HomeMy WebLinkAbout08/24/1989CITY OF MOUNDS VIEW
PARKS AND RECREATION COMMISSION
August 24, 1989
6:30 p.m.
Mounds View City Hall
Council Chambers
CALL TO ORDER
REVIEW JULY 27, 1989 COMMISSION MINUTES
III. COUNCILMEMBER'S REPORT
CHAIRPERSON'S REPORT ;{ o
AGENDA ADDITIONS' s
REVIEW "FESTIVAL IN THE PARK' PLANS
DISCUSS LETTER REGARDING BICYCLE PATH ALONG OLD
HIGHWAY 8
V REVIEW RESIDENT'S LETTER REGARDING SILVER VIEW
PARK PATHWAY
INFORM COMMISSION ON UPCOMING PROGRAMS
UPDATE REGARDING ARSENAL PLAYFIELD
REVIEW THE REVISED PLANS FOR THE SILVER VIEW PARK
PICNIC SHELTER
X\1. REVIEW PARK MAINTENANCE RESOLUTION WITH
COUNCILMEMBERS
XIII. OPEN FORUM FOR TOPICS OF DISCUSSION WITH
COUNCILMEMBERS
XIV. ADJOURNMENT
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
July 27, 1989
Mounds View City Hall
Council Chambers
6:30 p.m.
CALL TO ORDER The meeting was called to order at 6:35 p.m. by
Chairperson Wayne Burmeister.
ROLL CALL Commissioners present: Burmeister, Long, Silvis,
Starr, Stevenson and Trettel.
Councilmembers present: None
Staff present: Director Saarion, Administrative
Assistant Linke and Student Intern Johnson.
APPROVAL OF MINUTES A motion was made by Commissioner Silvis,
seconded by Commissioner Long to approve the June
22, 1989 minutes as written. Motion passed:
6 ayes, 0 nayes.
CHAIRPERSON'S REPORT Chairperson Burmeister reported that the Lakeside
Park Beach House was 99 percent completed with
only small items remaining such as door handles,
locks, and some restroom fixtures which are on back
order. Director Saarion stated that at this time, the
door handles and locks had arrived and have been
installed.
Chairperson Burmeister stated that concrete curb
stops around the parking lot had been added to deter
cars from driving on the park grounds. He added
that a dedication ceremony for the beach house will
be planned at a later date, after total completion of
the project.
Commissioner Starr inquired about landscaping of
the area. Chairperson Burmeister stated that he had
measured the area for sod installation and that the
Lion's will have a work day to lay the sod.
-2 -
Commissioner Long asked if the attendance had been
down at the beach. Director Saarion stated that it
had been down quite a bit. Inquiries at other
beaches show low attendance also for reasons
undetermined.
The Commission asked about the installation of the
volleyball courts. Director Saarion stated that
Midwest Asphalt will remove the asphalt from the
tennis court. After that, the sandlot volleyball court
would be installed in that same area.
AGENDA ADDITIONS Director Saarion had five additional items for the
agenda which will be added to the end of the
original agenda. They are:
1. Five Year Capital Improvement Plan review.
2. Long Term Financial Plan review.
3. Culvert at Silver View Park.
4. Silver View Picnic Shelter.
5. Consideration of student commission members.
SILVER VIEW PARK
MASTER PLAN PROPOSAL Director Saarion reviewed her memo to the
Commission regarding the establishment of an in-
house master plan for improvements at Silver View
Park. She requested that the Commission review
each item and be very specific as to changes or
additions.
First, staff reviewed the facilities which are currently
developed at Silver View Park. These include:
1. Woodchipped pathway - the Commission
requested that staff continue to budget for
replacement of wood chips with ag lime (750'
x 8' strip) each year in the operations budget.
2. Two adult softball fields with irrigation.
3. Landscaping - continually rearranged as
needed, by forester.
4. Paved/curbed parking lot entry.
-3-
5. Soccer field - plans to connect with softball
field irrigation system.
6. Hard -surface play court - still needs lining.
7. Benches along the pathway - a couple of
benches need to be moved, as they are
beginning to be grown with bushes.
8. One (1) swing bench - the bench is in good
shape, and the Commission would like to see
another one installed at the other end of the
park.
9. Sliding hill - Director Saarion stated that the
installation of the sliding was installed
because the contractor needed an area to
dump construction materials, rocks, etc. This
then put the original map out of proportion
because that was originally a flat area.
10. Amphitheater - Staff suggested possible
changes, as the steep sides of the
amphitheater are a hazard. Two possible
solutions were discussed:
a. Use it as a "slide" hill with a variety of
different slides such as wave slides and
tube slides.
b. Using a grader to terrace or more
gently slope amphitheater.
Commissioner Stevenson suggested that the
"slide" hill may be combined with a tot lot to
make a play area. The Commission agreed
that the amphitheater be designated as an
area of future redevelopment for possible play
areas.
11. Portable restroom enclosures.
12. Signs - additional signs were suggested
for each entry point to the park, rather
than just the two main entries.
-4-
13. Two pathway bridges - one bridge to
be replaced with a culvert due to a
request by the public works department
and approved by the City Council.
Staff requested that the Commission review
proposed items for Silver View Park and make
any additions or changes:
1. Large picnic shelter with water, sewer
and electricity - the Commission
strongly stated that this was of the
utmost importance to the usability of
the park and that the installation of the
water, sewer and electricity should
coincide with the construction of the
picnic shelter.
2. Play equipment with accessibility for
walking impaired persons.
3. Twin sand volleyball court.
4. Horseshoe pits.
5. Exercise course along the pathway
north on the side of the pond -
Commissioners didn't feel that this was
a high priority item.
6. Bituminous pathway around the upper
portion of the park, connecting activity
areas.
7. Water fountain near athletic fields.
8. Gazebo type construction near softball
fields.
9. Bleachers for soccer field and softball
field spectators.
10. Softball field scoreboard.
11. Additional picnic tables and grills.
12. Bike racks.
"FOCUS NEWSPAPER' ARTICLE
OAKWOOD PARK
IMPROVEMENT UPDATE
PARK MAINTENANCE STANDARDS
-5 -
13. Trash cans.
14. Pond management program.
The Commission directed staff to write a
resolution to be submitted to the City Council
for approval, encompassing all of the additions
and changes to the Silver View Park Master
Plan as recommended by the Parks and
Recreation Commission.
Commissioner Long requested that staff write
an article for the City Newsletter to let the
public know the many projects that have been
completed in the parks in the last five years.
Director Saarion distributed a copy of an
article which ran in the Focus Newspaper
regarding Silver View Park. Director Saarion
did call the reporter to request that in the
future, should the reporter write articles about
the parks, that she call Director Saarion to
verify that the information is accurate.
Director Saarion reported that the City Council
approved the proposed improvements at
Oakwood Park. Staff has ordered the
equipment and installation will begin as soon
as possible. The playground equipment will
be installed by an outside contractor rather
than in-house. SEH, consulting engineers for
the City, estimate that 500 cubic yards of fill
will be needed. Staff added that the new
backstop has been ordered as well.
A draft resolution accepting the standards will
go to the Council on August 7.
At this time, it is unsure if a meeting between
the Park and Recreation Commission and
Council is still planned. Staff will notify the
Commission of any meeting changes.
FIVE YEAR CAPITAL
IMPROVEMENT PLAN
M
Director Saarion distributed and reviewed a
memorandum that was sent to the City
Council on January 26, 1989 regarding the
Commissions yearly revision of the Five Year
Capital Improvements Plan. The Commission
made the following revisions:
1990
Silver View Park play facility $ 8,000.00
Floor replacement at:
Groveland Building 1,000.00
Hillview Building 1,000.00
Woodcrest Building 1,000.00
Silver View twin volleyball
sandlot court 1,500.00
A motion was made by Commissioner Long,
seconded by Commissioner Stevenson to
change the 1990 $8,000 designated for
Oakwood play structure to be used for Silver
View Park play structure and to leave the
other 1990 expenditures as previously
proposed. Motion passed: 6 ayes, ^v nayes.
1991
Woodcrest hockey boards
replacement $5,000.00
Handicapped play equipment
for Silver View Park 7,500.00
1992 - Last year of Everest Development Park
Dedication monies.
Play equipment for older
children at Silver View $2,500.00
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to use the
$5,000 originally proposed for the exercise
trail at Ardan Park and the $2,500 remaining
funds for the construction of handicapped play
equipment in 1991 at Silver View Park.
-7 -
It was moved that the 1992 park dedication
funds, in the amount of $12,500, be used to
construct play equipment for older children at
Silver View Park, thus completing a three
phase playground construction. It was further
moved that the 1993 proposed hard court
surface at Lambert Park for $7,500 and the
construction of a small picnic shelter at
Greenfield Park for $5,000 remain the same.
The motion passed: 6 ayes, 0 nayes.
1993 - Must be requested from general fund if
park improvement funds are not sufficient.
Hard court surface at Lambert $7,500.00
Greenfield Picnic Shelter 5,000.00
The Commission directed staff to write a
resolution to be submitted to the City Council
proposing the above changes to the Five Year
Capital Improvement Plan.
