Loading...
HomeMy WebLinkAboutResolution 7186RESOLUTION 7186 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION ADOPTING THE 2008 FEE SCHEDULE WHEREAS, revisions and updates to the Fee Schedule are necessary; and WHEREAS, each City of Mounds View Department Head has reviewed all fees relevant to his/her department and recommended changes to the City Council where necessary; and WHEREAS, the City Council reviewed the Fee Schedule at its November 26, 2007, City Council meeting. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Mounds View does hereby approve the 2008 Fee Schedule, which is attached to this resolution. Adopted this 26th day of November, 2007. Rob arty, Mayor ATTEST: ~~~v Jim Ericson, Interim City Administrator (seal) 2008 Fee Schedule Last updated: Nov 26, 2007 ~~a~~~2 ~~ ~~r~~~~ I .................... Building/Community Dev. Related Fees P. 4 a ........................................................................... Valuation Table P. 4-5 b ................................................................................. Surcharges P. 6 C ....................General Construction, Home, Building Permits, Misc. P. 7-10 Accessory Building/Shed .......................................................................................... Addition ..................................................................................................................... Basement .................................................................................................................. Basic Floor Area ....................................................................................................... Deck .......................................................................................................................... Door/Window Installation ......................................................................................... Driveways, Sidewalks, Parking Lots and Patios ...................................................... Electrical Work ......................................................................................................... E I evato rs .................................................................................................................. . Excavating, Grading, Filling ...................................................................................... Fences ...................................................................................................................... Fire Alarm System .................................................................................................... Garages .................................................................................................................... Garbage/Recycling Enclosure .................................................................................. HVAC ........................................................................................................................ Mobile Homes ........................................................................................................... Moving Buildings ...................................................................................................... Pipe Fitting ................................................................................................................ Plumbing Work ......................................................................................................... Porch ........................................................................................................................ Raising, Shoring ....................................................................................................... Refrigeration Work ................................................................................................... Remodeling .............................................................................................................. Reshingling ............................................................................................................... Re-siding/Stucco ...................................................................................................... Satellite Dishes ......................................................................................................... Signs/Billboards ........................................................................................................ Sprinkling System ..................................................................................................... Sprinkler Plan Check Fee ......................................................................................... Stucco ....................................................................................................................... Swimming Pools ....................................................................................................... Tank (fuel, gas) Installation/Removal ....................................................................... Tent, Temporary ....................................................................................................... Telecommunication Antenna Building Permit Fee ................................................... Windows ................................................................................................................... Wrecking ................................................................................................................... 