Loading...
HomeMy WebLinkAboutPlanning Commission Relolution 356-92 . MOUNDS VIEW PLANNING COMMISSION RESOLUTION NO. 356-93 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RECOMMENDATION TO THE CITY COUNCIL REGARDING CONDITIONAL USE PERMIT REQUEST BY BIRCHWOOD REALTY 7295 SILVER LAKE ROAD, PLANNING CASE NO. 357-92 WHEREAS, Birchwood Realty has requested City approval to locate a real estate sales and closing office at 7295 Silver Lake Road; and WHEREAS, the property is currently zoned B-1, Neighborhood Commercial District; and WHEREAS, the Mounds View Municipal Code allows for certain professional office uses in a B-1 zone district with the issuance of a conditional use permit; and . WHEREAS, the Planning Commission has determined that the development proposal is in conformance with the requirements of the Municipal Code, specifically Chapter 40.16 Subdivision D (2). NOW, THEREFORE, BE IT RESOLVED that the Mounds View Planning Commission recommends approval of the conditional use permit with the following conditions: 1. The operation be subject to the staging timeline provided with the applicants letter of request and attached to this resolution as Exhibit 1. 2. Landscaping and Parking on the site will be completed according to the plans received December 21, 1992 by the City of Mounds View and designated as Exhibits 2 and 3. The improvements listed on these plans shall be completed according to the aforementioned staging timeline. 3. The Conditional Use Permit shall be recorded with Ramsey County within 60 days of City Council approval. . . RESOLUTION NO. 356-92 PAGE TWO BE IT FINALLY RESOLVED THAT the Planning commission directs Staff to forward this resolution to the city council prior to approval of the minutes. Adopted this 6th day of 1993. ATTEST: ( SEAL) Cha-:lrman .// ./ .../- / I /-7, /~, L. Planner . . . . . EXHIBIT 1 REMODELING Building remodeling is planned for both the inside and outside of the building. This remodeling is planned to be done in three stages as the budget and needs will allow. The following is a breakdown of planned repairs and improvements by stage. STAGE ONE INSIDE - to be accomplished within 4 months of closing on or about June 1, 1993. 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) gut interior to the exterior walls relocated main breaker boxes, remove excess equipment, rewire interior to meet current needs add new stud walls ceramic foyer entry linoleum in kitchen/bathroom areas carpet main office new drop ceiling new plumbing and fixtures in rest room new water heater new heating ducts paint interior sheetrock new walls insulate exterior walls telephone system wiring neon signs for window (area to be included in the 100 square foot signage maximum) STAGE ONE OUTSIDE - to be accomplished within 4 months of closing on or about June 1, 1993. 1) site clean-up and debris removal 2) parking lot - remove weeds, patch holes, hot fill cracks, seal coat parking lot and restripe 3) new sign for building front 4) remove wood structure at rear of building 5) remove graffiti from building 6) repair leaks in roof 7) repair awning and paint to burgundy (same as for sale sign) 8) replace outside overhang lights STAGE TWO INSIDE - to be accomplished between October 1993 and December 1994. 1) new interior furnishings 2) finish second rest room 3) wallpaper interior 4) tinting for windows . . . STAGE TWO OUTSIDE - to be accomplished between October 1993 and December 1994. 1) 2) 3) 4) 5) 6) new freestanding sign flag pole on building install flower beds (petunias) on boulevards redesign and replace concrete apron add new wheelchair access install trees and flowers per the landscaping plan received December 21, 1992 and referenced in the attached resolution as Exhibit 2 STAGE THREE INSIDE - to be accomplished in 1995. 1) complete purchase of new furnishings STAGE THREE OUTSIDE - to be accomplished in 1995. 1) remove bituminous form north side of building and out back to grass 2) resurface parking lot from rear of building forward excluding rear lot 3) build airlock entry at building front 4) replace awning cover 5) install shrubs on north side of building (after bituminous is removed), per the landscaping plan received December 21, 1992 and referenced in the attached resolution as Exhibit 2 All repairs and improvements to be in compliance with existing city codes. Repairs to be performed by the owner or licensed contractors when required.