HomeMy WebLinkAbout06-28-2012 Agenda and Packet
PARKS AND RECREATION AND FORESTRY COMMISSION
6:30 P.M. | JUNE 28, 2012 | MOUNDS VIEW CITY HALL
MEETING AGENDA
1. CALL TO ORDER
2. ROLL CALL: Commissioners: Kunz, Palm, Kroeger, Aukee, Peterson, Arel, Long
Staff: Dazenski, DeBar | YMCA: Danielson
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES
A. May 24, 2012 Meeting Minutes
5. PUBLIC INPUT
Citizens may speak to issues not on tonight’s agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes.
6. STAFF REPORTS
A. YMCA
B. Public Works
7. UNFINISHED BUSINESS
A. Discuss Trailway and Sidewalk System Plan (verbal update)
8. NEW BUSINESS
A. Review Proposed County Road H Sidewalk Improvements
B. Discuss Playground Improvements at Lambert and Silverview Parks
C. Review BBC Donations and Status
9. COMMISSIONER REPORTS
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINESS
A. Next Regular Commission Meeting: July 26, 2012
1. Review Municipal Code Chapter 909 (Parks & Recreation)
2. Discuss Seasonal Park Attendant
3.
4.
5.
11. ADJOURNMENT
PARKS AND RECREATION AND FORESTRY COMMISSION
7:00 P.M. | MAY 24, 2012 | MOUNDS VIEW CITY HALL
MEETING MINUTES
1. CALL TO ORDER at 7:14 PM
2. ROLL CALL: Commissioners: Kunz, Kroeger, Aukee, Peterson, Arel, Long
Staff: Dazenski, Debar | YMCA: Danielson
3. APPROVAL OF AGENDA: Agenda amended to move city staff reports to follow the YMCA
report (#6) Motion by Arel to approve amended agenda, 2nd by Peterson. Motion Passed 6-0
4. APPROVAL OF MINUTES
A. April 26, 2012 Meeting Minutes. Motion by Kroeger to approve, 2nd by Kunz. Motion Passed
6-0
5. PUBLIC INPUT
Citizens may speak to issues not on tonight’s agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes. No residents present.
6. STAFF REPORTS
A. YMCA REPORT
Approximately 150 people attended the recent dance recital. Spring session is wrapping up
and summer session will start in 2 weeks. Enrollment is strong for the summer session.
Added some summer parent/child offerings for the summer. Summer parks program will
have approximately 70 participants. There are some programs aimed at older residents -
details on those events can be found in the Mounds View Matters.
Registration for summer fun run as part of the Festival in the Park is now open. Music-in-
the-Park ready to go for June (North Suburban Band), July (Ken Lehm and Friends), and
August (Teddy Bear Band). Summer hours starting May 29th. Event center bookings are
strong. Park building bookings are strong for most Friday, Saturday and Sundays.
Soccer camp is August 6th – 10th. Safety Camp is scheduled for August 15th and 16th.
Details for both are in the Mounds View Matters.
B. CITY STAFF REPORT
Punch list for Lambert building to finish up items. Irrigation and field work will begin shortly
on the ballfied for Lambert. The aerator will go in at Silverview Park within the next 3 – 4
weeks. Roofing is progressing well at the community center. Goal number 2 was stolen
from the disc golf course. Various parts of parks were again vandalized. Timbers will be
removed from Groveland volleyball court within the next few weeks. Ash tree treatments
have begun. City staff has been busy with maintenance and getting the fields ready for
summer use. There is a reminder in the Mounds View Matters regarding the adopt-a-park
program.
The ordinance related to city trees passed the City Council and will go into effect next week.
Changes to note include the ability for residents to inject trees and the DNR grant.
7. UNFINISHED BUSINESS
A. Discuss Trailway and Sidewalk System Plan:
Input from the group is needed on the walkway and trailway plan. Recent information on
understanding the state guidelines changes some of the recent findings.
