Loading...
HomeMy WebLinkAbout06/22/1989CITY OF MOUNDS VIEW PARKS AND RECREATION COMMISSION MEETING AGENDA June 22, 1989 6:30 p.m. Mounds View City Hall Council Chambers I. CALI, TO ORDER ✓II. REVIEW MAY 25, 1989 COMMISSION MINUTES III. AGENDA ADDITIONS V/rV. OAKWOOD PARK IMPROVEMENTS /V. SILVER VIEW PARK PICNIC SHELTER VVI. SILVER VIEW PARK PATHWAY ✓6II. MVCI' REPORT -FRANK SILVIS> ✓VIII. COUNCILMEMBER'S REPORT> ✓IX. CHAIRPERSON'S REPORT> /X 1tEC1tEATION AGTMTY REPORT /Xi PARK PROJECT UPDATE XII. ADJOURNMENT MINUTES OF THE PROCEEDINGS OF THE PARKS AND RECREATION COMMISSION CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA May 25, 1989 7:30 p.m. Mounds View City Hall Council Chambers CALL TO ORDER The meeting was called to order at 7:30 p.m. by Chairperson Wayne Burmeister. ROLL CALL Commissioners present: Burmeister, Long, Silvis, Starr, Stevenson and Trettel. Staff present: Director Saarion APPROVAL OF MINUTES Commissioner Silvis made a motion which was seconded by Commissioner Long to approve the minutes of April 27, 1989. Motion carried: 6 ayes, 0 nayes. CHAIRPERSON'S REPORT Chairperson Burmeister updated the Commission regarding additional appropriations from the Spring Lake Park Lion's Club for Lakeside Park improvements. These appropriations are ear -marked for the retaining wall and beachhouse patio. REPORT ON PARK CLEAN-UP Commissioner Starr reported on the clean-up at Hillview Park. She said that five eager, hardworking people helped clean, weed and rake Hillview Park. A thank you letter is being sent to each person. Commissioner Starr also reported that several people came and stopped at the park, inquired about the activity, but did not help. Commissioner Trettel reported on the clean-up at Silver View Park pond. Several truckloads of junk were hauled out of the pond and litter was collected along the pathway. Commissioner Trettel announced the businesses that donated food including Dominoes Pizza and Super America. Staff has submitted articles and pictures to both local papers although, the articles at this date, had not been published. Letters of thanks to the helpers will be sent to those whose names we have. Park and Recreation Commission May 25, 1989 minutes Page two OAKWOOD PARK Two grading proposals prepared by SEH were reviewed. The Commission's opinion was that the one plan was too extravagant. Other suggestions were offered on one of the plans to provide for a little more crowning on the ballfield diamond. Staff will offer the suggestions to SEH and request revised plan. The list of Oakwood Park improvements suggested by the Commission is: A rox. Cost Site Preparation $8,000.00 (1) Play equipment 11,000.00 (1) Bleachers 334.00 (1) Backstop 2,000.00 (2) Players benches 500.00 Ag lime infield 2,000.00 Sand volleyball court 1,500.00 Water fountain 1,000.00 Path realignment 1,000.00 Picnic area: 2 tables 700.00 2 grills 180.00 Horseshoe court (4) 500.00 $28,714.00 It is anticipated that a portion of the SYSCO park dedication fees would be used to fund these Oakwood Park improvements. The Commissioners agreed that residents living around Oakwood Park should be invited to the June 22 meeting. Staff will send letters of invitation. The main objective is to relay the Commission's improvement plans for Oakwood Park as suggested by the residents per the survey and the March 16 Commission meeting. SILVER VIEW PARK PICNIC SHELTER The Mounds View Lion's Club currently has plans for a Silver View Park picnic shelter out for bid. If price quotes are acceptable to the Lion's Club, the Club will be requesting approval to building the picnic shelter. Commissioners expressed their desire to have water, sewer and electric utilities put in at the same time that the Lion's are building the picnic shelter in order to complete the project. Parks and Recreation Commission May 25, 1989 minutes Page three SILVER VIEW PARK PICNIC SHELTER (CONT'D) The Commission discussed using Park Improvement Funds for such a project (estimated at $33,000). However, the Commissioners decided to bring a request to the City Council for the funding of such utilities from other sources so that the Park Improvement monies could be spent on other park improvements. The Commission agreed to attend the City Council agenda meeting on June 5 to discuss options for funding Silver View Park utilities. RECREATION PROGRAM REVIEW Director Saarion reviewed some of the summer programs