Loading...
HomeMy WebLinkAboutAgenda Packets - 2007/04/02 (2) CITY OF MOUNDS VIEW CITY COUNCIL WORK SESSION AGENDA MOUNDS VIEW CITY HALL Monday, April 2, 2007 5:30 p.m. ROLL CALL: Marty, Stigney, Flaherty, Hull, Mueller PUBLIC COMMENT Citizens may speak to issues not on tonight’s agenda. Before speaking, please give your full name and address for the minutes. Also, please limit your comments to three minutes and sign in on the sign-in sheet located on the podium. Agenda Items Discussed by Consensus ________ 5:30 pm Joint Meeting with the City of New Brighton City Council A. County Road H and Silver Lake Road Intersection Improvements B. School Liaison Officer at Irondale C. Bus Routes D. Development Update ________ 7:00 pm Regular Council Work Session 1. Annual Meeting with the Parks and Recreation and Forestry Commission 2. Public Works A. Consider Request for Stop Signs on Edgewood Ave. B. Draft Capital Improvement Program C. Review Streets and Utilities Task Force 3. Community Development A. Code Development Process - Presentation by Kathi Osmonson B. Tree Preservation Ordinance C. Mermaid Sign Replacement 4. Public Safety A. Discuss the 800 MHz Radio In-Building amplification ordinance (N. Zikmund) 5. Administration A. Review 2007-08 Action Plan B. 50th Anniversary Promotion C. Full Time Cable Coordinator Position Description and Salary D. City of Excellence Award Application ____________________________________________________________________________ Next Work Session: Monday, May 7, 2007 @ 7pm Next City Council Meeting: Monday, April 9, 2007@ 7pm Item No. 1 Meeting Date: April 2, 2007 Type of Business: WK WK: Work Session; PH: Public Hearing; CA: Consent Agenda; CB: Council Business City Administrator Review _______ City of Mounds View Staff Report To: Honorable Mayor and City Council From: Greg Lee, Director of Public Works Item Title/Subject: Parks and Recreation and Forestry Commission Meeting Background: The City Council has indicated a desire to meet with all City Commissioners to discuss various issues. Discussion: On February 22, 2007 and again on March 15, 2007 the Parks and Recreation and Forestry Commission indicated a desire to discuss several topics with the City Council. These topics are listed below: Oakwood Park Improvement Project The Commission has identified a need to upgrade Oakwood Park by creating an athletic field (soccer/ LaCrosse type field), installing a playground geared for younger children, and creating a disc golf course. The proposed upgrades to Oakwood Park are divided into three phases: Phase 1 – Grading and Irrigation Installation Phase 2 – Playground Installation Phase 3 – Disc Golf Course Installation There are many issues associated with these improvements the Commission would like to discuss with the Council. Improving Ball Fields The Commission has received several requests to improve City ball fields. The Commission would like to discuss this need with the City Council. Operations of the Mounds View Community Center The Commission would like discussion and clarification on what role they should play with regard to the Mounds View Community Center. Attendance of the Commission at City Council Meetings The Commission would like discussion regarding the City Council’s preference on whether they think the Commission should attend more City Council meetings – individually or as a group. Bethlehem Baptist Church – Donation Process and Procedure The Bethlehem Baptist Church donates $25,000 annually ($12,500 semi- annually) to organizations and causes of their choosing. The Commission would like discussion regarding the process and procedure of this donation and how they can play an active role. The Commission would like to discuss whether a formal committee could be developed or City representatives identified to assist in working with the Bethlehem Baptist Church so as to provide a list of park- related needs that could be considered as candidates for donations. Number of Parks and Recreation and Forestry Commissioners? With the recent submittals of applications and subsequent appointments to the various City commissioner positions for 2007, the Parks and Recreation and Forestry Commissioners would like discussion regarding the number of commissioners that best serves the community and achieves the best results. Other Topics? Recommendation: The Parks and Recreation and Forestry Commissioners thank the City Council for the opportunity to discuss these matters. Staff is looking for direction on these matters. Specifically, Staff is looking for Council direction and input as to how they would like to proceed with the aforementioned topics. Respectfully Submitted, Greg Lee, Director of Public Works THE CITY OF MOUNDS VIEW CAPITAL IMPROVEMENT PROGRAM 2007- 2013 Draft listing of projects / also contains possible projects beyond the 5-year scope 6/28/2006 Project Cost Year Project Description 2007 Dollars Utility Franchise City Bonds Special Project Park Dedication MSAS Assessments Federal Funds DNR Trail Grants City TIF MNDOT Cooperative Agreement Ramsey County CSAH Funds County Road 10 Turnback Funds Other Local Funds 2007 2007 CR 10 / Trail Segment 9-10 10 foot bituminous trail - Silver Lake to Long Lake Rd - start in the fall of 2006 601,000$ 601,000$ $455,270.71 contract +32% 2007 Generators: portable 2 portable generators to power wells, lift stations and possibly emergency command center if need 100,000$ 100,000$ $70,000 for Water and $30 2007 On-Line Bill Pay Software purchase an on-line bill paying software package 6,000$ 6,000$ 2007 Public Works Shop Addition / Rehabilitation (design phase)Indoor storage for trucks and equipment / Roof repair, windows, doors,parking lot,fence - in 2006 50,000$ 50,000$ 2007 Traffic Signalation @ intersection of Co. Rd. H and Silver Lak Finance the installation of a traffic signal @ Co. Rd. H & Silver Lake Road - County to reimburse?212,000$ 212,000$ Street Improvement Fund 2007 Seal Coat Project Seal coat numerous streets throughout the City 180,000$ 180,000$ Street Improvement Fund 2007 City Hall Alternative Power Supply Project Add generator to City Hall - see report from Dan Chmela dated April 4, 2006 80,000$ 80,000$ Possibly reduce this. Use 2007 City Hall Monument Sign Construct a City Hall Monument Sign DELETED 12,000$ 2007 Community Center Relocation of Entrance Sign Relocate the Community Center signcloser to Edgewood Drive to Increase Visibility 9,000$ 9,000$ 2007 Imaging System Imaging system to electronically record and store all City documents 15,000$ 15,000$ 2007 Hillview Playground Equipment Replacement replace the playground equipment at Hillview includeingfiberfill replacement 38,000$ 38,000$ 2007 Storm Water Project - Subwatershed AA-6 Feasibility Report - wetland management - Arden Ave. and TH10 -or other area based on street pr 15,000$ 15,000$ 2007 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 50,000$ 50,000$ 2007 Well Rehabilitation Project Inspect and rehabilitate Well No. 6 50,000$ 50,000$ 2007 Water Division Building Repair Program Roof Hatch at Reservoir, Gutter/downspouts at Well No. 5, Windows and Doors at Well No. 2 25,000$ 25,000$ Was $13,000 in 2006-201 2007 CR 10 median enhancements through corridor Median treatments 65,000$ 65,000$ 2007 Edgewood Drive Boulevard Project Place colored concrete or cobbles between curb and pathway 28,000$ 28,000$ 2007 Park Rehabilitation Program Make repairs / add ammenities based on the Parks Needs Analysis 35,000$ 35,000$ 2007 Greenfield Park Security Lights Replace / Upgrade Greenfield Park's security lights with more efficient fixtures 5,000$ 5,000$ 2007 Oakwood Park Rehabilitation Project Develop a soccer field in Oakwood Park - northwest corner of Quincy and Hillview - Add disc golf 110,000$ 110,000$ $50,000 budgetd in 2006 / 2007 City Hall Landscape and Grading Project Re-grade around City Hall to create a positive grade and then landscape 18,000$ 18,000$ 2007 Irrigation System at City Hall South side, East and West ends - originally budgeted in 2006 13,000$ 13,000$ 2007 Silver View Park Parking Lot Project Resurface Silver View Park parking lot - determine maintenance needed: seal coat, overlay…This 50,000$ 50,000$ 2007 Civil defence Siren Replacement Replace the Groveland Park (one of the three) civil defence sirens in the city. One was replaced v 16,000$ 16,000$ 2007 Total 1,771,000$ 240,000$ -$ -$ 247,000$ 238,000$ -$ -$ -$ -$ 666,000$ -$ -$ -$ 392,000$ 2008 2008 Pathway Construction Program Construct pathways as shown on the City Comprehensive Plan 104,000$ 104,000$ 2008 CR 10 /Trail Segment 1-5 10 foot bituminous trail - North side of County Road 10 - CR H to Silver Lake Road (Red Oak Dr.)1,093,000$ 500,000$ 100,000$ 493,000$ Was scheduled for 2007 in 2008 Roadway Major Maintenance Project could be either 2005 Street Improvement Project area, or 2007-2008 area 1,600,000$ 225,000$ 291,000$ 320,000$ 764,000$ 2008 Water System Repair Program Annual program to maintain the city's water system (coordinated with street projects)30,000$ 30,000$ 2008 Sanitary Sewer System Repair Program Annual program to maintain the city's sewer system (coordinated with street projects)10,000$ 10,000$ 2008 Mill and Overlay Project Mill and Overlay Mustang Drive (and perhaps Silver Lake Woods)350,000$ 70,000$ 280,000$ 2008 Seal Coat Project Seal coat numerous streets (mainly the 2003 Street Improvement Project Area)150,000$ 150,000$ Street Improvement Fund 2008 Storm Water Project - Subwatershed GF-4 Feasibility Report - wetland mngt - Greenfield Ave and Hillview Rd 15,000$ 15,000$ 2008 Storm Water Project - Subwatershed AA-3 New outlet pipe from wetland on the west side of Groveland Park 3,500$ 3,500$ 2008 Storm Water Project - Subwatershed GF-4 Construct sedimentation basin at inlet pipe from Edgewood Dr.95,200$ 95,200$ 2008 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 30,000$ 30,000$ 2008 Spring Creek Regional Pond - Land Acquisition Acquire the land necessary tro construct the Spring Creek Regional Pond (200'X500"=100,000sq.f 230,000$ 230,000$ 2008 Water Division Building Repair Program General Building Repairs to: Booster Station, Reservoir, Water Treatment Plant No. 1, Wells 2, 5, 110,000$ 110,000$ 2008 Well Head Protection Program Study of the City's well field as required by the Pollution Control Agency 25,000$ 25,000$ 2008 CR 10 / CR H Intersection Reconstruct east leg and new signal system, and landscaping 1,391,000$ 908,000$ 300,000$ 70,000$ 113,000$ 2008 