Loading...
HomeMy WebLinkAboutAgenda Packets - 2016/11/07 CITY OF MOUNDS VIEW CITY COUNCIL WORK SESSION AGENDA MOUNDS VIEW CITY HALL Monday, November 7, 2016 7:00 p.m. ROLL CALL: Flaherty, Gunn, Hull, Meehlhause, Mueller PUBLIC COMMENT Citizens may speak to issues not on tonight’s agenda. Before speaking, please give your full name and address for the minutes. Also, please limit your comments to three minutes. Agenda Items Discussed by Consensus 1. Presentation from Ramsey County Sheriff Matt Bostrom 2. Review Draft of 2017 Fee Schedule 3. Local Water Supply Plan 4. Update on City Council’s Goals and Priorities 5. Public Works Facility Update Next Work Session: Monday, December 5, 2016, at 7pm Next City Council Meeting: Monday, November 14, 2016, at 7pm Item No: 2 Meeting Date: November 7, 2016 Type of Business: WS City Administrator Review: _____ City of Mounds View Staff Report To: Honorable Mayor and City Council From: James Ericson, City Administrator Desaree Crane, Assistant City Administrator Item Title/Subject: Review Draft of 2017 Fee Schedule Attached is the draft of the 2017 Fee Schedule for your review. This was reviewed by all Department Heads, and a final draft will be presented to the City Council on Monday, November 14, 2016. Changes to the Fee Schedule are highlighted in red and blue. Respectfully Submitted, Respectfully Submitted, _______________________ _______________________ James Ericson Desaree Crane Approved: September 26, 2016 Work Session Review November 7, 2016 2017 Fee Schedule Page 1 of 21 I. ........................ Building/Community Dev. Related Fees P. 3 a. ............................................................................... Valuation Table P. 3 b. ..................................................................................... Surcharges P. 4 c. ............................General Construction, Home, Building Permits, Misc. P. 4 Accessory Buildings Additions & Remodels, Residential Deck Demolition & Wrecking Door/Window Installation Driveways, Sidewalks, Parking Lots and Patios Electrical Work Elevators Fences / Kennels Fire Permits Fireplaces HVAC Irrigation Systems Manufactured Homes Moving Buildings Plumbing Work Porch Raising, Shoring Reshingling Re-siding/Stucco Satellite Dishes Sheds Signs/Billboards Sprinkler Systems Swimming Pools Temporary Office Tent, Temporary Telecommunication Antenna Warehouse Racking Systems (commercial) Windows d. ................................................ Other Inspections/Planning Fees P. 8 Building Inspections Change of Address Comprehensive Plan Amendment Conditional Use Permit Contractor Licenses Development/Site Plan Review Escrow Housing and Fire Inspection Fees Interim Use Permit Interim Use Permit Amendment Investigation Fee Lead Safety Certification Verification Park Dedication Fee Plan Review Fee Planned Unit Development/Amendment Refund Policy Rezoning Street or Easement Vacation Subdivisions Text Amendment, Zoning Code Text Amendment, Other Code Variance Wetland Alteration Permit Wetland Buffer Permit Zoning Letter II. .............. Miscellaneous (copies, maps, agendas, etc.) P. 10 Certified Copies Filing Fee for Public Office Insufficient Fund Checks (NSF) Municipal Code Notary Public Pending Assessment Search Photocopies DVD Copies Zoning Code CD Rom 50th Anniversary Cookbook Mounds View History Book 2017 Fee Schedule Page 2 of 21 III…….……………. Police/ Administrative Offenses P. 10 IV. ................................................................... Licenses P. 12 Amusement Centers/ Devises/Rides, Carnivals, Circuses Automobile Sales Bowling Alley Cigarette and Tobacco Contractor’s License Dog Licenses Garbage and Rubbish Hauler License Gasoline Station License Kennel License Liquor Licenses/Investigation Fee Rental Dwelling License/Transfer Rental Dwelling Conversion Fee Pawn Shops Peddlers/Transient Merchant Recuperation of Half Way House Restaurant License Therapeutic Massage/Investigation V. ...... Park, Recreation, and MVCC Facility Rental Fees P. 14 Banquet and Conference Center Rental Gymnasium Rental Athletic Field Rental Park Building and Picnic Shelter Rental VI. ......................................... Public Works Related Fees P. 18 Call Out Rate Schedule Right-of Way Management Fees Municipal Water System Fees Municipal Sanitary Sewer System Fees Surface Water Management Utility Fees Street Lighting Utility Fees Construction Site and land Disturbance Fees Other Management Public Works Fees 2017 Fee Schedule Page 3 of 21 I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES A. V ALUATION TABLE The following Valuation Table shall be used to determine fees for those permits indicated below and in all cases where the work is of such a nature that the permit fees cannot be determined from the schedule established below for such work. The minimum fee for all permits shall be $29.50 for residential permits and $49.50 for commercial permits unless otherwise specified. $1 to $500 $29.50 $501 to $2,000 $28 for the first $500 plus $3.70 for each additional $100 or fraction thereof, to and including $2,000 $2,001 to $25,000 $83.50 for the first $2,000 plus $16.55 for each additional $1,000 or fraction thereof, to and including $25,000 $25,001 to $50,000 $464.15 for the first $25,000 plus $12 for each additional $1,000 or fraction thereof, to and including $50,000 $50,001 to $100,000 $764.15 for the first $50,000 plus $8.45 for each additional $1,000 or fraction thereof, to and including $100,000 $101,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75 for each additional $1,000 or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000 $1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereof Specific Valuations Accessory Buildings: Garages & Sheds Attached Garage $29.49 per sq. ft. Detached Garages & Sheds, > 120 sq. ft. (w/ concrete floor) $16.23 per sq. ft. Detached Garages & Sheds, > 120 sq. ft. (w/ wood floor) $10.32 per sq. ft. Carport / Lean-to $14.75 per sq. ft. Residential Dwelling Additions First Floor and basic floor area $86.02 per sq. ft. Second Floor $66.66 per sq. ft. Shell Only $48.94 per sq. ft. Addition (mobile home) $27.98 per sq. ft. Gazebo/Outdoor Living Room $30.05 per sq ft. 2017 Fee Schedule Page 4 of 21 Basement Unfinished, New Construction $16.94 per sq. ft. Finished, New Construction $28.64 per sq. ft. Basement Finish/Remodel, Existing $11.49 per sq. ft General Remodel $23.00 per sq. ft. Deck Residential $10.22 per sq. ft. Porch Open/Screen only $25.93 per sq. ft. Three-Season (wood frame/windows/doors Not Heated) $54.42 per sq. ft. Swimming Pools (See Chapter 1009) Above ground--Permanent (over 24” in depth and over 5,000 gallons) $8.24 per sq. ft. Below ground $32.78 per sq. ft. Above ground – Temporary (over 24” in depth and under 5,000 gallons) $30 (zoning permit) B. SURCHARGES Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is as follows: Building Surcharge (For valuation-based permits, the surcharge is as follows) Valuation of Work Surcharge Computation $1,000,000 or less .0005 x valuation $1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000) $2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000) $3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000) $4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000) Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000) For fixed-fee permits, the surcharge shall be $1.00 per permit (or .0005 of the permit fee if permit fee exceeds $10,000). Heating & Plumbing Surcharge Residential $1.00 per permit (or .0005 of the permit fee if fee exceeds $10,010). Commercial Use the above table C. