaires regarding staffing levels in the Public Works areas , throughout the Stanton 5 cities . Levels incuired were in water, sewer, streets and shop . In all accountable areas , Mounds View' s staffing levels are relatively to considerably lower than the other municipalities polled. Staff is recommending that the following additional positions be considered to provide the maintenance needs for the city and customers . 1996 - 1 seasonal streets 1998 - 1 full time public works positions, Funded 1/4 G/W/S/SWM, eliminate seasonal in streets Seasonal employees currently budgeted in the water and sewer departments would remain constant (4) . Should this staffing level not be achievable, some consideration to private contracting could be an option. Experimentation in merging Public Works and Parks staff may reduce or possibly eliminate the necessity of additional staffing requirements . * A crack filling machine is requested for purchase in 1996 . Crack filling has become a very important maintenance procedure to prolong the pavement life of the City' s streets. Staff has been crack filling for the past three (3) years, with rental machines . Although this practice has been somewhat acceptable in the past, numerous problems have been encountered with rental machines . Scheduling, breakdowns, unreliable equipment, and cost have prompted staff to request the purchase of this equipment. Estimated cost : $25 , 000 . Program: Pavement Management * Staff is recommending the purchase of a dump truck equipped with snow removal equipment for 1996 . This truck will be necessary when the turnbacks are effective . With the additional mileage the city would then have a ratio of 1 piece of equipment for every 10 miles of street. Although this is considered a very good service level, only two vehicles can apply chemicals . Major breakdowns of equipment during snow storms can provide hazardous conditions for motorist. This has not been the case with the current equipment, but as snow removal equipment ages, it' s reliability is lessened. The ability to create safe driving conditions, is a major concern of staff . The City currently does not have enough snow removal equipment should one breakdown. The purchase of this equipment is recommended to be funded from the Water and Wastewater Funds also. Total equipment expenditure is estimated at $81, 000 . Estimated cost : $28 , 800 . Program: Snow and Ice, and Pavement Management . * A seasonal position is requested for 1996 . This position was addressed in the 1994 LTFP staffing level -projection. The addition of this position will lessen the amount of projects and programs that are contracted. Estimated cost: $ 5 , 000 . Program: Pavement Management . SURFACE WATER MANAGEMENT * Ditch and 'retention pond cleaning will be needed in this and future years program. Estimated cost : $ 25, 000 . . WATER * Additional lab equipment is requested to enable staff to conduct various tests recuired by the Safe Water Drinking Water Act . Estimated cost : $ 1, 500 . Program: Water Production. * System maintenance is required on a scheduled basis for all wells and pumps . This procedure provides preventative 44 * A power valve wrench will increase the efficiency and safety for employees in operating system valves . These valves are exercised each year in part of the water main flushing program. Many of these valves require two (2) employees to turn. Utilization of a power valve wrench will decrease labor expenses, and the possibility of injury related to straining and twisting of employees backs . Estimated cost: $4 , 500 . Program: Infrastructure Maintenance. * A new compactor is requested for the 1996 budget . This purchase will increase the effectiveness and efficiency of trench compaction. The current compactor is very cumbersome and somewhat ineffective in confined spaces, when trying to compact material around—underground uti1-hies . Estimated cost: $2, 700 Program: Infrastructure Maintenance . SEWER • * A new heating system is requested for the old portion of the maintenance garage. The old high intensity infrared heaters are burning out and are not nearly as efficient as newer tube style . Staff has researched the possibility of installing used oil burning units to use as primary heat, and maintain the old system. Since the city has used oil supply on hand, purchasing oil burners may be a very cost effective alternative. A ventilation problem was identified by the Honeywell report which causes hazardous gases to remain within the building. This situation should be corrected. Total funds for the entire project are included in this estimate. This expenditure is recommended to be funded from the Water and Wastewater funds also. Total project is estimated at $30, 800 . Estimated cost : $ 10, 300 . Program: Infrastructure Maintenance. * A hot air blower is requested for 1996 . This blower will enable the inspection personnel to perform underground televising in the winter season. Being able to conduct this ' task during this season will increase productivity and decrease the amount of years necessary to complete the system , wide inspection. Estimated cost : $2, 350 . Program: Underground Inspection. * Dump