CR 10 median enhancements through corridor Median treatments 130,000$ 130,000$ Maybe moved to 2008 top 2008 Community Center Parking Lot Rehabilitation Redesign so the front ends of vehicles do not overhang sidewalk; address drainage problem by da 30,000$ 30,000$ Was scheduled for 2007 in 2008 City Hall Playground Equipment Replacement replace the playground equipment at City Hall includeing fiberfill replacement 32,000$ 32,000$ 2008 Civil defence Siren Replacement Replace the City Hall (one of the three) civil defence sirens in the city. One was replaced via resol 16,000$ 16,000$ 2008 Park Lighting Project Add/replace lights on all City property with energy efficient fixtures. Must have a positive cost/ben 150,000$ 50,000$ 100,000$ 2008 Total 5,594,700$ 548,700$ 225,000$ -$ 302,000$ 100,000$ 291,000$ 600,000$ 500,000$ 100,000$ 2,295,000$ 300,000$ 70,000$ 113,000$ 150,000$ Funding Source Project Cost Year Project Description 2007 Dollars Utility Franchise City Bonds Special Project Park Dedication MSAS Assessments Federal Funds DNR Trail Grants City TIF MNDOT Cooperative Agreement Ramsey County CSAH Funds County Road 10 Turnback Funds Other Local Funds Funding Source 2009 2009 Roadway Major Maintenance Location to be determined 1,600,000$ 225,000$ 291,000$ 320,000$ 764,000$ 2009 Water System Repair Program Annual program to maintain the city's water system (coordinated with street projects)30,000$ 30,000$ 2009 Sanitary Sewer System Repair Program Annual program to maintain the city's sewer system (coordinated with street projects)10,000$ 10,000$ 2009 Pathway Rehabilitation Program Annual program to maintain city pathways 20,000$ 20,000$ 2009 Playground Equipment Maintenance Annual program (Replace playground equipment at a park to be announced)25,000$ 25,000$ 2009 Pathway Construction Program Construct pathways as shown on the City Comprehensive Plan 104,000$ 104,000$ 2009 Spring Creek Regional Pond - Construction Construct a regional Storm water Pond at 2940 and 2948 Woodale Drive; Option No. 4 as per Dra 260,000$ 260,000$ 2009 Storm Water Project - Subwatershed EW-4 Sediment removal at west leg of Silverview Pond 7,000$ 7,000$ 2009 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 30,000$ 30,000$ 2009 Water Division Building Repair Program Exterior Brick Repairs: Booster Station, Reservoir, Water Treatment Plant No. 1, Wells 2, 5, & 6 - 220,000$ 220,000$ 2009 Well Rehabilitation Project Inspect and rehabilitate Well No. 1 and Well No. 2 60,000$ 60,000$ 2009 Well Number No. 2 Replace existing power source 100,000$ 100,000$ 2009 Greenfield Park Soccer Field Develop a soccer field in Greenfield Park near Trunk Highway 10 50,000$ 50,000$ 2009 CR 10 / Long Lake Rd Intersection Mill and overlay, new striping, new signal system, and landscaping 715,000$ 270,000$ 325,000$ 108,000$ 12,000$ 2009 CR 10 / Silver Lake Rd Intersection Mill and overlay, new striping, new signal system, and landscaping 1,040,000$ 270,000$ 638,000$ 120,000$ 12,000$ 2009 CR 10 / Trail Segment 6 10 foot bituminous trail - Red Oak to Pleasant View 481,000$ 200,000$ 50,000$ 231,000$ 2009 CR 10 / Other gateway features Added Entry Features 312,000$ 312,000$ 2009 CR 10 median enhancements through corridor Median treatments 65,000$ 65,000$ 2009 Sysco Outlot A Development Construct a small parking lot and bituminous trailway on the Sysco Outlot A property - City is comm 378,000$ 150,000$ 228,000$ Medtronic to pay for any a 2009 Public Works Shop Addition / Rehabilitation (construction pha Indoor storage for trucks and equipment / Roof repair, windows, doors,parking lot,fence/ Includes 598,000$ 598,000$ $273,000 expansion / $32 2009 Greenfield Soccer Field look at developing a soccer field in the undeveloped area near Trunk Hway 10 50,000$ 50,000$ 2009 Total 6,155,000$ 717,000$ 225,000$ 200,000$ 747,000$ 250,000$ 291,000$ 320,000$ 540,000$ 50,000$ 2,104,000$ -$ 228,000$ 24,000$ 459,000$ 2010 2010 Roadway Major Maintenance Location to be determined 1,600,000$ 225,000$ 291,000$ 320,000$ 764,000$ 2010 Pathway Rehabilitation Program Annual program to maintain city pathways 20,000$ 20,000$ 2010 Playground Equipment Maintenance Annual program (Replace playground equipment at a park to be announced)25,000$ 25,000$ 2010 Pathway Construction Program Construct pathways as shown on the City Comprehensive Plan 104,000$ 104,000$ 2010 Lambert Park Building (Design Phase)Replace building structure: Develop Architectural Design, Plan and Specs. :Smaller than Hillview 30,000$ 15,000$ 15,000$ 2010 Storm Water Project - Subwatershed EW-6 Construct new outlet under County Road 10 100,000$ 100,000$ 2010 FEMA Update Update the 1981 Flood Insurance Study 10,000$ 10,000$ 2010 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 30,000$ 30,000$ 2010 Well Number No. 4 Rehabilitate and bring Well No. 4 back on line, add pipe to Treatment Plant No. 1 545,000$ 545,000$ Was scheduled for 2008 in 2010 Well Rehabilitation Project Inspect and rehabilitate Well No. 1 and Well No. 2 60,000$ 60,000$ 2010 Water System Repair Program Annual program to maintain the city's water system (coordinated with street projects)30,000$ 30,000$ 2010 Sanitary Sewer System Repair Program Annual program to maintain the city's sewer system (coordinated with street projects)10,000$ 10,000$ 2010 800mZ Radio Program convert City communications to 800 Mega Hertz 35,000$ 35,000$ Cost is rough estimate. M 2010 CR 10 / Woodale Dr Intersection New signal system and landscaping 657,000$ 544,000$ 113,000$ 2010 CR 10 / Trail Segment 7 10 foot bituminous trail - Pleasant View to Knollwood 233,000$ 150,000$ 83,000$ 2010 CR 10 / Trail Segment 8 10 foot bituminous trail - Knollwood to Silver lake 222,000$ 150,000$ 72,000$ 2010 CR 10 median enhancements through corridor Median treatments 65,000$ 65,000$ 2010 Total 3,776,000$ 785,000$ 225,000$ -$ 199,000$ 15,000$ 291,000$ 320,000$ 300,000$ -$ 1,373,000$ -$ -$ 113,000$ 155,000$ 2011 2011 Roadway Major Maintenance Location to be determined 1,600,000$ 225,000$ 291,000$ 320,000$ 764,000$ 2011 City Hall Roof Replacement Replace roof area at City Hall that was installed in 1975 50,000$ 50,000$ 2011 Pathway Rehabilitation Program Annual program to maintain city pathways 20,000$ 20,000$ 2011 Playground Equipment Maintenance Annual program to maintain city playground equipment 25,000$ 25,000$ 2011 Pathway Construction Program Construct pathways as shown on the City Comprehensive Plan 104,000$ 104,000$ 2011 Lambert Park Building (Construction Phase)Replace building structure: Contract for Construction: Smaller than Hillview 260,000$ 130,000$ 130,000$ 2011 Storm Water Project - Subwatershed AA-5 Arden Avenue Trunk Storm Sewer 511,000$ 511,000$ 2011 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 30,000$ 30,000$ 2011 Greenfield Park Parking Lot Project Resurface Greenfield Park parking lot - determine maintenance needed: seal coat, overlay…50,000$ 50,000$ 2011 Fire Trucks - Two New Trucks Mounds View's share (16.5%) of the total cost to purchase two new fire trucks 250,000$ 250,000$ 2011 Water System Repair Program Annual program to maintain the city's water system (coordinated with street projects)30,000$ 30,000$ 2011 Sanitary Sewer System Repair Program Annual program to maintain the city's sewer system (coordinated with street projects)10,000$ 10,000$ 2011 CR 10 / CR I Intersection Reconstruct w/ right and left turn lanes, new signal system, and landscaping 1,918,000$ 692,000$ ########113,000$ 2011 CR 10 / Trail Segment 11 10 foot bituminous trail - 100 yds NW of CR H2 to Woodale 355,000$ 200,000$ 100,000$ 55,000$ 2011 CR 10 median enhancements through corridor Median treatments 65,000$ 65,000$ 2011 Total 5,278,000$ 581,000$ 225,000$ 250,000$ 329,000$ 180,000$ 291,000$ 320,000$ 200,000$ 100,000$ 1,521,000$ -$ ########113,000$ 55,000$ Project Cost Year Project Description 2007 Dollars Utility Franchise City Bonds Special Project Park Dedication MSAS Assessments Federal Funds DNR Trail Grants City TIF MNDOT Cooperative Agreement Ramsey County CSAH Funds County Road 10 Turnback Funds Other Local Funds Funding Source 2012 2012 Roadway Major Maintenance Location to be determined 1,600,000$ 225,000$ 291,000$ 320,000$ 764,000$ 2012 Pathway Rehabilitation Program Annual program to maintain city pathways 20,000$ 20,000$ 2012 Playground Equipment Maintenance Annual program to maintain city playground equipment 25,000$ 25,000$ 2012 Pathway Construction Program Construct pathways as shown on the City Comprehensive Plan 104,000$ 104,000$ 2012 Storm Water Project - Subwatershed AA-4 Replace existing outlet located north of Red Oak Court 2,800$ 2,800$ Do after Ardan Trunk Sew 2012 Storm Water Project - Subwatershed 35W-2 Sediment Removal 7,000$ 7,000$ 2012 Storm Water Project - Subwatershed EW-7 New outlet pipe from wetland to Long Lake Road storm sewer system 1,400$ 1,400$ 2012 Random Park Building (Design Phase)Replace building structure: Develop Architectural Design, Plan and Specifications 25,000$ 25,000$ 2012 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 30,000$ 30,000$ 2012 Well Rehabilitation Project Inspect and rehabilitate Well No. 3 and Well No. 5 60,000$ 60,000$ 2012 Water System Repair Program Annual program to maintain the city's water system (coordinated with street projects)30,000$ 30,000$ 2012 Sanitary Sewer System Repair Program Annual program to maintain the city's sewer system (coordinated with street projects)10,000$ 10,000$ 2012 CR 10 / Edgewood Intersection Intersection improvements and landscaping 689,000$ 689,000$ 2012 Total 2,604,200$ 141,200$ 225,000$ -$ 174,000$ -$ 291,000$ 320,000$ -$ -$ 1,453,000$ -$ -$ -$ -$ 2013 2013 Roadway Major Maintenance Location to be determined 1,600,000$ 225,000$ 291,000$ 320,000$ 764,000$ 2013 Pathway Rehabilitation Program Annual program to maintain city pathways 20,000$ 20,000$ 2013 Playground Equipment Maintenance Annual program to maintain city playground equipment 25,000$ 25,000$ 2013 Pathway Construction Program Construct pathways as shown on the City Comprehensive Plan 104,000$ 104,000$ 2013 Storm Water Project - Subwatershed EW-10 Storm sewer from Clearview Ave and Edgewood Dr to Clearview Ave and Irondale Rd. 2013 Storm Water Project - Subwatershed SC-1 Outlet from wetland to any future Silver Lake Road storm sewer 1,400$ 1,400$ 2013 Storm Water Project - Subwatershed SC-3 Replace existing 24" CMP with twin 36" RCP's and install a special outlet structure 2013 Storm Water Project - Subwatershed NW-1 Cost