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS. (Surcharges not included in all figures listed below -- See Surcharge Section in Chapter 1006 for more information) Accessory Buildings Use valuation table Additions or Remodels Use valuation table Columbarium $30 (no surcharge) Deck 30” and under, or not attached to dwelling Deck above 30” $30 (no surcharge) Use valuation table 2017 Fee Schedule Page 5 of 21 Demolition and Wrecking $30 plus $3.00 per 1,000 cubic feet or fraction thereof over 2,000 cubic feet plus $1.00 surcharge Residential Door or Window Installation Change Opening/Egress $40 for first windows/door plus $12.50 for each additional window/door (plus a$1.00 surcharge) Use Existing Rough opening $30 for first window/door plus $5.00 for each additional window/door (plus $1.00 surcharge) Drain Tile $40 (plus $1.00 surcharge) Driveways, Sidewalks, Parking Lots, Patios; New Installation or Overlay (No Surcharge) * A Right-of-way permit is also required for any construction that disrupts City-owned streets, curbing, sidewalks, etc. (No permit required for sealcoating or overlays without expansion.) Residential (R-1 or R-2 Overlay or Seal Coat with no expansion, no permit needed.) R-3 or R-4 Overlay Commercial Commercial Overlay Commercial Seal Coat RESIDENTIAL R1 or R2 Driveway R1 or R2 Patio or Sidewalk R1 or R2 Gravel* R3, R4 & R5 Driveway/Parking Lot R3, R4 & R5 Patio or Sidewalk COMMERCIAL/INDUSTRIAL** Driveway / Parking Lots Patio / Sidewalk * Refer to Zoning Code for Gravel limitations ** Includes churches and schools Concrete/Asphalt/Brick: $30 for first 500 square feet plus $2 for each additional 100 square feet or fraction thereof (no surcharge) Gravel*: $20 (no surcharge) * See zoning code for gravel limitations. $25 for first 500 square feet plus $2 for each additional 500 square feet. Use Valuation Table $30 plus $2 for every 500 square feet or faction thereof No permit required $45 $30 $25 $75 $50 $150 $75 Electrical Work -- Same as established by the Minnesota State Board of Electricity. Elevators Use valuation table Fences/Kennels Seven feet and below Above seven feet $30 per installation (no surcharge) $40 per installation (plus $1.00 surcharge) 2017 Fee Schedule Page 6 of 21 Fire Permits Fire (All Fire permits unless noted otherwise) Fire Works Display Fireworks Sales Temporary Tent Tank Installation (fuel, oil, gas, etc.) Tank Removal (fuel, oil, gas, etc.) Operational Permits $100 $100 $350 (business selling only fireworks) $100 (business selling fireworks & other retail) $50 $100 per tank (no surcharge) $50 per tank (no surcharge) $50 (annually) Fireplaces Wood/Corn burning Stove (Building Permit) Gas Fireplace $30 plus $1.00 surcharge See Mechanical Insulation $30 plus $1.00 surcharge Manufactured Homes (See Chapter 1110) Installation Permit Use valuation table Mechanical (Gas hook up) $25 (plus $5.00 surcharge) Installation Escrow $500 per permit Mechanical (Heating, Ventilation, Air Conditioning & Gas) Residential: Air Conditioning Furnace Air Exchanger Sheet Metal/Duct Work Ventilation Systems Gas Fireplace Gas/Oil Piping Steam, Hot Water Heating $35 per unit $35 per unit replacement, $45 per unit new $35 per unit $35 $20 for first fan plus $5 for each add’l fan $40 (includes incidental piping) $35 per unit $40 per unit Commercial Use valuation table plus surcharge of .0005 of contract price) Irrigation System (Back Flow Preventer) See Plumbing Fees Moving Buildings (See Chapter 1007) Principal Structure $175 per building (plus $1.00 surcharge) Accessory Structure (larger than 400sq. ft.) $50 per building (plus $1.00 surcharge) Accessory Structure (400 sq. ft. or less) $30 Plumbing Work - (Chapter 1004) Residential - Plumbing fixture, devices, Connections (Value more than $500) Residential - Plumbing fixture, devices, Connections (Value $500 or less) Commercial (4 units and up) $26 plus $8 per fixture (plus $1.00 surcharge) $15 or 5% of value, whichever is greater (plus $1.00 surcharge) Use valuation table plus surcharge at .0005 times contract price Porch Use valuation table Raising, shoring Use valuation table 2017 Fee Schedule Page 7 of 21 Re-shingling Residential (Re-shingling permit not required for buildings under 120 square feet) Commercial $25 for this first 500 square feet plus $4 for each additional 100 square feet or fraction thereof (plus $1.00 surcharge) Use Valuation Table Re-siding / Stucco Residential (Re-shingling permit not required for buildings under 120 square feet) Soffit/Fascia only (fee not required if included with siding permit) $25 for the first 500 square feet plus $4 for each additional 100 square feet or fraction thereof (plus $1.00 surcharge) Soffit/Fascia: $30 per installation (plus $5.00 surcharge) Commercial Use Valuation Table Retaining Wall Four feet and below Above four feet $30 (no surcharge) $40 (plus $1.00 surcharge) Satellite Dishes (See Chapter 1103.18) (no permit required for mini dish systems) $30 per installation (plus $1.00 surcharge) Renewable Energy Systems (Solar, geothermal, wind energy conversion) $100 Sheds (120 square feet and less) $30 (no surcharge) Signs (Zoning Permit, no surcharge) & Billboards (Building Permit, surcharge) See Chapter 1008 Signs up to 100 sq ft. $50 for the first 24 square feet plus $5.00 for each additional 25 square feet or fraction thereof up to 100 square Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10 for each additional 100 square feet or fraction thereof Signs re-facing or altering $40 per installation Temporary Signs $40 per 21 day period (Limit 4 permits per year plus one additional permit for a banner Billboards/Billboard Alterations (includes footings) $250 per billboard (plus $1.00 surcharge) Sprinkler Systems (Fire Suppression) Sprinkler; Residential (City fees waived for systems installed voluntarily) Use Valuation Table Sprinkler; Commercial Use valuation table plus surcharge at .0005 times the contract price Sprinkler Plan Check Fee 65% of permit fee (for new construction or 20 heads or more only) 2017 Fee Schedule Page 8 of 21 Residential Swimming Pools Permanent (above or below ground) Use Valuation Table Temporary (52” high or less) $25 (plus $1.00 surcharge) Telecommunication Antenna (Building Permit Fee, see also Chapter 1124) Repairs/Alterations/Swapping of Adding Antennas to Existing System (City or Private Property) Use Valuation Table $250 per permit Warehouse Racking Systems (commercial) Use Valuation Table Windows See Door/Window Installation 2017 Fee Schedule Page 9 of 21 D. OTHER INSPECTIONS / PLANNING FEES Applicants are responsible for all costs incurred associated with the filing, review and processing of development applications. Such fees are to be paid in escrow up front or upon receipt of statement from the City of Mounds View. Fees may include but are not limited to costs for consultants retained by the City, consultant planning services, attorney, and engineer fees. A deposit may also be required to cover costs of public notices, materials and staff time spent in the review, research or preparation of materials associated with this application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial fee and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant within 30 days after consideration of the application is completed. Payment of park dedication fees is required with subdivision applications. Application fees are not refundable. Building Inspections Inspections conducted outside of normal business hours $63.25/hr. (Minimum charge two hours) Inspections for which no fee is specifically indicated $63.25/hr. (Minimum charge - one half hour) Reinspection Fees $63.25/hr. Change of Address $150 Comprehensive Plan Amendment $500 Conditional Use Permit (CUP) R-1 to R-2 $200 All other Districts $400 CUP Amendment Same as CUP Fee Contractor Licenses (See Chapter 1001) $60 (after July 31st , $40) Contractors (State) License Verification Fee $5 per permit (See building procedures) Development/Site Plan Review $400 Escrow – Manufactured Homes $500 each permit Escrow – Occupancy a. Seed/Sod/Landscaping b. As-built grading survey (covers grading and survey completion) c. Driveway Installation d. Curb cut modifications e. Site clean-up f. Stormwater management/drainage features/site erosion g. Right-of-way restoration h. Any other item as determined by the Building Official $1,000 for