HomeMy WebLinkAbout06-22-2017 Packet
PARKS AND RECREATION AND FORESTRY COMMISSION
7:00 P.M. | MAY 25, 2017 | MOUNDS VIEW CITY HALL
MEETING MINUTES
1. CALL TO ORDER at 7:01 pm
2. ROLL CALL:
Commissioners: Arel, Aukee, Katovich, Kroeger, Kunz, Palm, Rundle,
Staff: Erickson, Peterson | YMCA: Thomas
3. APPROVAL OF AGENDA: Motion to approve by Palm, 2nd Aukee. Motion Passed 7-0
4. APPROVAL OF MINUTES
A. April 27, 2017: No minutes available. Approve in June. Palm will gather the minutes.
5. PUBLIC INPUT
Citizens may speak to issues not on tonight’s agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes. No residents present
6. STAFF REPORTS
A. YMCA: See attached report. New Sports Coordinator: Darryl Thibodeaux. Summer leagues
will be starting soon with about 140 participants. 130-150 children attending other summer
programming. Consider asking park building renters to complete a survey to get
feedback and see where we can make improvements. New park brochure separate from
MVMatters mailed to residents. Showcases programing and family events.
B. Public Works: See attached report. Eagle Scout candidate will be starting disc golf tee
boxes at Silverview Park about June 17th.
7. UNFINISHED BUSINESS
A. Silver View Disc Golf: Commission toured the course on the park tour this evening. Still
needs some clearing of trees and brush. How do we manage natural water flow through the
course resulting in erosion and mud? (i.e. rocks, wood barriers, wood chips?). Ramsey
County ditch along County Road I and Silver Lake Road should help some of this.
B. Pollinator Friendly City - update from staff / Council Work Session: Staff is still researching
this for the Commission and City Council. Hoping for an update at the July City Council
Work Session.
8. NEW BUSINESS:
A. Tennis and basketball Court Evaluation – Fred Kolkmann from Tennis and Sport Surfaces,
LLC gave his report on the status of our courts and his recommendations. We need to
decide which courts to save, which courts to let go, which courts to salvage and/or replace?
Motion to repair basketball courts at Random Park ($2.5-$3.6K estimate), and crack
repair with recoating at Silverview Park ($16-18.5K estimate) by Arel, 2nd by Rundle.
Motion Passed 7-0. Commission will discuss possible options for Greenfield and
Groveland tennis and basketball courts in June. Staff and Katovich will prepare options of
1-2 courts with and w/o basketball courts as well as lighting for June meeting.
B. Discussion of tonight’s Park Tour: Commission visited Silverview disc golf course and
basketball courts. Also visited City Hall Park and looked at the vision for the playground and
splash pad as well as moving the t-ball field.
9. COMMISSIONER REPORTS: NONE
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINESS
A. Forestry within the parks and public right-of-way
B. Next Regular Commission Meeting: June 22, 2017 6:30pm
11. ADJOURNMENT: Motion to adjourn at 8:35 pm by Aukee, 2nd by Kroeger. Motion Passed 7-0
6A
Mounds View Community Center / YMCA
1. Program updates
2. Events
6A
3. Park Rentals
6A
4. Fields
5. Other
a. Music \ Movie in the Park
i. June 22nd – Vinne Rose / Space Jam
ii. July 20th Teddy Bear Band / Happy Feet
iii. August 17th – Rich and the Resistors / A Dog’s Purpose
b. 5K Run Aug 19th @ Silver View Park
i. Registration open
ii. Active.com – search Festival in the Park 5K
Item No. 6 B
M E M O R A N D U M
To: Parks & Recreation & Forestry Commissioners
From: Brian Erickson - Public Works Director/City Engineer
Don Peterson - Public Works Supervisor
Date: June 22, 2017
RE: Public Works Staff Report
_______________________________________________________________________________
The following is a synopsis of recent activities and events of the Public Works Department.
Maintenance
Staff worked on the following items this last month:
• Painting and field prep all soccer, baseball and lacrosse fields
• Irrigation maintenance and repairs, Oak Wood Park
• Mowing and weed whipping
• Building maintenance repairs on locks and windows at various park shelter buildings and the
Community Center
• Planter sign maintenance, painting and weeding of sign planters
• Training of new seasonal help
• Community Center – new room name sign installation
• Silver View Disc Gold 400yards of wood chips placed, T- box site prep
• Storm Clean up
• Soccer goal net and frame repairs
Forestry
Staff worked on the following items this last month:
• Continue working on Emerald Ash Bore Response Plan – required by the DNR.
• Inspected a number of trees for EAB and Oak Wilt.
The following projects are planned this year. Current updates are in black text, and updates from
the previous two month period are in grey.
Silver View Park
Relocate Disc Golf Course:
• Scope: A new 9-hole course is proposed to be constructed in the NW corner of the park.
The work includes clearing trees, planting new tees, installing targets, removing existing
course items and landscape restoration.
• Budget: $25,000 (Park Dedication Fund) – includes $2,000 BBC contribution for improving
disc golf tees (Mar. 2011).
• Public Works Staff meet with Kelly to layout course will be reviewed later in the meeting,
staff also meet with Life Scout Ryan working towards Eagle for Tee boxes and baskets for
disc golf course.
• Tree removal and brush removal has been completed. Course T boxes and disc goals
have been GPS located and a map completed.
• No new progress at this time, meet with Eagle candidate Ryan this afternoon update will
be given at tonight’s meeting.
• Ramsey County will be clearing the ditch along County Rd I and Silver Lake Road starting
in August, hoping it is dryer by then.