Design for the walkway/bikeway on the north boulevard of County H is in progress, detailed
design information will be provided at the June meeting with the expectation of getting
citizen input during the July meeting
8. NEW BUSINESS
A. Discuss Silverview Park Trailway Rehabilitation: The city will need to work with some of the
neighboring property owners to work out some newly identified easement questions. There
will be some need to engage engineering/surveying resources to ensure that the rebuilt trail
has the appropriate foundation. City staff will work to address these 2 items and will report
back on progress next month.
B. Recommend Furniture Purchase for Lambert Park: A motion was made to acquire 35-40
plastic stackable chairs and 5 lightweight round tables as well as 2 square tables for the
inside of the building as well as for 4 square picnic tables that seat 8 people apiece for the
outside of the building at a cost not to exceed $10,000. The motion was amended to state
that $4,500 come from the donation from BBC and the remaining funds from the park
dedication funds. Amended motion was accepted. Motion passed 6-0.
C. Review 2013 General Fund Budget for Parks: The budgets were reviewed and minor line
items discussed. No changes suggested.
9. REPORTS
A. Reports of Commission Members:
Arel: Was approached by a citizen regarding a park patrol.
Dave Long will take place of Gerald at the June 11th Y Advisory Meeting
Long: Mentioned that he regularly walks Silverview park and keeps an eye on things at that
park
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINESS
A. Next Regular Commission Meeting: June 28, 2012
1. Recommend Playground Improvements (Lambert and/or Silverview)
2. Review Municipal Code Chapter 909 (Parks & Recreation)
3. Review BBC Donations and Status
4. Park Patrol
11. ADJOURNMENT: Motion to adjourn at 8:51 PM by Kroeger, 2nd by Long. Motion Passed 6-0.
Mounds View Community Center / YMCA
Program Update
1. Programs:
Summer I Summer I
2011 2012
MVCC Full-Day Program 34 51
MVCC AM Half-Day 0 9
MVCC PM Half-Day 15 11
Extended Care AM 9 19
Extended Care PM 15 21
Summer Spectacular 31 30
Summer Extravaganza 30
Play Days in the Park-
Monday 8 9
Play Days in the Park-
Tuesday 12 13
Play Days in the Park-
Wednesday 9 7
Play Days in the Park-
Thursday 5 13
Disney Dance Camp
Pop Star Dance Camp
Hip Hop Dance Camp 1
Move N Groove 3
Tony Sanneh Soccer
Clinic
Parent Child Tumbling 1
Tumbling Ages 3-5 8 4
Tumbling Ages 5-7
Little Kickers 13
Pottery Ages 3-5
Pottery 6-11 1
Totals 146 236
% Increase 62%
1. Clinics: Timberwolves had 73 youth!!!
2. Youth Programs: Painting, tumbling, preschool soccer
3. Senior Picnic – July 25th 11-1:00pm
Summer Parks and Leagues
4. Fall Soccer Registration open : Advertise July
5. Summer Parks : Summer parks 60+ kids, great staff,
doing great
Community Events ($1.00 refreshment provided) Comfort Keepers
6. Music in the Park – Concert Band was a hit!!!
7. 5K Fun Run / Family Walk August 18t
a. Registrations open now!!!
b. Music in the Park June 21st | July 19th | Aug. 16th
Building Happenings:
May
Adults
Medtronic Youth
Total
Gym 20 25 Gym 30
75
Fitness
Center 7
Fitness 1
8
Lobby 8
Lobby 105
113
Playland 2
Playland 5
7
June Thru the 8th
Adults
Youth
Total
Gym 20
Gym 30
50
Fitness
Center 7
Fitness 1
8
Lobby 8
Lobby 37
45
Playland 2
Playland 5
7
Event Center
Apr-11 Apr-12
Full 5 6 20%
Partial 8 25 50%
May-11 May-12
Full 14 17 21%
Partial 9 18 100%
Jun-11 Jun-12
Full 9 12 33%
Partial 9 14 56%
Other Business
A. Safety Camp – August 15-16th
Trailway System Plan – DRAFT April 2012
1
Goals and Objectives
1. Provide the highest level of safety practical to ensure the health and welfare of the pedestrian, bicyclist and
motorist.
