HomeMy WebLinkAbout06/22/1989CITY OF MOUNDS VIEW
PARKS AND RECREATION COMMISSION
MEETING AGENDA
June 22, 1989
6:30 p.m.
Mounds View City Hall
Council Chambers
I. CALI, TO ORDER
✓II.
REVIEW MAY 25, 1989 COMMISSION MINUTES
III. AGENDA ADDITIONS
V/rV. OAKWOOD PARK IMPROVEMENTS
/V. SILVER VIEW PARK PICNIC SHELTER
VVI. SILVER VIEW PARK PATHWAY
✓6II. MVCI' REPORT -FRANK SILVIS>
✓VIII. COUNCILMEMBER'S REPORT>
✓IX. CHAIRPERSON'S REPORT>
/X 1tEC1tEATION AGTMTY REPORT
/Xi PARK PROJECT UPDATE
XII. ADJOURNMENT
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
May 25, 1989
7:30 p.m.
Mounds View City Hall
Council Chambers
CALL TO ORDER The meeting was called to order at 7:30 p.m. by
Chairperson Wayne Burmeister.
ROLL CALL Commissioners present: Burmeister, Long, Silvis,
Starr, Stevenson and Trettel.
Staff present: Director Saarion
APPROVAL OF MINUTES Commissioner Silvis made a motion which was
seconded by Commissioner Long to approve the
minutes of April 27, 1989. Motion carried: 6 ayes, 0
nayes.
CHAIRPERSON'S REPORT Chairperson Burmeister updated the Commission
regarding additional appropriations from the Spring
Lake Park Lion's Club for Lakeside Park
improvements. These appropriations are ear -marked
for the retaining wall and beachhouse patio.
REPORT ON PARK CLEAN-UP Commissioner Starr reported on the clean-up at
Hillview Park. She said that five eager, hardworking
people helped clean, weed and rake Hillview Park.
A thank you letter is being sent to each person.
Commissioner Starr also reported that several people
came and stopped at the park, inquired about the
activity, but did not help.
Commissioner Trettel reported on the clean-up at
Silver View Park pond. Several truckloads of junk
were hauled out of the pond and litter was collected
along the pathway. Commissioner Trettel announced
the businesses that donated food including Dominoes
Pizza and Super America.
Staff has submitted articles and pictures to both local
papers although, the articles at this date, had not
been published. Letters of thanks to the helpers will
be sent to those whose names we have.
Park and Recreation Commission
May 25, 1989 minutes
Page two
OAKWOOD PARK Two grading proposals prepared by SEH were
reviewed. The Commission's opinion was that the
one plan was too extravagant. Other suggestions
were offered on one of the plans to provide for a
little more crowning on the ballfield diamond. Staff
will offer the suggestions to SEH and request revised
plan. The list of Oakwood Park improvements
suggested by the Commission is:
A rox. Cost
Site Preparation
$8,000.00
(1) Play equipment
11,000.00
(1) Bleachers
334.00
(1) Backstop
2,000.00
(2) Players benches
500.00
Ag lime infield
2,000.00
Sand volleyball court
1,500.00
Water fountain
1,000.00
Path realignment
1,000.00
Picnic area: 2 tables
700.00
2 grills
180.00
Horseshoe court (4)
500.00
$28,714.00
It is anticipated that a portion of the SYSCO park
dedication fees would be used to fund these Oakwood
Park improvements.
The Commissioners agreed that residents living
around Oakwood Park should be invited to the June
22 meeting. Staff will send letters of invitation. The
main objective is to relay the Commission's
improvement plans for Oakwood Park as suggested by
the residents per the survey and the March 16
Commission meeting.
SILVER VIEW PARK
PICNIC SHELTER The Mounds View Lion's Club currently has plans for
a Silver View Park picnic shelter out for bid. If price
quotes are acceptable to the Lion's Club, the Club will
be requesting approval to building the picnic shelter.
Commissioners expressed their desire to have water,
sewer and electric utilities put in at the same time
that the Lion's are building the picnic shelter in order
to complete the project.
Parks and Recreation Commission
May 25, 1989 minutes
Page three
SILVER VIEW PARK
PICNIC SHELTER (CONT'D) The Commission discussed using Park Improvement
Funds for such a project (estimated at $33,000).