which already began and provided information on a few which will begin after school concludes. Commissioner Silvis reported on the status of MVCT "Sound of Music" production schedule. ADJOURNMENT A motion was made by Commissioner Stevenson and seconded by Commissioner Starr to adjourn the meeting at 9:00 p.m. Motion carried: 6 ayes, 0 nayes. Respectfully submitted, Mary Saarion, Director Parks, Recreation and Forestry C(t4 Of RAMSEY COUNTY, MINNESOTA 2401 HIGHWAY 10 MOUND@ VIEW, MINN: 55112 794-3®§§ June 16, 1989 Dear Parks and Recreation Commissioners: The highlight for this coming meeting will be Oakwood Park improvements. The meeting is scheduled for Thursday, June 22 at 6:30 p.m. at City Hall. Residents from around the Oakwood Park area have been invited to attend. The preliminary site plan will be reviewed. Recommendations to be considered are park improvements plan and funding source and time -line. We must also review the Silver View picnic shelter plans provided by the Lion's Club. A recommendation of the plan and utilities installation must be decided to be presented to the City Council. Finally, we must discuss Silver View Park pathway extension, as well as review updates in parks and recreation activities. These important topics will make for an interesting meeting that will hopefully result in some decisions for recommendations to the City Council. If you are not able to attend the meeting, please notify me at 784-3055. Sincerely, Mary Saarion, Director Parks, Recreation and Forestry MS/SL June 13, 1989 Good Day: cif viowdgvipw RAMSEY COUNTY, MINNESOTA 2401 HIGHWAY 10 MOUNDS VIEW, MINN. 55112 7843055 You are invited to attend the Parks and Recreation Commission meeting to be held on Thursday, June 22, 1989 at 6:30 p.m. at City Hall. The featured topic on the agenda is discussion regarding a site plan for Oakwood Park improvements. This site plan offers facilities as prioritized by residents who attended the March Parks and Recreation Commission meeting and from the Oakwood improvement survey results. The Commission would like to hear your thoughts regarding the site plan. Sincerely, Mounds View Parks and Recreation Commission MEMO TO: PARKS AND RECREATION COMMISSION FROM: MARY SAARION, DIRECTOR PARKS, RECREATION AND FORESTRY DATE: NNE 14, 1989 SUBJECT: PARK IMPROVEMENT FUND The Park Improvement Fund is an accumulation of monies paid to the City by developers who subdivide land. These monies are dedicated for park improvements. As of today, this fund is $66,203.91. The SYSCO development will be paying $50,000 to the Park Improvement Fund. This money will most likely be received sometime in December. This money must be received before December 31, 1989. The Parks and Recreation Commission is contemplating two projects including Oakwood Park improvements at $29,000 and Silver View Park picnic utilities at $34,000. Both projects reflect a $63,000 expenditure. If both projects are completed with the estimated costs, the Park Improvement Fund will show a $53,203 balance. MS/SL MEMO TO: MAYOR AND COUNCILMEMBERS FROM: MARY SAARION, DIRECTOR PARKS, RECREATION AND FORESTRY DATE: MAY 31, 1989 SUBJECT: OAKWOOD PARK IMPROVEMENT PLAN The Parks and Recreation Commission has been working on ideas for an Oakwood Park improvement plan. Ideas for this plan originated from residents who were invited to a meeting for their input on needs at Oakwood Park. A survey was sent to surrounding residents requesting ideas for Oakwood Park improvements. The Commission has spent the last two meetings discussing prices, site plans and needs for park improvements at Oakwood. Here is a list, approximate cost and total cost of a plan for Oakwood Park. This plan will be open for review by residents who will be invited to the .lune 22, Park and Recreation Commission meeting. The Parks and Recreation Commission proposes to fund these Oakwood Park improvements with a portion of the $50,000 Park Dedication Fees received in 1989 from Sysco, Corp. IMPROVEMENTS Site preparation Play equipment Bleachers (3 tier) Backstop Two (2) players benches Ag -lime infield Sand volleyball court Water fountain Path re -alignment Two (2) picnic tables One (1) picnic grill Four (4) horseshoe courts APPROKIMATE COST $ 8,000.00 11,000.00 334.00 2,000.00 500.00 2,000.00 1,500.00 1,000.00 1,000.00 700.00 180.00 500.00 $28,714-00 The site grading plans will be at the meeting for review. The proposed plan offers adequate drainage using a crowning affect on the infield. SEH provided an alternate plan which offered much better drainage at twice the cost. The Commission reviewed the two SEH plans and offered revision ideas for the first less expensive plan to offer some additional drainage with minimal cost increase. This revised plant is the one recommended by the Parks and Recreation Commission. MS/SL Z wo aln O/?