LONG TERM FINANCIAL PLAN Staff distributed copies of the 1989 proposed
Long Term Financial Plan and reviewed it
with the Commission. After a lengthy
discussion regarding the proposed Arsenal
playfield and the SYSCO land use study and
parks survey, the Commission recommended
the following changes to the Long Term
Financial Plan:
1990
Change Oakwood Play Facilities to Silver View
Play Facilities - $8,000 - Park Dedication
Fund.
Remove $1,000 for feasibility study for Silver
View Park pond bridge - to be done in-house.
After a lengthy discussion regarding the
proposed Arsenal Play Field, the Commission
stated that they agreed with the concept of
the combined three city Arsenal Play Field, but
felt it was speculative at this time and that to
tie $50,000 for the project was unrealistic.
The Commission requested staff to write a
resolution including these points:
The playfield is still a speculative
concept.
- The playfield development costs are
speculative.
The city, as a partner to a plan that
does not have a cost.
Since the city is mostly interested in
soccer fields, offer an amount that
typically would cover development
costs.
Explain how the cities' interests are in
the plan.
Explain who would most likely receive
user fees.
In-kind services are as important and
may possibly be of value in lieu of
monetary contribution.
MW
The Commission recommended that monies
allocated for a bridge at the Silver View Park
pond narrows be removed. The Cor:unussiOn
requested staff to write a resolution stating
these reasons:
- Higher traffic.
People may jump off.
People may throw trash and litter into
pond.
It costs a lot of money.
A pathway offers an avenue around the
pond at a lesser cost.
- A bridge encourages "short cut" use
rather than exercise.
- Money could be better spent.
- A bridge ruins the natural aesthetics of
the pond.
- A bridge may alter geese landing
patterns.
- A bridge breaks up the continuity look
or appearance of the pond.
-9 -
The Commission proposed that the $20,000
for the Land Use Study and Parks Survey be
delayed. The Commission does not feel that
there is sufficient money currently available
for development of this newly acquired land.
The Commission further proposed that when
the study is done, that it be funded through
the General Fund, rather than the Park
Dedication Fund, as other studies have been in
the past.
The Commission requested staff to write a
resolution including these points:
- The land is not yet all available.
- Much of the area is wetland.
- The land may be used for other city
functions.
- The opinion that the cost of the survey
should not come from the Park
Improvement Fund.
- As a priority, the Commission believes
the study is a low priority.
The opinion that even if a study were
done, where is the money for
development?
1992 and 1993
No changes proposed.
The Commission directed staff to write a
resolution to be submitted to the City Council
proposing the above changes to the 1989
Long Term Financial Plan, for approval.
CULVERT INSTALLATION AT SILVER Director Saarion reviewed the past Council
VIEW PARK action regarding the Public Works request for
a $13,000 culvert at Silver View Park to be
funded out of the Parks Improvement Plan.
The Commission was opposed to the entire
funds coming from the Parks Improvement
Fund. The Commissioners stated that because
the culvert will aid the Public Works
Department and also be an asset to storm
water management, that these funds should
share in the expense.
SILVER VIEW PICNIC SHELTER
STUDENT COMMISSIONERS
-10 -
The Commission requested that staff research
into past practices for the possibility of
funding such projects from more than one
funding source.
The Commission directed staff to write a
resolution to the City Council, with supporting
documentation, to request that one-third of
the funds come from the Park Dedication
Fund, one-third from the General Fund and
one-third from the Storm Water Management
Fund.
Director Saarion reviewed Mayor Hankner's
resolution with the Commission regarding the
utilities at Silver View Park. After a lengthy
discussion, Commissioner Silvis moved to
direct staff to write a resolution to the City
Council stating that after revisions to the Long
Term Financial Plan as proposed by the Parks
and Recreation Commission, there should be
sufficient funds in the Park Dedication Fund to
adequately fund the installation of sewer,
water, and electricity for the Silver View Park
picnic shelter. The motion was seconded by
C oaun issioner Long. Mlotion passed: 6 ayes,
0 nayes.
The Commission was asked to consider the
possibility of student representatives on the
Commission. After discussion, the Commission
stated that student commissioners would be
acceptable, although they would suggest that
students not be voting members and would
not be considered necessary for a quorum.
ADJOURNMENT A motion was made by Commissioner
Stevenson, seconded by Commissioner Long to
adjourn the meeting at 10:00 p.m. Motion
passed: 6 ayes, 0 nayes.
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
August 16, 1989
Dear Commissioners:
I
cit� of V0UnC'gV11QW
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
7843055
The regular August Parks and Recreation Commission meeting will be held at 6:30
p.m. at City Hall Council Chambers on Thursday, August 24, 1989. City
Councilmembers will be in attendance to discuss topics in an open forum atmosphere.
If you have ideas, questions, or suggestions regarding parks and recreation issues this
is the time to voice them. The Council will also be reviewing with you and discussing
the proposed maintenance resolution.
If you are unable to attend this meeting, please call and notify the office at 784-3055.
Thank you.
Sincerely,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
Enclosure
MEMO TO: MAYOR AND COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: AUGUST 16, 1989
SUBJECT: UPDATE ON "FESTIVAL IN THE PARK" ACTIVITIES
SHOWMOBILE ENTERTAINMENT
Noon - 12:45 p.m.
1:00 - 1:30 p.m.
2:00 - 2:45 p.m.
3:00 - 7:00 p.m.
FIREWORKS
Kitchen Kut -ups
MVCT "Sound of Music"
Steel Drum Band
Rockin' Hollywoods
Dusk is at 7:20 p.m. so the fireworks display is planned to begin at 8:00 p.m.
NON-PROFIT GROUP ACTMTIES
These groups are not charged a fee and funds raised go towards their organization.
1. MVCT - face painting.
2. Early Childhood Family Education - children's games.
3. IHS Cheerleaders - cake walk.
4. IHS Hockey Moms - sports games/raffle/donuts, coffee and cider.
5. Lindy's Gymnastics Club - bingo
SPORTING ACTIVITY & SPECTATORSHIP
1. Softball tournament championship games.
2. Volleyball tournament.
CRAFT BOOTHS/FLEA MARKET - $10.00/booth
Six currently registered.
FOOD CONCESSIONAIRES - $75.00 fee
1. John Olson
2. Betsy Medley
3. Domino's Pizza
-2 -
NON -PROFIT FOOD FUND RAISERS - No charge
1. Cross of Glory Church - Queen's apples.
2. Mounds View Lioness Club - Ice cream/coffee
3. Mounds View Lion's Club - Hot dogs/brats/pop
The department is currently pursuing participation by the Irondale High School
Marching Band, local PTA's and an organization to sell popcorn.
MS/SL
August 14, 1989
Mr. Ken ;deltzein
Ramsey County Engineer
3377 N. Rice Street
St. Paul, MN 55126
Dear Mr Weltzein:
I was directed to you after placing calls to both Mounds View City
Offices and Ramsey County Public Works, and I wish to apprise you
of my concerns regarding a potentially serious and dangerous
situation.
I refer to the section of Old Highway 8 in Mounds View, as it runs
from the New Brighton/Mounds View City limits, north to the
intersection of Highway 10 and County Road H, within Ramsey County.
I drive and ride a bicycle, as do my children, frequently along
that roadway. I have seen and been involved in accidents and close
calls for accidents due to the narrow width of the roadway and
unpaved shoulders. It is not possible to ride a bicycle on the
sand shoulder. Because there is no other route to get to the
southbound Highway 8 area from Mounds View, non -motorized traffic
must use this dangerous course.
As you are probably aware, Old Highway 8 was upgraded South of that
location to four lanes and wide gutter areas, making it ok for
bicycle traffic. But when it enters 11ounds View, for only a few
city blocks, it is narrowed down to two lanes wide enough for only
two motor vehicles to pass. Due to the industrial area in New
Brighton, this road bears large trucks and many other vehicles. I
have been forced off the road onto the shoulder more than once
while bicycling, and have observed other close calls with
bicyclists and pedestrians. Saturday, I was again forced into the
freeway fence by a truck, and I fear it is just a matter of time
before a child or other person gets killed.
I learned that there are plans to change the roadway somewhat in
the next few years and possibly something can be done then, but I
don't think this is a situation that can wait. In the interim, I
would like to see a paved shoulder added or a even a separate
bicycle/pedestrian path or sidewalk away from the roadway, which
could probably be retained even when the upgrade of the road does
commence. Perhaps the City and County park departments can work
together in finding a solution to the problem.
I understand that New Brighton plans to add a bicycle path along
Old Highway 8 in the very near future and is involved with park
development around the Long Lake area. Additionally, there is much
new industrial and business development in this area of Mounds
View, with even more construction underway. These will surely
increase the traffic and intensify the severity of this dangerous
situation.
I would be happy to discuss this further with you or any other
official who can initiate a resolve to this situation. If there
is anything else I can or should do please let me know. I would
like to see something done in the very near future, and feel that
it would not have to be a costly solution. An asphalt trail would
be a small price for the protection of citizens' lives.
