HomeMy WebLinkAbout12-06-1989 PROCEEDINGS OF THE PLANNING COMMISSION
• CITY OF MOUNDS VIEW
RAMSEY COUNTY, MINNESOTA
Regular Meeting
December 6, 1989
Mounds View City Hall
2401 Hwy. 10, Mounds View, MN 55112
The Mounds View Planning Commission was called to 1. Call to
order by Chair Mountin at 7:37 PM on Wednesday, Order
December 6, 1989.
MEMBERS PRESENT: Commissioners Jones, Miller, 2. Roll Call
Zollner and Chair Mountin.
It was noted Commissiner Dian had an excused
absence. It was further noted Commissioner Burgers
had an unexcused absence.
ALSO PRESENT: City Planner Hren and Councilmember
Wuori .
Motion/Second: Zollner/Jones to approve the 3. Approval of
0 November 1, 1989 and November 15, 1989 minutes Minutes:
as presented. November 1 and
November 15,
4 ayes 0 nays 1989
Motion Carried
There were no residents requests or comments from 4. Residents
the floor. Requests and
Comments from
the Floor
Ms.Hren advised this request had not been reviewed 5. Consideration
by the Planning Commission at their agenda session. of Resolution
She reviewed the request of the applicant for a No. 274-89
variance from the concrete curb and gutter standard. Regarding
She advised the ordinance does not specifically Variance Re-
state concrete curbing, but the description implies quest of
it is concrete. Staff took the request to the City Dynamic Design-
Council for interpretation of the ordinance and ers, 7660
the Council determined that concrete curb and gutter Woodlawn Dr. ,
is the appropriate and standard material in the Planning Case
City of Mounds View. The applicant has requested No. 138-83
the variance as he has already installed asphalt.
• Art Freetag, a partner in Dynamic Designers, stated
it is not specified in the Code. He stated there
is a little bit of everything in Mounds View, and
Mounds View Planning Commission December 6, 1989
Regular Meeting Page Two
411 they are at the mercy of the Planning Commission. He
stated they installed the asphalt in good faith and
thought they had met the Code requirements. He
added he agrees now the Code does imply concrete,
but he did not realize that at the time of installa-
tion. He added they would like to get an occupancy
permit, as the building is finished and they have
two units rented out but cannot allow the renters
to move in until this issue is resolved.
Ms.Hren reported the development agreement refers
back to the site plan, and what was installed is
not what was shown on the site plan. She explained
B618 is a MnDOT standard for concrete.
Chair Mountin stated the request for a variance
must be so unique that another one should not be
seen in the community, and it cannot be self-
created, and it must have unusual and unique circum-
stances. A variance cannot be granted based on a
monetary hardship.
Mr. Freetag stated what is there in asphalt is
certainly more servicable than anything else
required.
• Upon reviewing the plan before the Planning
Commission, it was noted it was dated October 30,
1989 and was not the plan the Planning Commission
originally approved. Ms. Hren pointed out the
Planning Commission based their decision on the
specified B618 concrete curb, for a four plex, and
she reviewed the resolution which approved the
plan. She also provided a copy of the original
plan, as submitted by the developer and approved by
the Planning Commission, which specified concrete.
Mr. Freetag stated he would be willing to replace
the asphalt with concrete in the future, if the
curbing breaks down.
Commissioner Zollner noted this property has a long
history of different proposals and working with the
Planning Commission. She added it is unfortunate
the curb was installed with the improper material,
but the site plan as approved called for concrete,
and she cannot agree to a variance now.
Commissioner Miller stated she agreed, that the
site plan provided by the developer specified con-
crete.
• Commissioner Jones stated he was in agreement with
Commissiners Zollner and Miller.
Mounds View Planning Commission December 6, 1989
Regular Meeting Page Three
. Chair Mountin stated it is unfortunate the asphalt is
already installed, and she regrets there does not appear
to be a condition on which a variance could be granted.
She pointed out the developer did enter into a contract
with the City which clearly spelled out concrete as
being required. She also explained the appeal process
to Mr. Freetag.
Ms. Hren stated the Council has the option of granting
a certificate of occupancy, and they could choose to
grant it temporarily or require a security bond to
cover the cost of the work needed to be done. She
agreed to forward the information to the Council for
the next packet.