a. Encourage compliance of traffic laws through applicable departments
b. Develop and promote guidelines governing the appropriate use of the trailways system
c. Establish a signage standard for trail use that minimizes potential conflicts among users
d. Conform to existing Minnesota Department of Transportation engineering standards
e. Minimize bicycles/pedestrian/motorist encounters by providing off-street trailways whenever economically
possible
f. Promote safe bicycling through publications, programs and events while assisting with the promotion of bicycle
safety education through the City publications
2. Provide and maintain a system to achieve a high recreation potential.
a. Provide links between Ramsey County, Anoka County, and neighboring cities’ trailway systems
b. Develop a system that can be used as a recreational link between the existing city parks, and to promote a means of
making the park property as well as recreational activities accessible to all residents of in the city
c. Provide a recreation opportunity for the family and individual
d. Develop a system that would be suitable to short and long distance recreational use
e. Utilize man-made or natural linear resources in order to take advantage of the scenic qualities in the City
3. Provide and maintain a system that can be used as an alternate transportation mode.
a. Promote a system to provide access to local points of destination such as civic centers, businesses, schools and
libraries
b. Promote a system that would provide an efficient means of destination orientation traffic
c. Connect the bikeway/walkway systems with existing and future mass transportation systems
d. Encourage the development of secure bicycle parking opportunities at existing commercial and industrial
developments
Commented [K1]: All: Important Question; Who’s Goals and
Objectives are these? May drive reconsideration of these G&Os.
Deleted: possible
Formatted: Strikethrough
Commented [K2]: Nick: Are there other standards to consider
(Ramsey County)?
Deleted: newsletter
Deleted: within the City
Deleted: a
Deleted: and
Deleted: assessable
Deleted: accessible
Deleted: which use of trailways can provide
Deleted: as well as long distance trail use
Deleted: high population concentration areas (ie: shopping
centers, schools, parks, library, businesses, etc.)
Commented [CP3]: What does this mean?
Trailway System Plan – DRAFT April 2012
2
e. Advocate safe trailways through communication of requests and needs to roadway owners including Ramsey
County and the Minnesota Department of Transportation
4. Publicize trail use opportunities in the community.
a. Provide for citizen involvement through the entire planning process
b. Support and encourage the community in the development of a trailways system
c. Recommend the adoption of a Resolution by the City Council supporting the concept of a trailways system
d. Encourage application for grants and funding aid for trailway projects
Trailways Connection to County Linkages
Anoka County Connections
The Rice Creek Chain of Lakes Regional Park Corridor begins in Anoka County at Centerville. The Trail Corridor plans show a
trailway continuing through Circle Pines, Shoreview, Arden Hills and Mounds View and continuing along Rice Creek through
New Brighton, Fridley and finally connecting to the Mississippi River Trail. The Rice Creek Trail will be a long distance of
beautiful scenic areas. The trail is a joint effort between Anoka and Ramsey Counties. A portion of the Rice Creek trail
corridor currently passes through the decommissioned Twin City Army Ammunition Plant (TCAAP). Improvement to County
Road H from Interstate 35W to across County Road 10 would ultimately link to the trailway portion which is in Mounds View
continuing along Rice Creek.
The Mounds View portion of the Rice Creek trail corridor would link the passage through the TCAAP property to New
Brighton leading to Long Lake Regional Park.
When the Rice Creek Trail Corridor finally becomes a reality, it is the proposal of the Trailways Advocacy Group that the
connecting link to Mounds View trailways routes would be Edgewood Drive, across County Road H. This connector would
provide a safe route connecting to Mounds View trailways.
Commented [K4]: Nick: How would we restate this update to a
previously (1992) plan?
Commented [K5]: Is this still the case?
Deleted: The
Deleted: lies
Deleted: A portion of Rice Creek that follows through the Twin
City Army Ammunition Plant (TCAAP) is currently a hindrance of the
project. This portion of Rice Creek which is located on TCAAP
property is currently being advocated by federal legislators who are
negotiating with the United States Army.¶
Deleted: Trail
Deleted: Corridor
Commented [K6]: Needs updating
Trailway System Plan – DRAFT April 2012
3
Mounds View is located in the middle of the long Rice Creek trail corridor, having the route to Centerville Chain of Lakes in
one direction and the Mississippi River Trail connection in the other direction. For this reason, Mounds View will benefit
from the completion of these exciting trailways.