/,rW OO"o MEMO TO: MAYOR AND COUNCILMEMBERS FROM: MARY SAARION, DIRECTOR PARKS, RECREATION AND FORESTRY DATE: JUNE 1, 1989 SUBJECT: SILVER VIEW PARK PATHWAY EXTENSION PROJECT The materials cost of the pathway extension has been budgeted in 1989. It was originally planned that City staff would perform the pathway installation. However, the heavy schedule of Public Works does not allow timely installation of this pathway (early sumer) as indicated to the residents. Therefore, staff has requested bids on this project. Three bids were received. Those bids are attached. I have performed reference checks on each and I am prepared to discuss each proposal at the agenda meeting. It has also been recommended and staff agrees that installation of a large culvert at the west side storm water sewer outlet would be a wise investment. This culvert would allow park maintenance vehicles to drive on the trail and over the ditch for greater efficient trail maintenance. The cost of the two culvert options are: Option #1 - 48" culvert $ 6,500.00 Option #2 - Metal arch $13,000.00 Option #3 - Inexpensive pedestrian bridge which would barely allow a small pick-up. $20,000 - 25,000.00 The size and style of the second culvert option has been recommended by City Engineer Minetor. It will be large enough to handle the five year storm. The budget has $3,157.00 for materials cost for the basic trail extension which will basically cover the materials costs of all the proposals (except the asphalt option). The additional options of labor for contracting the work and the cost of installation and purchase of a culvert is additional unbudgeted expenses that could be funded with monies from the Park Improvement Fund. Staff will be in attendance at the agenda meeting to discuss this park project and seek direction from the council as to how this project should proceed. MS/SL Attachment BID SUMMARY SHEET MIDWEST LANDSCAPING TOTAL ...... $6,077.00 Labor ...... $2,609.00 Materials .. 3,468.00 References: City of Maple Grove City of Coon Rapids DARRELL'S CONTRACTING INC. Option #1 Crushed limestone with mat $9,250.00 Option #2 Crushed asphalt and concrete without mat $5,165.00 Option #3 Crushed asphalt and concrete base and blacktop $12,750.00 References: City of Blaine Buzzell Masonry GREENS FOREVER LANDSCAPING (Does not have equipment to install culvert) TOTAL ..... $4,946.00 Labor ..... $1,782.00 (additional $200.00 packing - has never packed before) Materials.. 3,164.00 miDwerr LnnDfcApinG PROPOSAL: Sheet No.: 1 of 1 Date: 5/11/89 Proposal Submitted To: Work To Be Performed At: City of Mounds View Silverview Park 2401 Highway 10 Trail Connection Mounds View, MN 55112 Attn: Mary Saarian We hereby propose to furnish all the materials and perform all the labor necessary for the completion of: Excavate 725' x 8' x 4" 2,009.00 Install GTF 200 Geotextile Fabric 908.00 Install 3/16 minus Limestone 4" Deep 2,560.00 Pack Limestone 600.00 $6,077.00 All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted, and completed in a substantial workmanlike manner for the sum of 6 , 077 • 00 Dollars. W ch payment to be made as follows Payment in full_ due in -30 --days from substantial completion. A 2N se'rvice charfie will 6e as essed.oirl1 the 31st day and a ch month they afte til paid. Any alterations or devta ion from above specifications rnvnlving extra costs. wtli be exec on only upon written oreders, anE ,8 become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry tire. tornado. and other necessary insurance upon above work. Workmen's Compensation and Public Liability Insurance on above work to be taken out by Midwest Landscaping.' Respectfully submitted Note - This proposal may be withdrawn by us if not accepted within 120 days. Warranty: Midwest Landscaping will replace (once any tree orshrub that fails to live I'orune veal- front date ol'plartring provided: plants have been properly maintained, the los has been reporter) within t hat year. [he loss has not been caused Crum insects M' disease. and the account has been paid according to terms. ACCElYrAINCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to du the work as specified. Payment will be made as outlined above. I understand an additional service charge 42",, per month on the iverduv halance may he charged if payment is not made as specified. Date Signature ='` � : :'E;JUE `JCRTH - MAPLE GRCVE. MN 55369 ,6121 -:20-4201 GREENS FOREVER LAN1)SCAPI NV Jay Clemens 755-5628 Name: Phone: MATERIAL: Timber ........................... Spikes... ... .;. -*.4, Rock... ✓tf . ��rn... .. o.... , Edging ........................... Stakes.:: Plants & Shrubs... ............