share w/ City of SLP for drainage project for Park Square - N of 10/W of Pleasantvw 22,500$ 22,500$ 2013 Storm Water Project - Subwatershed EW-8 Construct water quality wetland at long Lake Road and Ridge Lane 151,200$ 151,200$ Developer may fully const 2013 Storm Water Project - Subwatershed GF-5 Replace existing CMP culvert east of Lois and Knoll with RCP 9,800$ 9,800$ Do with Lois Street Recon 2013 Storm Water Project - Subwatershed GF-4 Improve outlet under Hillview Rd. to eliminate grouted riprap 2,800$ 2,800$ Do with Hillview Street Re 2013 Storm Water Project - Subwatershed GF-6 Ditch improvement on reach draining into Judicial Ditch #1 21,000$ 21,000$ Possibly do with a streets 2013 Storm Water Project - Subwatershed AA-2 Sherwood Road Trunk Storm Sewer 280,000$ 280,000$ Do with Sherwood Street 2013 Storm Water Project - Subwatershed EW-8 Trunk Storm Sewer from EW-6 (Co. Rd. 10 & H2) to EW-8 (Long lake Rd. & H2) 2013 Storm Water Project - Subwatershed EW-9 Repair, modify,and/or replace wetland outlet located near Woodcrest Dr. & Ironwood Rd.9,800$ 9,800$ Do with Irondale Street Re 2013 Storm Sewer / Surface Water Rehabilitation Program Repair storm sewer and drainage issues throughout the City 30,000$ 30,000$ 2013 Water System Repair Program Annual program to maintain the city's water system (coordinated with street projects)30,000$ 30,000$ 2013 Sanitary Sewer System Repair Program Annual program to maintain the city's sewer system (coordinated with street projects)10,000$ 10,000$ 2013 CR 10 / Groveland Rd. Intersection Intersection improvements and landscaping 260,000$ 260,000$ 2013 CR 10 / Spring Lake Road Intersection Intersection improvements and landscaping 260,000$ 260,000$ 2013 CR 10 / CR H2 Intersection Realignment, new signal system, and landscaping 2,698,000$ 500,000$ 1,300,000$ 113,000$ 785,000$ 2013 CR 10 / South/East end gateway sign South/east end entry feature 293,000$ 293,000$ 2013 CR 10 / North/West end gateway sign North/West end entry feature 163,000$ 100,000$ 163,000$ 2013 CR 10 / Other gateway features Civic Entry Feature 104,000$ 104,000$ 2013 Total 6,095,500$ 568,500$ 225,000$ 813,000$ 149,000$ -$ 291,000$ 320,000$ 600,000$ -$ 2,227,000$ -$ -$ 113,000$ 889,000$ TOTAL ESTIMATED CITY COST 31,274,400 3,581,400 1,350,000 1,263,000 2,147,000 783,000 1,746,000 2,200,000 2,140,000 250,000 11,639,000 300,000 1,411,000 476,000 2,100,000 *Does not include capital equipment Item No. 2B Meeting Date: April 2, 2007 Type of Business: WK WK: Work Session; PH: Public Hearing; CA: Consent Agenda; CB: Council Business City Administrator Review _______ City of Mounds View Staff Report To: Honorable Mayor and City Council From: Greg Lee, Director of Public Works Item Title/Subject: Capital Improvement Program - DRAFT Background: The Five Year Financial Plan is comprised of several components. These include: o The Capital Improvement Program o The Vehicle & Equipment Replacement Plan o The General Fund Multi-year Operating Budget o The Impact on Capital Projects Funds’ Cash Balance o The Utility rate Studies The Capital Improvement Program, also referred to as the CIP, is a planning document that is utilized to forecast expenditures on capital items over the next several years. Discussion: Attached is the current draft Capital Improvement Program. Recommendation: Staff is looking for direction on these matters. Specifically, Staff is looking for Council direction and input on the current draft Capital Improvement Program. Respectfully Submitted, Greg Lee, Director of Public Works Item No: 3A Meeting Date: April 2, 2007 Type of Business: Worksession Administrator Review: ____ City of Mounds View Staff Report To: Honorable Mayor and City Council From: James Ericson, Community Development Director Item Title/Subject: Code Development Process and Residential Fire Sprinklers – Presentation by Kathi Osmonson Introduction: Kathi Osmonson, the Mounds View’s Building Official and Fire Marshal, has prepared a powerpoint presentation that outlines the process by which building and related codes are developed and the purposes behind their adoption. Discussion: One issue that is being considered for adoption relates to a requirement for all new homes, twin homes and townhomes to be equipped with automatic fire sprinklers. In her presentation, Ms. Osmonson addresses the nationwide problem of residential fires and the property damage and loss of life associated with these preventable tragedies. Ms. Osmonson provides national and state fire statistics and responds to common myths about residential sprinkler systems. Attached to this cover sheet is an article that appeared in a recent edition of the League of Minnesota Cities weekly bulletin which addresses the issue of proposed legislation dealing with construction codes. The concern, as expressed by the LMC and the Association of Minnesota Building Officials, is that the legislation would confer too much power to trades groups and industry representatives. Their amendments could result in degradation of essential life, health and safety requirements—the very tenets of governing Codes—and could threaten cities ability to conduct independent code inspection activities. Recommendation: The information in the attached power point presentation is meant to inform and educate the City Council and community in general about the code development process and one topic in specific which is generating much debate—the requirement to provide residential sprinkler systems in all new homes, twin homes and townhomes. If you have any questions prior to the meeting, please feel free to contact Ms. Osmonson directly at 763-717-4024. Respectfully submitted, ________________________ ___________________________ James Ericson Kathi Osmonson Community Development Director Building Official / Fire Marshal 1 Building Code Building Code DevelopmentDevelopment Presented by: Kathi OsmonsonPresented by: Kathi Osmonson International Code CouncilInternational Code Council ƒƒThe ICC Model The ICC Model Codes are the basis Codes are the basis of the Minnesota of the Minnesota State Building Code State Building Code (MSBC)(MSBC) ƒƒMN Department of MN Department of Labor and Industry Labor and Industry creates amendments creates amendments to the Model Codes to the Model Codes creating the MSBCcreating the MSBC ICC Body of Codes ICC Body of Codes Includes:Includes: ƒƒBuilding IBC / IRCBuilding IBC / IRC ƒƒFireFire ƒƒMechanicalMechanical ƒƒState PlumbingState Plumbing ƒƒFuel GasFuel Gas ƒƒHousing and Property Housing and Property MaintenanceMaintenance ƒƒReferenced StandardsReferenced Standards ƒƒState Amendments State Amendments create MSBCcreate MSBC 2 Purpose of the MSBCPurpose of the MSBC ““The purpose of the code is to provide minimum The purpose of the code is to provide minimum standards to safeguard life and limb, health, standards to safeguard life and limb, health, property, and continuing public welfare by property, and continuing public welfare by regulating and controlling the design, regulating and controlling the design, construction, quality of materials, use and construction, quality of materials, use and occupancy, location, and maintenance of all occupancy, location, and maintenance of all structures and equipment specifically covered structures and equipment specifically covered by the code in a jurisdiction that adopts and by the code in a jurisdiction that adopts and enforces the code.enforces the code.””MSBC 1300.0030MSBC 1300.0030 Code DevelopmentCode Development ƒƒCoconut GroveCoconut Grove ƒƒNovember 28, 1942November 28, 1942 ƒƒ492 people died 492 people died trying to exit the trying to exit the building through building through doors that swung doors that swung inward or were inward or were hiddenhidden ƒƒMany code Many code provisions resultedprovisions resulted Continuing Research and Continuing Research and DevelopmentDevelopment 3 Development ProcessDevelopment Process ƒƒLegislativeLegislative ƒƒCode change proposals may be Code change proposals may be submitted by anyonesubmitted by anyone ƒƒProposals are posted on the ICC website Proposals are posted on the ICC website http://http://www.iccsafe.org/cs/codeswww.iccsafe.org/cs/codes//prior to prior to code hearingscode hearings ƒƒCode hearings typically occur twice per Code hearings typically occur twice per code cyclecode cycle Development ProcessDevelopment Process ƒƒICC committees hear the testimonies on ICC committees hear the testimonies on proposed changesproposed changes ƒƒICC members may vote on code changes ICC members may vote on code changes if present at the hearingsif present at the hearings ƒƒIndustry employs Industry employs ““lobbyistslobbyists””to testify for to testify for code changescode changes ƒƒCode Officials also testify at the hearingsCode Officials also testify at the hearings Importance of Code Importance of Code OfficialsOfficials ƒƒIt is imperative that Code Officials It is imperative that Code Officials continue to review and testify on continue to review and testify on proposed code changesproposed code changes ƒƒLife Safety focusLife Safety focus ƒƒNo sales agendaNo sales agenda ƒƒDifficult to compete with fullDifficult to compete with full--time time lobbyistslobbyists 4 Benefits of ParticipationBenefits of Participation ƒƒMaintain integrity of the codesMaintain integrity of the codes ƒƒHands on educationHands on education ƒƒContinuing Education creditsContinuing Education credits ƒƒRepresent jurisdiction nationwideRepresent jurisdiction nationwide ƒƒCreate uniformity in enforcementCreate uniformity in enforcement ƒƒTo be able to do our jobs betterTo be able to do our jobs better Association of MN Association of MN Building OfficialsBuilding Officials ƒƒState wide State wide organization of organization of Building OfficialsBuilding Officials ƒƒSupports membersSupports members ’’ participation at the participation at the National Code National Code hearingshearings ƒƒCity support is crucialCity support is crucial Local Code Development Local Code Development CommitteesCommittees ƒƒAMBO supports the local IBC / IRC Code AMBO supports the local IBC / IRC Code development committeesdevelopment committees ƒƒKathi Osmonson ~ Chairman of the IBC Kathi Osmonson ~ Chairman of the IBC Development Committee.Development Committee. ƒƒSubcommittees include:Subcommittees include: ƒƒStructuralStructural ƒƒMeans of egressMeans of egress ƒƒFire safetyFire safety ƒƒMechanical Mechanical ƒƒGeneralGeneral 