Truck, see Streets Estimated cost : $28 , 800 . Program: Infrastructure Maintenance. • 1997 - 2000 CAPITAL EXPENDITURES See LTFP Capital Worksheet 41/ PARKS , RECREATION & FORESTRY es 9 1995 L1'1-413 DEPARTMENT OF PARKS, RECREATION & FORESTRY communication, reporting, park file retention, park ordinance regulations, grant preparation, budgeting, facility permitting processes and other activities required for park activities and facility management. EFORESTATION - the purpose being preservation of our best natural asset, trees. The green canopy over Mounds View is a X very prized asset for beauty in Mounds View. Trees in the parks, city entries, corner lots, streets and boulevards add beauty to the community. Trees offer other environmental assets including shade for cooling, air filtration, bird sanctuaries, barriers for pedestrian traffic, sight lines and other uses. TREE D-I-SEASE CONTROL - provides city-wide inspection-of-trees to---- detect diseased trees for treatment or removal to eliminate the ;spread of predominately fungus and insect spread tree diseases and to nullify conditions which host disease causes ie. woodpile insp tions, gypsy moth migration, tree root transfers, etc. C LE CASTING CITY MEETINGS - is a program to increase citizen wareness of city government functions with the cable casting of City Council meetings and other special meetings. In addition, the program provides cable casting of minutes and agendas of Commissions and City Council meetings. / / CABLE CASTING PUBLIC INFORMATION PROGRAMS - which informs the / public of activities and events, topics and issues associated with the community. Cable TV programming is a newspaper of information on television. YOUTH RECREATION ACTIVITY - offers recreation activity /opportunities for the youth of the community including after- V school activities, school vacation activities, youth athletic programs, trips, safety programs,- instructional classes, skill development programs, clinics, pre-school programs, and special events. ADULT RECREATION ACTIVITY - offers recreation activity opportunities for adults of the community including senior /citizens. Activities include athletic leagues, instructional classes tri s clubs wellness ro rams ro rams social trips, programs,� safety programs, activities such as bridge groups, and garden club. GENERAL RECREATION ACTIVITY - provides recreational opportunities for families and special events for wide spectrums of people, /includes picnic kit rentals, merchandise sales, concessions, L.,/ Community Theatre production and ticket sales and other activities and contests for a wide range of participants. SWIMMING RECREATION ACTIVITY - the primary purpose of this ,program is to teach children to swim and advance their swimming skills. Safety and learning new water skill activities is also a major purpose of this program. Another purpose is to provide opportunities for the general public to use and enjoy the pool at 5: 5 - YEAR GOALS - 1996 - 2000 TRAIL DEVELOPMENT - The addition of a Pedestrian Bridge linking north and south trails across Highway 10 in 1996 will be a great addition to the trail system. Other improvements include on- street striping and marking as well as other opportunities for off-street trails especially to be considered at times when roads are turned back as is the case with County Road H2 which is scheduled for turn-back in 1996. Another opportunity is the grant for finishing the Silver Lake Road off-street trail from County Road H to Highway 10. This project, if awarded would be slated for 1996. Trail development is an on-going project where grants-are available and Pa-rtia-l-fundinghopeful. There ore-it is recommended that the City continue to pursue grants for expansion to the trail system. WOODCREST PARK DEVELOPMENT - Woodcrest Park has been a very difficult park to develop because of its high water table and peat subsoils. However, rather than spend money on new parkland, it has been indicated that community members would rather see Woodcrest Park developed. Although Woodcrest Park has limitations on development potential due to its characteristics, some improvements can be made to expand the recreational use of the park. PLAY EQUIPMENT REPLACEMENT - Play equipment has a longevity of approximately 15 years. There are play equipment in various parks which are nearing replacement stages. Random Park and Groveland Park play equipment structures are the first to require replacement. PARK BUILDING IMPROVEMENTS - Hillview and Groveland Park buildings have been improved for greater use and accessability. Lambert Park building improvements would include the installation of a unisex restroom. It has been experienced that the park building have greater community use and offers a more diverse use when indoor utility facilities are available. UPGRADING ATHLETIC FIELD FENCING FOR SAFETY - The City athletic field fencing needs to be heightened to comply with current standards in height for player safety. The new standards are 10 ' . At least four fields require heightened fences including City. Hall, Greenfield and both Silver View fields. CITY TREE TRIMMING PROGRAM - The City's tree trimming program for streets