each item listed Housing Inspection Fees (See Chapter 1012) Initial and Follow up Inspection/no show) No charge Each Additional Inspection/no show) $63.25/inspection (approved by Resolution 7330) Interim Use Permit (IUP) $400 IUP Amendment $400 Investigation Fee Equivalent to permit fee (when work commences without an approved permit) 2017 Fee Schedule Page 10 of 21 Lead Safety Certification Verification Fee $5 Park Dedication Fee (See Ordinance 745) Up to 10% of fair market land value Plan Review Fee (Payment may be required before plans are reviewed) Additional Plan Review Fee required by changes, additions or revisions to plans Plan review for outside consultants for plan checking and inspections, or both. Plan Review Fee -- “Similar” 65 percent of permit fee for all commercial permits and for residential permits for new dwellings, dwelling additions, garages, garage additions, decks, sheds over 216 square feet, and major remodeling. $47/ hr. (Minimum charge one half hour) Actual costs including administrative and overhead costs. Where all units are the same or similar, each unit after first shall be 25% of original fee. Planned Unit Development (PUD) (See Chapter 1120) $750 PUD Amendment $400 Refund Policy, Permits Plan Review State Surcharge All but $40 of the permit fee can be refunded within 100 days of application if work has not commenced. Plan review may not be refunded after review has been completed; otherwise 100%) 100% Rezoning $500 Street or Easement Vacation $250 Subdivisions Minor Subdivision Reapproval Fee $350 $400 $50 Major Subdivision Reapproval Fee $700 $750 $100 Text Amendment, Zoning Code $400 Text Amendment, Other City Code $300 Variance R-1, R-2 (Administrative) $100 (additional $125 if formal variance is required) R-1, R-2 (Formal) $200 All Other Zoning Districts $400 Wetland Buffer Permit R-1 and R-2 $30 All Other Districts $100 Wetland Alteration Permit R-1 and R-2 $200 All Other Districts $350 Zoning Code Review $200 Zoning Letter $50 2017 Fee Schedule Page 11 of 21 II. MISCELLANEOUS FEES Certified Copies $5 plus photocopy fee of .25 per page Filing Fee for Public Office See Mounds View City Charter Insufficient Funds (NSF) checks (returned or NSF checks) $30 Municipal Code $200 Notary Public $5 per signature plus any photocopy charges Photocopies Black/White (8 ½” x 11”): $0.25/printed side Black/White (11” x 17”): $0.50 /printed side Black/White (24”x 36”): $2.00/printed side Color (8 ½” x 11”): $1.00/printed side Color (11” x 17”): $2.50/printed side Color (24”x 36”): $10.00/printed side Pending Assessments Search $10 CD or DVD Copies $15 Zoning Code CD Rom $15 50th Anniversary Mounds View Cookbook Mounds View History Book $5 $5 10 III. POLICE/ADMINISTRATIVE OFFENSES Crime Free Multi Housing Participant No charge Fingerprint Cards $20 for first card/$5 for each add’l card Police/Accident Reports .25 for each page Police Reports Research $50 per hour research fee for all requests exceeding 100 pages. Certified Copy of Report $5 for certification and .25 per page Color Printed Copy $2.00/page 35mm Standard Photos $1.00/print Cassette or Video tape $25.00 Electronic copies to Digital Media $15.00 per disc Impound Vehicle Storage Fee $15.00 per day 30’ Stop Sign $15 Alcohol in public $50 Animal Violations Fee $25 for the 1st violation within 12 months $50 for the 2nd violation within 12 months $75 for the 3rd and subsequent violations w/in 12 months Building and Fire Code $150 Blocking Driveways $100 False Alarm Charges $50 Third false alarm in a 12 month period $75 for each false alarm in excess of three in a twelve month period Fire Hydrant $25 Fire Lane $25 2017 Fee Schedule Page 12 of 21 Garbage Dumping $100 Handicap Zone $200 House Numbers $25 Junk Vehicles See Property Based Violations Junk & Debris See Property Based Violations Loads limits $150 Loitering $25 Other Illegal Parking $15 Park and Recreation (Chapter 909) $25 Regulated Business Activity (Title 500) $100 Signs (Chapter 1008) $100 Snowbirds $25 Loud Parties/Noise: Mufflers, Stereos and other violations of State and City Noise Codes $50 Property Based Violations 1st Offense: $150 2nd Offense (within 12 months): $300 3rd Offense (within 12 months): $450 Administrative Hearing: $50 Tobacco Penalties, Sale to Minors: Administrative Penalties for Individuals First Offense Subsequent Offenses $100 The fine increases by $50 for each subsequent offense within a 24 month period Truck parking $25 Watering Ban Violations 1st violation Written Warning 2nd violation $25 3rd violation $50 4th violation $100 5th violation $200 6th violation Turned over to the City Attorney for criminal prosecution Wetlands (Chapter 1010) $150 Zoning (Title 1100) $150 2017 Fee Schedule Page 13 of 21 IV. LICENSES – All Licenses are Subject to a 20% Late Fee Amusement Devices and Centers (Chapter 506) $16 per location plus $16 per machine Automobile Sales (Chapter 510) $204 per year Amusement Rides, Carnivals, Circuses (Chapter 506) $133 for first day plus $21 for each additional day Bowling Alleys (Chapter 507) $21 per alley Christmas Tree Sales $204 per month Cigarette and Tobacco License Fee (Chapter 512) $330 per year Contractor License $60 per year Prorated after July 31st $40 Dog Licenses (decreased by 50% after one year) Spayed or neutered $12 for two years Unsprayed or Unneutered $20 for two years Duplicate tags $5 Donation Collection Bin $100 per year, per bin Garbage and Rubbish Hauler (Chapter 603) $120 plus $50 per vehicle per year Gasoline Stations (Chapter 509) Gasoline Stations (Chapter 509) $75 plus $25 per pump Keeping of Chickens/Ducks License $100 for initial yearly permit, then $30 for yearly renewal Keeping of Honeybees License $50 Kennel (Chapter 701) Residential $45 per year Commercial $80 per year Liquor Licenses (Chapter 502, 503) On-Sale, Intoxicating $.65 per square foot for that space which is used primarily as bar area and $.53 per square foot for that space which is used primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 On-Sale, Sunday Sales $200 per year State Liquor Certificate $20 per year On-Sale Brewery Taproom License $800 per year Off-Sale Brewery Malt Liquor License $200 per year On-Sale Microdistillery License $800 per year Off-Sale Microdistillery License $200 per year Sunday Growler Sales $200 per year On-Sale Wine $800 per year Off-Sale Intoxicating $200 per year Bottle Club $330 per year On-Sale Malt Liquor/3.2 Beer $800 per year Off-Sale Malt Liquor/3.2 Beer $100 per year Set Ups $330 per year Club $330 per year Temporary Liquor License $100 per event Investigation Fee: All Liquor Licenses Single Person $350 Partnership $385 Corporation $450 2017 Fee Schedule Page 14 of 21 Rental Dwelling License (Annual) (Chapter 1012) Single Family (New Single Family Rental License) Multi-Family License Fee Discounts: License Renewal LATE FEE $60 $60 plus one-time conversion fee $60 base fee plus $8 per unit Certification Level C 20% fee reduction Certification Level B 33% fee reduction Certification Level A 50% fee reduction Double the Annual Fee Rental Dwelling License Transfer $40 (per building) Rental Dwelling Conversion Fee (When a Single Family dwelling is converted to rental property or has been unlicensed for more than a year) $375 ($100 if owner presents proof of participation in an applicable education or hires a management company for at least a year.) This conversion fee is in addition to the annual license fee. (Buildings that are owned by a nonprofit entity are exempt from the conversion fee.) Pawn Shops (Chapter 516) Non-Refundable Application Fee (includes cost of investigation) $500 New Manager Investigation Fee $150 Annual License $10,000 Billable Transaction Fee $1.50 per transaction Performance Bond $10,000 Peddlers / Transient Merchants / Solicitors (Chapter 504) Permits $61 per day $204 per month $510 per year Investigation fee, per new peddler / solicitor $15 I.D. Card $5.00 per person Recuperation or Half Way House (Chapter 511) Less than 10 beds $33 per year 10-49 beds $55 per year 50-99 beds $82 per year Over 100 beds $110 per year Restaurants -- Class A (occupancy load greater than 100) (Chapter 505) Operating 16 hours/day or less $280 Operating more than16 hours/day $560 Restaurants -- Class B (occupancy load of 100 or less) Operation 16 hours/day or less $168 Operating more than 16 hours/day $337 Therapeutic Massage License Fee/Investigation (Chapter 514) Enterprise License $255 Therapist License $102 Individual Investigation Fee $100 Partnership / Corporation Investigation Fee $350 Temporary Massage License $100 2017 Fee Schedule Page 15 of 21 IV. PARK, RECREATION, AND MVCC FACILITY RENTAL FEES Classifications for Rental Fee Rates: Class 1: School District 621, Mounds View Scouts, Lions and 4-H, Mounds View Area Athletic Associations (w/10% roster MV residents) Class 2: Mounds View Residents, Mounds View Religious Groups (w/Mounds View Address), Local Political Groups and Mounds View Non-Profits (w/Mounds View Address) Class 3: Mounds View City Employees, Non-local School Districts, Non-local Non-profit Groups. Class 4: All For-Profit Groups, Non-local Religious Groups, Non-resident individuals/private agencies, businesses/vendors, and Colleges and Universities. **The City Administrator may waive the rental fees for charitable events held for the benefit of Mounds View residents upon receiving a written request outlining the nature of such event.** BANQUET AND CONFERENCE CENTER RENTALS Class Rates: Class 4: 100% Class 3: 75% Class 2: 50% Class 1: 25% Event Center 1/6 (Seats 50) *Class I excludes set up services in Event Center or additional set-up in multi-purpose rooms and gymnasium. Hourly Rate 4-Hour Block Daily Rate 2016 $ 54 $184 $552 2017 $ 56 $190 $570 2018 $ 58 $587 Event Center 1/3 (Seats 100) *Class I excludes set up services in Event Center or additional set-up in multi-purpose rooms and gymnasium. Hourly Rate 4-Hour Block Daily Rate 2016 $ 90 $306 $918 2017 $ 93 $316 $948 2018 $ 96 $976 Full Event Center (Seats 400) *Class I excludes set up services in Event Center or additional set-up in multi-purpose rooms and gymnasium. Hourly Rate 4-Hour Block Daily Rate 2016 $206 $700 $2,100 2017 $212 $721 $2,163 2018 $220 $2,228 Kitchen (To be used by Licensed Caterer Only) Hourly Rate 4-Hour Block Daily Rate 2016 $ 89 $303 $909 2017 $ 92 $313 $929 2018 $ 95 $957 2017 Fee Schedule Page 16 of 21 PACKAGES: Sound Package (Microphone and up to four speakers): $75* Visual Package (Screen and projector): $75* A/V Package (Sound package & Visual package): $125* * Items subject to class rate pricing Multi-Purpose Rooms Aspen, Birch, Maple & Willow (Seating up to 20 ) For multi-purpose rooms and gymnasium rentals, if the MVCC is not otherwise open, the permit holder will be charged an additional $15/hour for a staff fee. Hourly Rate 4-Hour Block Daily Rate 2016 $ 54 $184 $552 2017 $ 56 $190 $570 2018 $ 58 $587 Multi-Purpose Room Cedar (Seating up to 40) * Two-hour minimum rental * For multi-purpose rooms and gymnasium rentals, if the MVCC is not otherwise open, the permit holder will be charged an additional $15/hour for a staff fee. Hourly Rate 4-Hour Block Daily Rate 2016 $ 88 $300 $900 2017 $ 91 $309 $927 2018 $ 94 $955 Multi-Purpose Room Pine, Studio For multi-purpose rooms and gymnasium rentals, if the MVCC is not otherwise open, the permit holder will be charged an additional $15/hour for a staff fee. Hourly Rate 4-Hour Block Daily Rate 2016 $74 $252 $756 2017 $ 76 $258 $774 2018 $ 78 $797 Miscellaneous MVCC Charges Overhead Projectors Microphone & 1 speaker Screen LCD Projector Lobby Bar Fabric Backdrop Backdrop Lighting $10* $50* $50* $50* $25 per hour/ $150 per day $20 $150 $100 Coffee Pot & Carafes Table Linens Napkins Prep Kitchen* $25 $3 each $0.15 each $25 per hour/ $150 per day 2017 Fee Schedule Page 17 of 21 Gymnasium Rental Class Rates: Class 4: 100% Class 3: 75% Class 2: 65% Class 1: 50% Full Gym - Hourly - Four Hour Block - All Day Half Gym - Hourly - Four Hour Block All tournaments are subject to a 20% concessions charge (10% for non- profit organizations). A cleaning surcharge may also be applicable. Full Day (8 am – 9 pm) Gym Rental Staffing Fee: $15 per hour $ 125 130 $ 410 $1,465 1,500 $ 65 67 $ 210 Athletic Field Rentals Fees Based Upon an Individual Event/Game/Practice. Reservations for Classes 2, 3, and 4 will begin on March 1st. Field Reservations may be limited depending upon the number of teams and fields available. The MV YMCA & Parks Maintenance Staff will set a seasonal field use policy to determine field available, appropriate age groups, dates, and times available and fields available. For purposes of the fees below, a time block is considered four (4) hours. Tournaments: $100 per Field per Day (If Field Maintenance is required during tournaments, an additional $30 per hour with a two-hour minimum will be charged.) Baseball & Softball Fields (Youth Only) Hillview, Groveland, Oakwood, Greenfield, Lambert, City Hall Softball Fields (Adults or Youth) City Hall, Silverview Soccer Fields (Youth Only) Silverview, Groveland, Oakwood Lighting Fee for Softball Fields Class 1 Class 2 Class 3 Class 4 Class 1 Class 2 Class 3 Class 4 Class 1 Class 2 Class 3 Class 4 Class 1 Class 2 Class 3 Class 4 $5 per time block $5 per time block $10 per time block Not applicable $5 per time block $5 per time block $15 per time block $30 per time block $5 time block $5 per time block $10 per time block Not Applicable $20 per time block $30 per time block $40 per time block $40 per time block 2017 Fee Schedule Page 18 of 21 Park Building and Shelter Rentals Class Rates: Class 4: 100% Class 3: 75% Class 2: 50% Class 1: 25% Groveland, Hillview, and City Hall Parks $100 $200 Refundable Damage Deposit Required $75 Service Fee will be Charged to Groups of 50 or more $25 Refundable Key Deposit 4 hours $100 Lambert, Random, and Silver View Parks $100 $200 Refundable Damage Deposit Required $75 Service Fee will be Charged to Groups of 50 or more $25 Refundable Key Deposit 4 hours $150 (Rates based upon 4 hour blocks or fraction thereof. For example, a 7 hour rental equals two 4 hour blocks.) 2017 Fee Schedule Page 19 of 21 V. PUBLIC WORKS RELATED FEES CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) Normal Business Hours for Call-out Rates 7:00 a.m. to 3:30 p.m., Monday thru Friday Standard Call-out Rate: Specified time conducted entirely within normal business hours $50 per hour specified After-Hours Call-out Rate: Specified time conducted outside normal business hours $100 per hour specified Holiday Call-out Rate: Specified time conducted on holidays $150 per hour specified RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) Excavation Permit Fees:* Hole Fees: Boulevard Areas Pavement Areas Underground Utility Work (requires Hole Fee): Open Trenching – Boulevard Areas Open Trenching – Pavement Areas Trenchless Installation Overhead Installation $100 per hole excavated $200 per hole excavated $50 per 100 lineal feet or fraction thereof $70 per 100 lineal feet or fraction thereof $35 per 100 lineal feet or fraction thereof $25 per 100 lineal feet or fraction thereof Obstruction Permit Fees:* Pavement Obstruction Fees: New Obstructions Replacing Existing Obstructions (in-kind) Temporary Obstruction Fees: Dumpsters, Portable Restrooms, etc. Equipment Used for Excavation Permit $100 per obstruction $50 per obstruction $25 per obstruction No charge Other ROW Management Fees and Costs: Registration Fee (ROW Users & Registrants) Permit Extension Delay Penalty Degradation Fee Restoration Cost Overhead Utility Line Repair Street Curb Alteration Temporary Access Penalty for Work Done without a Permit Discount For Work Done with City Project $30 $30 10% of ROW Permit Calculated at time of permit Calculated at time of permit ($5,000 min.) No charge $50 $25 per access Double Fee 50% *Additional fees may be required for legal and engineering costs incurred by the City 2017 Fee Schedule Page 20 of 21 MUNICIPAL