I thank you for your attention in this urgent matter.
You s ver trul ,
Don McNamara Ph. 786-5551
5551 St. Stephen Street
Mounds View, MN 55112
cc:
Mounds View Mayor, Sue Hankner
Mounds View City Council Members
Mounds View Public Works Dept.
Mounds View Parks Commission
Ramsey County Parks Commission
Ms. Susan Hankner
Mayor
City of Mound View
2401 Highway 10
Mounds View, MN 55112
Dear Sue:
August 11, 1989
I would like to take this opportunity to summarize some of the events that have led to our
frustration with the Silver View Park path extension.
1. In November 1985, I purchased my home at 7405 Park View Drive. At that time, the
builder briefly discussed the future plans of Silver View Park including a bridge at the
narrows.
2. In
the spring of
1988, I met with other residents, then mayor
Jerry Linke,
and
Mary
Saarion
at the path
site where we expressed our concerns and
objections to
the
path
extension. One of our specific objections had been its proximity to
our lot line.
We
were
told at
that time that before anything was decided, a plan would
be done showing the
exact location of the
path. The residents would have an opportunity to review
the
plan
before
any decision
was reached.
3. A meeting was later held with the forrester where planting options were discussed. I
was unable to attend this meeting, but I have been informed that a plan for the path was
not available for the residents to review.
4. In June 1989, I
attended
a Park
& Recreation meeting
where I was told by the
commission that the
copy of
the Silver View Park master
plan blueprint that I had
recently seen, which
included a
bridge
at the narrows and no
path extension, had never
been approved. We
were told
that the
only master plan for
Silver View Park was the
brief reference in the
1981 Master Plan
book.
Note: The blueprint I had seen was one that had been given to Carol and Steve Golden by
the Mounds View Park Commissioner. The Goldens had requested confirmation prior to
purchasing their home in 1983 that no path would be constructed behind the private
homes. This blueprint was provided to them at that time.
5. My husband, therefore, went to city hall and requested a copy of the master plan done
in 1981 so that we would be aware of the plans that had been approved.
6. However, after extensive research, we have found Park & Recreation Commision and
City Council meeting minutes which document the approval of the Silver View Park
Master Plan.
Park & Recreation Commission 4-23-81
City Council 4-27-81
The dates of these meetings correspond with the dates on the Goldens' blueprint.
7. At the August 7, 1989 City Council meeting, there was no denial by the Park &
Recreation attendees that a master plan exists. Instead, they commented that it is
continually being updated and changed. My interpretation of this is that there is a
master plan, but that the Park & Recreation Commission has decided not to follow it. It is
my understanding, that significant changes to the plan (i.e. path extension, elimination
of a bridge, grossly expanded picnic shelter, etc.) requires public notification and
hearings to determine the requirements of the residents, as well as, to ensure those
changes fit in with the intent of the original master plan.
8. In July 1989, 1 attended a City Council meeting and was surprised when I was told that
the path had been approved. I had expected that Mary Saarion would keep her word
when she said in the spring 1988 meeting and subsequent meetings and letters that the
residents would have an opportunity to see the plan before anything was approved. As
far as I know, none of the residents directly impacted by the path had seen the plan
prior to its approval. As a matter of fact, there are several of us who did not even know
that it had been approved.
9. Since that time, I have contacted the city and requested all the background
information that went into the approval of the path. I have received copies of several
memos, but to date, I am still waiting for a copy of the Council minutes when it was
approved so I can find out when it happened.
10. 1 would like to comment on a memo from Mary Saarion to the Mayor and Council
Members dated June 14, 1988 (see attached).
• When questioned why the wood chip path did not extend around the entire pond,
an appropriate response would have been that the master plan includes a bridge
to connect the two existing paths and provide easy access to the park. When
funds were available, it would be constructed.
• I think Mary stated it very appropriately in her memo when she wrote, "it was
the desire of the Park & Recreation Commission to extend the path" - not the best
interests of the residents that were considered.
11. In Mary Saarion's memo to the Mayor and Council Members dated March 28, 1989 (see
attached), she states "the pathway plan was ... reviewed several times by residents." This
statement is not true. We never saw a plan until late this summer after we were told it
had been approved.
12. Once I finally received a copy of the path plan (July 1989), 1 contacted both Rick
Wriskey and Wayne Burmeister regarding its proximity to our lot line. The path and
plantings as currently planned will be on our property. We had pointed this out to Mary
in the spring 1988 meeting, but we were accused of moving the stakes that had been put
in for the meeting. This past week Wayne Burmeister has restaked our property lines
and agrees that there is a problem.
There is no room for the plantings which the residents have been promised. Since our
lot is also adjacent to the concrete access walk, it is even more critical that there be a
definition of our property. Otherwise, there will be a tendency to "cut the corner"
through our yard. In addition, if the ag-lime turns out to be anything like the wood
chips, many walkers will choose to walk along side the path rather than on it.
13. The plan also indicates the path will be 8 feet and "narrower as required." Since the
culvert is being put in so vehicles can cross and drive down the path, anything
narrower than 8 feet would have the trucks driving on the unstable bank of the pond or
on the plantings.
14. It should also be noted that two trees will need to be relocated to complete the path.
15. It is obvious that it was never intended to have the path along the residences.
• There is not enough room for it. Our lot line would not have been established
where it is if there had been a plan for the path.
• Plantings have already been made based on the master plan.
• In addition, if one looks at the master plan, it is quite obvious that the paths and
bridge at the narrows are intended to provide easy access to the park and its
facilities. There is no need for a path behind the residences. The bridge at the
narrows would connect the park to the paths from County Road H2 and the two
concrete access walks from Park View Drive.
16. It also comes as a surprise to me that in the packet of information I received
regarding the path, there is not one mention of cost - either development or
maintenance. As a tax paying citizen, I believe I have the right to that information.
There must be some document itemizing the cost for the development (i.e. material,
labor, backfilling, plantings, tree relocation, culvert bridge, benches, waste containers,
etc.). In addition, maintenance costs must include annual smoothing of the ag-lime,
filling in of holes in the bank caused by rodents, tree trimming, repair and replacement
of benches and waste containers, etc. These costs and associated benefits should have
been compared to the costs and benefits of a bridge at the narrows before a decision was
made to change the master plan.
Note: I disagree with the comments that using the city equipment and labor for the
construction of the path is "free." The maintenance department is already over! --
burdened and not providing the service and maintenance to the parks that is required.
For example, at Silver View Park alone, the trees need to be trimmed, the holes in the
bank need to be filled, the new bench needs to be re -anchored, etc. If the people who
normally are responsibile for park maintenance are spending their time constructing a
path, then there will be even less maintenance provided to the parks. This is not "free"
labor.
As you can see, we are very frustrated for a number of different reasons. I believe that
the residents have been lied to, ignored, and insulted. The tax paying citizens and
businesses are paying for projects that have not been cost/benefit justified, and as such,
our money is being used to satisfy the desires of a few individuals not the needs of the
community.
This situation needs to change. Your help and support is greatly appreciated.
Regards,
Deborah M. Jones
7405 Park View Drive
MEMO TO: MAYOR AND COUNCILMEMBERS
1
FROM: MARY SAARION, DIRECTOR \0
PARKS, RECREATION AND FORESTRY 1
DATE: JUNE 14, 1988
SUBJECT: SILVER VIEW PARK PATHWAY
The completion of Silver View Park pathway became an issue when staff received
telephone calls from residents who inquired why the wood chip path did not
extend around the entire pond. Staff brought this issue up to the Park and
Recreation Commission in the Spring of 1987. After several meetings
discussing this issue with residents on both sides, it was the desire of the
Park and Recreation Commission to extend the path completely around the pond.
Some residents living on land bordering park land continued to object to the
extension of the pathway. The issue was turned over to the City Council with
the recommendation from the Park and Recreation Commission that the pathway be
extended.
The City Council held several meetings with residents during the 1-1/2 year
timespan. A final plan explaining the pathway layout has been developed by
Engineer Dan Boxrud (see attached).* It is staff's request that direction be
given from the Council to staff regarding the wood chio path at Silver View
Park.
The City staff has conferred and it is the opinion that work done on the
pathway could not be accomplished until fall of this year. Plantings would be
stressed if planted during the summer months and there is already a long list
of summer maintenance projects to be completed.
City Council direction is requested.
MS/SL
Attachment
MEMO TO: MAYOR AND COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR O
PARKS, RECREATION AND FORESTRY
DATE: MARCH 28, 1989
SUBJECT: SILVER VIEW PARK PATHWAY EXTENSION
It was suggested last year that the City look towards Spring,
1989 to install the pathway link of trail between the present
woodchip trail on the northwest side of the pond to the south
side cement walk easement and adjoining woodchip trail.
It was determined that this segment should be a crushed rock
material. The completion of this segment of pathway would follow
with the planting of shrubs and trees. Forester Rick Wriskey
will visit with each resident abutting this park area to consider
their desires for tree and shrub variety and placement.