5 Local Code Development Local Code Development CommitteesCommittees ƒƒEach subcommittee downloads their Each subcommittee downloads their section of proposed code changes for section of proposed code changes for reviewreview ƒƒA voterA voter’’s guide is created after reviewing s guide is created after reviewing the the changeschanges ƒƒMN amendments are proposed nationally MN amendments are proposed nationally in an effort for uniformityin an effort for uniformity Region III CommitteeRegion III Committee ƒƒIncludes:Includes: ƒƒWisconsinWisconsin ƒƒNorth DakotaNorth Dakota ƒƒSouth DakotaSouth Dakota ƒƒIowaIowa ƒƒIllinoisIllinois ƒƒMinnesotaMinnesota Region III CommitteeRegion III Committee ƒƒMN is currently the only state in the MN is currently the only state in the region with a development process in region with a development process in placeplace ƒƒFirst joint meeting was held at the Region First joint meeting was held at the Region III education February 5, 2007III education February 5, 2007 ƒƒGoal is to work together, share the load Goal is to work together, share the load and the input = more respect at the and the input = more respect at the hearing phasehearing phase 6 Development ScheduleDevelopment Schedule ƒƒCode Development Hearings and Annual Code Development Hearings and Annual Conference in Orlando FL September 20, Conference in Orlando FL September 20, 20062006 ƒƒFinal Action Hearings for the 2007 Final Action Hearings for the 2007 Supplement to the ICC Code Body in Supplement to the ICC Code Body in Rochester NY May 21, 2007Rochester NY May 21, 2007 ƒƒAnnual Conference in Reno NV Annual Conference in Reno NV September 30, 2007September 30, 2007 HOT TOPICHOT TOPIC SECTION R313 FIRE SPRINKLER SYSTEMS. R313.1 General Fire protection systems. An approved automatic fire sprinkler system shall be installed in new one- and two-family dwellings and townhouses in accordance with NFPA 13D Section 903.3.1 of the International Building Code. September 2, 2003September 2, 2003 7 8 9 City of Mounds ViewCity of Mounds View Residential Fire SprinklersResidential Fire Sprinklers Your Personal Fire FighterYour Personal Fire Fighter = The Problem The Problem –– Residential FiresResidential Fires ƒƒNationwide (2005)Nationwide (2005) ƒƒ78% of all structure fires occurred in 78% of all structure fires occurred in residential properties. There is a residential residential properties. There is a residential fire every 80 seconds.fire every 80 seconds. Source: NFPA – Fire Loss in the US, 10/06 519,500 402,000 117500 0 100,000 200,000 300,000 400,000 500,000 600,000 TotalResidentialAll OthersStructure Fires - Nationwide (2003) The Problem The Problem –– Residential FiresResidential Fires ƒƒNationwide (2005)Nationwide (2005) ƒƒ82% of all civilian fire deaths occurred in the home. 82% of all civilian fire deaths occurred in the home. There was a civilian fire death in the home every There was a civilian fire death in the home every 143 minutes.143 minutes. Source: NFPA – Fire Loss in the US, 10/06 3925 3145 780 0 500 1000 1500 2000 2500 3000 3500 4000 Total In the Home Others Civilian Fire Deaths - Nationwide (2003) 10 The Problem The Problem –– Residential FiresResidential Fires ƒƒNationwide (2005)Nationwide (2005) ƒƒ77.5% of all fire 77.5% of all fire property loss property loss occurred in residential occurred in residential properties. properties. Source: NFPA – Fire Loss in the US, 10/06 $8,678,000,000 $6,074,000,000 $2,604,000,000 $0 $1,000,000,000 $2,000,000,000 $3,000,000,000 $4,000,000,000 $5,000,000,000 $6,000,000,000 $7,000,000,000 $8,000,000,000 $9,000,000,000 Total Residential Others Property Damage - Nationwide (2003) The Problem The Problem –– Residential FiresResidential Fires ƒƒMinnesota (2005)Minnesota (2005) ƒƒ5,043 fires or 72% of 5,043 fires or 72% of all structure fires all structure fires occurred in residential occurred in residential properties.properties. 6951 4858 2093 0 1000 2000 3000 4000 5000 6000 7000 Total Residential All Others Structure Fires - Minnesota (2003) Source: MN Dept. of Public Safety - 2005 Fire in Minnesota The Problem The Problem –– Residential FiresResidential Fires ƒƒMinnesota (2005) Minnesota (2005) ƒƒ29 or 73% of all 29 or 73% of all civilian fire deaths civilian fire deaths occurred in the home. occurred in the home. Civilian Fire Deaths - Minnesota (2005) 29 11 In the Home Other Locations Source: MN Dept. of Public Safety - 2005 Fire in Minnesota 11 The Problem The Problem –– Residential FiresResidential Fires ƒƒMinnesota (2005) Minnesota (2005) ƒƒ$96.3 million or 72% $96.3 million or 72% of all fire property loss of all fire property loss occurred in residential occurred in residential properties.properties. 154 92.8 61.2 0 100 200 In MillionsTotalResidentialAll OthersProperty Damage - Minnesota (2003) Source: MN Dept. of Public Safety - 2005 Fire in Minnesota The Problem The Problem –– Residential FiresResidential Fires ƒƒThe Facts:The Facts: ƒƒFires occur more in Fires occur more in residential properties than residential properties than in any other type of in any other type of structure.structure. ƒƒResidential structure fires Residential structure fires kill more people than any kill more people than any other type of fire.other type of fire. ƒƒResidential structure fires Residential structure fires cause more property cause more property damage than any other damage than any other type of fire.type of fire. The Problem The Problem –– Residential FiresResidential Fires ƒƒWho is most at Who is most at Risk?Risk? ƒƒStatistics show that Statistics show that seniors citizens age seniors citizens age 65 and over and 65 and over and children under the children under the age of 5 have the age of 5 have the greatest risk of greatest risk of dieing in a fire.dieing in a fire. Source: U.S. Fire Administration 12 What is the solution to What is the solution to this problem?this problem? ƒƒResidential Residential Fire Fire Sprinklers!Sprinklers! The Solution The Solution –– Residential Fire Residential Fire SprinklersSprinklers ƒƒResidential fire Residential fire sprinklers are like sprinklers are like having a firefighter in having a firefighter in your home 24 hours your home 24 hours a day, 7 days a a day, 7 days a week, 365 days a week, 365 days a year.year. The Solution The Solution –– Residential Fire Residential Fire SprinklersSprinklers ƒƒResidential fire sprinklers often contain Residential fire sprinklers often contain and may even extinguish the fire before and may even extinguish the fire before the fire department even gets the call to the fire department even gets the call to respond.respond. Source: U.S. Fire Administration 13 The Solution The Solution –– Residential Fire Residential Fire SprinklersSprinklers ƒƒResidential fire Residential fire sprinklers save lives sprinklers save lives by reducing the by reducing the amount of heat and amount of heat and toxic gases that are toxic gases that are produced by an produced by an uncontrolled fire.uncontrolled fire. Source: U.S. Fire Administration The Solution The Solution –– Residential Fire Residential Fire SprinklersSprinklers ƒƒFire damage is greatly reduced because Fire damage is greatly reduced because the fire is controlled or extinguished when the fire is controlled or extinguished when it is small with very little water.it is small with very little water. Source: Fire Marshal’s Association of Minnesota MythsMyths ƒƒMyth:Myth: ƒƒAll the sprinklers go All the sprinklers go off at once like in the off at once like in the movies.movies. ƒƒFact:Fact: ƒƒOnly the sprinklers Only the sprinklers closest to the fire go closest to the fire go off.off. ƒƒ90% of fires are 90% of fires are contained by the contained by the operation of just one operation of just one sprinkler.sprinkler. Source: U.S. Fire Administration 14 MythsMyths ƒƒMyth:Myth: ƒƒSprinklers cause a Sprinklers cause a large amount of water large amount of water damage.damage. ƒƒFact:Fact: ƒƒResidential Sprinklers Residential Sprinklers discharge 8 to 14 discharge 8 to 14 gallons of water per gallons of water per minute and quickly minute and quickly control the fire limiting control the fire limiting both water and fire both water and fire damage.damage. ƒƒA firefighterA firefighter ’’s hose s hose will discharge 150 to will discharge 150 to 200 gallons of water 200 gallons of water per minute.per minute. Source: U.S. Fire Administration VS. MythsMyths ƒƒMyth:Myth: ƒƒSprinklers could Sprinklers could accidentally go off or accidentally go off or leak.leak. ƒƒFact:Fact: ƒƒThe odds of a The odds of a sprinkler accidentally sprinkler accidentally going off are 1 in 16 going off are 1 in 16 million.million. ƒƒThe chances of a The chances of a sprinkler system sprinkler system leaking are the same leaking are the same as the regular as the regular plumbing system in plumbing system in your home leaking . your home leaking . Source: U.S. Fire Administration MythsMyths ƒƒMyth:Myth: ƒƒResidential fire Residential fire sprinklers are ugly.sprinklers are ugly. ƒƒFact:Fact: ƒƒSprinklers are now Sprinklers are now being designed to fit being designed to fit in with most din with most déécor.cor. 15 MythsMyths ƒƒCan you find the sprinklers in this photo?Can you find the sprinklers in this photo? ¿ ¿ MythsMyths ƒƒMyth:Myth: ƒƒResidential sprinkler Residential sprinkler systems are systems are expensive.expensive. ƒƒFact:Fact: ƒƒFor about the same For about the same amount that it would amount that it would cost to install new cost to install new carpet in your home carpet in your home you could have a you could have a sprinkler system sprinkler system installed.installed. ƒƒIn new construction In new construction the average cost is the average cost is $1.50 to $2.00 per $1.50 to $2.00 per square foot.square foot. MythsMyths ƒƒMyth:Myth: ƒƒYour insurance Your insurance company will charge company will charge you more due to fear you more due to fear of possible water of possible water damage from the damage from the residential sprinkler residential sprinkler systemsystem.. ƒƒFact:Fact: ƒƒMany insurance Many insurance companies will give companies will give homeowners a homeowners a discount of 5 to 10 % discount of 5 to 10 % on their homeowners on their homeowners insurance policy if the insurance policy if the home is protected with home is protected with residential fire residential fire sprinklers.sprinklers. 