HomeMy WebLinkAboutPlanning Commission Relolution 356-92
.
MOUNDS VIEW PLANNING COMMISSION
RESOLUTION NO. 356-93
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RECOMMENDATION TO THE CITY COUNCIL REGARDING
CONDITIONAL USE PERMIT REQUEST BY BIRCHWOOD REALTY
7295 SILVER LAKE ROAD, PLANNING CASE NO. 357-92
WHEREAS, Birchwood Realty has requested City
approval to locate a real estate sales and closing office at
7295 Silver Lake Road; and
WHEREAS, the property is currently zoned B-1,
Neighborhood Commercial District; and
WHEREAS, the Mounds View Municipal Code allows for
certain professional office uses in a B-1 zone district with
the issuance of a conditional use permit; and
.
WHEREAS, the Planning Commission has determined that
the development proposal is in conformance with the
requirements of the Municipal Code, specifically Chapter 40.16
Subdivision D (2).
NOW, THEREFORE, BE IT RESOLVED that the Mounds View
Planning Commission recommends approval of the conditional use
permit with the following conditions:
1. The operation be subject to the staging timeline
provided with the applicants letter of request and
attached to this resolution as Exhibit 1.
2. Landscaping and Parking on the site will be
completed according to the plans received December
21, 1992 by the City of Mounds View and designated
as Exhibits 2 and 3. The improvements listed on
these plans shall be completed according to the
aforementioned staging timeline.
3. The Conditional Use Permit shall be recorded with
Ramsey County within 60 days of City Council
approval.
.
.
RESOLUTION NO. 356-92
PAGE TWO
BE IT FINALLY RESOLVED THAT the Planning commission
directs Staff to forward this resolution to the city council
prior to approval of the minutes.
Adopted this 6th day of
1993.
ATTEST:
( SEAL)
Cha-:lrman
.//
./ .../- /
I
/-7,
/~,
L.
Planner
.
.
.
.
.
EXHIBIT 1
REMODELING
Building remodeling is planned for both the inside and outside of the
building. This remodeling is planned to be done in three stages as
the budget and needs will allow. The following is a breakdown of
planned repairs and improvements by stage.
STAGE ONE INSIDE - to be accomplished within 4 months of closing on
or about June 1, 1993.
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
gut interior to the exterior walls
relocated main breaker boxes, remove excess equipment, rewire
interior to meet current needs
add new stud walls
ceramic foyer entry
linoleum in kitchen/bathroom areas
carpet main office
new drop ceiling
new plumbing and fixtures in rest room
new water heater
new heating ducts
paint interior
sheetrock new walls
insulate exterior walls
telephone system wiring
neon signs for window (area to be included in the 100 square
foot signage maximum)
STAGE ONE OUTSIDE - to be accomplished within 4 months of closing on
or about June 1, 1993.
1) site clean-up and debris removal
2) parking lot - remove weeds, patch holes, hot fill cracks, seal
coat parking lot and restripe
3) new sign for building front
4) remove wood structure at rear of building
5) remove graffiti from building
6) repair leaks in roof
7) repair awning and paint to burgundy (same as for sale sign)
8) replace outside overhang lights
STAGE TWO INSIDE - to be accomplished between October 1993 and
December 1994.
1) new interior furnishings
2) finish second rest room
3) wallpaper interior
4) tinting for windows
.
.
.
STAGE TWO OUTSIDE - to be accomplished between October 1993 and
December 1994.
1)
2)
3)
4)
5)
6)
new freestanding sign
flag pole on building
install flower beds (petunias) on boulevards
redesign and replace concrete apron
add new wheelchair access
install trees and flowers per the landscaping plan received
December 21, 1992 and referenced in the attached resolution as
Exhibit 2
STAGE THREE INSIDE - to be accomplished in 1995.
1) complete purchase of new furnishings
STAGE THREE OUTSIDE - to be accomplished in 1995.
1) remove bituminous form north side of building and out back to
grass
2) resurface parking lot from rear of building forward excluding
rear lot
3) build airlock entry at building front
4) replace awning cover
5) install shrubs on north side of building (after bituminous is
removed), per the landscaping plan received December 21, 1992
and referenced in the attached resolution as Exhibit 2
All repairs and improvements to be in compliance with existing city
codes. Repairs to be performed by the owner or licensed contractors
when required.