The pathway plan was designed by Short -Elliot -Hendrickson and
reviewed several times by the residents, Parks and Recreation
Commission and City Council. The crushed rock has been budgeted
for this year in the Parks Account. The public works crew would
cut the grade, pour the rock and pack the material. Forester
Wriskey would coordinate the planting details with each
individual resident whose property abuts this section of pathway.
RECOMMENDATION: Approval to proceed with the installation of the
south section of pathway using crushed rock material as a base.
MS/SL
CITY OF ARDEN HILLS
MEMORANDUM
DAT August 7, 1989
T0: Mayor and City Council
FROM: John T. Buckley, Parks Director
SUBJECT: Arsenal Athletic Field Complex Update
Present Status of Athletic Field :?roposal -
The athletic field proposal was presented to Ted Schulte, Commander's
representative, on April 4, 1989. The proposed concept was approved
by Mr. Schulte and forwarded to the U.S. Army Real Estate Division at
Rock Island, IL for their concept approval. No decision has been made
to date.
I have contacted the offices of Senators Durenberger and Boschwitz,
and Representative Vento for assistance in moving this project
forward.
The contact person for Senator Durenberger is Phil Cohen. The contact
person for Senator Boschwitz is Kim Dettmer, and for Representative
Vento, it is Kate Seng.
All three offices have a copy of our proposal and plan for the
complex. I did receive a positive response from their aides; however,
I do not know whether the Congressmen have contacted the Army on our
behalf.
ACTION REQUIRED:
None, this is for your information only.
JTB:madlr
A
s
M in
nML
ppppp�
:L
n
J
Zk..
RESOLUTION NO. 2516
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION ESTABLISHING STANDARDS OF MAINTENANCE FOR
THE CITY'S PARKS AND PUBLIC WORKS INFRASTRUCTURE
WHEREAS, the Mounds View Public Works and Parks,
Recreation and Forestry Departments have been developing
maintenance standards at the direction of the City Council;
and
WHEREAS, proposed standards were developed recogni-
zing the current limitations of the City's manpower and
resources and assuming there were no such limitations; and
WHEREAS, the two sets of standards revealed that the
most desireable level of maintenance would require 14.76
full time equivalent positions as compared to the 12.72 full
time equivalent positions currently available; and
WHEREAS, an additional 2 full time equivalent
Positions would require the expenditure of already limited
City resources to provide wages and benefits as well as
equipment to allow the additional personnel to perform their
duties; and
WHEREAS, the City Council realizes that in view of
the City's limited resources the level of maintenance of
the Parks and Public Works Infrastructure may be improved
through the introduction of more efficient methods and
practices and improved employee training and motivation; and
WHEREAS, the City Council wishes to ultimately
achieve the desireable level of maintenance by way of
improved practices and training as well as additional
funding or manpower, when available.
NOW, THEREFORE, BE IT RESOLVED that the City Council
of the City of Mounds View adopts the "Current" Maintenance
Standards, which are hereto attached and made a part hereof
presented by the Parks and Recreation and Public Works
Departments as the accepted standards for maintenance of the
City's parks and public works infrastructure.
BE IT FURTHER RESOLVED that the City Council directs
the Parks, Recreation and Forestry and Public Works Depart-
ments to establish annual goals through the City's Long -Term
Financial Plan and Annual Budget documents to dedicate
additional resources or introduce operational efficiencies
and improved employee training that will implement the
"Desireable" Maintenance Standards which are attached hereto
and made a part hereof.
RESOLUTION NO. 2516
PAGE TWO OF TWO
BE IT FINALLY RESOLVED that it is the goal of the
City Council of Mounds View to maintain the City's Parks and
Public Works infrastructure in a fashion that will assure
the City's taxpayers that their investment in the community
is being well-managed by establishing standards of
maintenance that assure the City's Parks and Public Works
infrastructures are being properly maintained and operated.
ATTEST:
(SEAL)
Adopted this 21st day of August, 1989.
Mayor
Clerk -Administrator
ms's••
MEMO TO: MAYOR AND COUNCIL
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: AUGUST 16, 1989
SUBJECT: WORKSHEET OUTLINING PARK IMPROVEMENT FUND EXPENDITURES
IN THE LONG TERM FINANCIAL PLAN
I&;.
Beginning fund balance $ 56,000.00
Revenue: (To be received by December 31, 1989)
SYSCO - $50,000
Everest - $12,500
Celebrate MN - $4,000
Expenditures:
Oakwood Park
Silver View pond management study
Culvert
Utilities contribution
Bridge feasibility study
Park amenities
Estimated yearend balance
1990
Beginning fund balance
Revenue (Everest Ltd)
Expenditures:
Arsenal playfield
Park amenities
66,500.00
$122,500.00
$ 18,000.00 (encumbered)
4,500.00 (encumbered)
13,000.00 (approved by not
encumbered)
16,350.00 (approved by not
encumbered)
1,000.00 (suggested but not
encumbered)
12.500.00 (items purchased as
approved in budget)
$65,350.00
$57,150.00
$57,150.00
12.500.00
$69,650.00
$50,000.00
12,500.00
$62,500.00
Estimated yearend balance $ 7,150.00
-2-
1991
Beginning fund balance $ 7,150.00
Revenue (Everest Ltd) 12,500.00
$19,550.00
Expenditures - park amenities $12,500.00
Estimated yearend balance $ 7,150.00
1992
Beginning fund balance $ 7,150.00
*Revenue (Everest Ltd) 12,500.00
$19,550.00
Expenditures - park amenities $12,500.00
Estimated yearend balance $ 7,150.00
*This is the last year receiving park dedication fees of $12,500.00 from Everest, LTD.
1993
Beginning fund balance $ 7,150.00
Revenue -0-
Expenditures -0-
1994
At this point the Park Improvement Fund will be minimal unless additional Park
Dedication Fees are received. To estimate probable fund expenditures of an unknown
amount is speculative and unreliable to forecast due to unknown circumstances of the
times.
o C
(>D
WA
°�
w
�w
��
E
PIC
apj
En
o
£
(D
m
R
(D
11
m PCO
�
`11
r 0
fD
r O
(CD
�c b�7]
C p
cn
N
cn r
I �C
O
En
Ihrt H. r-
rt rt
�t
�t
rt P-9
rpt
a
pC
N
o
o"
w
arr
',t i -n
b
rt
PV CD
;v
ro
�m�s
rx
ro
°h
N
(D
n
rt
rtw0En
w
rr
m
I
m
0 0 0 0 0 0 0
rr
rRn
orh
En
o
£
(D
(D
a
H
`` r
o
o"
w
arr
ro
°h
N
rt
N
rtw0En
rt
N
0
w
r
r
�o
O
O
O
O
J
Ln
O
r
0
8
0
G
G
C
N
�
Ln
N
O
O
Vl
J
r
8
0
w
G
O
O
r
r
r
8
a
0
O
O
O
m
0
a
rt
a
m a
cab
m a
m w
fD
m
(D
(D
(D
�
fD
�
x
-�
rt x
-c
rt x
(Dr*
x
rr
a
w
a
a
a
ro
'
a
H
2i
ro�
a0
a0
°'o
ao
as
N m
m
0 0 0 0 0 0 0
rr
rRn
,d
ro
00
ro
H
e
v
m
�vnw
r mS
ro
3�
ron
nc
E
r-
Ui
�C w
rr
�< (aD
m 0
110
• (
r
v�
bU t N
61 r-
(D
:3 G
(n x r •
a O
x N
a
(D
�O
cn
N O
N
(D
rt
(D C
C
CA lul
Orn
r
r
ro
ro
cn (D
R
rr
rr CD
Bg
r-
x�
x K
n
-�
S
bi
k
(D
�
P) 0 ��
(n G rt � rr n � 1 m M 1D n
(D In (DH rn O b (n r - *t
ra rt rr (D �3 (D C rr rr
K m a m a a f m
La rt rr (n
r �` � °� �rr
r~� �6 �rt
b
Cm �
aw
rt n
h rr
0 a
co O r 4 N
O O In 01 O
0 0 0 0 00 g Ln
N
F-
CD
C 123.
rt X Z X ::5 6 r. _j H z O
rt Al r-,. �j r- (D (D (D rfi
rr Ci rr n 'i `'c `t C:
N (D N `t
n
a o o C
o n
m m m a a,
�E
CD Ln Ul c En
ul
g o ���
O O Tin
rt
ro
a
FIVE YEARS OF PARK IMPROVEMENTS
What improvements have taken place in the
parks in the last five years? That is a
questions that Parks and Recreation
Commissioners are often asked. Following is
an overview of improvements to our City parks
over the past five years. The Parks and
Recreation Commission must plan for park
improvements based on the limited monies
available. Because of government grants, park
foundations, and donations the City Council
has been able to approve the funding of these
park improvements requested by the Parks and
Recreation Commission. If you have interests
in park improvements, please call and relay
your desires to any of the Parks and Recreation
Commissioners listed below:
Chairperson Wayne Burmeister (786-2585)
Commissioner David Long (784-1349)
Commissioner Frank Silvis (784-4587)
Commissioner Pam Starr (780-2409)
Commissioner Gary Stevenson (786-4638)
Commissioner Edd Trettel (780-3941)
1985 PARK IMPROVEMENTS
Greenfield Park - LAWCON Park Development
- Relocation of baseball field with fencing,
backstop and bleachers.