WATER SYSTEM FEES (Chapter 906) Water Availability Charge (WAC): Residential $500 per unit Commercial/Industrial $1,000 per acre of developable land ($1,000 minimum charge) Water Rates and Surcharges: WATER USAGE RATE – Residential Water Base Charge per quarter 0 to 15,000 12,000 gallons per quarter 15,001 12,000 to 30,000 24,000 gallons per quarter Over 30,000 24,000 gallons per quarter $6.00 $8.00 $2.10 per 1,000 gallons $2.31 per 1,000 gallons $2.66 per 1,000 gallons WATER USAGE RATE – Commercial Water Base Charge per quarter 0 to 150,000 125,000 gallons per quarter 150,001 125,001 to 750,000 700,000 gal. per quarter 750,001 700,001 to 1,250,000 1,100,000 gal. per quarter Over 1,250,000 1,100,000 gallons per quarter $6.00 $2.10 per 1,000 gallons $2.31 per 1,000 gallons $2.54 per 1,000 gallons $2.92 per 1,000 gallons Water Quality Testing Charge $1.59 per connection quarterly Water Service Line Repair Insurance Charge $7.50 per connection quarterly Meter Read Program Penalty (Failure to participate or grant access for installation or repair) $100 per connection quarterly Utility Bill Late Payment Fee 10% of delinquent bill amount Utility Bill Assessment Search $10 Water Connection/Repair Permit Fees:* Service size of less than 4-inches $100 plus $5 surcharge Service size over 4 inches $150 plus $5 surcharge $150 plus $5 surcharge Inspection Fees No charge during normal business hours, otherwise 1 hour at Call-out Rate per visit Re-inspection Fees 1 hour at Call-out Rate per visit *Right-of-Way Permit needed if excavation occurs in public Rights-of-Way Miscellaneous Fees and Material Costs: Manual Water Meter Read Fee 1 Hour at Call-Out Rate Hydrant Meter Deposit $2,500 Hydrant Rental (one week minimum) $50/week; $150/month Water Shut-off/Turn-on Fee (Repairs) No charge during normal business hours, otherwise 1 hour at Call-Out rate per visit Water Shut-off/Turn-on Fee (Snowbirds) $25 per shut-off/turn-on Water Meter Testing Fee 1 Hour at Call-Out Rate (fee waived if meter is faulty) Water Testing Fee 1 Hour at Call-Out Rate Water Meter - Residential City cost plus 10% administration fee Radio Remote Reading Device City cost plus 10% administration fee Shut-Offs and Curb Stop, Valve Boxes, Covers City cost plus 10% administration fee 2017 Fee Schedule Page 21 of 21 MUNICIPAL SANITARY SEWER SYSTEM FEES (Chapter 907) Sewer Service Availability Charge (SAC) $2,485 per Metropolitan Council Environmental Services Sewer Rates and Surcharges: Sewer Usage Rate $2.46 $2.61 per 1,000 gallons water sold Sewer Service Charge - Residential $30.94 $32.80 per Residential Equivalent Unit (REU) Connection Quarterly Sewer Service Charge – Commercial, Industrial, Public Bldgs., & Churches $75.99 $80.55 per REU Connection Quarterly Sewer Connection/Repair Permit Fees:* Service Conn./Repair Permit Fee $100 plus $5 surcharge Unit Charge – New Connection $150 per connection Inspection Fees No charge if during normal business hours, otherwise 1 hour at Call-out Rate per visit Re-inspection Fees 1 hour at Call-out Rate per visit *Right-of-Way Permit needed if excavation occurs in public Rights-of-Way SURFACE WATER MANAGEMENT UTILITY FEES (Chapter 908) Surface Water Management Utility Charges - New Construction: R-1 $212 per lot R-2 $1,038 per acre R-3, R-4, R-0 $1,500 per acre B-1, B-2, B-3, B-4 $1,500 per acre I-1, PUD $2,096 per acre Surface Water Management Utility Fee Rates: R-1, R-2 Single & Two Family Residential $10.00 per unit quarterly R-3 Medium Density Residential $54.67 per acre quarterly R-4, R-5, R0 High Density Residential Mobile Homes and Residential Office $64.84 per acre quarterly B-1, B-2, B-3, B-4 Neighborhood Business, Limited Business, Highway Business, Regional Business $84.93 per acre quarterly I-1 Industrial $66.30 per acre quarterly PUD Planned Unit Development $75.19 per acre quarterly CRP Conservancy, Recreation and Presentation $9.24 quarterly School/Church, Public, Private $30.52 quarterly STREET LIGHTING UTILITY FEES (Chapter 904) Residential (includes single family homes, duplexes, four-plexes, condominium and town homes) $4.25 per unit quarterly Commercial/Industrial $19.92 per acre quarterly Institutional/Charitable $19.92 per acre quarterly Apartments $19.92 per acre quarterly 2017 Fee Schedule Page 22 of 21 CONSTRUCTION SITE AND LAND DISTURBANCE FEES (Ord. 804/Chapter 1303) Land Disturbance Permit Fees:* 50 cubic yards or less 51 to 100 cubic yards 101 to 1000 cubic yards 1001 to 10,000 cubic yards 10,001 to 100,000 cubic yards 100,001 cubic yards or more *Additional fees may be required for legal and engineering costs incurred by the City. $25 $50 $50 base fee plus $20 for each 100 cubic yards or fraction thereof $250 base fee plus $25 for each 1000 cubic yards or fraction thereof $500 base fee plus $100 for each 10,000 cubic yards or fraction thereof $1,500 base fee plus $250 for each 100,000 cubic yards or fraction thereof. OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time is rounded up to the nearest full hour) Load Limit Waiver Fee $25 per trip Emergency Utility Locates No charge if during business hours, otherwise actual time at call-out rate Call-out Charge for Contractor Negligence (lack of maintenance, traffic signs, etc.) Actual time at Call-out Rates Water Tower Tele communications Fees: Maintenance/Repair Access Fee No charge if during normal business hours, otherwise actual time at Call-out Rate Plan Review and Inspection Fees Actual legal and consulting engineering costs plus 10% management fee ($500 minimum) Item No. 3. Meeting Date: November 7, 2016 Type of Business: Work Session City Administrator Review: ______ City of Mounds View Staff Report To: Honorable Mayor and City Council From: Brian Erickson, P.E., Director of Public Works /City Engineer Item Title/Subject: Local Water Supply Plan Introduction State Statute 103G.291, requires all public water suppliers that operate a public water distribution system, serve more than 1,000 people and/or all cities within the seven-county metropolitan area, must have a water supply plan approved by the DNR. These plans must be updated and submitted to the DNR for approval every 10 years. This requirement is designed to encourage communities to deal proactively with providing sustainable drinking water for citizens, businesses, and industry. Discussion The Minnesota Department of Natural Resources (DNR) and the Minnesota Department of Health (MDH) provide oversight and direction regarding public water suppliers. In particular, the DNR is responsible for managing the overall groundwater supply in the state and the MDH provides direction regarding the distribution system to insure the public’s health is protected. State Statute 103G.291 provides guidelines regarding the water supply plans and in general the plan must address: • Projected demands • Adequacy of the water supply system and planned improvements • Existing and future water sources • Natural resource impacts or limitations • Emergency preparedness • Water conservation • Supply and demand reduction measures • Allocation priorities In light of this, the DNR has put together a Local Water Supply Plan Template to assist the public water suppliers in preparing their plans and to ensure that all the required items are addressed. Staff is currently working on this template and once completed will submit to the DNR for review and approval. As part of the process the DNR will forward this to the Metropolitan Council for review. Once approved by the DNR, staff will return to City Council for official adoption. It is anticipated that this will not occur until the second quarter of 2017 as there are 130 plans due by December 31, 2016. Staff will provide an overview of the Local Water Supply Plan template and discuss upcoming steps for completing this prior to the deadline. Respectfully Submitted, Brian Erickson, P.E. Item No: 4 Meeting Date: November 7, 2016 Type of Business: Work Session City of Mounds View Staff Report To: Honorable Mayor