HomeMy WebLinkAboutResolution 9174RESOLUTION 9174
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
APPROVING THE PROPOSAL FROM ADVANCE ENGINEERING AND
ENVIRONMENTAL SERVICES, INC. (AE2S) FOR WATER TREATMENT
BACKWASH STUDY AND COMPLIANCE ISSUE
WHEREAS, the Public Works Department has many responsibilities including
efficiently operating the water distribution system. The system includes (6) wells, an
elevated water tower, a ground reservoir, a booster station and (3) water treatment
plants; and
WHEREAS, the water treatment systems have been in operation for over 45
years with no major upgrades or repairs to the system; and
WHEREAS, The City Council approved a water production study be completed
and a management program be prepared by AE2S. After the study was completed the
results along with a time line for upgrades and improvements to the plants were presented
at the October, 3, 2016 Work Session; and
WHEREAS, At the March 25th, 2019 City Council Meeting the Council approved
AE2S to perform the water study and proceed with design and bidding phases of the
rehabilitation of WTP No. 1, WTP No. 2, WTP No. 3, and the Booster Station; and
WHEREAS, AE2S has the plans and specifications at the 95% milestone of the
final design phase, and the City Council discussed the Project at the October 7, 2019
Work Session; and
WHEREAS, During the water study and testing at Water Treatment Plant No. 1,
the Minnesota Department of Health (MDH) brought to the attention of AE2S and Mounds
View Public Works Staff, that WTP No. 1 had combined radium results above the
regulated maximum contaminant level (MCL); and
WHEREAS, AE2S has provided a proposal for completing a pilot study at Water
Treatment Plant No. 1 (WTP1) for a proposed cost for the study of $38,900.00.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds
View, Ramsey County, Minnesota as follows:
1. Authorizes Advanced Engineering and Environmental Services, Inc. (AE2S) to
complete the plans and specifications for the Water Treatment Plant rehabilitation
project for Plants #2 and #3 and the booster station.
The Mounds View Vision
4 7hrir iri- Lr.wrahle Cnirtmimi.iv
Resolution 9174 Continued
2. Approves AE2S to prepare bidding documents in order for the City to receive bids
for this project.
3. Approves the proposal form AE2S for completing a pilot study at Water Treatment
Plant No. 1 (WTP1), a proposed cost for the study of $38,900.00 to be funded from
the Water Fund, 700-4823-3030.
4. The Mayor and City Administrator are hereby authorized and directed to execute all
appropriate documents to effectuate the actions contemplated by this resolution.
5. The Mayor and City Administrator, Staff and consultants are hereby authorized and
directed to take any and all additional steps and actions necessary or convenient in
order to accomplish the intent of this Resolution.
Adopted this 14th day of October, 2019
Carol A. Mueller, Mayor
ATTEST:
Nyleikm nd, City Administrator
(seal)
The Mounds View Nisiou
-1 Thrhvin", Desirrhlc L'urr-ir umii