- Installation of lighted tennis courts and hard
surface play area.
- Installation of bituminous pathway and ag-
lime nature trail including the installation of
two wooden pathway bridges.
- Installation of paved parking lot and entry.
- Regrading for berm, storm water ditch
improvement and landscaping.
1986 PARK IMPROVEMENTS
City Hall Park - Installation of outfield fences
for the two adult softball fields.
Greenfield Park - Installation of playground
equipment.
Groveland Park
- Installation of sand volleyball court.
- Installation of playground.
- Landscaping park building.
- Installation of new windows.
1987 PARK IMPROVEMENTS
City Hall Park
- Installed pre-school age play equipment.
- Installed twin sand volleyball courts.
- Installation of sprinkling system in front of
City Hall.
Greenfield Park - Installation of horseshoe
courts (Eagle Scout project).
Groveland Park
- Installed twin tennis courts and hard surface
court play area.
- Installed tennis court lighting.
- Constructed a skating rink entry for winter
skating.
- Installed security lighting system.
Lambert Park
- Constructed a skating rink boardwalk.
- Replaced three garage door panels with
three permanent wooden walls with one
window.
Woodcrest Park
- Installed playground equipment.
- Installed picnic tables and grill.
- Landscaped the park building.
- Improved the parking lot.
- Re -located the direction of the pleasure rink.
Random Park
- Re -located a portable classroom building and
set on a permanent foundation.
- Landscaped the building area.
- Established a parking lot.
Improved drainage.
- Constructed retaining drainage area of the
berms.
- Installed toilet facilities in the building.
- Installed electricity and security lighting.
Silver View Park - Construction of a bridge
across the ditch on the west side of the pond.
1988 PARK IMPROVEMENTS
Ardan Park
- Maintained windrows, prepared for compost
distribution and collection of leaves.
- Installed class 5 rock on driveway.
City Hall Park
- Installed portable toilet enclosures.
- Re -roofed picnic shelters.
Greenfield Park
- Installed drain pipes.
- Installed drinking fountain.
- Installed portable toilet enclosure.
- Installed tennis court sign.
- Moved sign and flower bed for better
viewing.
Groveland Park
- Installed drinking fountain.
- Installed portable toilet enclosure.
- Installed tennis court sign.
Hillview Park
- Installed new play structure
- Re -located building.
- Improved drainage.
- Installed new electrical lighting system.
Lambert Park
- Installed a timber border around the tot lot.
- Installed portable toilet enclosure.
- Installed permanent walls and two windows.
Oakwood Park
- Removed old play structure.
- Installed portable toilet enclosure.
Random Park
- Installed parking lot boundary posts.
- Installed picnic table and grill.
Silver View Park
- Installed curb and asphalt surface to parking
lot.
- Installed hard court surface play area.
- Installed portable toilet enclosure.
Installed park sign.
Woodcrest Park
Installed maintenance gate.
Installed parking lot boundary posts.
Installed drinking fountain.
Improved drainage.
Installed portable toilet enclosirre.
1989 PARK IMPROVENIENTS incom fete
As of August 15, 1989
Ardan Park - Maintained windrows, prepared
for collection of leaves.
City Hall _Park
- Installed park regulation/curfew signs.
- Warning tracks installed on two adult
softball fields.
Greenfield Park
- Installed park regulation/curfew signs.
- Installed park security lighting.
Groveland Park
- Installed park regulation/curfew signs.
- Remodeled the building interior.
- Park sign timbering re -structured.
Hillview Park
- Installed picnic tables, grill and decorative
trash container.
- Landscaped around bldg./picnic area.
- Installed a sand volleyball court (Eagle Scout
project).
- Installed drinking fountain.
Installed park regulation/curfew signs.
Lambert Park
- Installed park regulation/curfew signs.
- Installed permanent decorative trash
container.
Woodcrest Park
- Remodeled the building interior.
- Installed park regulation/curfew sign
Silver View Park
- Installed a sprinkling system for the softball
fields with coupling capabilities for the tree
grove and berms.
- Backfilled the curbs, disced the soccer geld.
- Installed additional park regulation and
curfew signs.
Random Park
- Re -shingled the roof, increased insulation.
- Planted bushes around the parking lot
perimeter.
- Installation of permanent decorative trash
container.
Lakeside Beach - Constructed new beach house.
ANTICIPATED PROJECTS TO BE COMPLETED:
Oakwood Park
* Re -location of the softball gelds.
* Installation of playground, picnic tables and
grill.
* Installation of sand volleyball court and
horseshoe court.
Silver View Park
* Pond management proposal to be presented
in September/October.
* Turf management program.
* Installation of warning tracks on the two
softball fields.
A
pm
i I. nus`�-
19gll
MEMO TO: MAYOR AND CITY COUNCIL
PARKS AND RECREATION COMMISSION
FROM: MARV JOHNSON, PARKS AND RECREATION DEPT.
DATE: AUGUST 225 1989
SUBJECT: OTHER CITIES' POLICIES
TOWARDS ACCEPTING DONATIONS
On Thursday, August 17, I called around to different cities to see if they
had any type of public policy pertaining to the acceptance of donations.
The cities I called were Edina, Brooklyn Center, Brooklyn Park, Shakopee
and Roseville. All of these cities told me that they have no written public
policy towards the acceptance of donations. Edina, Brooklyn Center and
Shakopee said that they except any and all donations that are deemed
appropriate. By this, they mean that it has to be worthwhile for all
residents of the city.
Finally, in Roseville, they are starting to work on a city-wide policy on
accepting donations. This will give them certain standards to follow
whenever someone wants to make a donation to the city.
MJ/SL
Mr. Wayne Burmeister
Chairman
Mounds View Park &
Recreation Commission
Dear Mr. Burmeister:
volinh 61
LIONS CLUB
August 21, 1989
On June first, 1989s the Mounds View Lions Club committed $75,000
from the charitable Gambling account to construct a park shelter in
Silverview Park. On August 179 1989, a motion was made, seconded, and
carried to honor our commitment for the cost of a shelter up to G
$759000. A letter will be submitted to the Park & Recreation CommitlfeA/
to go ahead and develop the appropriate shelter at Silverview park.
The money will be presented upon completion of the structure.
Sincerely,
1�
Don Hodges
Secretary
Mounds View Lions
C.C. Mary Saarian
City Council
August 17 , 1989 C*1-
Mayor, City Council, and Staff:
As a volunteer coach for the past 7 years, from T -ball through traveling baseball, I would like
to commend the City of Mounds View and its staff for the fine youth baseball program and the
timely maintenance of the ball fields. The MVAA, with your cooperation, has afforded many
young people the opportunity to enjoy the game of baseball at a reasonable cost.
After coaching the 12-13 year old traveling team this year, it has become apparent to me that
the young adults between the ages of 12-17 have outgrown the available facilities. I realize that
Greenfield Ball Park was designed to accommodate this age group, however, it falls far short of
their requirements. As a result, I regularly held practice on Shoreview or New Brighton fields
which still did not meet all the needs of my team. There is not, at present, a quality major
league field in this area. With a few modifications, Greenfield could be the facility so greatly
needed.
As a result I respectfully request that Greenfield be upgraded. Some major changes would be
required to reach this end. They include:
moving the outfield fence to a minimum distance down the foul lines to 320 feet and
center field to 400 feet
- the distance from homeplate to the backstop should be twice what it is now
- the infield should be resodded and the outfield reseeded
- dugouts should be constructed
- a sprinkler system should be installed throughout to maintain a quality playing field.
1 feel that investing in a park of this nature today will have long lasting rewards; not the least of
which would be the pride in our community reflected in our young people. It hurts me greatly
to hear the derogatory comments by visiting teams about the conditions of our playing fields.
What hurts even more is knowing that my team hears these same comments.
Each year I tell my team that I expect them to give me 100%, and I will settle for nothing less.
In return, I promise them that I will use everything at my disposal to help them reach their
goals for the year. If I did not bring this to your attention, I would be violating their trust.
Therefore, I again request, on their behalf, that we as a community provide a quality facility for
them to perform.
Respectfully,
Neal Valley, MVAA Coach
8440 Knollwood Drive
Mounds View, MN 55112
REPORT TO: MARY SAARION, MOUNDS VIEW PARK AND RECREATION
DIRECTOR
FROM: TONI MILLER, MOUNDS VIEW PARK AND RECREATION SUMMER
PLAYGROUND SUPERVISOR
DATE: AUGUST 21, 1989
SUBJECT: REPORT ON SUMMER PLAYGROUND PROGRAM
The Mounds View Park and Recreation Summer Playgrounds
Program has wrapped up once again. Each Playcenter Leader
was asked to complete an evaluation form of their own per-
formance and of the Mounds View Playcenter Program. In this
report I will discuss the Playcenter Leaders', parents', and
my own comments and suggestions.