Motion/Second: Jones/Zollner to adopt Resolution
No. 274-89, denying the variance request by Jim
Cepress, Dynamic Designers, for alternative curbing
materials at 7660 Woodlawn Drive, Planning Case
No. 138-83.
5 ayes 0 nays Motion Carried
Ms. Hren reported the Planning Commission has not 6. Consideration
reviewed this request in an agenda session yet. She of Resolution
review the request of the applicant for a waiver of No. 275-89
the moratorium district requirements in order to Regarding
. replace an existing sign on the property with another Request of
sign. She reported if the moratorium district was Firstar Bank
not in place, the proposed sign would meet all to Erect Sign
requirements as outlined in Chapter 39, the sign in Moratorium
code. She also reviewed the criteria used in the District, 2711
appeal process. Highway 10,
Planning Case
Jim Werner, branch manager of Firstar Bank, reviewed No. 285-89
their request also. He stated they would like their
name and instant cash to appear on the sign, to let
people know what is available. He added people do
not know they have instant cash, and it is a service
for the community to use.
Ms. Hren reviewed the timing concerns of the appli-
cant in placement of a new sign.
Mr. Werner explained the existing sign is plywood,
with a light on it, and they would like to upgrade
to a slightly larger sign, with better lighting
and advertisement of instant cash, and they would
like to get it in before the weather turns too cold.
The new sign would be 5 ' from the existing sign, on
a better foundation, and would be 10 ' x 7 ' , with
lights. He added they would like to be identified
• as a Firstar bank.
Mounds View Planning Commission December 6, 1989
Regular Meeting Page Four
• Commissioner Jones pointed out there is an existing
sign on the property, and they have previously denied
the request of Mid-American Auto for a similar change.
Commissioner Miller also pointed out the denial on
Mid-American Auto. She stated an appeal could be
made to the Council. Based on previous practices, she
feels this request must be denied.
Commissioner Zollner stated she feels this would be
an improvement to the existing sign, but she does not
feel the five conditions for an appeal are met.
She pointed out they have operated with the existing
sign for many years, and it was okay up until now.
Commissioner Jones stated the intent of the ordinance
is not to stop everything completely.
Commissioner Zollner stated they could possibly look
at not being able to market new products as a hardship.
Commissioner Miller responded she did not see any
undue hardship.
Chair Mountin stated a waiver would weaken the integrity
of the ordinance.
• Ms. Hren pointed out the moratorium will end this
coming April.
Motion/Second: Miller/Zollner to approve Resolution
No. 275-89, recommending denial of a request by
Firstar Bank for a waiver of the Highway 10 moratorium
district requirements, Planning Case No. 285-89.
3 ayes 1 nay Motion Carried
Commissioner Jones voted against the motion, stating
he does not believe the moratorium is intended to
restrict normal operations of businesses in the area,
and by denying this, they are restricting the ability
to do business. He stated he feels they have demon-
strated a reasonable hardship , as the current sign
is not clearly readible, and he does not feel approval
of this request would have an impact on the integrity
of the moratorium.
Ms. Hren advised the public hearing before the
Council is scheduled for December 11.
•
Mounds View Planning Commission December 6, 1989
Regular Meeting Page Five
• Tim Nelson, of Everest Development, explained he would 7. Consideration
be making an informational presentation on Mounds View of Mounds
Business Park Phase 3, east and west. View Business
Park East and
Mr. Nelson made a slide presentation of Mounds View West
Business Park, as well as other projects they have done
in the metro area, and he reviewed the plans for
development of phase 3, east and west. He presented
sketches of the site and landscaping plans.
Mr. Nelson explained they plan to sit down for a
development stage review meeting next Monday, submit
everything officially and be placed on the December
20 Planning Commission agenda.
This would be a revision to the original Mounds View
Business Park PUD, and consists of 21 acres with four
proposed buildings. Mr. Nelson reviewed the proposed
building layouts, elevations, parking plans, land-
scaping, ponding, public improvements and tentative
building schedule.
Councilmember Wuori reported she was aware of only
two complaints concerning trucks going into the resi-
dential area on the north end, and both complaints
had been handled satisfactorily.