• Work in progress: Eagle Scout will start on July 1 with the installation of the T boxes,
Public Works Staff started to remove some of the stumps, spread chips and prep T box
sites
Public Works Staff Report
2/3
Reconstruct Trailways:
• Scope: Reconstruction of the asphalt trails with an engineered pavement section and
grading/drainage corrections. Will require professional engineering services and obtaining
permanent trailway easements from Scottland Green apartments and Silver Lake Woods
Townhome Association
• Budget: $150,000 (Spec. Projects Fund). Increased to $452,116.09 based on engineering
and construction costs.
• Silver View trial pavement was completed Sept. 16, 2016. Northwest Asphalt is working on
punch list items and waiting for some concrete sidewalk work to be completed.
• Restoration will be competed in spring of 2017
• Contractor is working on punch list items.
Irrigation Improvements at Silver View:
• Scope: Expand the irrigation system to cover various locations including around shelter
and new playground.
• Budget: $15,000 (Park Dedication Fund).
• The main irrigation underground control vault will also be replaced with an above ground
control.
• Staff has been meeting with contractors and currently obtaining quotes for the work.
• Staff has started some of this work in house and also meet with electrical contractor for a
quote on the electrical work.
Random Park:
Building Renovation:
• Scope: Interior and exterior renovation to repair rotted wood fascia, increase meeting
space and improve the overall aesthetics of the building.
• Budget: $20,000 (Park Dedication Fund).
• Contractor has been scheduled for the upgrade in lighting and new carpet installation
• All work has been completed by contractor, interior work is completed, and painting of the
exterior will be completed in 2017.
• Staff is obtaining quotes for new tables, coat rack has been ordered.
• Staff will start painting in June.
City Hall Campus:
Irrigation & Landscaping Improvements:
• Scope: The front of City Hall is planned to have new landscaping features installed and
irrigation system expanded to cover dead spots and the portion of the park between City
Hall and Mounds View Boulevard (County Highway 10) (volley ball area).
• Budget: $25,000 (Special Projects Fund).
• The CHPTF task force was created and meet to discuss the campus, the task force will be
meeting and bring information forward at a future PRF Commission Meeting, To be
discussed tonight.
• No update at this time
Groveland Park:
Tennis/Basketball Court Rehabilitation (Design):
• Scope: Evaluation, design, and bidding documents for option selected, to be constructed
in 2016.
• Budget: $15,000 (Park Dedication Fund).
• Staff has received proposal to evaluate all the courts for a total of $3,000. This will be
brought forward to the City Council for approval.
• To be discussed tonight
Public Works Staff Report
3/3
Trails/Sidewalk:
Hillview Road, Quincy Street and Jackson Drive (2016 Street and Utility Improvement Project –
Area I)
• Scope: Reconstruction of streets and utilities in the northeast quadrant of Mounds View.
Sidewalks will be constructed along Hillview, Jackson and Quincy.
• Budget: $4.2M (Street Improvement Fund).
• Construction is complete for the season. Most of the sidewalk has been constructed
except for tie in at Hillview and Quincy which will be completed in 2017.
• Contractor paved Terrace, Oakwood, and Hillview today.
• Estimated completion date week of July 10.
CSAH 10 Trail Segments #6 & #11:
• Scope: Construction of trail segments between Red Oak Drive and Groveland Road
(Segment #6) and between Woodale Drive and Edgewood Drive (Segment #11).
• Budget: $627,000 ($39,300 cost share with Ramsey County) (Street Improvement Fund).
• Construction underway. Northwest Asphalt has paved the trails, electrical sub has
completed light base and pole installation wiring is nearly complete. Curb cuts and
pavement repair at intersections is complete. Anticipate lighting completion in December
(dependent upon Xcel timelines).
• Contractor working to complete the electrical for trail lights. Tie in locations were changed
requiring additional wire and trenching
• Contractor is working on punch list items.
Greenfield Park:
RCWD ARJD#1 Project: Rice Creek Watershed District is planning the re-profiling and repair of
Anoka-Ramsey Judicial Ditch No. 1 which runs through Greenfield Park. Also included is Branch
No. 5 which is located behind the baseball outfield and crosses below the parking lot entrance.
Staff will be meeting with RCWSD to inquire the status of this work.
• RCWD has the goal of completing this project this year, but may wait until colder weather
for work to commence.
• Staff has been trying to get an updated timeline for the project from RCWD
• Staff meet with RCWD to clarify scope of work. Tree removals in along the ditch will likely
be required to allow equipment access. RCWD will need to coordinate the stabilization of
the bank after removals. Staff stated they will need to provide some cover near the
parking lot. No scheduled start date.
Other:
MCES Sewer Interceptor Project: Metropolitan Council Environmental Services is planning to
improve a large diameter sewer pipe at the northwest corner of Quincy and Hillview. MCES is
finalizing construction plans and have been reviewed by engineering division, comments returned
to MCES. MCES still planning on a 2015 project. Some trees have been tagged in order to be
transplanted in other City Parks. Project still scheduled to start later this spring. The work on the
meter station at the intersection of Quincy and Hillview has been delayed due to heavy rains and
flooding in September. Contractor is having to clean out the interceptor again due to heavy
sediment deposits in the line. Work will continue through the winter. A December closure of
Quincy Street to the north of Hillview is anticipated and is be required to complete Project is
nearly completed. Staff met with MCES to coordinate the installation of trail and planting of trees
as part of the restoration. A cooperative layout and tree location is being coordinated between
Mounds View and MCES. Working with MCES for final restoration of the southeast corner of the
park.