16 0% Interest Loan Program0% Interest Loan Program ƒƒThe Spring Lake Park The Spring Lake Park ––Blaine Blaine ––Mounds Mounds View Fire Department offers a zero interest View Fire Department offers a zero interest loan to residents of our communities to loan to residents of our communities to equip their new homes or retrofit their equip their new homes or retrofit their existing homes with residential sprinkler existing homes with residential sprinkler systems.systems. 0% Interest Loan Program0% Interest Loan Program ƒƒThe program provides up to $4,000.00 per The program provides up to $4,000.00 per single family resident with payment to be single family resident with payment to be remade over 24 months.remade over 24 months. The Choice is yours!The Choice is yours! Without Fire SprinklersWith Fire Sprinklers 17 For More InformationFor More Information ƒƒFor more information regarding residential sprinklers For more information regarding residential sprinklers systems visit the following web sites:systems visit the following web sites: ƒƒU.S. Fire AdministrationU.S. Fire Administration http://www.usfa.fema.gov/http://www.usfa.fema.gov/ ƒƒHome Fire Sprinkler CoalitionHome Fire Sprinkler Coalition http://www.homefiresprinkler.org/http://www.homefiresprinkler.org/ ƒƒNational Fire Sprinkler AssociationNational Fire Sprinkler Association http://www.nfsa.org/http://www.nfsa.org/ ƒƒMinnesota State Fire Marshals OfficeMinnesota State Fire Marshals Office http://www.dps.state.mn.us/fmarshal/fmarshal.htmlhttp://www.dps.state.mn.us/fmarshal/fmarshal.html ƒƒFire MarshalFire Marshal’’s Association of Minnesotas Association of Minnesota http://www.fmam.org/http://www.fmam.org/ Item No: 3B Meeting Date: 04/02/07 Type of Business: Work Session City of Mounds View Staff Report To: Honorable Mayor and City Council From: Heidi Heller, Planning Associate Item Title/Subject: Proposed Tree Preservation & Landscaping Ordinance Background Staff has revised the tree ordinance since meeting with the City Council, Planning Commission and Parks and Recreation and Forestry Commission in March. There have been many good suggestions from everyone, and all the groups are very supportive of having a tree ordinance. Both the Planning Commission and Parks and Recreation and Forestry Commission felt strongly that this ordinance should not prohibit single family property owners from doing what they want on their property with their trees. The revised ordinance addresses this by exempting all R-1 and R-2 zoned properties from the section regarding “tree removal on lots without construction or grading activity.” Staff’s thoughts are that the tree replacement and preservation requirements would only be in effect if there is construction on the property, particularly a new home built. But does the City want to impose these requirements on an R-1 or R-2 property owner who is just building a new garage or deck? "Exempting R-1 and R-2 properties when no "development" is occurring however creates a loophole. There are presently three or four potential infill residential redevelopment areas in the City. Submitting a subdivision application is the trigger for the tree plan, inventory, replacement requirements, etc,. Knowing this, the land owner(s) could clear cut the lots without penalty PRIOR to submitting the subdivision application thereby avoiding any requirements whatsoever. Staff is unsure how to close this loophole without otherwise restricting the typical single-family property owner. Staff will require some direction from the Council regarding this issue." After the discussion at the March City Council Worksession, draft ordinance was amended to increase the max fine for each significant or specimen tree illegally removed to $750. Other penalties could include withholding a Certificate of Occupancy for new development, forfeiture of all or part of a bond, escrow or financial guarantee and stoppage of a project if violations are extreme. There was some discussion as to whether the City should be exempted from these requirements (see 1127.04 Subd. 2e). Presently the ordinance does exempt the City and its agents. Does the Council wish to change that? Other changes made to the ordinance include additional species were added to the high value tree list and any tree in excess of 30 inches in diameter is now defined as a specimen tree. Recommendation It is recommended that the City Council review and discuss this revised draft ordinance. Staff has included an article in the May/June 2007 edition of the Mounds View Matters newsletter and asked for feedback from residents. At this time, staff is proposing that Council not act on this ordinance until after residents have an opportunity to respond. CHAPTER 1127 DDDRRRAAAFFFTTT 333-- TREE PRESERVATION & LANDSCAPING SECTION: 1127.01: Purpose 1127.02: Definitions 1127.03: General Tree Protection Requirements 1127.04: Tree Removal on Lots without Construction or Grading Permits 1127.05: Landscaping 1127.06 Appeal Process 1127.07 Violation and Penalties 1127.01: PURPOSE. The purpose of this chapter is to identify trees and woodlots which are to be preserved in general and saved when development is occurring or at any point thereafter. It is the City’s goal to ensure that development is compatible with the natural environment and is accommodated without destroying desirable environmental features and natural amenities. It is not the City’s intent, however, to preserve significant trees or woodlots where substandard subdivision design, poor drainage, excess slope in streets and driveways or inefficient utility construction will result. 1127.02: DEFINITIONS: When used in this Chapter, the following words and phrases shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: DRIP LINE: The imaginary line at the outer edge of a tree or shrub, the point where water would drip to the ground from the outermost branches or leaves. HIGH VALUE TREES: Any tree from the list below. ƒ Birches (River & Paper) ƒ Black Walnut ƒ Catalpa ƒ Cherry ƒ All Firs ƒ Flowering Crabapples & Hawthorns ƒ Hackberry ƒ Hybrid American Elm ƒ Ironwood ƒ Japanese Tree Lilac ƒ All Lindens ƒ All Maples ƒ All Oaks ƒ Ohio Buckeye ƒ Pines (except Jack) ƒ All Spruce ROOT ZONE: That area of effective tree rooting (out to the extent of the branches plus 5 five feet). -222888---000777 1 2 SIGNIFICANT TREE: A significant tree is defined as any live healthy High Value tree measuring eight (8) inches in diameter or greater, measured at 4.5 feet above the ground. SPECIMEN TREE: Any High Value Tree over 16 inches in diameter, or any other species over 30 inches in diameter. TREE CROWN: The upper part of a tree, including the branches and leaves. WOODLOT: An area of trees of significant or specimen size on at least twenty-five (25) percent of the total lot area. 1127.03: GENERAL TREE PROTECTION REQUIREMENTS. Developers, landowners, and builders shall attempt to preserve the maximum number of significant and specimen trees on lots as possible by using creative design techniques for the location of structures and other improvements within property boundaries. Subd. 1. Preservation Standards. a. Structures and other amenities shall be located in such any manner that the optimum number of trees shall be preserved. b. Prior to the granting of a permit, the person requesting the permit shall demonstrate that there are no feasible or prudent alternatives to the removal of significant or specimen trees on the site. c. Forestation, reforestation or landscaping shall utilize a variety of tree species and shall not utilize any species presently under disease epidemic. d. Development including grading and contouring shall take place in such a manner that the root zone, as defined in Section 1127.02, of existing trees shall not be affected 1127.04: TREE REMOVAL ON LOTS WITH CONSTRUCTION OR GRADING ACTIVITY Subd. 1. Tree Plan Required. A tree plan, which would include a tree inventory, prepared by an arborist, landscape architect or forester, shall be submitted for any project in which trees will be impacted as a result of said project. Tree inventories shall identify existing healthy significant trees, specimen trees, woodlots and smaller groups of non-significant trees within the limits of the proposed project area. The inventory should clearly indicate which trees would be lost as a result of the project and which trees would be saved. The tree inventory shall be submitted at the same time as any other required application submittals. This requirement may be waived at the discretion of the Community Development Director and the City Forester. 3 Subd. 2. Replacement Standards. Replacement tree species shall be approved by the City Forester in accordance with Section 1127.05. a. For every significant tree removed, the permit holder or property owner shall plant a new tree on a one-to-one replacement basis, up to five new trees on lots less than an acre and up to ten new trees on lots one acre or larger. No additional plantings shall be required on lots less than one acre where five or more replacement and high value trees over eight inches in diameter would remain or on lots one acre or larger where ten or more replacement and high value trees over eight inches in diameter would remain. b. For every specimen tree removed, the permit holder or property owner shall plant five new trees on lots less than an acre or ten new trees on lots one acre or larger. c. Replacement trees shall be planted no later than twelve months beyond the date of tree removal. The owner or permit holder shall guarantee the survival of the replacement trees for two full growing seasons beyond the year of planting. In cases where replacement cannot occur within the specified timeframe, an extension may be granted at the discretion of the City Forester or Community Development Director. d. Replacement Quantity Reductions. The number of required replacement trees may be reduced when deemed appropriate at the sole discretion of the City Forester based on existing site conditions. e. Exceptions. Replacement requirements shall not apply to trees lost as a result of utility trimming or maintenance, work conducted by or on behalf of a governmental agency in pursuance of its lawful activities or functions, disease, storms or other acts of natural occurrence. Subd. 3. Trees within development areas designated for preservation shall be protected from construction damage by placing a snow fence or flags in a perimeter five feet beyond the tree’s dripline, within which area no equipment shall traverse or materials, debris or fill shall be placed. Subd. 4. Additional Removals. If, through the course of a development activity, it becomes necessary to remove additional trees beyond what was previously approved in the Tree Plan. It shall be the responsibility of the applicant to submit such request to the City in writing, explaining the reasons necessitating the additional removals, and obtain written approval of the Community Development Director or designee before proceeding. 