The self-evaluation began by asking each leader if she/he
thought that the activities of which were provided at their
park (Woodcrest, Groveland, Lambert, or Hillview) promoted
participation and interest for the area youths. Each leader
responded positively. For instance, a leader cited Groveland
Park's attendance saying that the Park had increasing atten-
dance all summer. He continued to say that the children
enjoyed the activities at Groveland Park and kept coming back.
Groveland Park had 108 youths registered for the Playcenter
Program of which about 70 attended each day.
In addition to a large turnout at the parks, the Play -
center Leaders felt that there were several other good points
in the Mounds View Summer Playground Program. Most of the
leaders applauded each other, the Mounds View Park and Recre-
ation coordination/supervision, and administration. Many
leaders addressed the Playcenter Program and its employees as
-1-
committed leaders, solidly coordinated, well qualified, well -
liked by the community, well organized, and a produbtive summer
activity for the neighborhood children. Finally, the leaders
repeatedly addressed the commitment that the City of Mounds View
has towards the Summer Playcenter Program. one leader said
that "the community support and strong city backing is an
important and positive dimension to the program." Without
this support, the summer program would not be successful. As
the supervisor of the Mounds View Summer Playcenter Program,
I am especially pleased with these positive comments and
reactions to the Playcenter Program at Mounds View.
Summer activites at each park centered around arts and
crafts, games, sports, puppetry, songs, and excursions. To
prepare for these activities, the leaders had a two day orien-
tation at City Hall. In past years, the summer playground
leaders have also had an additional orientation day with the
Minneapolis Parks Department. Through many of the evaluations,
the leaders asked for an additional preparation day to get more
ideas for programming. The Mounds View leaders do realize that
the Minneapolis Parks Department is no longer running an orien-
tation/idea session and suggested that they meet with the New
Brighton Park and Recreation staff and/or the Shoreview Park
and Recreation staff to exchange ideas and interests. I agree
with this very much; another day of preparation would be a
great help for the leaders and for myself. I particularly like
the idea of meeting with another park and recreation department
to get ideas on other summer playground programs.
The playground activities themselves were quite successful
on both the "Butterflies are Free" program and the "Playcenter"
-2-
program this summer. The leaders and participants truly enjoyed
the arts and crafts activities that were purchased for them but
they thought that it would be nice to have one more craft activ-
ity for each program. The leaders felt positive about the ath-
letic equipment supplied for them and were often amazed at the
amount available. All leaders also applauded the Puppet Wagon
for the superb job that they did at each park. Finally, the
excursions were overall, enjoyed by the leaders and the parti-
cipants. Some suggestions for excursions included picking
places that were close to Mounds View. Often, the drive to the
excursion was longer than the activity itself. Another sugges-
tion was to coordinate the bus pick-up better. Instead of
picking up the participants every ten minutes, the busses should
be separated and pick the children up at the same time. A final
suggestion would be to purchase t -shirts as part of the summer
fee. This would make the excursions easier for the leaders as
they could keep track of the participants better. All of the
leaders enjoyed having three "Butterflies are Free" excursions
and five "Playcenter" excursions. The program should definitely
keep the excursions the same. The leaders informed me that the
participants thoroughly enjoyed each excursion and were excited
about each one. However, the children were disappointed that the
Twin's game was cancelled. This was beyond our control.
Finally, the leaders discussed the playcenter facilities
in their evaluations. Hillview Park leaders like the placement
of the new building and are looking forward to the new picnic area.
They are all pleased with the needed changes at Hillview. The
only change that could improve the park would be new shade trees
in the picnic area. Woodcrest Park leaders also enjoyed their
-3-
park. They complimented the the playground, the picnic area, the
parking lot, the shade trees and the park shelter. However, the
vollyball court does need to be improved. Lambert Park leaders
unfortunately felt that the park seems to be the least priority
when it comes to maintenance, fix -ups, and equipment. The park
certainly needs more shadetr.ees-but does have a nice playground
and softball diamond. Groveland Park leaders gave the most
positive feedback about the park. They enjoyed the shelter and
its placement in the park, the picnic area, the playground, the
vollyball court, the tennis courts, softball diamond and the
many shadetrees. The Groveland leaders were especially pleased
with the community support from parents and neighbors. The
leaders feel that the support was an integral part of the success
at Groveland. Finally, all of the leaders feel that the water
} fountains at each park are a great asset and a needed safety
measure considering the heat during the last two summers.
When looking over the past summer, I as the Summer Play-
ground Supervisor am very pleased. There are certain changes
needed in the Park Program, but overall the program is very
successful considering the positive feedback from parents, the
participants, and the playground leaders. For improving the
Mounds View Playcenter Program, I suggest to coordinate the bus
pick-ups better on excursions and to pick excursions that are
within twenty minutes of Mounds View. Specific Mounds View
Summer Playground t -shirts would help the leaders supervise the
participants on excursions. I would like to see an additional
orientation day before the summer program begins to help with
programming. Seven art and crafts for each program would be a
positive improvement. The final suggestion that I have for the
-4-
Park Notes
A newsletter of the Friends of St. Paul and Ramsey County Parks
1621 Beechwood Avenue, St. Paul, Minnesota 55116 698-4543
Volume 3, Number 3 August, 1989
Kellogg Dream Comes Mounds of dirt and generalized destruction on Kellogg Boulevard will gradually
TrUe emerge as St. Paul's newest park. The rejuvenated park, to be opened by fall, will feature
a pool, arbors, a grove of trees and a series of sculptures placed along the History Walk.
The focal point at Minnesota Street is the site of the first chapel in St. Paul.
Marking the spot will be a 40 foot circular pool. A bell in a small belfry, the first of four
sculptures selected as metaphors for the founding of the city, reminds visitors of the role
of the Catholic Church in the founding and early growth of the city.
The next sculpture, a paddle wheel represents commerce and transportation
followed by an ax, a symbol of labor and industry. The final sculpture is a structure
representing St. Paul's early buildings. Each sculpture is bronze and about 3 feet tall.
A historical text or quotation from early city records marks each sculpture. One,
a quote by Mark Twain from Life on the Mississippi , seems particularly fitting," ` St. Paul
is a wonderful city. It is put together in solid blocks of honest brick and stone and has
the air of intending to stay." "The redeveloped Kellogg Mall has all indications of
living up to Twains praise," said Friends' Executive Director Peggy Lynch.
Cliff Garten, Associate Professor of Art at Hamline University and Karen Sproles,
textual consultant to the artist helped bring art and history together in a way not
previously seen in St. Paul. A 1987-88 taskforce helped develop plans for the Kellogg
Mall park.
St. Paul Gets First Operating on a shoe string, and out of the truck of her car, St. Paul's first naturalist
Naturalist plunged forward in creating a "full service" nature program at Crosby Lake Regional
Park.
Connie Dorn began as a student intern with a very special mission. Create a pro-
gram where none had gone before. She quickly realized that with only herself as staff,
that was going to be a very small program. She began recruiting volunteers and even
convinced naturalists from other regional nature centers to assist. During their first
summer, 1988, they sponsored numerous workshops and children's activities covering
subjects from pond life to butterfly banding. (Yes, you can band a butterfly. It takes a
very patient butterfly and a very small band.)
With the coming of fall and school the program came to an end but Dorn developed
2
a funding proposal so it could be resumed in the spring. With the addition of the recycled
nature trailer from Tamarack Park the possibility of operating more services throughout
the year became a reality.
Current programs include nature crafts, films, guided tours, and classes. Nature
Center birthday parties are even possible. For the modest sum of $1.50 per child or a
minimum of $15, Nature center staff will lead the birthday partiers a guided tour, lead
craft activities, etc.
In cooperation with the Minnesota Humanities Commission a 5 part series, "Life
along the Mississippi" fittingly focuses on floodplains and rivers. It is the largest
program to date at the nature center. It focuses on early area residents, both native
Americans and the farmers who replaced them. The August program is free and open
to the public. Those interested in any of the Center programs may call 292-7400 for
brochures.
Crosby Lake Park is located in the floodplain of the Mississippi on the former site
of Thomas Crosby's farm. Crosby, an immigrant from England, settled his land in 1855
and farmed there for over 30 years. Others continued the truck farming operation until
the early 1960's when the St. Paul Port Authority purchased the property. They turned
it over to the City for park usage where it is maintained in its natural condition.
American Heritage Trust The American Heritage Trust bill, legislation designed to provide stable and improved
funding levels for the Land Water Conservation Fund (LWCF) and the Historic
Preservation Fund (BPF) is facing a substantial threat in the US Congress.
The LWCF was created in 1964 to purchase land with natural, scenic ana'
recreational significance. A few years later HPF was created to acquire historically
important resources. Although funds are automatically authorized each year, they are
subject to congressional apl)ropriation. Although funding levels were adequate during
the 1970's, since 1980 appropriations levels have declined substantially. Land and
Water funds, for example, fell from peak funding of $805 Million to less than $200
Million. Historic Preservation Funding has met a similar fate.