• Mr. Nelson advised they have withdrawn their request
for a drive opening by Perkins, and instead plan to
make that green space.
Bill Franke reviewed future plans for the site.
Ms . Hren reported the City is doing a survey of the 8. Staff Report
residents, and she asked for any feedback or comments
from the Planning Commission concerning the proposed
questions for the economic development area. Comments
should be received back by Staff by December 20.
Chair Mountin requested Staff look into the flashing 9. Report of
light at the Christmas tree lot at Highway 10 and Chair
Silver Lake Road.
The attendees at the November 15 agenda session were
CommissignersBurgexs, Miller, Zollner and Chair
Mountin, City Planner Hren and Councilmember Wuori .
Commissioner Dian had an excused absence, and
Commissioner Jones had an unexcused absence.
Mounds View Planning Commission December 6, 1989
Regular Meeting Page Six
• There being no further business before the Planning 10. Adjournment
Commission, Chair Mountin adjourned the meeting at
9:47 PM.
Respectfully submitted,
Michelle Hren
City Planner
•
•
RESOLUTION NO. 275-89
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
S
RESOLUTION RECOMMENDING DENIAL OF A REQUEST
BY FIRSTAR BANK FOR A WAIVER OF THE HIGHWAY 10
MORATORIUM DISTRICT REQUIREMENTS, PLANNING CASE NO. 285-89
WHEREAS, the Mounds View Planning Commission has reviewed
the request by Firstar Bank to allow replacement of their
existing sign with a new sign on their property located at 2711
Highway, legally known as :
SPRING LAKE PARK HILLVIEW
EX SWLY 100 FT FOR HWY;
LOTS 108, 109, 110 AND 111; and
WHEREAS, the Planning Commission has reviewed Ordinance
No. 466 addressing Highway 10 moratorium district requirements;
and
WHEREAS, the Planning Commission has reviewed the appeal
provision which is Section 6 of Ordinance No. 466; and
WHEREAS, the Planning Commission has determined that the
request does not meet the criteria outlined in the appeal
provisions ; and
• WHEREAS, the Planning Commission states the following
reasons for their denial :
1. Lack of demonstrated undue hardship.
2. Approval would impair the integrity of the moratorium
district.
NOW, THEREFORE, BE IT RESOLVED that the Planning
Commission of the City of Mounds View recommends to the City
Council denial of the requested waiver of the Highway 10
moratorium district requirements for Firstar Bank.
BE IT FURTHER RESOLVED that the Planning Commission
directs Staff to forward this resolution to the City Council
prior to approval of the minutes.
Adopted this 6th day of December, 1989.
ATTEST: 7
• Alidti-/-7;c_ -
Cha rm--
. (SEAL) A
Pity • anner
RESOLUTION NO. 274-89
CITY OF MOUNDS VIEW
410COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION DENYING THE VARIANCE REQUEST BY MR. JIM
CEPRESS, DYNAMIC DESIGNERS, FOR ALTERNATIVE CURBING
MATERIALS, 7660 WOODLAWN DRIVE, PLANNING CASE NO. 138-83
WHEREAS, the Mounds View Planning Commission has reviewed
the request by Mr . Jim Cepress to allow for asphalt curbing at
7660 Woodlawn Drive instead of concrete; and
WHEREAS, the Planning Commission has reviewed the criteria
for granting a variance per Section 40. 26, Subd. D, "Variances" ;
and
WHEREAS, the Planning Commission has reviewed the
development agreement and the referenced Exhibit 2 site plan,
specifically calling out concrete curb; and
WHEREAS, the Planning Commission has determined that the
request does not meet the criteria for granting a variance; and
WHEREAS, the Planning Commission concurs with the City
• Council ' s determination that the City Code requires concrete
curbing and gutter as the standard material used per. Section
44. 06.
NOW, THEREFORE, BE IT RESOLVED that the Planning
Commission of the City of Mounds View denys the requested
variance to allow asphalt curbing rather than concrete curbing.
BE IT FURTHER RESOLVED that the Planning Commission
directs Staff to forward this resolution to the City Council
prior to approval of the minutes.
Adopted this 6th day of December, 1989.
ATTEST:
/ / /14---47,1Chai man, ria
(SEAL)
/' / / ' /61QVIL,,
City Planner
•