1 d ..........................................Other Inspections/Planning Fees P. 1o-13 Building Inspections ................................................................................................. Code Appeal ............................................................................................................. Comprehensive Plan Amendment ........................................................................... Conditional Use Permit ............................................................................................. Contractor Licenses ................................................................................................. Development/Site Plan Review ................................................................................ Housing Inspection Fees .......................................................................................... Multiple Dwelling Registration/Transfer .................................................................... Plan Review Fee ...................................................................................................... Planned Unit Development/Amendment .................................................................. Reinspection Fees .................................................................................................... Rezoning ................................................................................................................... Street or Easement Vacation ................................................................................... Subdivisions ............................................................................................................. Variance .................................................................................................................... Wetland Alteration Permit ........................................................................................ Wetland Buffer Permit .............................................................................................. II.......... Miscellaneous (copies, maps, agendas, etc.) P. 13-14 Apartment/Multiple Dwelling List .............................................................................. Blue Prints/Maps ...................................................................................................... Council/Planning Commission Meeting Packets ..................................................... Dog License List ....................................................................................................... Filing Fee for Public Office ....................................................................................... Insufficient Fund Checks (NSF) ............................................................................... Mailed Agendas ........................................................................................................ Mailed Minutes .......................................................................................................... Mounds View Business List ...................................................................................... Municipal Code ......................................................................................................... Notary Public ............................................................................................................ Outdoor Sign Usage ................................................................................................. Pending Assessment Search ................................................................................... Photocopies .............................................................................................................. Picnic Kits ................................................................................................................. Police/Accident Report ............................................................................................. Resident List ............................................................................................................. Sales Tax .................................................................................................................. Special Assessment Search .................................................................................... Tree Removal ........................................................................................................... Video Tape Copies ................................................................................................... Zoning Code: Photocopy/CD Rom ........................................................................... III ....................... Police/ Administrative Offenses P. 15-17 2 IV .................................................................... Licenses P. 17-20 Amusement Centers/ Devises/Rides, Carnivals, Circuses ...................................... Automobile Sales ...................................................................................................... Bowling Alley ............................................................................................................ Boxing and Wrestling Permit .................................................................................... Cigarette and Tobacco ............................................................................................. Dog Licenses ............................................................................................................ Fireworks .................................................................................................................. Garbage and Rubbish Hauler License ..................................................................... Gasoline Station License .......................................................................................... Kennel License ......................................................................................................... Liquor Licenses/Investigation Fee ............................................................................ Peddlers/Transient Merchant License/Investigation Fee ......................................... Recuperation of Half Way Wouse ............................................................................. Restaurant License .................................................................................................. Therapeutic Massage/Investigation ......................................................................... V ......................... Community Center and Parks Fees P. 21-25 Mounds View Community Center ................................................................ City Parks ................................................................................................................. VI ................................. Water, Sewer and Street Fees P. 2s-Zs Late Payment ............................................................................................................ Load Limits Fee ........................................................................................................ MIU/MXU .................................................................................................................. Meter Testing ............................................................................................................ Park Dedication Fee ................................................................................................. Row Permit Fees ...................................................................................................... Sewer Availability Charge (SAC) .............................................................................. Sewer Charge ........................................................................................................... Sewer Connection/Repair Permit ............................................................................. Service Restoration .................................................................................................. Shut-of and Curb Stop .............................................................................................. Street Light Utility ...................................................................................................... Street Opening Permit .............................................................................................. Storm Water Management (SWM) ........................................................................... Surface Water Management .................................................................................... Tapping ..................................................................................................................... Unit Charge ............................................................................................................... Water Charge ........................................................................................................... Water Connection/Repair Permit ............................................................................. Water Disconnect/Reconnect in Spring ................................................................... Water Hydrant Deposit ............................................................................................. Water Meter .............................................................................................................. Water Quality Testing ............................................................................................... Utility Bill Assessment Search ............................................................................... 3 I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES A. VALUATION TABLE The following Valuation Table shall be used to determine fees for those permits indicated below and in all cases where the work is of such a nature that the permit fees cannot be determined from the schedule established below for such work. The minimum fee for all permits shall be $23.50 un{ess otherwise specified. $1 to $500 $23.50 for the first $500 $501 to $2,000 $23.50 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 $2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each additional $1,000 or fraction thereof, to an including $50,000 $25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof to an including $50,000 $50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each additional $1,000 or fraction thereof, to and including $100,000 $101,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof. $1,000,001 and up $5608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof. 4 Specific Valuations Accessory Buildings: Garages & Sheds Attached Garage $~1-0 ft. 9 27.27 per sq. Detached Garages & Sheds, > 120 sq. ft. (w/ concrete floor) $a-4:~ ft. 15.00 per sq. Detached Garages & Sheds, > 120 sq. ft. (w/ wood floor) $9-4a 9.54 per sq. ft. Carport $~3-e~ ft. 9 13.64 per sq. Residential Additions First Floor and basic floor area $~:~ ft. 4 79.53 per sq. Second Floor $6-1-~ ft. 2 61.63 per sq. Shell Only $44:9 ft. 9 45.25 per sq. Addition (mobile home) ............ $4-8 ft. 6 25.22 per sq. Basement Unfinished $4~-a ft. 8 15.66 per sq. Rough-In Finish $9A-~> ft. ~ 20.38 per sq. Finished $~ ft. 3 26.49 per sq. General Remodel $~1-9 ft. f 21.27 per sq. Deck Residential $9-36 9.45 per sq. ft. Porch Screen only $~ ft. 9 $27.78 per sq. Three-Season (wood frame/windows/doors Not Heated) $49-8 sq. ft. -1- 50.31 per Swimming Pools (See Chapter 1009) Above ground -Permanent (over 52" in depth) $~-9:89 10.10 per sq. ft. Below ground $39:89 30.30 per sq. ft. B. SURCHARGES Building Surcharge: Where the fee for the permit is based upon valuation, the surcharge is as follows: 1. Building Surcharge (For valuation-based permits, the surcharge is as follows) Valuation of Work Surcharge Computation $1,000,000 or less .0005 x valuation $1,000,000 to $2,000,000 $500 + .0004 x (Value - $1,000,000) $2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000) $3,000,000 to $4,000,000 $1,200 + .0002 x (Value - $3,000,000) $4,000,000 to $5,000,000 $1,400 + .0001 x (Value - $4,000,000) Greater than $5,000,000 $1,500 + .00005 x (Value - $5,000,000) For fixed-fee permits, the surcharge shall be $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). 2. Heating & Plumbing Surcharge Residential $.50 per permit (or .0005 of the permit fee if fee exceeds $1,000). Commercial Use the above table C. GENERAL CONSTRUCTION, HOME, MISCELLANEOUS BUILDING PERMITS. (Note: Surcharges Not Included in All Figures Listed below -- See Surcharge Section in Chapter 1006 for More Information) Accessory Buildings Use valuation table Residential Additions Use valuation table Residential Remodels Use valuation table Deck 30" and under, or not attached to dwelling $25 (no surcharge) Demolition and Wrecking $20 plus $2.00 per 1,000 cubic feet or fraction thereof over 2,000 cubic feet plus $.50 surcharge Door or Window Installation Change Opening $40 for first windows/door plus $12.50 for each additional window/door (plus $.50 surcharge) Use Existing Rough opening $20 for first window/door plus $2.50 for each additional window/door (plus $.50 surcharge) Egress Basement Window $50 for first window $25 for each additional window (plus $.50 surcharge) Driveways, Sidewalks, Parking Lots, Patios; New Installation or Overlay (No Surcharge) Residential R-1 or R-2 Overlay or Seal Coating with no expansion, no permit needed. Concrete/Asphalt/Brick: $20 for first 500 square feet plus $2 for each additional 100 square feet or fraction thereof (no surcharge) Gravel*: $20 (no surcharge) * See zoning code for gravel limitations. Commercial Use valuation table Electrical Work -- Same as established in the Minnesota State Board of Electricians, March 1, 1972 Edition of Laws and Regulations Licensing Electricians and Inspections of Electrical Installations as Amended. €a~stris~l-Ifl~ester QL~nL Clnn~rinnl Qnn~ ~nc+t Cnrmc , Elevators Use valuation table Fences Six feet and below $25 per installation (no surcharge) Above six feet $25 per installation (plus .50 surcharge) Fire Permits Fire Alarm Systems Fireworks Sales Temporary Tent Tank Installation (fuel, oil, gas, etc.) Tank Removal (fuel, oil, gas, etc.) $50 $350 (business selling only fireworks) $100 (business selling fireworks & other retail) $50 $100 per tank (no surcharge) $50 per tank (no surcharge) Fireplaces Wood burning Stove (Building Permit) $25 plus .50 surcharge Gas Fireplace (Mechanical Permit) $25 plus .50 surcharge HVAC (Plus Surcharge) Commercial HVAC 1.5% of contract price plus surcharge at .0005 times contract price Residential: Air Conditioning $30 per unit Furnaces $40 per unit -New $30 -Replacement Air Exchanger $25 per unit Sheet Metal /Duct Work $30 Ventilation Systems $10 for the first fan plus $4 for each additional Gas fireplace $25 (includes incidental piping) Gas, oil piping $25 per unit Gas Meter, Regulator Upgrade $25 Steam, hot water heating $40 per unit Irrigation Systems (landscaping) $27 (plus .50 surcharge) Mobile Homes (See Chapter 1110} Installation $50 per installation (plus $.50 surcharge) Mechanical (Gas hook up) $25 (plus $.50 surcharge) Moving Buildings (See Chapter 1007) Principal Structure $175 per building (plus $.50 surcharge) Accessory Structure (larger than 400sq. ft.) $50 per building (plus $.50 surcharge) Accessory Structure (400sq. ft. or less) $25 Plumbing Work - (Chapter 1004) Residential -Plumbing fixture, devices, $20 plus $7 per fixture (plus $.50 Connections surcharge) Residential -Fixture Replacement (same $15 or 5% of value whichever is greater opening} or Repair up to $27 (plus $.50 surcharge) Commercial (4 units and up) 1.5% of contract price plus surcharge at .0005 times contract price Porch Use valuation table Raising, shoring Use valuation table Re-shingling Residential $20 for this first 500 square feet plus $3 for each additional 100 square feet or (Re-shingling permit not required for buildings fraction thereof (plus .50 surcharge) under 120 square feet) Commercial Use Valuation Table Re-siding /Stucco Residential $20 for the first 500 square feet plus $3 for each additional 100 square feet or fraction thereof (plus .50 surcharge) (Re-shingling permit not required for buildings Soffit/Fascia: $25 per installation (plus under 120 square feet) .50 surcharge) Soffit/Fascia only (fee not required if included with siding permit) Commercial Use Valuation Table Retaining Wall Four