and City Council From: James Ericson, City Administrator Item Title/Subject: Update on Progress Associated with City Council Goals for 2016 Introduction: On February 29, 2016, the City Council and department heads met for a joint strategic planning and goal setting retreat at the Mounds View Community Center. Subsequent to this retreat and goal setting session, the Council adopted a series of priorities for 2016 which would serve as guiding principles for City staff. In addition, the Council requested periodic updates on the progress being made on the priorities. Discussion: The Council reviewed its list of goals and priorities at the March 7, 2016, City Council Work session, directing that the priorities be organized by service area. Finding that the re- ordered list captured the essence of the issues discussed at the retreat, the Council approved the 2016 Priorities via Resolution 8528 at their March 14, 2016 meeting (attached for your reference.) Staff previously updated the City Council of its progress on the goals at the June work session. Items from the June review remain on the list for Council reference, with new additions bolded for emphasis. ADMINISTRATION Develop a program to recognize outstanding employee achievement • Staff has completed preliminary research on employee recognition programs. Attached is a statement of position from the Minnesota State Auditor on Recognition Programs and Events, a LMC Public Purpose Expenditure Memo (page 12) and Minnesota State Statute 15.46. Staff is conducting a survey of surrounding cities to share employee recognition policies. • Staff continues to review recognition polices from other cities to assess what might be a good fit here. 2016 Priorities Update Report Nov 7, 2016 Page 2 ADMINISTRATION (Continued) Pursue the naming of County Road 10 • After meeting with MnDOT and County staff, the City was told signage on the 35W corridor could be replaced at no cost to the City. • First reading of Ordinance 918 occurred on May 23. Second reading scheduled for June 13. • The ordinance renaming County Road 10 to Mounds View Boulevard was approved on June 13 and became effective on July 25. • Property owners on County 10 were notified of the change, as were all dispatch and emergency services. • Staff reached out to mapping and GPS companies to inform them of the change. • Ramsey County engaged Anoka County to fabricate and install the new “Mounds View Blvd” signage along the corridor, which should be completed in November. Ensure Mounds View’s interests are protected and promoted relating to the Rice Creek Commons redevelopment • Staff has been attending all project management team meetings hosted by the County and its consultants. • Alert businesses and residents regarding construction activity, road closures and detours. • Attend meetings with the County and MnDOT regarding impacts to certain properties within the Mounds View Manufactured Home Park due to construction of a sound wall. • Staff continues to attend project management meetings regarding the intersection work at County H and Mounds View Blvd as well as the 35W and County H interchange. • Ramsey County estimates the bridge will reopen by December 1st along with all legs of the County 10 / County H intersection. 2016 Priorities Update Report Nov 7, 2016 Page 3 COMMUNITY DEVELOPMENT Encourage development and promote programs and opportunities to improve neighborhoods and eliminate blight • Staff has prepared handouts which highlight developable sites and properties potentially available to be assembled for redevelopment. • Meet with interested builders and developers. • Ensure City website is updated to reflect internal and external programs designed to support development. • Meet with the Housing Resource Center to better promote programs. • Continue Code Enforcement efforts to improve neighborhoods and address blighting influences. Develop the vision associated with Crossroad Pointe • Discuss development scenarios with the Beard Group, the entity presently controlling the property via a pre-development agreement with the City. • Consult with financial advisor to assess viability of using tax credits or tax increment financing. • The Beard Group was recently awarded a grant in the amount of $85,000 from Ramsey County to assist in the project development. • Re-evaluate development options and scenarios subsequent to the Beard Group’s predevelopment agreement termination. • Discussion scheduled with the Council to consider process moving forward regarding site and development potential FINANCE Implement technology enhancements to expand access and availability to residents, businesses and City departments; provide for greater security in parks and City buildings • Security camera installation will begin this month at City Hall and the Community Center. • Staff is reviewing a timesheet program to improve efficiency and reduce employee administrative costs. • Security cameras have been installed in both locations and are fully operational. • Finance Dept staff will demo timesheet software at the City of North St. Paul. 2016 Priorities Update Report Nov 7, 2016 Page 4 POLICE Promote positive partnerships and outreach efforts between the Mounds View Police Department and the community it serves • Organized a Highway clean up event along I-35W. • Coordinated the Tubman Diaper Drive and Target shopping spree. • Plan for a National Night Out pre-party at City Hall with the MVPD, Allina, SBM Fire, National Guard, etc. • The Department is exploring other programs for the year, which could include things like a Thanksgiving food drive, Goonie mini golf tournament, Homelessness Backpacks with Essentials, Halloween Party, 3-3 basketball tournament, and Curling with a Cop. • Build upon last year’s successes with programs such as Punt, Pass & Kick; Shop with a Cop; and Bowling with a Cop. • Hosted the first “Coffee with a Cop” event on October 7th. • Pass, Punt, and Kick competition occurred on Sept 17th, almost 50 kids participated! • The MN Wild hockey team will be donating hockey gear so we can set up a fun “Kids N Cops” hockey program. • Obtained a mobile rock climbing wall which will be used during outdoor community engagement events. • Veterans Day program scheduled at Silver Lake Pointe senior facility with children from Pinewood Elementary participating. PUBLIC WORKS Focus on corridor maintenance, aesthetics, landscaping and appearance; pursue linkages to promote regional trailway connectivity • The construction contract for Mounds View Boulevard (CSAH 10) Trail Segments 6 & 11 has been awarded. Staff and Northwest Asphalt will be meeting to discuss start time and project duration. • Staff has met with one contractor to gain pricing to contract out maintenance on the center median of Mounds View Blvd. Additional pricing is being sought. • Staff will coordinate with Ramsey County for regular mowing. • County Road H is under construction as part of the County’s project to replace the bridge over I-35W . Estimated completion date is November 2016. The work will include a trail along County Road H between Arden Hills and Mounds View. 2016 Priorities Update Report November 7, 2016 Page 5 PUBLIC WORKS (Continued) Focus on corridor maintenance, aesthetics, landscaping and appearance; pursue linkages to promote regional trailway connectivity (continued) • Construction of Trail Segments 6 & 11 is nearing completion. Residents already using the new trails! Lighting is in process of being installed and final grading and restoration are being performed. • Council to review RFP for median maintenance services at the Nov 14 council meeting • Regional trail along County Road H has been paved and will be connected as construction on County Road H progresses. • Preliminary estimate for Mounds View Boulevard (CSAH 10) Trail Segment 8 was prepared, should the Council desire to implement. Explore renewable energy and energy efficiency improvements; pursue Green-Step City designation Level 2 • Council approved the agreement between the Mounds View and Xcel to allow for sale of power back into the grid. This was the final requirement needed to get the solar panel systems on line. Trane will be providing a message board for both City Hall and the Community Center indicating the power being generated. • Staff continues to work with Trane to review some other possible energy savings improvements for the Community Center. • Energy savings efforts and accommodations will be addressed in the Public Works Facility design. • Staff is working on the requirements needed for Level 2 Green Step City. • Xcel meters have been installed at City Hall and the Community Center. The solar panels are now feeding electricity into the buildings and reducing electrical usage. Staff is working on installing ‘dash boards’ in City Hall and Community Center. • Xcel’s Energy Design Assistance program has been used with the Public Works Facility design. Three savings ‘bundles’ were established with the goal being a specified savings over the estimated energy baseline. Upon completion of construction and verification of energy usage Xcel will provide an incentive payment. • Staff has started inputting energy usage into the B3 (Buildings, Benchmarks and Beyond) application for City Hall. Community Center data will be input by mid-November as time allows. • GreenStep Level 2 has been reviewed and will be updated as time allows. • New lighting for Trail Segments 6 & 11 are LED fixtures. 2016 Priorities Update Report November 7, 2016 Page 6 Finalize and approve the design, size, location, and financing plan for the new Public Works building • Staff and some Council members toured Public Works Facilities at White Bear Lake, Vadnais Heights and Little Canada. • Oertel Architects has begun schematic design on the new Public Works Facility. Oertel Architects met with staff after the tours to review the design and take input from staff. It is anticipated that Oertel will provide an updated schematic design in June. • City Council will be provided an update at the July work session as Oertel refines the schematic design. • Detailed design is proceeding and is approximately 60% complete. • Project estimate is being reviewed for cost savings and value engineering to reduce total project cost. • Council update to be provided at an upcoming work session. • Planning Commission review is planned for November 2016. Develop a vision for City Hall Park • The Parks, Recreation and Forestry Commission established a City Hall Park Task Force (CHPTF) consisting of 3 commissioners. • CHPTF has reviewed the existing conditions across the entire block, and is in the process of establishing a vision. During their June meeting, the Commission will be further discussing the vision with the intent of meeting with the Council at a future work session. • Parks, Recreation and Forestry Commission members met with the City Council at the September Work Session. • Commission members discussed next steps at their October meeting with the intent of completing the vision for City Hall Park by the end of 2016. Develop and approve a sustainable streets and utilities maintenance and reconstruction program • Staff has been working on the Capital Improvement Plan and reviewing needs. • A preliminary seal coat and mill & overlay program is being established. • Work will continue in conjunction with budget development. 2016 Priorities Update Report November 7, 2016 Page 7 Recommendation: Review the individual priorities and the action steps completed, underway and planned in support of the Council’s priorities. Respectfully submitted, ________________________ James Ericson City Administrator Attachment: 1. Resolution 8536 RESOLUTION NO. 8536 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION APPROVING THE CITY COUNCIL’S IDENTIFIED PRIORITIES FOR 2016 WHEREAS, the City Council and department heads held a planning and goal setting retreat on February 29, 2016, at the Mounds View Community Center; and, WHEREAS, at the retreat, the City Council reviewed and discussed the many issues and challenges presently faced by the City; and, WHEREAS, the City Council identified their most important priorities for 2016, which are identified on the attached Exhibit A. NOW, THEREFORE BE IT RESOLVED THAT the Mounds View City Council does hereby approve its identified Priorities for 2016 as referenced in Exhibit A. Adopted this 14th day of March, 2016. _______________________________ Joe Flaherty, Mayor ATTEST: _______________________________ James Ericson, City Administrator (seal) 2016 City Council Priorities On February 29, 2016, the Mounds View City Council and members of the management team held a planning and goal-setting retreat at the Mounds View Community Center. The City of Mounds View provides a variety of core and essential services to its residents, property owners and business owners. Each of these service delivery areas is an acknowledged and supported priority and each supports the City’s Mission, Vision and Values statements. Recognizing that such core and essential services are ongoing priorities, the City Council has chosen to focus particular attention this year on the following identified goals, organized by City department: ADMINISTRATION: • Develop a program to recognize outstanding employee achievement • Pursue the naming of County Road 10 • Ensure Mounds View’s interests are protected and promoted relating to the Rice Creek Commons redevelopment COMMUNITY DEVELOPMENT: • Encourage development and promote programs and opportunities to improve neighborhoods and eliminate blight • Develop the vision associated with Crossroad Pointe FINANCE: • Implement technology enhancements to expand access and availability to residents, businesses and City departments; provide for greater security in parks and City buildings POLICE: • Promote positive partnerships and outreach efforts between the Mounds View Police Department and the community it serves PUBLIC WORKS: • Focus on corridor maintenance, aesthetics, landscaping and appearance; pursue linkages to promote regional trailway connectivity • Explore renewable energy and energy efficiency improvements; pursue Green-Step City designation Level 2 • Finalize and approve the design, size, location, and financing plan for the new Public Works building • Develop a vision for City Hall Park • Develop and approve a sustainable streets and utilities maintenance and reconstruction program In addition to the above, the City Council believes the County Road 10 corridor to be a key component in the City’s redevelopment vision. A vibrant, easily accessible and aesthetically pleasing commercial corridor will be Mounds View’s foundation upon which our other amenities and community assets will be strengthened and reinforced. (Approved March 14, 2016, Resolution 8536) EXHIBIT A 15 year term 15 year term 15 year term 20 year term 20 year term 20 year term 6.5m Bond 7.0m Bond 7.5m Bond 6.5m Bond 7.0m Bond 7.5m Bond 2017 2017 Additional Additional Additional Additional Additional Additional Market Taxable Tax for Tax for Tax for Tax for Tax for Tax for Value Value Debt Serv Debt Serv Debt Serv Debt Serv Debt Serv Debt Serv 59,075 35,475 20.93 22.55 24.14 17.51 18.86 21.84 118,150 91,550 54.01 58.21 62.31 45.19 48.68 56.37 177,223 155,923 91.98 99.14 106.12 76.96 82.90 96.00 236,298 220,298 129.95 140.07 149.93 108.74 117.13 135.64 295,373 284,673 167.93 180.99 193.75 140.51 151.36 175.27 354,447 349,147 205.96 221.99 237.63 172.34 185.64 214.97 413,521 413,521 243.94 262.92 281.44 204.11 219.87 254.60 472,596 472,596 278.78 300.48 321.65 233.27 251.28 290.98 531,671 531,671 313.63 338.04 361.86 262.43 282.69 327.35 184,350 163,750 Median 96.60 104.11 111.45 80.83 87.07 100.82 Annual DS Levy Increase 6.5m 15yr 527,000 11.99% 7.0m 15yr 568,000 12.93% 7.5m 15yr 608,000 13.84% 6.5m 20yr 441,000 10.04% 7.0m 20yr 475,000 10.81% 7.5m 20yr 508,000 11.56% Memorandum Date: October 24, 2016 To: Honorable Mayor and City Council From: Brian Erickson, Director of Public Works/City Engineer Subject: Public Works Facility Cost Estimate Update Staff has been working with Oertel Architects on the cost estimate for the new Public Works Facility. At this point, the total cost estimate is $6,972,808. The previous working total project estimate was $7,753,725. This estimate includes the following items: 1. Public Works building with offices, vehicle storage, vehicle maintenance, and shop space. 