Ramsey County Connections
Ramsey County trail connections include a route to downtown St. Paul. The City of Shoreview has developed and continues
to expand upon their trailways system. The City of Mounds View currently has a link to their system on County Road I. This
trail connects to Highway 49 (Hodgson Rd which then becomes Rice St. at Hwy 96). Ramsey County proposes that both
Lexington Avenue and Rice Street become routes to downtown St. Paul. The roadways in Shoreview already provide either a
bikelane or off street trail on both streets. Once in St. Paul, many options are available for routes to Ramsey County
trailways and parks, including plans for the Burlington Northern Trailway Corridor.
Trailway Connection to Minneapolis
Mounds View also has the opportunity to connect onto trailways leading to downtown Minneapolis. The connection to Silver
Lake Road offers an off street sidewalk all the way to County Road D, entering the City of St. Anthony and connecting to
Highway 88. At this point, many routes to downtown Minneapolis can be pursued along residential routes.
The Mounds View connection to this lengthy Silver Lake Road route to Minneapolis is using the Long Lake/County Road H
connector or the Groveland/Knollwood/Pleasant View Dr. route (or the many connectors in between).
Deleted: Trail
Deleted: Corridor
Trailway System Plan – DRAFT April 2012
4
Trailway Connections to Neighboring City Linkages
Shoreview Connections
The City of Mounds View currently has an established connection to Shoreview with the trail along County Road I. Another
connection which could become a reality in the future is along County Road J. The City of Blaine has a right-of-way along the
north side of County Road J. A right-of-way is thought to exist along the south side of County Road J east of Coral Sea Road.
An off-street trail is located east of the 35W bridge leading into Shoreview, connecting to Lexington off-street trailway. MN
DoT is planning on having an eight foot wide sidewalk along one side of the Hwy 610 overpass. There is an opportunity for
County Road J to be a connector road if trailways were advocated by the participating cities of Mounds View, Blaine and
Shoreview. The Rice Creek Corridor will also provide a linkage between Shoreview and Mounds View.
New Brighton Connections
Trailway connections to the City of New Brighton are offered on an off-street path along Long Lake Road (the Mounds View
portion to be completed the summer of 1992). Also, the connections to Silver Lake Road provide a direct arterial route to
New Brighton trailways. This proposal accesses Mounds View routes to both Long Lake Road and Silver Lake Road trailways
continuing into New Brighton and beyond.
Future Old Highway 8 connection will provide opportunities to plan a trailway along Old Highway 8 for a connection to Long
Lake Regional Park. The intersection of Old Highway 8, County Road H and Highway 10 will be realigned during the
development of the Rice Creek Trailhead project coordinated by Ramsey County. This realignment will provide an
opportunity to connect trailways which are recommended in this proposal.
Fridley Connections
The City of Mounds View connects to the Fridley trailway system along County Road H, County Road H2 and County Road I.
All three connectors provide access onto the Fridley trailway system.
Trailway System Plan – DRAFT April 2012
5
Spring Lake Park/Blaine Connections
Common city boundary trailways have not been indicated by the Cities of Spring Lake Park or Blaine. The future may offer
opportunities to establish trailway linkages with Mounds View, Spring Lake Park and Blaine.
Trailway System Arterial Roads
The routes listed below play an integral role in the Mounds View trailway system, serving as arteries for connecting streets
and linking to other trailway systems. North-South Routes
• Groveland Road
• Silver Lake Road/Red Oak Drive
• Long Lake Road
• Edgewood Drive
• Quincy Street
East-West Routes
• County Road J
• Arden Avenue
• Hillview Road
• County Road I
• County Road 10
• County Road H2
• County Road H
•
•
•
Deleted: roads
Deleted: Trailway
Deleted: System
Deleted: <#>¶
Groveland Road (Continuing with Knollwood Rd. south of Hwy
10)
Trailway System Plan – DRAFT April 2012
6
The following routes serve as connectors, providing access to the arterial routes.