However, the Commissioners decided to bring a
request to the City Council for the funding of such
utilities from other sources so that the Park
Improvement monies could be spent on other park
improvements. The Commission agreed to attend the
City Council agenda meeting on June 5 to discuss
options for funding Silver View Park utilities.
RECREATION PROGRAM
REVIEW Director Saarion reviewed some of the summer
programs which already began and provided
information on a few which will begin after school
concludes.
Commissioner Silvis reported on the status of MVCT
"Sound of Music" production schedule.
ADJOURNMENT A motion was made by Commissioner Stevenson and
seconded by Commissioner Starr to adjourn the
meeting at 9:00 p.m. Motion carried: 6 ayes, 0
nayes.
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
C(t4 Of
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUND@ VIEW, MINN: 55112
794-3®§§
June 16, 1989
Dear Parks and Recreation Commissioners:
The highlight for this coming meeting will be Oakwood Park improvements. The
meeting is scheduled for Thursday, June 22 at 6:30 p.m. at City Hall. Residents
from around the Oakwood Park area have been invited to attend. The preliminary
site plan will be reviewed. Recommendations to be considered are park
improvements plan and funding source and time -line.
We must also review the Silver View picnic shelter plans provided by the Lion's
Club. A recommendation of the plan and utilities installation must be decided to be
presented to the City Council.
Finally, we must discuss Silver View Park pathway extension, as well as review
updates in parks and recreation activities.
These important topics will make for an interesting meeting that will hopefully
result in some decisions for recommendations to the City Council.
If you are not able to attend the meeting, please notify me at 784-3055.
Sincerely,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
June 13, 1989
Good Day:
cif
viowdgvipw
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
7843055
You are invited to attend the Parks and Recreation Commission
meeting to be held on Thursday, June 22, 1989 at 6:30 p.m. at City
Hall. The featured topic on the agenda is discussion regarding a site
plan for Oakwood Park improvements.
This site plan offers facilities as prioritized by residents who attended
the March Parks and Recreation Commission meeting and from the
Oakwood improvement survey results.
The Commission would like to hear your thoughts regarding the site
plan.
Sincerely,
Mounds View Parks and Recreation Commission
MEMO TO: PARKS AND RECREATION COMMISSION
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: NNE 14, 1989
SUBJECT: PARK IMPROVEMENT FUND
The Park Improvement Fund is an accumulation of monies paid to the
City by developers who subdivide land. These monies are dedicated for
park improvements. As of today, this fund is $66,203.91. The SYSCO
development will be paying $50,000 to the Park Improvement Fund. This
money will most likely be received sometime in December. This money
must be received before December 31, 1989.
The Parks and Recreation Commission is contemplating two projects
including Oakwood Park improvements at $29,000 and Silver View Park
picnic utilities at $34,000. Both projects reflect a $63,000 expenditure.
If both projects are completed with the estimated costs, the Park
Improvement Fund will show a $53,203 balance.
MS/SL
MEMO TO: MAYOR AND COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: MAY 31, 1989
SUBJECT: OAKWOOD PARK IMPROVEMENT PLAN
The Parks and Recreation Commission has been working on ideas for an Oakwood
Park improvement plan. Ideas for this plan originated from residents who were
invited to a meeting for their input on needs at Oakwood Park. A survey was sent to
surrounding residents requesting ideas for Oakwood Park improvements.
The Commission has spent the last two meetings discussing prices, site plans and
needs for park improvements at Oakwood. Here is a list, approximate cost and total
cost of a plan for Oakwood Park. This plan will be open for review by residents who
will be invited to the .lune 22, Park and Recreation Commission meeting.
The Parks and Recreation Commission proposes to fund these Oakwood Park
improvements with a portion of the $50,000 Park Dedication Fees received in 1989
from Sysco, Corp.
IMPROVEMENTS
Site preparation
Play equipment
Bleachers (3 tier)
Backstop
Two (2) players benches
Ag -lime infield
Sand volleyball court
Water fountain
Path re -alignment
Two (2) picnic tables
One (1) picnic grill
Four (4) horseshoe courts
APPROKIMATE COST
$ 8,000.00
11,000.00
334.00
2,000.00
500.00
2,000.00
1,500.00
1,000.00
1,000.00
700.00
180.00
500.00
$28,714-00
The site grading plans will be at the meeting for review. The proposed plan offers
adequate drainage using a crowning affect on the infield. SEH provided an alternate
plan which offered much better drainage at twice the cost.