As the cost of acquiring lands increases, the funds available have declined.
Numerous environmentally sensitive areas remain privately owned and are constantly
threatened by urban development and economic exploitation.
The American Heritage Trustbill wouldestablish self-perpetuating trust accounts
for both the Land & Water and Historic funds. The interest-bearing accounts, primarily
funded by revenues paid by oil companies for drilling on the outer continental shelf,
would insure a return to the pre 1980 funding levels. States and localities would be the
big winners with this legislation, receiving at least 50 percent of the annual funding
which would be dispersed with dollar for dollar matching grants.
Minnesota's congressional delegation is split in support of the bill. To date Con-
gressmen Tim Penny, Vin Weber, Bruce Vento, Jerry Sikorski, and Senator Dave
Durenberger have indicated they intend to vote for the bill. Bill Frenzel opposes the bill
and Arlan Stangeland, James Oberstar and Rudy Boschwitz have not established a
position. If you wish to support this bill, write to Representatives regarding HR 876 to
Congressman , House of Representatives, Washington, D.C. 20510. Write to
Senators regarding S 270 Senator , Senate of the United States, Washington, D.0
20510. 'exerpted from The Amerfeon Hiking Society,
Park Notes is published quarterly by the Friends of St. Paul and Ramsey County Parks. Editors are Peggy
Lynch and Jeanne Weigum. For additional information call (612) 698-4543.
3
New Bikeway Maps I The Minnesota Department of Transportation has just issued Explore Minnesota
Available Bikeways, Twin Cities Metro East and Metro West maps. Conveniently, this two
map set replaces eight separate maps. Roadways suitable for biking are rated from good
to unsatisfactory. They can prove a valuable resource in planning a safe trek across the
metro area.
Maps can be obtained from MDDOT, Room B-20, John Ireland Boulevard, St.
Paul, MN 55155. The cost of the maps is $2.00.
The Greening of St. The earliest settlers of the territory that was to become St. Paul would undoubtedly be
Paul amazed that in 1989 there would be a movement called St. Paul Green. Back then there
was plenty of green. Along the base of Summit Hill were stands of cedar and tamarack.
A dense forest of elms surrounded the Upper Landing below Third Street. That forest
gradually was consumed by development, with the trees providing shelter in the form
of rough-hewn log cabins.
St. Paul Green does not intend to replant the tamarack forest, but rather seeks to
encourage decorative plantings on public lands. Patterned after the ten year old
Philadelphia Green program, the emphasis is on stimulating an ongoing effort from
residents and volunteers to turn vacant lots and other other suitable areas into pleasant
neighborhood focal points.
The Minnesota State Horticultural Society is the coordinating body helping build
the "Greening" program by providing technical assistance in planning, land utilization
and horticultural training plus access to plantings and construction materials.
S t. Paul Green's 1989 concentration has been on Hamm Plaza, MaryDale Park and
Mears Park. Other sites are in the planning stage. Volunteers are needed to tend the
gardens, and supply plant materials as well as brain power. Volunteers may call Rick
Bohlander, Minnesota Green Coordinator at 624-7752.
Minnesota Prairie Day August 19 is a day for Minnesotans to rediscover their prairie heritage, and have a good
`ole time. Minnesota Prairie Day is an annual celebration of the open, tallgrass plains
that once covered much of the Midwest.
While 18 million acres of prairie once covered Minnesota, today less than one
percent remain. The surviving prairie remnants are truly wondrous areas and home to
dozens of rare and endangered plants and animals. Mid -August is the peak time to enjoy
the color and beauty of prairie wildflowers and grasses. Join the activities of Prairie Day
including hikes, wagon ride and the opportunity to meet some buffalo hunters.
Included in the celebrations around the state are:
Shooting Star Roadside Prairie Just west of LeRoy on Highway 56 in Mower County.
This is a beautiful prairie remnant along the highway/railroad right-of-way.
Afton State Park on the St. Croix River in Southern Washington County. Visitors can
see how the park is restoring prairie, observe prairie birds and listen to the music of Larry
Long.
LacQui Parle Wildlife Management Area near Watson on Highway 59 in Chippewa
County. This 50,000 acre prairie follows the Minnesota River Valley between Odessa
Become a Friend! A
very good Friend!
and Watson. Visitors can ride by horse-drawn wagon to join an 1800 rendezvous.
Kilen Woods State Park/Prairie Bush Clover Scientific and Natural Area In
Jackson County south of Windom, these prairies harbor the world's largest population
of the endangered Prairie Bush Clover.
Agassiz Dunes Natural Area near Fertile in southern Polk County offers sand hill dunes
and the Oak Sand Savanna, one of Minnesota's most rare prairie types.
For further information, contact Peter Buesseler, DNR Prairie Biologist, (218) 739-7576
or DNR Information Center (218) 296-6157.
The Friends of St. Paul and Ramsey County Parks is a membership organization. In
fact, without our members we aren't even an organization! If you care about parks in our
community you are invited to become a card carrying Friend. A basic membership is
$10. Supporting memberships are $20,$25, or ? (the sky's the limit). Make your check
out to Friends of St. Paul and Ramsey County Parks, and mail it to 1621 Beechwood
Avenue, St. Paul, Minnesota 55116. If you are already a member but have not yet
renewed your membership please make your annual contribution today.
. The Friends is a very, reheat, very low budget organization. Our expenses for
1987-88 were just under $10,000. We rely on volunteers to accomplish many of our
objectives. But no organization runs on nothing. (Another way of saying that every
volunteer organization needs m o n e y.) Our current fund balance is at an all time low
so this would be an excellent time to nuke a financial contribution to an organization
that does not pledge to save whales but does pledge to save and enhance your parks.
The Friends of St. Paul and Ramsey County Parks
Non -Profit Org.
1621 Beechwood Avenue
U.S. Postage
St. Paul, Minnesota 55116
Paid
St. Paul,MN
Return Address Requested
Permit No. 3413
------ --- -- -- -
$rY 5sarion
Park & Recreatio
Mounds View Cit Director
2401 Hi ghw$Y IQ Y Hall
Mounds View, MN 55112
^ `^1
August 17, 1989 t r
Mayor, City Council, and Staff: r
�T
,r-
As a volunteer coach for the past 7 years, from T -ball through traveling baseball, I would like
to commend the City of Mounds View and its staff for the fine youth baseball program and the
timely maintenance of the ball fields. The MVAA, with your cooperation, has afforded many
young people the opportunity to enjoy the game of baseball at a reasonable cost.
After coaching the 12-13 year old traveling team this year, it has become apparent to me that
the young adults between the ages of 12-17 have outgrown the available facilities. I realize that
Greenfield Ball Park was designed to accommodate this age group, however, it falls far short of
their requirements. As a result, I regularly held practice on Shoreview or New Brighton fields
which still did not meet all the needs of my team. There is not, at present, a quality major
league field in this area. With a few modifications, Greenfield could be the facility so greatly
needed.
As a result I respectfully request that Greenfield be upgraded. Some major changes would be
required to reach this end. They include:
- moving the outfield fence to a minimum distance down the foul lines to 320 feet and
center field to 400 feet
- the distance from homeplate to the backstop should be twice what it is now
- the infield should be resodded and the outfield reseeded
dugouts should be constructed
a sprinkler system should be installed throughout to maintain a quality playing field.
I feel that investing in a park of this nature today will have long lasting rewards; not the least of
which would be the pride in our community reflected in our young people. It hurts me greatly
to hear the derogatory comments by visiting teams about the conditions of our playing fields.
What hurts even more is knowing that my team hears these same comments.
Each year I tell my team that I expect them to give me 100%, and I will settle for nothing less.
In return, I promise them that I will use everything at my disposal to help them reach their
goals for the year. If I did not bring this to your attention, I would be violating their trust.
Therefore, I again request, on their behalf, that we as a community provide a quality facility for
them to perform.
Respectfully,
Neal Valley, MVAA Coach
8440 Knollwood Drive
Mounds View, MN 55112
REPORT TO: MARY SAARION, MOUNDS VIEW PARK AND RECREATION
DIRECTOR
FROM: TONI MILLER, MOUNDS VIEW PARK AND RECREATION SUMMER
PLAYGROUND SUPERVISOR
DATE: AUGUST 21, 1989
SUBJECT: REPORT ON SUMMER PLAYGROUND PROGRAM
The Mounds View Park and Recreation Summer Playgrounds
Program has wrapped up once again. Each Playcenter Leader
was asked to complete an evaluation form of their own per-
formance and of the Mounds View Playcenter Program. In this
report I will discuss the Playcenter Leaders', parents', and
my own comments and suggestions.
The self-evaluation began by asking each leader if she/he
y thought that the activities of which were provided at their
park (Woodcrest, Groveland, Lambert, or Hillview) promoted
participation -and interest for the area youths. Each leader
responded positively. For instance, a leader cited Groveland
I
Park's attendance saying that the Park had increasing atten-
dance all summer. He continued to say that the children
enjoyed the activities at Groveland Park and kept coming back.