4 1127.05 TREE REMOVAL ON LOTS WITHOUT CONSTRUCTION OR GRADING ACTIVITY 1 : Subd. 1. No more than two significant or specimen trees shall be permitted to be removed per year on lots upon which no development or grading activity is occurring, unless an approved Tree Plan has been obtained. Trees removed because they are an obstruction to traffic or power lines, or trees removed because they pose a hazard to structures or sewer systems, or have been identified by the City Forester as diseased or hazardous, shall be excluded from these requirements. Subd. 2. Tree Plan: A tree plan will be required if more than two significant trees and/or specimen trees per year are removed. If determined necessary by the Community Development Director or City Forester, the tree plan shall be prepared by a forester, arborist or landscape architect, and may be reviewed by the Parks, Recreation and Forestry Commission prior to approval by the Community Development Director and City Forester. The tree plan shall include the following information: a. A scaled map designating all forested areas and existing and proposed uses of such areas. b. Location of all existing structures, roads, utilities, and driveways on the site. c. A written narrative describing specific activities and reasons for developing the plan, and how these actions and activities will affect the forest. Specific examples include, but are not limited to: better forest management (thinning or removal of dead or diseased trees), improved wildlife habitat, recreational use, outdoor education, and trails. Subd. 3. Tree Replacement. As a condition of a tree plan approval, tree replacement may be required. 1127.06 LANDSCAPING: Subd. 1. Applications for development in the R-3, R-4, B-1, B-2, B-3, B-4, I-1 and PUD districts shall be accompanied by a detailed landscape plan. The landscape plan should be developed in accordance with the site plan submitted for approval. Subd. 2. Detailed landscape plans shall include the following information: a. General: name and address of developer/owner, name and address of architect/designer, date of plan preparation, date and description of all revisions, name of project or development, scale of plan, north point indication. 1 Parcels in the R-1, Single Family Residential, and R-2, Single and Two Family Residential zoning districts are exempt from the provisions of this section. 5 b. Site analysis: Boundary lines of property line with dimensions based upon certified survey, name and alignment of proposed and existing adjacent on- site streets, location of all proposed utility easements and right-of-way, location of existing and proposed buildings, topographic contours at two (2) foot contour intervals, location of parking areas, water bodies, proposed sidewalks, and percentage of site not covered by structures and impervious surfaces. c. Landscape data: A planting schedule table shall include symbols, quantities, common names, botanical names, size of plant materials, root specifications, and special planting instructions. d. Typical sections and details of fences, retaining walls, berms and other landscape improvements. e. Typical sections of landscape islands and planter beds with identification of materials used. f. Details of planting beds and foundation plantings. g. Delineation of both sodded and seeded areas indicated in square footage. h. Where landscape or inorganic materials are used to provide required screening from adjacent and neighboring properties, a cross section shall be provided at a legible scale illustrating the prospective of the site from the neighboring property and property line elevation. Subd. 3. Number of plant materials required: In order to achieve an appropriate and complete quality landscaping of a site, the following minimum number of plant materials shall be provided as indicated below: a. One (1) overstory deciduous shade tree for every two thousand (2,000) square feet of the total building footprint. b. One (1) coniferous tree for every two (2,000) square feet of building or one (1) coniferous tree for every two hundred (200) feet of site perimeter, whichever is greater. c. One (1) understory shrub for every three hundred (300) square feet of building or one (1) shrub for every thirty (30) feet of site perimeter, whichever is greater. d. One (1) ornamental tree for every two thousand (2,000) square feet of building or one (1) ornamental tree for every two hundred (200) feet of site perimeter, whichever is greater. e. The number of plant materials required in Subdivision 3 a-d may be reduced by fifteen percent in each category in the I-1 districts. 6 f. In the event a site plan layout does not have adequate space to accommodate plant quantities as required herein, such quantities per species can be reduced, provided that total required height or caliper is maintained. The Community Development Director and City Forester must approve all changes. Subd. 4. Minimum size of plantings and species requirements: a. Only tree species from High Value Tree list or other tree species as approved by the City Forester shall be used. b. Overstory deciduous – 2 ½ inch caliper. c. Coniferous – 6 feet in height as measured from grade. d. Shrubs – 24 inch plant (potted). e. Ornamental trees – 2 inch caliper. Subd. 5. Method of installation: All deciduous and coniferous trees shall be ball and burlap and staked and guyed per National Nurserymen’s Standards. All shrubs shall be potted. Subd. 6. Use of Landscaping for Screening: a. Where natural materials, such as trees or hedges are approved in lieu of the required screening by means of walls or fences, density and species of planting shall be such to achieve screening year round. Subd. 7. Maintenance. Property owners shall be responsible for the upkeep of all required plantings and landscape materials. Upon written notice from the City, a property owner shall be required to trim broken or damaged tree boughs, remove fallen trees or storm damaged trees and remove diseased trees as identified by the City Forester.2 Uprooted or diseased tree stumps shall be removed or ground down below grade. 1127.07 PLAN REVIEW PROCESS All tree inventories, preservation plans and landscape plans shall be reviewed by the City Forester. The Parks and Recreation and Forestry Commission may also review such plans at the request of the Community Development Director or the City Forester. When such plans are required as part of a development application (e.g. development review, conditional use permit, minor or major subdivision) the Planning Commission and City Council shall have approval authority. For such plans submitted when no official planning action is necessary, the Community Development Director and City Forester shall retain administrative approval authority. 2 Refer to Chapter 605, Tree Disease Control. 7 1127.08 APPEAL PROCESS Administrative decisions by the City Forester and/or Community Development Director may be appealed to the City Council. An appeal shall be filed in writing no more than fourteen (14) days following the date of the administrative decision by the City. The appeal shall be scheduled for consideration by City Council at the next regularly scheduled City Council meeting which is at least seven (7) days from the date of the appeal. 1127.09 VIOLATION AND PENALTIES Except as provided herein, no significant or specimen tree shall be removed from any property in the City. Any violation of any provision of this Chapter shall constitute a misdemeanor offense. Property owners or permit holders having been cited for illegal tree removal may be fined up to $750 for each significant or specimen tree illegally removed. In addition to the punishment specified in this section, the City may enforce this Code by any other appropriate form of action which could include withholding a Certificate of Occupancy, forfeiture of all or part of a bond, escrow or financial guarantee and stoppage of the project. Item No: 3C Meeting Date: April 2, 2007 Type of Business: Worksession Administrator Review: ____ City of Mounds View Staff Report To: Honorable Mayor and City Council From: James Ericson, Community Development Director Item Title/Subject: Request from Charlie Hall Representing the Mermaid, Regarding their On-Premises Animated Sign Introduction: As reported at the Council meeting on March 26, 2007, Charlie Hall, owner of the Mermaid Entertainment and Event Center located at 2200 County Road 10, has submitted a letter concerning the Mermaid’s animated on-premises sign fronting County Road 10. Mr. Hall is seeking permission from the City to replace their sign, which was damaged last year after a lightning strike, utilizing newer LED technology. Discussion: Mr. Hall has explored repairing the sign however it has been determined that parts are no longer available through the manufacturer or vendor. It had been expressed to Mr. Hall in a letter dated March 9, 2007 that a sign moratorium had been adopted which prohibits new electronic changing message signs. While the moratorium does allow damaged signs to be replaced, the caveat is that the sign may only be replaced to the same condition and method of construction and operation that existed prior to the damage. (Sect. 3.03 of Ord. 784.) Mr. Hall is urging the City Council to make an exception to the ordinance to allow them or the future owner to replace the existing, damaged sign with a new sign using new technology, as the old technology cannot be replicated. Mr. Hall has also inquired as to whether the City Code presently would allow for the advertising of off-premises goods or services on their on-premises sign. The Code is somewhat silent on this matter as a result of previous ordinance amendments eliminating content-based regulation. Billboards, however, are defined in the code as a sign upon which goods or services located off site are advertised. Billboards may only be located in certain predefined areas