The Commission reviewed the two SEH plans and offered revision ideas for the first
less expensive plan to offer some additional drainage with minimal cost increase. This
revised plant is the one recommended by the Parks and Recreation Commission.
MS/SL
Z
wo
aln
O/?/,rW OO"o
MEMO TO: MAYOR AND COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: JUNE 1, 1989
SUBJECT: SILVER VIEW PARK PATHWAY EXTENSION PROJECT
The materials cost of the pathway extension has been budgeted in 1989. It was originally
planned that City staff would perform the pathway installation. However, the heavy
schedule of Public Works does not allow timely installation of this pathway (early sumer)
as indicated to the residents. Therefore, staff has requested bids on this project. Three
bids were received. Those bids are attached. I have performed reference checks on each
and I am prepared to discuss each proposal at the agenda meeting.
It has also been recommended and staff agrees that installation of a large culvert at the
west side storm water sewer outlet would be a wise investment. This culvert would allow
park maintenance vehicles to drive on the trail and over the ditch for greater efficient trail
maintenance. The cost of the two culvert options are:
Option #1 - 48" culvert $ 6,500.00
Option #2 - Metal arch $13,000.00
Option #3 - Inexpensive pedestrian bridge which
would barely allow a small pick-up.
$20,000 - 25,000.00
The size and style of the second culvert option has been recommended by City Engineer
Minetor. It will be large enough to handle the five year storm.
The budget has $3,157.00 for materials cost for the basic trail extension which will
basically cover the materials costs of all the proposals (except the asphalt option).
The additional options of labor for contracting the work and the cost of installation and
purchase of a culvert is additional unbudgeted expenses that could be funded with monies
from the Park Improvement Fund.
Staff will be in attendance at the agenda meeting to discuss this park project and seek
direction from the council as to how this project should proceed.
MS/SL
Attachment
BID SUMMARY SHEET
MIDWEST LANDSCAPING
TOTAL ...... $6,077.00
Labor ...... $2,609.00
Materials .. 3,468.00
References: City of Maple Grove
City of Coon Rapids
DARRELL'S CONTRACTING INC.
Option #1 Crushed limestone with mat
$9,250.00
Option #2 Crushed asphalt and concrete without mat
$5,165.00
Option #3 Crushed asphalt and concrete base and blacktop
$12,750.00
References: City of Blaine
Buzzell Masonry
GREENS FOREVER LANDSCAPING (Does not have equipment to install culvert)
TOTAL ..... $4,946.00
Labor ..... $1,782.00 (additional $200.00 packing - has never packed before)
Materials.. 3,164.00
miDwerr
LnnDfcApinG
PROPOSAL:
Sheet No.: 1 of 1
Date: 5/11/89
Proposal Submitted To:
Work To Be Performed At:
City of Mounds View
Silverview Park
2401 Highway 10
Trail Connection
Mounds View, MN 55112
Attn: Mary Saarian
We hereby propose to furnish all the materials and perform all the labor necessary for the completion of:
Excavate 725' x 8' x 4" 2,009.00
Install GTF 200 Geotextile Fabric 908.00
Install 3/16 minus Limestone 4" Deep 2,560.00
Pack Limestone 600.00
$6,077.00
All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications
submitted, and completed in a substantial workmanlike manner for the sum of 6 , 077 • 00 Dollars.
W
ch payment to be made as follows Payment in full_ due in -30 --days from substantial completion. A
2N se'rvice charfie will 6e as essed.oirl1 the 31st day and a ch month they afte til paid.
Any alterations or devta ion from above specifications rnvnlving extra costs. wtli be exec on only upon written oreders, anE ,8
become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our
control. Owner to carry tire. tornado. and other necessary insurance upon above work. Workmen's Compensation and Public
Liability Insurance on above work to be taken out by Midwest Landscaping.'
Respectfully submitted
Note - This proposal may be withdrawn by us if not accepted within 120 days.
Warranty: Midwest Landscaping will replace (once any tree orshrub that fails to live I'orune veal- front date ol'plartring provided:
plants have been properly maintained, the los has been reporter) within t hat year. [he loss has not been caused Crum insects M'
disease. and the account has been paid according to terms.
ACCElYrAINCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to du the work as
specified. Payment will be made as outlined above. I understand an additional service charge 42",, per month on the iverduv
halance may he charged if payment is not made as specified.