• Bronson Drive
• Wooddale Drive
• Mounds View Drive
• Woodcrest Drive
• Pleasant View Drive
•
In efforts to make this plan as inexpensive, manageable and realistic as possible, the plan does not recommend for a trailway
on every city street. This trailway plan does provide a systematic route of accessibility to all areas of the City, making special
provisions to provide access to schools, parks, business and civic areas. This Trailways plan also makes special efforts to link
Mounds View routes with neighboring trailway systems.
There are priorities of the Mounds View Trailways Plan originally recommended by the Trailways Advocacy Group in 1992,
and updated by the Parks, Recreation, and Forestry Commission in 2012.
The following Detail Plan defines the existing and proposed formal trailways through the City of Mounds View and the
respective status. The focus of the formal trailways is to connect with landmarks and regional trailways, and in some
instances, isolated neighborhoods with other trailways. Landmarks are defined as Mounds View parks, civic and local
educational facilities. Bus routes are not a direct consideration.
Deleted: remaining
Deleted: roads
Deleted: roads
Deleted: which lead to linking trailway systems
Deleted: <#>Arden Avenue¶
<#>Hillview Road¶
Deleted: <#>Edgewood Drive¶
Deleted: <#>Quincy Street¶
Deleted: proposal
Deleted: is proposal
Deleted: provide
Deleted: proposal
Deleted:
Deleted: and City Hall
Deleted: Proposal
Deleted: These
Commented [CP7]: I like “These” better
Deleted: Proposal
Deleted: as
Deleted: through this plan update.
Trailway System Plan – DRAFT April 2012
7
Trailways encompass Bikeways and Walkways. The following defines expectations for formal Bikeway and Walkway
configurations:
• Bikeway – Paved, no or limited conflict with street parking, integrated crosswalks, clear path with visibility consistent
with speed, continuous and maintained. On or Off street, 5-10’ wide. Identified on a map and/or marked with signage.
• Walkway – Paved, integrated crosswalks, clear path with visibility consistent with speed, continuous, maintained, with
potential shared usage with pedestrians. Off street, 4’ wide minimum. Identified on a map and/or marked with signage.
North/South
Routes
Bike-
way
Walk-
way Connecting Landmarks and Regional Trailways Status – Gaps - Plans
Groveland Road Yes No • Connects with Groveland Park
• Connection with Blaine trailway along CR J/ 85th
Ave
Striped lanes 4-8’, both sides, from CR 10 to CR J/ 85th Ave. MSA route north
of CR 10
Gap: No striped lanes from Bronson to CR10
Plan: Future extension of trailway with Knollwood Dr with local street project
Silver Lake Road –
Red Oak Drive
Yes
?
Yes • Full North/South route: Connects Silver View and
Woodcrest Parks
• Connection with Rice Creek trailway with Long
Lake Park and the Mississippi River trailway as
destinations
• Connection with Blaine trailway along CR J/ 85th
Ave
Concrete sidewalk, on east side, from CR H, through CR 10, continuing on
Red Oak Dr to Hillview Rd. MSA route north of CR 10 (Red Oak Dr)
Gap: No controlled walk/bike features from Hillview Rd to Long Lake Rd
coinciding with bump outs
Plan: Mark trailway on west side
Long Lake Road Yes Yes • Full North/South route: Connects Random and
Arden Parks and Irondale HS. Connection with
Rice Creek, Blaine and New Brighton trailways,
and with Long Lake Park and the Mississippi River
trailway as destinations
Concrete sidewalk, on west side, from south end to Eastwood Dr. On street
marked 4’ wide striped lane, both sides, from CR H to CR H2 and CR I to
Eastwood
Gaps: North end west from Eastwood Dr to Groveland Rd has no controlled
walk/bike features. No striping between CR H2 to CR I
Plan: Future extension of trailway with local street project
Edgewood Drive Yes Yes • Connects Edgewood MS, City Hall, City Hall Park,
Police Station and Community Center
Concrete sidewalk, east side, and 6’ striped lanes, both sides, from CR H to
CR H2. Concrete sidewalk, west side, from CR H to CR 10, and both sides
from CR 10 to Bronson Ave, changing to striped lanes, both sides, to CR I.