and only with an IUP, so it clearly could be argued that advertising a good or service NOT available at the Mermaid would render the sign equivalent to a billboard and thus prohibited, as the City is presently at its maximum threshold for billboards—ten. If the City Council agrees that the intent of the Code was to prohibit off-premises advertising on an on-premises sign, clarifying language will need to be added to the City Code. Legal Review: Before sending the letter to Mr Hall dated March 9, staff had asked Kennedy & Graven to review the ordinance in response to Mr. Hall’s request. The legal review indicated that the moratorium would in fact prohibit the replacement of the existing Mermaid sign if a more advanced technology were utilized. Mermaid Sign Request April 2, 2007 Page 2 Recommendation: Direction is requested from the City Council in response to the request from Mr. Hall. If the Council believes the sign can be replaced despite the moratorium, it will need to direct staff to prepare a resolution which finds that either extenuating circumstances warrant approval or that the sign replacement would fall outside the provisions of the moratorium. The resolution would be brought back for Council action on April 9, 2007. If the Council chooses this option, a condition prohibiting off-site advertising would be incorporated into the resolution. If the City Council does not support the replacement of the Mermaid sign using newer LED technology, a resolution indicating as much would be prepared for the Council’s consideration on April 9, 2007. Such a resolution will address the fact that a moratorium is in place and that the City has not completed its study on the issue of electronic signs and the safety considerations associated with them. Respectfully submitted, ________________________ James Ericson Community Development Director 306301v1 SJR MU125-11 1 ORDINANCE NO. 784 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA AN EMERGENCY ORDINANCE ESTABLISHING A ONE YEAR MORATORIUM ON THE INSTALLATION, ERECTION, CONSTRUCTION, REPLACEMENT, MODIFICATION OR IMPROVEMENT OF STATIC OR CHANGING ELECTRONIC, DIGITAL, VIDEO, DISPLAY SIGNS OR BILLBOARDS AND FLASHING, MOTION, ANIMATED, CHANGEABLE COPY AND ILLUMINATED SIGNS IN ALL ZONING DISTRICTS THE CITY OF MOUNDS VIEW DOES ORDAIN: Section 1. Background. 1.01. The City of Mounds View regulates signs in all zoning districts; 1.02. Section 1008.02 of the Mounds View City Code defines certain signs as follows: ANIMATED SIGN: a sign that has any moving or rotating part; or uses movement or change of lighting to depict action or create a special effect or scene; CHANGEABLE COPY SIGN: a sign or portion thereof with characters, letters or illustrations that can be changed or rearranged electronically or manually without altering the face or the surface of the sign. A sign on which the message changes more than eight (8) times a day shall be considered an animated sign for the purposes of this Section. That portion of the sign on which the only copy that changes is an indication of the time and temperature shall be considered a public informational sign. Portable or non-permanent changeable copy signs shall, for the purposes of this Section, be considered temporary signs. FLASHING SIGN: a sign or portion thereof whose illumination is characterized by a repetitive cycle in which the period of illumination is either the same as or less than the period of non-illumination. For the purposes of this Section, flashing will not be defined as occurring if the cyclical period between on-off phases of illumination exceeds four (4) seconds. 1.03. Section 1008.01 prohibits signs in all zoning districts of the City that are located, designed or maintained in a manner which are likely to cause confusion or interfere with the safety of motorists, cyclists, pedestrians and other users of public streets and rights of way and visibility of traffic signs, traffic control devices, crossroads, driveways or crosswalks; 1.04. Section 1008.12, subdivision 1, of the Mounds View City Code prohibits flashing signs, except those that provide public services information including time and temperature per Section 1008.02; 306301v1 SJR MU125-11 2 1.05. Representatives of the sign industry have issued press releases indicating the intention to deploy digital billboard networks in the Twin Cities of Minneapolis and St. Paul and their surrounding ring suburbs; 1.06. These digital billboards have been observed by the Mounds View Zoning Administrator, and the electronic, digital, video, display signs, billboards and billboard networks were determined to fall within the City ordinance definitions for flashing, animated or changeable copy signs; 1.07. The City of Mounds View has several existing billboards and pylon signs along major public roadways within its corporate boundaries that currently do not have electronic, digital, video, display signs, billboards and billboard network displays; 1.08. The City of Mounds View regulates signs and displays on signs in order to reduce potential traffic safety hazards and visual blight. A major study on electronic signs prepared by the Federal Highway Administration (FHA) found that “motion or the illusion of motion of lights or other display features, including animation, has “the greatest potential for motorist distraction as well as a dominant visual impact on the aesthetic environment”. (FHA Report, Part VI, Section L.) The FHA study also found that control of the message interval and message cycle as well as appearance of flashing must be regulated to prevent contributing to traffic hazards. (FHA Report, Part VI, Sections G-J.) Signs, including changing image signs, that display graphics that are animated, or portray motion, or display rapidly moving messages may contribute to traffic safety hazards and /or have adverse aesthetic impacts on the visual environment; 1.09. There is a need to conduct a study so that the City of Mounds view can consider possible amendments to its sign ordinance and zoning regulations pertaining to electronic, digital, video display signs, billboards, billboard networks, flashing, motion, animated, changeable copy and illuminated signs; 1.10. There is a need for an interim ordinance to be adopted for the purpose of protecting the planning process and the welfare of the citizens of the City until such a study has been completed. There is a need to restrict certain signage until the study has been completed and any modifications to the City's sign ordinance and zoning regulations are accomplished; and 1.11. Minnesota Statutes, section 462.355, subdivision 4, permits the adoption of interim zoning ordinances during the planning process. Sec. 2. Findings. 2.01. The City Council finds there is a need to conduct a study so that the City of Mounds View can consider possible amendments to its sign ordinance and zoning regulations pertaining to electronic, digital, video display signs, billboards, billboard networks, flashing, motion, animated, changeable copy and illuminated signs. 2.02. The City Council finds that there is a need to adopt a moratorium ordinance for all Zoning Districts within the City while the studies referenced in section 2.01 of this ordinance are being conducted. 306301v1 SJR MU125-11 3 Sec. 3. Planning Study; Moratorium. 3.01. The City of Mounds View Staff are directed to undertake a study regarding electronic, digital, and video display signs, billboards, billboard networks, flashing, motion, animated, changeable copy and illuminated signs. The scope of the study should include review of regional and national studies, local research, ordinances in other jurisdictions, review of relevant studies and a legal analysis of applicable case law, sign display operational literature, existing electronic signs and other factual and quantifiable information. 3.02. Upon completion of the study, the matter is to be considered by the Planning Commission for its review and recommendation to the City Council. 3.03. A moratorium is hereby adopted on the installation, erection, or construction of any new sign or the alteration, modification or replacement of any existing sign, so that the new or existing sign (as altered or modified) uses static or changing electronic, digital, or video display or flashing, motion, animated, or changeable copy. The moratorium applies in all Zoning Districts. The moratorium does not apply to repair or replacement of either an existing legal sign or an existing legal nonconforming sign that has been damaged by less than 50 percent of its market value (using the replacement cost approach to value), as determined by the building official, provided that the repair or replacement only restores the damaged sign to the same condition and method of construction and operation that existed prior to the damage. 3.04. The moratorium is adopted pending completion of the study authorized by this ordinance and the adoption of any amendments to the City's sign ordinance or Zoning Ordinance. No sign alteration shall be completed without a permit, and no sign permit may be issued for any sign within the scope of this moratorium. Sec. 4. Enforcement. The City may enforce this ordinance by mandamus, injunction or other appropriate civil remedy in any court of competent jurisdiction. Sec. 5. Term. Unless earlier repealed by the City Council, the moratorium established under this ordinance shall remain in effect until February 11, 2008. The moratorium period may be extended for a reasonable time, in accordance with Minnesota Statutes Section 462.355. Sec. 6. Effective Date. This emergency ordinance is effective immediately upon adoption, as provided by Section 3.06 of the Mounds View City Charter. ____________________________________ Rob Marty, Mayor ATTEST: _____________________________________ Kurt Ulrich City Clerk-Administrator (seal) 1 SPRING LAKE PARK – BLAINE – MOUNDS VIEW FIRE DEPARTMENT FIRE REGULATIONS #-## PUBLIC SAFETY 800 MHz RADIO BUILDING AMPLIFICATION SYSTEM GOVERNING REGULATIONS IFC Section 104.1 1.0 General. Except as otherwise provided, no person shall erect, construct, change the use of or provide an addition of more than 20% to, any building or structure or any part thereof, or cause the same to be done which fails to support adequate radio coverage for the Minnesota Regional Radio Communications System, including but not limited to firefighters and police officers. This section shall not apply to: buildings of less than 8,500 square feet, or any building constructed of wood frame; provided none of the aforementioned buildings make use of any metal construction or any below-grade levels or parking areas. Any part of any R -3 occupancy building, including below-grade levels and parking areas, is exempt from the requirements of this section. For the purposes of this section, parking structures and stairwells are included in the definition of “building” and stair shafts and elevators are included in the definition of “all parts of the building.” For purposes of this section, adequate radio coverage shall be an average received field strength of no less than –93 dBm, or 1% BER, measured at 30 to 36 inches above the floor over 90% of the area of each floor and other critical areas determined by the Fire Chief or the Fire Chief's designee such as fire command centers, stairwells, elevators, high hazard areas, basements, and parking areas. Without an in-building radio system, only the received signal level standard must be achieved as the talk-out path is equivalent to the talk-in path in this regional radio system. 