Date Signature
='` � : :'E;JUE `JCRTH - MAPLE GRCVE. MN 55369 ,6121 -:20-4201
GREENS FOREVER LAN1)SCAPI NV
Jay Clemens
755-5628
Name:
Phone:
MATERIAL:
Timber ...........................
Spikes... ... .;. -*.4,
Rock... ✓tf . ��rn... .. o.... ,
Edging ...........................
Stakes.::
Plants &
Shrubs... ............•
Trees... .... .. ...p �...
Black Dirt .......................
Sc.brat...........................
Other ............................
Total Material
• + 6% Sales 'fax
-E;z.r /'07%
LABOR:
General Labor $-
Sod Labor
lJ
$ 3 .f.44..
Total Labor $ j JTg1.Va
TOTAL: ........................................... $ ,q35
70
T
�1C��-r� s! ►n7 e
THANK YOU
rignature
w '
[ D�j
�tt�
s
6 V
t.
-o(� • y , �, � � - 7s'v � � �� o -o goo
co
_7� R
7s- w,.
bou"g" T
C`7?y - 52yyl
MEMO TO: PARKS AND RECREATION COMMISSION
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: MAY 31, 1989
SUBJECT: ESTIMATED PRICES FOR SILVER VIEW PARK UTILITIES
The estimated costs of installing utilities at Silver View Park are
summarized below:
1. ELECTRICITY - coming across Silver
Lake Road and underground to shelter.
2. WATER - coming off County Road I
with 6 inch pipe, underground
approximately 7 feet.to picnic shelter.
3. SEWER - going to main connecting
Manor Homes, across pond narrows to
home development.
Approximate total cost
MS/SL
$ 5,600.00
16,033.00
10,540.00
$32,173.00
TO: MAYOR, CITY COUNCIL, PARK AND RECREATION DIRECTOR
FROM: POLICE CHIEF
DATE: JUNE 15. 1989
SUBJECT: SECURITY AT PROPOSED SHELTER BUILDING AT SILVER VIEW PARK
I reviewed the site plan on the proposed shelter building at
Silver View Park. It is my understanding that the building will
be constructed with concrete blocks and the perimeter will be
acequaze l y l it.
At toe proposed site, I see no great concern regarding security
of the building. Obviously, theft and vandalism can occur anywhere,
however the Proposed site offers no greater risks than other
Park buildings in the City.
MEMO TO: PARKS AND RECREATION COMMISSION
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: NNE 14, 1989
SUBJECT: PARK PROJECTS
Work in the parks has been non-stop since our last meeting. Two seasonal
groundskeepers have been mowing using the 6' and 15' mowers almost non-stop, five
days a week from 7:00 a.m. until 3:00 p.m. and still we are barely keeping up with
grass growth. The other two seasonal employees perform daily field grooming duties,
dump trash twice a week and perform such tasks as putting in signs, picking up
materials, repairs of equipment and buildings, and other last-minute needs for
programs.
The full-time employees have performed such projects as:
1. Finished the sprinkling system pit installation.
2. Completed the curb backfilling at Silver View Park.
3. Disced and seeded Hillview Park drainage area, Silver View field and Greenfield
Park.
4. Re -plumbed, repaired and turned on the drinking fountains.
5. Installed the drinking fountain, picnic tables, grill and bench at Hillview Park.
6. Installed rules and regulations, and curfew signs at parks.
7. Landscaping of Hillview Park building.
Four projects that have been contracted out for completion are:
1. Sprinkling system installed at Silver View Park.
2. Carpentry work at Hillview Park building.
3. Security lighting system installation at Greenfield Park (not yet complete).
4. Re -roofed Random Park building.
-2-
1. Seedling planting at Greenfield Park with Girl Scouts.
2. Planted shrubs along Random Park parking lot.
3. Planted City Hall flowers.
4. Planted flowers in park sign entries.
S. Supervised planting project on the triangle of County Road I, Pinewood Drive
and Quincy Street with Pinewood School.
6. Assisted in the coordinating and planting project at Pinewood School
playstructure location.
7. Replaced several trees at Silver View Park with monies donated from the Odas
Newton family.
8. Removed trees as necessary.
9. Trimmed trees as necessary.
10. Performed woodpile and noxious week inspections.
MS/SL
lupe W
O -r opz ��fG '-�
bGn--bgL
,gl.
g89f-os
L�rh��.�L,
*�?Rq (W -�d )zfiG
I/
dSbJ
lv-a�
?7�7U