MSA route from south border to CR I
Gap: No sidewalk north of Bronson. No controlled walk/bike features north
of CR
Plan: Future improvement of trailway with local street project and addition
of formal trailway through wooded area between CR I and Hillview Rd
Trailway System Plan – DRAFT April 2012
8
Quincy Street Yes Yes • Connects Oakwood and Greenfield Parks,
Pinewood Elementary and industrial park
Striped 6-10’ lanes, both sides, from CR 10 to CR I. Concrete sidewalk, on
east side, from Hillview Rd to CR H2. MSA route along majority of length
Gap: No sidewalk from CR 10 to CR H2
Plan: Future implementation of sidewalk with local street project
East/West Routes
Bike-
way
Walk-
way Connecting Landmarks and Regional Trailways Status – Gaps - Plans
Co Rd J (85th) No Yes • Full East/West route
• Connection to Blaine and Shoreview trailways
along CR J/ 85th Ave
Sidewalk along north (Blaine) side of route
Gap: No controlled walk/bike features along south (Mounds View) side of
route
Plan: Future implementation of walkway. Obtain right of way from Spring
Lake Road to Coral Sea on south side of route
Arden Avenue No Yes • Connects with Groveland and Arden Parks On street 4-6’ wide lane, both sides, from Spring Lake Rd to Eastwood
Rd.MSA route
Gap: No controlled walk/bike features from Eastwood Rd to Long Lake Rd
and limited room for off–street walkway
Plan: Future implementation of walkway with local street project. Use MSA
funds for walkway
Hillview Road Yes Yes • Connects Hillview and Greenfield Parks On street 4-8’ wide lane, both sides, from Red Oak Dr to east end. MSA
route along majority of length
Gap: NA
Plan: Maintain existing.
Co Rd I Yes Yes • Full East/West route: Connects Silver View and
Lakeside Parks, Pinewood Elementary
• Connection to Shoreview, TCAAP and Fridley
trailways
Sidewalk, on north side, from west end to Silver Lake Rd. Sidewalk changes
to south side from Silver Lake Rd to Long Lake Rd. Sidewalk, both sides,
from Long Lake Rd to Quincy St, then paved only north side to east end
Gap: No on street striped lanes. Bikes must use sidewalks. Poor trailway
intersectionat CR 10
Plan: Maintain existing. Improve CR 10 intersection
Co Rd 10 Yes Yes • Full East/West route: Connects city civic area,
retail business parks, high density and senior
housing
Intermittent paved trailways along both sides of route
Gap: Intermittent unpaved sections along both sides
Plan: Pursue grants and use of annual budgeted trailway funds to complete
trailways on both sides of CR10
Co Rd H2 Yes Yes • Full East/West route: Connects Silver View Park Concrete 8’ sidewalk, north side, from west end across CR 10 to Jackson Dr.
Deleted: Bikes must use sidewalk
Trailway System Plan – DRAFT April 2012
9
and through industrial park
• Connection to Fridley trailways
Continues as 4-5’ lane, both sides, to east end
MSA route along majority of length
Gaps: No walkway on south side between Silver Lake Rd and Long Lake Rd.
Bikes must use sidewalks
Plan: Consider walkway by townhomes
Co Rd H Yes Yes • Full East/West route: Connection to Edgewood
MS, Irondale HS, Sunnyside Elementary
• Connection to Rice Creek, TCAAP and Fridley
trailways
Concrete sidewalk, north side, from west end to Silver Lake Rd. Sidewalk
continues, south (New Brighton) side, from Silver Lake Rd to Edgewood Dr,
then transitions to paved trailway to Old Hwy 8
Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No
controlled walk/bike features from Old Hwy 8 to east end (35W) or to TCAAP
Plan: Implement needed features with local street and Co Rd H and 10
intersection projects
Park Trailways Bike-
way
Walk-
way
Connecting Landmarks and Trailways Status – Gaps - Plans
Silver View Park
Yes Yes • Connects with Long Lake Rd, Silver Lake Rd, CR H
and I trailways
Complete – Paved
Gap: NA
Plan: Maintain
Greenfield Park
Yes Yes • Connects with Hillview Rd and Quincy St trailways
and Oakwood Park
Trailway is a mix of paved and gravel
Gap: Gravel portions not conducive to biking. Bridges need attention.
Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport
Arden Park
No Yes • Connect with Long Lake Rd and Arden Ave
trailway
• Connection with Blaine trailway along CR J/ 85th
Ave
Future – Walkway from Edgewood Dr along sound wall, behind park, to Long
Lake Rd
Gap: Does not exist
Plan: Future implementation of gravel or paved walkway
Woodcrest Park No Yes • Connect with Silver Lake Rd trailway Complete – Gravel
Gap: NA
Plan: Maintain
Trailway System Plan – DRAFT April 2012
10
Connector
Trailways
Bike-
way
Walk-
way Connecting Landmarks and Trailways Status – Gaps - Plans
Pleasant View Court
to Spring Lake Road
Yes Yes • Connects to Arden Ave trailway and neighborhoods
Complete – Paved
Gap: NA
Plan: Maintain
Arden Ave to Laport
Drive
Yes Yes • Connects Groveland Park, Arden Ave trailway to
neighborhoods
Complete – Paved
Gap: NA
Plan: Maintain
Arden Avenue to
Sherwood
Yes Yes • Connect Arden Ave trailway to neighborhoods Currently a worn foot path
Gap: Does not exist
Plan: Future implementation of paved trailway
Lois Lane to Knoll
Drive
Yes Yes • Connects neighborhoods Complete – Paved
Gap: NA
Plan: Maintain
Hidden Hollow South
to Hidden Hollow
North
Yes Yes • Connect CR H and H2 trailways and neighborhoods Currently a worn foot path
Gap: Does not exist
Plan: Future implementation of paved trailway
Edgewood Drive to
Bona Road
Yes Yes • Connects Edgewood MS, Edgewood Dr trailway to
neighborhoods
Complete – Paved
Gap: NA
Plan: Maintain
Edgewood Drive -
North of CR I to
Hillview Rd
Yes Yes • Connect Edgewood Dr through wooded area between
CR I and Hillview Rd
Currently a worn foot path
Gap: Trailway does not exist
Plan: Future implementation of paved trailway
Fill the Gaps Priorities
Short Term:
• Complete CR H walkway (sidewalk) between Edgewood Drive and Silver Lake Road. Coordinate with area street construction project in area.
Medium Term:
• Complete CR 10 trailways (North and South sides)
• Complete Long Lake Rd trailway along north end to CR J/ 85th Ave and to Groveland Rd
• Continuation of existing walkways along main E/W and N/S routes.
Must define purpose of striped lanes or acceptable uses, and if bike use of sidewalks is acceptable.
Deleted: Future (Need Input)
Deleted: Future -
Deleted: Co Rd H2 to Co Rd 10
Formatted: None, Indent: Left: -0.01", Hanging: 0.13",
Space Before: 0 pt, After: 0 pt, Line spacing: single, Don't
keep with next, Don't keep lines together
Deleted: to CR 10 trailway past theater
Deleted: Complete off-set trailway through theater parking lot
Deleted: NA
Deleted: Maintain
Deleted:
Deleted: at
Deleted: (North County Line)
Greenwood DriveLong Lake RoadBona RoadIrondale RoadEdgewood DriveLongview DriveRed Oak DriveSunnyside RoadBrighton LaneRainbow LaneEastwood RoadGreenwood DriveSilver Lake RoadLong Lake RoadCounty Road H
DATE:COMM:V:\1938\ACTIVE\193800504\CAD\DWG\193800504F01.DWG
LOCATION PLAN
CITY OF MOUNDS VIEW, MINNESOTA
PROPOSED COUNTY ROAD H SIDEWALK
FIGURE 1
PROPOSED
SIDEWALK
ALIGNMENT