2. Attached cold storage building. 3. Salt storage shed. 4. Fuel tanks and pump area. 5. Material storage bins 6. Associated site work, landscaping, stormwater management and fencing. 7. Demolition of existing buildings. 8. Allowances for furniture, public works equipment, geotechnical evaluation, furniture, telecommunications/information technology, special inspections, sewer access charge, system commissioning, and the design fees. Within this estimate are costs which are estimated based on the construction estimate. Those include design and construction contingency and general requirements of the contract. They were estimated at 10% respectively; however based on recent bids the general requirements was reduced to 5% and the contingency was reduce to 6%. This resulted in estimated costs reductions of $322,000 and $264,000 respectively for a total of $587,000. The contingency will likely drop to 3% at time of contract award, resulting in an additional reduction of $175,000. We also reviewed additional areas for savings and have incorporated those in the current estimate. These include: • Eliminating one maintenance bay at an estimated savings of $123,000. • Reducing the pavement area and yard space at an estimates savings of $40,000. • Removing the purchase of public works equipment (lifts, crane, wash bay) from the contract and purchasing this equipment from state bid at an estimated savings of $30,000. The following table lays out the estimates and reductions shown above: Current Estimate Previous Estimate Cost Reduction Main Building 4,490,767$ 4,805,431$ (314,664)$ Site Work 880,618$ 927,269$ (46,651)$ Auxillary Structures 347,397$ 347,397$ -$ Subtotal 5,718,782$ 6,080,097$ (361,315)$ General Conditions*285,939$ 608,010$ (322,071)$ Contingency **343,127$ 608,010$ (264,883)$ Other Costs/Allowances 624,959$ 457,609$ 167,350$ Total Project Estimate 6,972,807$ 7,753,725$ (780,918)$ * General Conditions at 10% and reduced to 5% ** Contingency at 10% and reduced to 6% TOTAL PROJECT ESTIMATE Finally, there is a requirement to relocate the existing water line connecting Well #2 with the Water Treatment Plant. This line runs around the south side of the existing building and would thus be underneath the planned vehicle storage garage. This line would be relocated to the north into the existing boulevard. This results in an estimated cost of $84,000. This cost should be paid from the Water Fund. Whether or not that is paid initially (into the Capital Project Fund) or utilized for Bond repayment is to be established. Staff continues to review the estimate and is working with the architect to identify additional possible savings. Respectfully submitted, Brian Erickson – Director of Public Works/City Engineer Item No. 5. Meeting Date: November 7, 2016 Type of Business: Work Session City Administrator Review: ______ City of Mounds View Staff Report To: Honorable Mayor and City Council From: Brian Erickson, P.E., Director of Public Works /City Engineer Item Title/Subject: Public Works Facility Update Introduction Staff has reviewed the status of the Public Works Facility at the July 5 and September 5, 2016 Work Sessions and again at the October 24, 2016 Council Meeting. During the discussion on October 24, staff presented the current estimate of $6,972,808 and explained that the design team (staff and architect/engineer) is working on reducing the total project cost. This estimate includes design, construction, demolition, site work, landscaping, furniture, and information technology needs. Since that time, the design team has reworked additional items with the goal of reducing cost, while still providing necessary space. In addition, future expansion has been considered as well. Discussion Since the October 24th update to City Council, the design team reviewed additional items that will result in an overall savings to the project. Currently the Oertel Architects is updating the cost estimate and should have it completed Friday morning, November 4, 2016. Staff will distribute this updated cost estimate to Council members as soon as it is received. Updated cost for the site work has been calculated and is shown in the table below. For reference, the Detailed Design column is the most current estimate and is being updated by Oertel. The Schematic Design column is the estimate that the design team was working on in October. The Cost Reduction column shows the reduction from Design Development to Detailed Design. Detailed Design Schematic Design Design Development Cost Reduction Main Building 4,490,767$ 4,490,767$ 4,805,431$ (314,664)$ Site Work 872,000$ 880,618$ 927,269$ (55,269)$ Auxillary Structures 347,397$ 347,397$ 347,397$ -$ Subtotal 5,710,164$ 5,718,782$ 6,080,097$ (369,933)$ General Conditions*285,508$ 285,939$ 608,010$ (322,502)$ Contingency **342,610$ 343,127$ 608,010$ (265,400)$ Other Costs/Allowances 624,959$ 624,959$ 457,609$ 167,350$ Total Project Estimate 6,963,241$ 6,972,807$ 7,753,725$ (780,918)$ * General Conditions at 10% and reduced to 5% ** Contingency at 10% and reduced to 6% TOTAL PROJECT ESTIMATE In addition to the reductions noted in October (detailed below), the design team is working on additional cost savings measures namely: • Reducing the office space by approximately 330 square feet. This resulted in rearranging some of the spaces, but will still provide adequate space for administrative functions. • Adding shelving prep along the southwest side of the vehicle storage area to account for potential lost storage at the east end. • Reducing the concrete pad around the above ground fuel storage tanks. • Recommending a deductive alternate for cold storage, which would be awarded if contract comes in above budget. This deduction will result in a smaller savings due to the type of construction for this area. • Recommending a deductive alternate for vehicle storage, which would be awarded if the contract comes in above budget. This deduction will result in a larger savings; however, it would require additional equipment be stored in the cold storage area. The previous changes included: • Eliminating one maintenance bay. • Reducing pavement area and yard space. • Removing purchase of equipment from the contract and purchasing separately. These proposed changes can be seen in the attached floor plan. It should be noted that the deductive options for cold storage and vehicle storage, if used, could be added relatively easily at some future date if the facility needs to be expanded. With the current configuration all existing equipment, except for a small handful of trailers, would be parked inside either vehicle storage or cold storage. Attachment 2 provides information regarding the impact of the financing for the facility. Shown are three bond amounts for two bond timeframes and the estimated impact for various property values. The levy increase ranges from approximately 10% ($6.5M over 20 years) to nearly 14% ($7.5M over 15 years) depending upon the scenario. Similarly, the property tax impact on a median value home of $184,350 ranges from $80.83 to $111.45. Staff will review the savings for the anticipated changes/reductions as part of the Work Session. In addition, a discussion regarding the anticipated property tax impact will be provided. Unfortunately, Mr. Cooper, Oertel Architects will be unable to attend the Work Session. However, the design team will continue to note areas for savings and adjust the project to reduce the costs. Respectfully Submitted, Brian Erickson, P.E.