2.0 Amplification systems allowed. Buildings and structures which cannot support the required level of radio coverage shall be equipped with either a radiating cable system or an internal multiple antenna system with FCC type accepted bi-directional 800 MHz amplification as needed. If amplification is used in the system, all required FCC authorizations must be obtained prior to the use of the system. If any part of the installed system or systems contains an electrically powered component, the system shall be capable of operating on an independent battery and/or generator system for a period of at least 12 hours without external power input. The battery system shall automatically charge in the presence of an external power input. 2 3.0 Testing procedures. 3.1 Acceptance test procedure. With or without an in-building radio system, it will be the building owner's responsibility to have the regional radio system performance tested to ensure that two-way coverage on each floor of the building is a minimum of 90% of the total floor area and the critical areas designated. 3.1.1 Talk-in From the Regional Radio System Coverage Testing The talk-in coverage testing process shall be the same for buildings with and without in-building amplification systems. During test measuring, the center of the test equipment receive antenna shall be between 30 and 36 inches above the floor. On each floor of a building to be tested, the floor space, except for designated critical areas, shall be divided into square or rectangular areas of approximately the same size and shape. Each floor shall have at least ten grid areas; however, the maximum size of grid areas shall not exceed 2,500 square feet. In buildings with support columns laid out in a grid, the corners of each grid may be arranged at the columns for ease in identifying grid corners while testing is in progress. In buildings, such as a warehouse, with large open areas, tests shall be conducted near the center of each grid although the exact center may not be easily accessible due to the location of large machinery, storage racks, and the like. In buildings with divided office spaces, with or without floor to ceiling partitions, tests shall be conducted in an office at or near the center of a grid. In buildings with a large open area and an attached two-story, split-level office or other area, the lower level of the two-story, split-level attachment shall be considered as an extension of the large open area. In multi-story buildings and parking ramps, testing shall begin at the lowest level, including any sub-grade level(s), and continue up one floor at a time. In -building amplification may only be required on the lowest level or levels of a multi-story building or parking ramp. Average radio signal field strength shall be measured and recorded in each grid and in each designated critical area defined above. Average field strength may be obtained through use of an instantaneous measuring instrument and a computer that samples the actual field strength at very short time intervals and averages the sample values. As an alternative, a field strength measuring instrument with an analog or digital readout of average field strength may also be used. Measurements shall be made while the measuring instrument is moved over a distance of four to ten feet. If the average field strength varies over the measurement path, the lowest (most negative) value shall be recorded. The test 3 instrumentation used shall have been calibrated within the six-month period prior to the testing. The percentage of area passed shall be calculated as 100 times the result of dividing the number of grids and critical areas that are at least at –93 dBm or 1% BER by the total number of grids and critical areas tested. The donor antenna in an in-building amplification system may receive up to 87 800 MHz radio frequencies of approximately equal field strength from the regional system, plus some others of approximately equal field strength from other radio systems. At any time, the donor antenna may be receiving at least 60 radio frequencies of approximately equal level in the pass band ranges. For that reason, it shall be assumed that the output level of talk-in amplifiers will be at + 3.2 dBm per channel maximum. Therefore, grid and critical areas tests shall be conducted while the headend amplifier is disconnected and a signal of + 3.2 dBm is inserted into the connector downstream from the headend amplifier. Any in-building talk-in amplification system shall have pass band filters before the input to the first (headend) amplifier that shall pass 806 to 817 MHz and 821 to 824 MHz only. In the future, within six months after notification by the Fire Chief or the Fire Chief’s designee, the pass band filter frequency range shall be changed in accordance with instructions, or an additional pass band filter for 700 MHz band frequencies shall be added. When the donor antenna is installed, the average signal level received on the nearest Anoka County site control channel shall be measured at the antenna connector. A signal at that average received signal level shall be inserted into the cable to the headend amplifier and filter while the output level of the headend amplifier is measured, and the output level of the amplifier shall be set at + 29 + 1 dBm. Alternative in-building amplification systems that do not involve broadband pass band filters will be accepted provided that similar testing can be demonstrated. 3.1.2 Talk-out to the Regional Radio System Testing With an in-building amplification system, the talk-out (to the regional 800 MHz radio system) shall be measured at the same grid and critical area locations as the talk-in measurements were made. The measurements shall be made using a three- watt portable radio with a well-charged battery to transmit into the in-building radio system while field strength is measured out of the connector that is normally attached to the donor antenna. To pass, the field strength at the donor antenna shall be the measured value at the connector plus the donor antenna gain and minus a free space loss factor. The free space loss factor shall be –93 dB for a distance of one mile to the nearest Anoka County base radio location, adjusted by 6 dB each time the distance is halved or doubled. The acceptable range for passing shall be between –65 and –95 dBm. Gain values of all amplifiers shall be measured and the test measurement results shall be kept on file with the building owner so that the measurements can be 4 verified each year during the annual tests. In the event that the measurement results become lost, the building owner will be required to rerun the acceptance test to reestablish the gain values. 3.2 Annual tests. When an in-building radio system is required, the building owner shall test all active components of the system, including but not limited to amplifiers, power supplies and backup batteries, a minimum of once every 12 months. Amplifiers shall be tested to ensure that the gain is the same as it was upon initial installation and acceptance. Backup batteries and power supplies shall be tested under load for a period of one hour to verify that they will properly operate during an actual power outage. If within the one-hour test period, in the opinion of the testing technician, the battery exhibits symptoms of failure, the test shall be extended for additional one-hour periods until the testing technician confirms the integrity of the battery. All other active components shall be checked to determine that they are operating within the manufacturer's specifications for the intended purpose. 3.3 Five-year tests. In addition to the annual test, the building owner shall perform a radio coverage test a minimum of once every five years to ensure that the radio system continues to meet the requirements of the original acceptance test. A radio test shall also be performed whenever there is a change in or to the building that may have an impact on coverage. Examples of the types of changes that may change radio coverage are interior remodeling that adds and/or changes partitions, removal of windows, and the addition of metalized treatment to window surfaces. The procedure described in section 3.1 shall be used for these tests. 3.4 Qualifications of testing personnel. All tests shall be conducted, documented and signed by qualified and competent personnel that includes: persons in possession of a current FCC license, or a current technician certification issued by the Associated Public-Safety Communications Officials International (APCO) or the Personal Communications Industry Association (PCIA), or a qualified radio engineer licensed as a registered professional engineer by the State of Minnesota. Testing personnel shall have test equipment that is appropriate for the testing procedure, and that test equipment shall have been calibrated within six months prior to the testing. All test records shall be retained on the inspected premises by the building owner and a copy shall be submitted to Fire Department officials. 3.5 Field testing. Fire and police personnel, after providing reasonable notice to the owner or the owner's representative, shall have the right to enter onto the property to conduct testing to be certain that the required level of radio coverage is present.