feet and below $25 (no surcharge) Above four feet $35 (plus .50 surcharge) io Re-siding /Stucco Commercial Use Valuation Table Satellite Dishes (See Chapter 1103.18) • (no permit required for mini dish systems) $25 per installation (plus $.50 surcharge) Sheds (120 square feet and less) $ 25 (no surcharge) Signs (Zoning Permit, no surcharge) ,Billboards (Building Permit, surcharge) (See Chapter 1008) Signs up to 100 sq ft. $50 for the first 24 square feet plus $5.00 for each additional 25 square feet or fraction thereof up to 100 square Signs 100 sq. ft. and over $75 for the first 100 square feet plus $10 for each additional 100 square feet or fraction thereof Signs re-facing or altering $25 per installation Temporary Signs $30 per 21 day period (Limit 3 permits per year) Billboards $200 per billboard (plus $.50 surcharge) Sprinkling Systems (Fire Suppression) Sprinkler; Residential $30 plus $4.50 for each ten sprinkler heads or fraction thereof over the ten heads, plus $.50 Sprinkler; Commercial 1.5% of the contract price plus surcharge at .0005 times the contract price Sprinkler Plan Check Fee 65% of permit fee (for new construction or 20 heads or more only) Swimming Pools Above ground -Permanent Use Valuation Table Temporary (52" high or less) $25 (plus .50 surcharge) Telecommunication Antenna (Building Permit Fee, see also Chapter 1124 $750 plus $.50 surcharge per system installation. For installations on-city property, fee is 7% of yearly rent to city (plus .50 surcharge) Temporary Office (Mobile home) $50 ($10 annual renewal) Windows See DoorlWindow lnstallation Wood burning Stove $25 (plus $.50 surcharge) 11 D. OTHER INSPECTIONS /PLANNING FEES Applicants are responsible for all costs incurred associated with the filing, review and processing of development applications. Such fees are to be paid in escrow up front or upon receipt of statement from the City of Mounds View. Fees may include but are not limited to costs for consultants retained by the City, consultant planning services, attorney, and engineer fees. A deposit may also be required to cover costs of public notices, materials and staff time spent in the review, research or preparation of materials associated with this application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant within 30 days after consideration of the application is completed. Payment of park dedication fees is required with subdivision applications. Application fees are not refundable. Building Inspections Inspections conducted outside of normal business hours $47/hr. (Minimum charge two hours) Inspections for which no fee is specifically indicated $47/hr. (Minimum charge -one half hour) Reinspection Fees $47/hr. Change of Address $150 Comprehensive Plan Amendment $500 Conditional Use Permit (CUP) R-1 to R-2 $150 All other Districts $375 CUP Amendment Same as CUP Fee Contractor Licenses (See Chapter 1001) $50 per Year State License Contractors License Verification Fee ............. $5 per permit (See building procedures) DevelopmentlSite Plan Review $375 Housing Inspection Fees (See Chapter 1012) Initial and Follow up Inspection No charge Each Additional Inspection $2~ 47 /inspection Interim Use Permit (IUP) $375 IUP Amendment $375 12 Investigation Fee Equivalent to permit fee (when work commences without an approved permit) Park Dedication Fee (See Ord 745) Up to 10% of fair market land value Plan Review Fee 65 percent of permit fee for all commercial permits and for residential permits for new dwellings, dwelling additions, * Refund Policy: No plan review garages, garage additions, decks, sheds over 216 square fee may be refunded after feet, and major remodeling. Additional Plan Review Fee review has been completed. required by changes, additions or revisions to plans $47/ hr. (Minimum charge one half hour) Plan review for outside consultants for plan checking and inspections, or both. Actual costs including administrative and overhead costs. Plan Review Fee "Similar" Where all units are the same or similar, each unit afterfirst , shall be 25 /° of original fee. Planned Unit Development (PUD) (See $750 Chapter 1120) PUD Amendment $375 Refund Policy All but $40 of the permit fee can be refunded within 100 days of application if work has not commenced. Rezoning $500 Street or Easement Vacation $250 Subdivisions Minor Subdivision $275 Major Subdivision $500 Text Amendment, Zoning Code $250 Text Amendment, Other City Code $150 Variance R-1, R-2 (Administrative) $75 (additional $100 if formal variance is required) R-1 and R-2 (Formal) $150 All Other Districts $375 13 Wetland Buffer Permit R-1 and R-2 $25 All Other Districts $100 Wetland Alteration Permit R-1 and R-2 $150 All Other Districts $300 Zoning Letter $25 II. MISCELLANEOUS FEES (Copies, Agendas, Maps, Minutes, etc.) Annual Financial Report $25 Adopted Annual Budget $25 Apartment/Multiple Dwelling List $5 Blue Prints /Maps, Up to 11 x 17 Colored map $5 Blue Prints /Maps, Up to 24 x ~6 Blue line $5 Colored map $10 Capital Improvement Plan $25 Certified Copies $5 plus photocopy fee of .25 per page Dog License List $.25 per page Filing Fee for Public Office See Mounds View City Charter Insufficient Funds (NSF) checks (returned or NSF checks) $30 Long Term Financial Plan $25 Mailed Agendas City Council $60/year Planning Commission $54/year 14 Special Meeting $25/year Work Session $45/year Mailed Minutes City Council $150/year Planning Commission $144/year Mailed Meeting Packets City Council $250/year Planning Commission $175/year Work Session $200/year Mounds View Business List $.25 per page Municipal Code $200 Notary Public $1 plus any photocopy charges Outdoor Sign Usage (City Hall) $25 (2 week maximum) Photocopies $.25 per sheet Sales Tax 6.5%, maps, copies Sign Code Chapter $5 Pending Assessments Search $10 Tree Removal See City Forester Video Tape/ DVD Copies $15 Zoning Code Photocopy $50 Zoning Code CD Rom $15 15 III. POLICE/ADMINISTRATIVE OFFENSES Crime Free Multi Housing Participant No charge Driver License Record (MN) Resident: No charge Non-Resident: $3 Driver License Record (Out of state) $6 Fingerprint Cards $15 for first card/$5 for each additional card Police/Accident Reports ............ .25 for each page Police Reports Research .......... $50/hr for research, .25 #eFaddi#ienat each page Certified Copy of Report $5 for certification and .25 each page Color Printed Copy $2.00/page 35mm Standard Photos ........... $1.00/print Cassette or Video tape $25.00 Electronic copies to Digital Media $15.00 per disc Impound Vehicle Storage Fee $15.00 per day ADMINISTRATIVE OFFENSES 30' Stop Sign $15 Alcohol in public $50 Animals $25 Bldg. And Fire Code $100 Blocking Driveways $100 Expired Plates/Registration $25 Fire hydrant $25 Fire Lane $25 Fireworks $100 Garbage Dumping $100 Handicap Zone $200 16 House Numbers $25 $a-A9 Junk Vehicles $50 Junk & Debris $50 Keys in Ignition $20 Loads limits $100 Loitering $25 Other Illegal Parking $15 Park Ordinance $25 PlatelTab missing $20 I~;faEi~-~I~i~sanses $~-A9 Regulated Business Activity Title 500 $100 Seat Belts $25 Signs (Chapter 1008) $100 Snowbirds $25 Snowmobiles $25 Speed, Stop Sign, Semaphore or unsafe lane use violations $40 Loud Parties/Noise Mufflers, Stereos and other Violations of State and City Noise Cades $50 Property Based Violations 1 sc Offense 150 2"d Offense within 12 months 300 3~d Offense within 12 months 450 Tobacco Penalties, Sale to Miners: Administrative Penalties for Businesses 1st Offense $150 2~d Offense within 24 months $400 3~d Offense within 24 months $500 17 Tobacco Penalties, Sale to Minors: Administrative Penalties for individuals 1St Offense: .._......... $100 Subsequent Offenses $50 per offense Tobacco Penalties: Possession by Minors 2"d Offense for possession or use $50 Trespass $25 Truck parking $25 Watering Ban Violations 1St violation Written Warning 2"d violation $25.00 3`d violation $50.00 4th violation $100.00 5th violation $200.00 6th violation Turned over to the City Attorney for criminal prosecution of theft Wetlands (Chapter 1010) $100 Zoning (Title 1100) $100 IV. LICENSES (All licenses subject to a 10% late fee where applicable.) Amusement Devices and Centers (Chapter 506) $15 per location plus $15 per machine (MN Stat. 449.15) Automobile Sales (Chapter 510) $158.00/year Amusement Rides, Carnivals, Circuses (Chapter 506) $130 for first day plus $20 for each additional day Bowling Alleys (Chapter 507) $21/alley/year Boxing and Wrestling Processing Fee Regulated by the State of Minnesota Cigarette and Tobacco Licenso Fee (Chapter 512) $158.00/year 18 Dog Licenses (decreased by 50% after one year) Spayed or neutered $7/2 years Unsprayed or Unneutered $13/2 years Duplicate tags $2 Garbage and Rubbish Hauler (Chapter 603) $78 plus $21 per vehicle/year Gasoline Stations (Chapter 50~) $63 plus $11 per pump 19 Kennel (Chapter 701) Residential $31 /year Commercial $52/year Liquor Licenses (Chapter 502, 503) On-Sale without Cabaret $.65 per square foot for that space which is used primarily as bar area and $.53 per square foot for that space which is issued primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 On-Sale with Cabaret $.65 per square foot for that space which is used primarily as bar area and $.53 per square foot for that space which is issued primarily as dining area with a minimum fee of $3,000 and a maximum fee of $10,000 (Resolution No. 4629) Temporary Liquor License Fee $35/event; $10 Investigation Fee if applicant does not hold license within Mounds View State Liquor Certificate $20/year On-Sale Wine ........... $800/year Off-Sale Intoxicating $200/year Bottle Club $330/year On-Sale Malt Liquor/3.2 Beer $1,000/year Off-Sale Malt Liquor/3.2 Beer $100/year Set Ups $330/year Club $330/year Investigation Fee: Wine/General Liquor Single Person $300/$350 Partnership $365/$385 Corporation $400/$450 20 Multiple Dwelling License (Chapter 1012) License fee discounts: • Certification Level C • Certification Level B • Certification Level A $8 per unit with minimum of $50 per building per year. 20% fee reduction 33% fee reduction 50% fee reduction Multiple Dwelling License Transfer $25 Pawn Shops (Chapter 515) Non-Refundable Application Fee (includes cost of investigation) $500 New Manager Investigation Fee $150 Annual License $10,000 Billable Transaction Fee $1.50 per transaction Performance Bond $10,000 Peddlers /Transient Merchants /Solicitors (Chapter 504) Permits $60/day $200/month $500/year Investigation fee $10 investigation fee for new peddler I.D. Card $5.00/person Recuperation or Half Way House (Chapter 511) Less than 10 beds $33/year 10-49 beds $55/year 50-99 beds $82/year Over 100 beds $110lyear Restaurants -- Class A (occupancy load greater than 100) (Chapter 505) Operating 16 hours/day or less $275 Operating more thanl8 hours/day $550 21 Restaurants -- Class B (occupancy load of 100 or less) Operation 16 hours/day or less $165/year Operating more than 16 hours/day $330lyear Tattoo and Body Piercing License !Investigation