and boulevards took a back seat many years ago during budgeting sessions. Streets are in a condition where branches are hanging over and trucks and maintenance vehicles are rubbing over the branches. An additional allotment of one summer seasonal employee for Forestry services would suffice for the trimming of streets and boulevards. INTERACTIVE SYSTEM - This is a communication system where the 5 - YEAR PROJECTION FOR PERSONNEL NEEDS 1996 PARKS MAINTENANCE WORKER: PARKS MAINTENANCE PROGRAM - 1996 An additional Parks Maintenance Worker is requested for parks maintenance services. Increased use of parks and increasingly high e-xpectat-ons-for park maintenance requires-additional hours---- of labor. This position would be funded through the general fund. At level I the position and benefits would be approximately $38, 000. ADDITIONAL HOURS TO THE JOINT POWERS FORESTRY CONTRACT FOR FORESTRY ACTIVITY AT THE BRIDGES GOLF COURSE: GOLF COURSE PROGRAM - 1996 Additional tree planting is necessary for the golf course. Buffer tree planting along Highway 118 to avert stray golf balls and tree planting for aesthetics along Fairways # 1 & 2 screening the trucking firms is in the plans of the golf course. With additional hours added on to the Joint Powers Forestry Contract, tree planting could be done in-house. In addition, landscaping plans and planting, tree trimming and disease control could be extended forestry services provided at the golf course. It is expected that the revenues of the golf course would fund this extra time. Add 100 days of labor at approximately $7 . 00 per :our or $5, 600 plus benefits totaling approximately' $6, 000. ADDITIONAL FORESTRY WORKER TIME TO THE JOINT POWERS CONTRACT: REFORESTATION & DISEASE CONTROL - 1997 There are many projects that would benefit from additional Forestry work including landscaping along the noise barrier at Long Lake Road and Hwy 118 , the Highway 10 Corridor landscaping project, City street and boulevard trimming (which is way behind in trimming due to lack of time and lack of money for contracting the work) . Grants are readily available, but lack of time r stricts projects. Contracted tree services for trim work :should be budgeted at approximately $2 , 000 each year or the additional of a seasonal forestry employee at approximately $7. 00 per hour for 100 days or $5, 600 plus benefits totaling approximately $6, 000. Either option would be funded with general funds. Jr-� • PROGRAMMING: 1996 1 NEW COLORED PRINTER - 1/3 cost of a colored printer to be used for recreation programming, marketing and City Communications Programs. Estimated cost is $500 or 1/3 cost to be $166. 2 NEW PRINTER FOR REGISTRATION RECEIPTS - The old printer is far beyond longevity and is an old model that wastes paper. A new printer would cost approximately $500. 1997 * LEAGUE SCHEDULER SOFTWARE - This software makes scheduling of leagues more efficient, less labor intense. The cost is approximately $2 ,500. 1998 * UPGRADE FACILITY MANAGEMENT (WINDOWS) - Combined with the League Scheduler, this software fits league schedules into a facility management program, assigning play spaces. The approximate cost is $3 , 900 . 1999 2000 COMMUNICATIONS: 1996 1 22" MONITOR FOR ADMINISTRATIVE ASSISTANT - 1/2 cost of the purchase of a new large monitor. This person prepares the City Newsletters and other City information booklets and therefore would benefit from a larger printer. Approximate cost is $1500, or $750 for 1/2 cost. 1 1/3 COST OF COLORED PRINTER - approximate cost of $166 to be shared with Recreation Sales and Marketing and Recreation Programming Programs. 2 INFORMATION KIOSK - to advertise City information, to be placed in a public place that generates traffic. Approximate cost is $2 , 000. 1997 1 1/2 COST OF REPLACING SHARIE 'S COMPUTER sg • athletic fencing. Approximate cost is $11, 000. 3 PAVE GREENFIELD PARK PATH - Paving the path will provide for multi-use activity, make the path more accessible to those with handicaps, and would require much less maintenance. Approximate cost is $50, 000. . 4 HEIGHTEN THE OUTFIELD FENCE AT GREENFIELD PARK BASEBALL FIELD - For the same reasons previously stated, this ballfield would benefit from taller outfield fencing. Approximate cost, $12, 000. 1998 • * IMPROVE LAMBERT PARK BUILDING - Install indoor restroom facility. This would also provide for water service in the building which is a great benefit when running children' s programs. Estimated cost is $15, 000. 1999 * REPLACE RANDOM PARK PLAY EQUIPMENT - This play equipment is old. In addition, since Random Park has become the park facility where all the Preschool Programs are held Mondays through Thursdays. Preschool age equipment would be much more appropriate for this park than the current equipment. Approximate cost is $35, 000 . 2000 * REPLACE GROVELAND PARK PLAY EQUIPMENT - Play equipment has a longevity of 10 - 15 years. This play equipment is has extended its longevity and has had extensive use over the years. Many parts are replacement parts, or make-shift parts. The play equipment needs replacement. PARK MAINTENANCE: 1996 * REPLACE CUSHMAN VEHICLE - This vehicle is due for replacement as per the Equipment Replacement Plan. Estimated cost is $16, 000. 