Groveland Park had 108 youths registered for the Playcenter
Program of which about 70 attended each day.
In addition to a large turnout at the parks, the Play -
center Leaders felt that there were several other good points
in the Mounds View Summer Playground Program. Most of the
leaders applauded each other, the Mounds View Park and Recre-
ation coordination/supervision, and administration. Many
leaders addressed the Playcenter Program and its employees as
-1-
committed leaders, solidly coordinated, well qualified, well -
liked by the community, well organized, and a produ.6tive summer
activity for the neighborhood children. Finally, the leaders
repeatedly addressed the commitment that the City of Mounds View
has towards the Summer Playcenter Program. one leader said
that "the community support and strong city backing is an
important and positive dimension to the program." Without
this support, the summer program would not be successful. As
the supervisor of the Mounds View Summer Playcenter Program,
I am especially pleased with these positive comments and
reactions to the Playcenter Program at Mounds View.
Summer activites at each park centered around arts and
crafts, games, sports, puppetry, songs, and excursions. To
prepare for these activities, the leaders had a two day orien-
tation at City Hall. In past years, the summer playground
leaders have also had an additional orientation day with the
Minneapolis Parks Department. Through many of the evaluations,
the leaders asked for an additional preparation day to get more
ideas for programming. The Mounds View leaders do realize that
the Minneapolis Parks Department is no longer running an orien-
tation/idea session and suggested that they meet with the New
Brighton Park and Recreation staff and/or the Shoreview Park
and Recreation staff to exchange ideas and interests. I agree
with this very much; another day of preparation would be a
great help for the leaders and for myself. I particularly like
the idea of meeting with another park and recreation department
to get ideas on other summer playground programs.
The playground activities themselves were quite successful
on both the "Butterflies are Free" program and the "Playcenter"
-2-
program this summer. The leaders and participants truly enjoyed
the arts and crafts activities that were purchased for them but
they thought that it would be nice to have one more craft activ-
ity for each program. The leaders felt positive about the ath-
letic equipment supplied for them and were often amazed at the
amount available. All leaders also applauded the Puppet Wagon
for the superb job that they did at each park. Finally, the
excursions were overall, enjoyed by the leaders and the parti-
cipants. Some suggestions for excursions included picking
places that were close to Mounds View. Often, the drive to the
excursion was longer than the activity itself. Another sugges-
tion was to coordinate the bus pick-up better. Instead of
picking up the participants every ten minutes, the busses should
be separated and pick the children up at the same time. A final
suggestion would be to purchase t -shirts as part of the summer
fee. This would make the excursions easier for the leaders as
they could keep track of the participants better. All of the
leaders enjoyed having three "Butterflies are Free" excursions
and five "Playcenter" excursions. The program should definitely
keep the excursions the same. The leaders informed me that the
participants thoroughly enjoyed each excursion and were excited
about each one. However, the children were disappointed that the
Twin's game was cancelled. This was beyond our control.
Finally, the leaders discussed the playcenter facilities
in their evaluations. Hillview Park leaders like the placement
of the new building and are looking forward to the new picnic area.
They are all pleased with the needed changes at Hillview. The
only change that could improve the park would be new shade trees
in the picnic area. Woodcrest Park leaders also enjoyed their
-3-
park. They complimented the the playground, the picnic area, the
parking lot, the shade trees and the park shelter. However, the
vollyball court does need to be improved. Lambert Park leaders
unfortunately felt that the park seems to be the least priority
when it comes to maintenance, fix -ups, and equipment. The park
certainly needs more shadetrees-but does have a nice playground
and softball diamond. Groveland Park leaders gave the most
positive feedback about the park. They enjoyed the shelter and
its placement in the park, the picnic area, the playground, the
vollyball court, the tennis courts, softball diamond and the
many shadetrees. The Groveland leaders were especially pleased
with the community support from parents and neighbors. The
leaders feel that the support was an integral part of the success
at Groveland. Finally, all of the leaders feel that the water
fountains at each park are a great asset and a needed safety
measure considering the heat during the last two summers.
When looking over the past summer, I as the Summer Play-
ground Supervisor am very pleased. There are certain changes
needed in the Park Program, but overall the program is very
successful considering the positive feedback from parents, the
participants, and the playground leaders. For improving the
Mounds View Playcenter Program, I suggest to coordinate the bus
pick-ups better on excursions and to pick excursions that are
within twenty minutes of Mounds View. Specific Mounds View
Summer Playground t -shirts would help the leaders supervise the
participants on excursions. I would like to see an additional
orientation day before the summer program begins to help with
programming. Seven art and crafts for each program would be a
positive improvement. The final suggestion that I have for the
-d-
summer playcenter would be to improve Lambert Park's grounds (add
shadetrees) and attempt to maintain the park better during the summer.
The strong points in the summer program are many: committed
leaders, organized supervision and coordination, strong comm-
unity backing and exciting activities. I suggest that the pro-
gram continues to have three "Butterflies are Free" excursions
and five "Playcenter" excursions, a six-week activity period and
planned activities each day. The program was a success this
summer, and I feel that the greatest reason behind this success
is due to the leaders; I would like to see them all next summer
as playcenter leaders for the City of Mounds View.
TO: MAYOR AND CITY COUNCIL
FROM: MARY SAARION, DIRECTOR OF PARKS AND RECREATION
DATE: AUGUST 21, 1989
SUBJECT: QUARTERLY REPORT
tter of
1. Last Monday, August 14, 1989 I received a 1Lindquist.
resignation from Aquatics Supervisor Kelly September 1,
His last day of employment will be Friday, E
State University in pursuit
Cloud
i
1989. Kelly has plans to commute daily
t of a physical education
Kelly does not feel
licensure. As a full-time student,
that he could devote the time necessary for his job and
studies.
ts Council's approval to accept Kelly's
Staff reques
resignation and to approve staff's recruitment for
filling the open position of Aquatics Supervisor.
ersons have accomplished tasks which the summer
2. Several p Because of the busy
Council wishes to recognize.
months these persons hoe not been comavamon
open has
accepting recognition, however, a common these persons
been found. On Monday, August 28, 1989,
will be available to accept invitationehave sbeen�sentota
accomplishment. Letters of
those listed below.
Ben Vos - Won State Spelling Bee
Tadd King - Eagle Scout Project - refinished park
playground equipment
,,like Strauss
- structed
Eagle Scout Project - conKing Church
ballfield for Christ the
Eagle Scout Project - construction of
Chad Nelson Hillview volleyball court
Richard Wriskey - City Forester, 7 years of "Tree
City USA"
- Eagle Scout Project - construction
Scott Peterson g
of Silver View and WOOdcrest Par
sign landscaping
Bill Engberg - Volunteer, installation of Silver
View wood bench and other
landscaping projects
3. The Parks and Recreatio9S9Com6
Thursday, August 24, s30°p1lbmeeting
.matCityHall °n
Council Chambers.
4. Arsenal PLa field U date
- Last week staff received a
City
lls
copy of a memo sent to the
updatedren linformation uonlthe
rOm
Director John Buckley with lex.
status of the Arsenal Athletic Field Comp
MAYOR AND CITY COUNCIL
PAGE TWO
AUGUST 21, 1989
The athletic field proposal was presented to Ted
Schulte, commander's representative on April 4, 1989.
The proposed concept was approved by Mr. Schulte and
forwarded to the U.S. Army Real Estate Division at Rock
Island, IL for their concept approval. No decision has
been made to date.
See the attached memo copy.
5. "Festival In The Park" Update - Plans for the Festival
have been preceding. Several community groups are
interested in participating. It is hoped that once
school begins, student organizations will jump on the
bandwagon.
See the attached memo for more specifics.
6. Silver View Park Culvert - SEH Engineer Boxrud has
written specifications for the culvert. City Engineer
Minetor has reviewed and approved the specifications.
Staff requests Council's approval to receive two or more
written quotes which upon receipt of at least two
written quotes, staff would present them to the City
Council for consideration of awarding a bid.
7. Oakwood Park Improvements - Oakwood Park playground
equipment, picnic tables and grill have been installed.
Fill material has been delivered and bids are currently
being received for grading. The backstop, players
benches and bleachers are ordered but have not been
delivered as of this date.
MS/MJS
Attachments: (2)
O
:.C... _ _ .. :...l
Mr. Wayne Burmeister
Chairman
Mounds View Park &
Recreation Commission
Dear Mr. Burmeister:
votlndS 6V
LIONS CLUB
August 21, 1989
On June first, 19899 the Mounds View Lions Club committed $75,000
from the charitable Gambling account to construct a park shelter in
Silverview Park. On August 17, 1989, a motion was made, seconded, and
carried to honor our commitment for the cost of a shelter up to G
$752000. A letter will be submitted to the Park & Recreation CommitlteA/
to go ahead and develop the appropriate shelter at Silverview park.
The money will be presented upon completion of the structure.
C.C. Mary Saarian
City Council
Sincerely,
Don Hodges
Secretary
Mounds View Lions