• Trees... .... .. ...p �... Black Dirt ....................... Sc.brat........................... Other ............................ Total Material • + 6% Sales 'fax -E;z.r /'07% LABOR: General Labor $- Sod Labor lJ $ 3 .f.44.. Total Labor $ j JTg1.Va TOTAL: ........................................... $ ,q35 70 T �1C��-r� s! ►n7 e THANK YOU rignature w ' [ D�j �tt� s 6 V t. -o(� • y , �, � � - 7s'v � � �� o -o goo co _7� R 7s- w,. bou"g" T C`7?y - 52yyl MEMO TO: PARKS AND RECREATION COMMISSION FROM: MARY SAARION, DIRECTOR PARKS, RECREATION AND FORESTRY DATE: MAY 31, 1989 SUBJECT: ESTIMATED PRICES FOR SILVER VIEW PARK UTILITIES The estimated costs of installing utilities at Silver View Park are summarized below: 1. ELECTRICITY - coming across Silver Lake Road and underground to shelter. 2. WATER - coming off County Road I with 6 inch pipe, underground approximately 7 feet.to picnic shelter. 3. SEWER - going to main connecting Manor Homes, across pond narrows to home development. Approximate total cost MS/SL $ 5,600.00 16,033.00 10,540.00 $32,173.00 TO: MAYOR, CITY COUNCIL, PARK AND RECREATION DIRECTOR FROM: POLICE CHIEF DATE: JUNE 15. 1989 SUBJECT: SECURITY AT PROPOSED SHELTER BUILDING AT SILVER VIEW PARK I reviewed the site plan on the proposed shelter building at Silver View Park. It is my understanding that the building will be constructed with concrete blocks and the perimeter will be acequaze l y l it. At toe proposed site, I see no great concern regarding security of the building. Obviously, theft and vandalism can occur anywhere, however the Proposed site offers no greater risks than other Park buildings in the City. MEMO TO: PARKS AND RECREATION COMMISSION FROM: MARY SAARION, DIRECTOR PARKS, RECREATION AND FORESTRY DATE: NNE 14, 1989 SUBJECT: PARK PROJECTS Work in the parks has been non-stop since our last meeting. Two seasonal groundskeepers have been mowing using the 6' and 15' mowers almost non-stop, five days a week from 7:00 a.m. until 3:00 p.m. and still we are barely keeping up with grass growth. The other two seasonal employees perform daily field grooming duties, dump trash twice a week and perform such tasks as putting in signs, picking up materials, repairs of equipment and buildings, and other last-minute needs for programs. The full-time employees have performed such projects as: 1. Finished the sprinkling system pit installation. 2. Completed the curb backfilling at Silver View Park. 3. Disced and seeded Hillview Park drainage area, Silver View field and Greenfield Park. 4. Re -plumbed, repaired and turned on the drinking fountains. 5. Installed the drinking fountain, picnic tables, grill and bench at Hillview Park. 6. Installed rules and regulations, and curfew signs at parks. 7. Landscaping of Hillview Park building. Four projects that have been contracted out for completion are: 1. Sprinkling system installed at Silver View Park. 2. Carpentry work at Hillview Park building. 3. Security lighting system installation at Greenfield Park (not yet complete). 4. Re -roofed Random Park building. -2- 1. Seedling planting at Greenfield Park with Girl Scouts. 2. Planted shrubs along Random Park parking lot. 3. Planted City Hall flowers. 4. Planted flowers in park sign entries. S. Supervised planting project on the triangle of County Road I, Pinewood Drive and Quincy Street with Pinewood School. 6. Assisted in the coordinating and planting project at Pinewood School playstructure location. 7. Replaced several trees at Silver View Park with monies donated from the Odas Newton family. 8. Removed trees as necessary. 9. Trimmed trees as necessary. 10. Performed woodpile and noxious week inspections. MS/SL lupe W O -r opz ��fG '-� bGn--bgL ,gl. g89f-os L�rh��.�L, *�?Rq (W -�d )zfiG I/ dSbJ lv-a� ?7�7U