1997 * NEW PRINTER - Parks Workers currently use an old dot matrix printer that is far outdated. Since Parks Workers use the computer more frequently for reports, inventory, letters, memorandums, etc. it would be feasible to provide a new printer. Estimated cost, $500. 1998 6.0 * EQUIPMENT - Equipment for Interactive Communications - $7, 500. 1997 * NEW CAMRECORDER - small compact for use by all departments. Approximate cost, $1, 000. 1998 1999 2000 GOLF COURSE: 1996 1 TREES - for buffer areas, for aesthetics and safety. Approximately $5, 000. 2 BRIDGE MATS - Mats for the boardwalk and bridges for walking safety and durability. Approximate cost $ . 3 BUFFER FENCING - Heightened fencing along Holes 1 & 2 for aesthetics and safety. Approximate cost is $8, 000. 1997 1 RAIN SHELTER - for inclement weather that also is a restroom and has a vending machine. 15, 000. 2 TREES - for buffer areas. $5, 000 x_998 1 TREES - More trees for buffer areas. $5, 000 • PAVE CART PATHS - Approximately $15, 000 2000 1 TREES - for buffer areas. $5, 000. 2 NETTING - as determined necessary. Approximate cost, $15, 000. 1999 • TREES a ? CTI CE RANGE: 5 - YEAR GOALS - 1996 - 2000 TRAIL DEVELOPMENT - The addition of a Pedestrian Bridge linking north and south trails across Highway 10 in 1996 will be a great addition to the trail system. Other improvements include on- street striping and marking as well as other opportunities for off-street trails especially to be considered at times when roads are turned back as is the case with County Road H2 which is scheduled for turn-back in 1996. Another opportunity is the grant for finishing the Silver Lake Road off-street trail from County Road H to Highway 10. This project, if awarded would be slated for 1996. Trail development is an on-going project where grants are available--and partial funding hopeful, Therefore it is recommended that the City continue to pursue grants for expansion to the trail system. WOODCREST PARK DEVELOPMENT - Woodcrest Park has been a very difficult park to develop because of its high water table and peat subsoils. However, rather than spend money on new parkland, it has been indicated that community members would rather see Woodcrest Park developed. Although Woodcrest Park has limitations on development potential due to its characteristics, some improvements can be made to expand the recreational use of the park. PLAY EQUIPMENT REPLACEMENT - Play equipment has a longevity of approximately 15 years. There are play equipment in various parks which are nearing replacement stages. Random Park and Groveland Park play equipment structures are the first to require replacement. PARK BUILDING IMPROVEMENTS - Hillview and Groveland Park buildings have been improved for greater use and accessibility. Lambert Park building improvements would include the installation of a unisex restroom. It has been experienced that the park building have greater community use and offers a more diverse use when indoor utility facilities are available. UPGRADING ATHLETIC FIELD FENCING FOR SAFETY - The City athletic field fencing needs to be heightened to comply with current standards in height for player safety. The new standards are 10 ' . At least four fields require heightened fences including City Hall, Greenfield and both Silver View fields. CITY TREE TRIMMING PROGRAM - The City' s tree trimming program for streets and boulevards took a back seat many years ago during budgeting sessions. Streets are in a condition where branches are hanging over and trucks and maintenance vehicles are rubbing over the branches. An additional allotment of one summer seasonal employee for Forestry services would suffice for the trimming of streets and boulevards. INTERACTIVE SYSTEM - This is a communication system where the Revenue & Expenditure Projections No Franchise Fee 1998 - 2000 Inflation Adjustment Only 1995 1996 1997 1998 1999 2000 Revenues ( $3,449,2491 $3,489,6171 $3,594,306 $3,702,1351 $3,813,199 $3,927,595 Expenditures 1 $3,449,2491 $3,489,617 $3,594,306 $3,702,1351 $3,813,1991 $3,927,595 Lev Increase $0I $63,376 $232,015 $72,782 $75,244 % Lev Increase 1 . 0.00%1 3.98% 14.00% 3.85% I Incr Tax Av.e Home I $2.711 $21.08 $55.831 $4.83 $25,52 % Tax Incr Av.e Home 1.00% 7.72% 18.99% 1.38% - 7,19% New Proarams Parks worker $41,5291 $42,677 $43,8561 $45,072 $46,424 Forestry worker $5,164 $5,7821 $5,955 $6,134 Police officer $40,441 $44,780 $49,876 $56,715 $58,416 Maintenance worker 1 $42,597 $44,301 $46,0731 $47,916 $49,3531 Admin Aide $25,090 $25,843 $26,618 $27,417 $28,240 Volunteer coord $40,000 $41,200 $42,436] $43,709 $45,02o 1 Total new Programs $189,657 $203,965 $214,6411 $226,784 $233,588 Inflation Adjustment+ New Programs Total Expenditures I $3,449,2491 $3,679,274 $3,798,271 $3,916,7761 $4,039,9831 $4,161,183 I Levy Incr- New Programs $189,658 $14,308 $10,676 $12,143 $6,804 Levy Incr- Inflation $0 $63,376 $232,015 $72,782 L $75_,244 Total Levy Increase $189,6581 $77,684 $242,691 $84,925 $82,0481 I I % Levy Increase I 11.90% 4.36%1 13.04% 4.04% 3.75% Tax Incr Avge Home 1 $47.51 $8.201 $64.24 I $5.56 $27.93 %Tax Incr Avge Home I 17.58% 2.58%1 19.71%I t42% 7.06% /1I