Fee Enterprise License License Fee $250 Investigation Fee $100 Specialist License License Fee $100 Investigation Fee $100 Temporary License $100 Therapeutic Massage License Fee/Investigation (Chapter 514) Enterprise License $250 Therapist License $100 Individual Investigation Fee $100 Partnership /Corporation Investigation Fee $350 22 V. COMMUNITY CENTER & RECREATION FEES Mounds View Banquet and Conference Center -Basic Services Class I: School District 621, Mounds View Scouts, Lions and 4-H, Mounds View Area Athletic Associations (w/10% roster MV residents) Class II: Mounds View Residents, Mounds View Religious Groups (w/Mounds View Address), Local Political Groups and Mounds View Non-Profits (w/Mounds View Address) Class III: Mounds View City Employees, Non-local School Districts, Non-local Non-profit Groups. Class IV: All For-Profit Groups, Non-local Religious Groups, Non-resident individuals/private agencies, businesses/vendors, and Colleges and Universities. "*The City Clerk/Administratorrnay waive the rental fees for charitable events held for the benefit of Mounds View residents upon receiving a written request outlining the nature of such event "" BANQUET AND CONFERENCE CENTER RENTALS Class 1 hour: Exempt* 4 hour block over 1 hour: $15" Event Center 1/6 (Seats 50) Hourly over 1 or 4 hours: $10" Class II ~- houry: $~5 20 4 hour block e~rer~-k~e~: $59 70 '"Class I excludes setup services in Event Center or additional set- Class I I I up in multi-purpose rooms and 4. hour: $29 25 gymnasium. 4 hour block-eve~i- $~ 85 Class IV ~- hours: $~ 35 4 hour block-eue~-1-#e~: $S9 120 $~ Class 1 hour: Exempt* 4 hour block over 1 hour: $25" Event Center 1/3 (Seats 100) Hourly over 1 or 4 hours: $15" Class II ~- hours: $2~ 30 4 hour block-e~re~1-hem: $~ 100 *Class I excludes setup services in ~ Event Center or additional set-up in multi-purpose rooms and Ctass III gymnasium. ~ hourly: $~5 40 4 hour blockea~: $~A9 130 $3~ Class IV ~- houry: $4~ 60 4 hour block-euer~-het: $4~9 200 :~ 23 Fuli Event Center (Seats 400) Class I 1 hour: Exempt" 4 hour block over 1 hour: $75* Hourly over 1 or 4 hours: $25'` '`Class I excludes setup services Class II in Event Center or additional set- -~ hours: $~ 80 up in multi-purpose rooms and 4 hour block over 1 hour: $~ 260 gymnasium. Class III ~- hoary: $a-9a 110 4 hour block over 1 hour: $389 360 Class IV ~ hoary: $~ 140 4 hour block over 1 hour: $369 460 Kitchen Class I (To be used by Licensed Caterer 1 hour: Exempt" Only) 4 hour block over 1 hour: $25* Hourly over 1 or 4 hours: $15* Class II ~ hoary: $~ 30 4 hour block-eve~1-#s~: $73 100 : ~ Class III ~- hours: $~ 40 *Class /excludes setup services 4 hour block-euer~-f~ee~: $~99 130 in Event Center or additional set- $3b up in multi purpose rooms and gymnasium. Class IV ~ hours: $43 60 4 hour block-f~eu~: $~~9 200 $42 Class I Multi-Purpose Rooms A and B 1 hour: Exempt' (Seating up to 10-20) 4 hour block over 1 hour: $15* Hourly over 1 or 4 hours: $10" For multi-purpose rooms and gymnasium rentals, if the MVCC is not Class I I otherwise open, the permit holder will be ~ hoary: $~ 20 charged an additional $15/hour fora 4 hour block eves-1- $59 70 staff fee. - Class III ~- hoary: $39 25 4 hour block~r: $~5 85 24 Class IV ~ hourilr: $2a 35 4 hour blocket~: $98 120 :~ Multi-Purpose Room C and Youth Class I Room (Seating up to 30-40) Hourly Rate (~ 2 hr min.): $35 4 r~ Hours block: $289 120 Class II Hourly Rate (~- 2 hr min.): $g8 45 4 6-~ Hours block: $~8 150 Class III For multi-purpose rooms and Hourly Rate (~ 2 hr min.): $69 50 gymnasium rentals, if the MVCC is not 4 &->~ Hours-block: $~9 170 otherwise open, the permit holder will be charged an additional $15/hour fora Class IV staff fee. Hourly Rate (#~ 2 hr min.): $~8 60 4 6-~ Hours-block: $3~9 200 Other Charges Overhead Projectors: $10/day TV & VCR: $15/day Microphone (single): $15/day Microphone (multiple): $45/day Screen: $35/da Gym Rental Class I: $39 35 Fu11 Gym (Up to 4 hours -hourly rate) Class II: $3a 40 Class III: $4$ 45 Class IV: $58 60 Full Gym (Hourly Rate Exceeding 4 Class I: $68 70 Hours) Class II: $~79 80 Class III: $88 90 Class IV: $98 120 Half Gym (Up to 4 Hours -hourly rate) Class I: $29 25 Class II: $~ 30 Class III: $38 35 Class IV: $49 50 Class I: $48 50 Half Gym (Hourly Rate Exceeding 4 Class II: $58 60 hours) Class III: $&8 70 Class IV: $79 120 25 Mounds View Athletic Fields Fees Based Upon an lndividua/ Event/Game/Practice. Reservations for Classes ll, lll, lV will begin on March lit. Field Reservations maybe limited depending upon the number of teams and fields available. The MV YMCA & Parks Maintenance Staff will set a seasonal field use pt~licy to determine field available, appropriate age groups, dates, and times available and fields available. For purposes of the fees below, a time block is considered 55 minutes. Tournaments $100 per Field per Day (If Field Maintenance is required during tournaments, an additional $30 per hour with atwo-hour minimum will be charged. Baseball & Softball Fields (Y©~th Only) Hillview Class I: 1 time block free per/wk Groveland $5 per add'I time block Oakwood Class II: $5 per time block Greenfield Class III: $10 per time block City Hall Class IV: Not applicable Softball Fields (Adults or Youth) Class I: 1 time block free per/wk City Hall $5 per add'I time block Silverview Class II: $5 per time block Class III: $15 per time block Class IV: $30 per time block Soccer Fields (Youth Only) Class I: 1 time block free per/wk Silverview $5 per add'I time block Groveland Class II: $5 per time block Oakwood Class III: $10 per time block Class IV: Not Applicable Lighting Fee for Softball Fields Class I: $20 per time block Class II: $30 per time block Class III: $40 per time block Class IV: $40 per time block 26 Park Shelter Rental (see Page 21 for Classifications) Class 4 hours: $i 5 Full day: $30 $100 Refundable Damage Deposit Required Class II 4 hours: $30 $50 Service Fee will be Charged to Groups Full day: $60 of 50 or more Class III 4 hours: $45 Full day: $90 Class IV 4 hours: $60 Full day: $120 Silverview and City Hall Picnic Shelters (see Page 21 for Classifications) Class I $100 Refundable Damage Deposit 4 hours: $30 Required Full Day: $60 $50 Service Fee will be Charged to Groups Class II 4 h $45 of 50 or more ours: Fult day: $90 Class III 4 hours: $60 Full day: $120 Class IV 4 hours: $75 Full day: $150 27 VI. WATER, SEWER, STREET AND OTHER FEES -~e~--e€-t~+~ Load Limits Permit Fee $25/entry/truck Right of Way Permit Fees Yearly Registration Fee: $25.00 Excavation Permit Fee: $125.00 Obstruction Permit Fee: $50.00 Permit Extension: $25.00 ROW Security Fee: Subject to the Discretion of the Public Works Director. Street Opening Permit $125 permit fee plus $1000 Security Fee Land Disturbance Fees (i.e., excavating, 50 cubic yards or less ............................$29.00 grading, filling) 51 to 100 cubic yards.. .$44.00 101 to 1000 cubic yards ........................$44.00 for the first 100 cubic yards, plus $21.00 for each additional 100 cubic yards or fraction thereof. 1001 to 10,000 cubic yards ..................$226.00 for the first 1000 cubic yards, plus $18.00 for each additional 1000 cubic yards or fraction thereof. 10,001 to 100,000 cubic yards ...............$377.00 for the first 10,000 cubic yards, plus $78.00 for each additional 10,000 cubic yards or fraction thereof. 100,001 cubic yards or more ..............$1,064.00 for the first 100,000 cubic yards, plus $44.00 for each additional 100,000 cubic yards or fraction thereof. ("Applicant maybe responsible for any City engineering costs) Sewer Fees Availability Charge (SAC) $~,§7a 1 825 (effective 1/1/8 08 per Metropolitan Council Environmental Services. Sewer Charge Service Charge per Residential Equivalent Residential Rates Connection $21.58 per Quarter plus Usage Rate Based on Metered Water Usage $1.72 per 1,000 gallons 28 Commercial, Industrial, Public Buildings, and Church Rates Service charge per residential equivalent connection $47 53 per quarter Sewer Connection/Repair Permit $30 (no surcharge) Unit Charge $100 per new structure Service Restoration $75 between 7:00 a.m. and 3:30 p.m., M-F;$100 between 3:30-5:30 p.m., M-F; No restoration after 5:30 p.m. or on weekends or holidays. Shut-Off and Curb Stop cost plus 10% for handling plus sales tax Street Light Utility -User Fees (Chapter 904) Residential (includes single family homes, duplexes, four-piexes, condominium and town homes) $3.25 per unit per quarter Commercial/Industrial $16.25 per acre per quarter Institutional/Charitable $16.25 per acre per quarter Apartments $14.37 per acre per quarter C+ro~+ (lnnninn Dormi+ Storm Water Management (SWM) (Chapter 908) -New Construction R-1 $202 per lot R-2 989 per acre R-3, R-4, R-0 $1,429 per acre B-1, B-2, B-3, B-4 $1,429 per acre I-1, PUD $1,996 per acre Storm Water Management -Utility Fees R1, R2 Single & Two Family Residential $x-59 8.25per quarter per unit R-3 Medium Density Residential 45.10per quarter R-4, R-5, RO High Density Residential Mobile Homes and Residential Office $48-7-2 53.49per quarter/acre B-1, B-2, B-3, B-4 Neighborhood Business Limited Business, Highway Business, Regional Business $~:~ 70.16per quarter/acre I-1 Industrial Q^~°-~ 54.69per quarter/acre PUD Planned Unit Development $~-~9- 62.03per quarter/acre 29 CRP Conservancy, Recreation and Presentation $8_:84 7.63 per quarter School/Church, Public, Private $~8 25.18per quarter Water Availability Charge (WAC) Residential $400/unit Commercial/Industrial $1,000/acre of developable area (minimum $1,000} W~~QQ- , Tapping (water or sewer) City does not perform this service Water Connection/Repair Permit Inspection An after hours inspection of a water andlor sewer connection or repair will be charged as a callout. A callout is defined as a minimum of two hours pay at one and one-half (1 ~/2) times the employee's base pay rate. Service less than 4 inches $30 (no surcharge) Service 4 inches or greater $50 (no surcharge) Water Disconnect or Reconnect $25 Water Hydrant Fees Deposit $1,000 Water used from hydrant: $x-59 Current Rate per 1,000 gallons Meter Deposit, 2- 3": $500 5/8" Meter Deposit: $100 Wrench Deposit: $100 Hose Deposit: $100 per hose Adapters: $100 deposit Water Meter $89 Cost plus sales tax Meter Testing (Chapter 906) $50 (Free if meter is faulty) MXU Radio Remote Reading Device $~-1-9 Cost plus sales tax 30 \A/~}ter Cr~niin~ 1 inn Qc~n~ir Cn~ Qn n(~~ ~~*. ~" ~ Water Rates & Surcharges Water Rate 1.55/1000 gallons water sold lA/nc.}n 1Al.,}or Q.+}i+c+ QA7 nn near QC/'` /Qrc~irlorlti~l Ccu.ti~i~ll+n} e Meter Read Program Failure to participate or grant access for installation or repair Res~e~th0.i-YYtete•r-vi~ttT ~~~ a`~ nn/n~,~r+or ~ inn{1: Q-~•nn ' $~4-A9 75.00 per quarter Utility Bill Late Payment 10% of bill Water Disconnect or Reconnect 25 each Water Quality Testing Charge $1.59 per quarter (MNC -per connection) Water Service Line Repair Fee $4.00 per quarter Utility Bill Assessment Search 10 31