HomeMy WebLinkAbout09/28/1989CITY OF MOUNDS VIEW
PARKS AND RECREATION COMMISSION
AGENDA
September 28, 1989
6:30 p.m.
Mounds View City Hall
Council Chambers
CALL TO ORDER
% REVIEW AUGUST 24, 1989 COMMISSION MINUTES
N. WALKING TOUR OF GREENFIELD PARK BASEBALL FIELD
I DISCUSSION ON GREENFIELD PARK BASEBALL FIELD
AGENDA ADDITIONS : I4vm gt;n
REPORT ON SILVER VIEW PARK PICNIC SHELTER
SILVER VIEW TRAIL ESTIMATES AND BRIDGE ESTIMATES AS
REQUESTED
V%[I. UPDATE ON OAKWOOD PARK IMPROVEMENTS
OLD HIGHWAY 8 BICYCLE PATHWAY REQUEST
- COUNTY REPLY
REVIEW "FESTIVAL IN THE PARK'
REVIEW FALL PROGRAMS
.�I. DISCUSS PART-TIME POSITION
X�I. COUNCILMEMBERS REPORT
J�V. CHAIRPERSONS REPORT -LAKESIDE PARK
xV. ADJOURNMENT
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CALL TO ORDER
ROLL CALL
APPROVAL OF MINUTES
COUNCILMEMBER'S REPORT
CHAIRPERSON'S REPORT
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
August 24, 1989
Mounds View City Hall
Council Chambers
6:30 p.m.
The meeting was called to order by
Chairperson Wayne Burmeister at 6:33 p.m.
Commissioners present: Burmeister, Silvis,
Starr and Trettel.
Commissioners absent: Long and Stevenson.
Councilmembers present: Hankner, Quick and
Wuori.
Staff present: Director Saarion and
Administrative Assistant Linke.
Visitors:
Debbie Jones, 7405 Parkview Drive
Sue and Dave Rademacher, 7421 Parkview Dr.
Carole Golden, 7417 Parkview Dr.
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to approve
the July 27, 1989 minutes as written. Motion
carried: 4 ayes, 0 nayes.
None
Chairperson Burmeister reported that at the
upcoming September 6 meeting the committee
will be planning a dedication ceremony for the
Lakeside Beach House. The Spring Lake Park
Lion's Club is still committed to doing more
projects at Lakeside Park. The projects
completed so far are the beach house,
retaining wall and playground. Chairperson
Burmeister further stated that the Lion's are
planning a work day at the park to install sod
around the sides of the beachhouse.
-2 -
CHAIRPERSONS REPORT CONT'D Director Saarion mentioned that purple
loosetrif had been discovered at Spring Lake
and that the weeds will be chemically treated.
This treatment was expected it eradicate the
weeds.
AGENDA ADDITIONS
REVIEW "FESTIVAL IN
THE PARK" PLANS
Director Saarion requested that the following
items be added to the agenda:
1. Review Long Term Financial Plan.
2. Review Silver View Park Shelter plans.
3. Discuss letter regarding Greenfield
baseball diamond.
Director Saarion reviewed the memo dated
August 16 outlining plans for the September
17, 1989 "Festival in the Park" celebration.
Changes to the plan after August 16 are as
follows:
1. City Council approved the hiring of a
warm-up band. "Westbound" Band was
contracted to play from 12:00 noon -
2:00 p.m.
2. Because "Westbound" was hired, the
Kitchen Kutups will not be performing.
3. Councilmember Paone suggested hiring
a local magician to perform a 20 - 40
minute show for a fee of $250.00.
Staff will bring this suggestion to the
Council at Mondays meeting.
Staff further stated that local groups will be
performing between the band sets under the
grove of trees in order to allow the "Rockin'
Hollywoods" time to set up.
There are several community groups doing
food sales and games for fundraising purposes,
but not too many arts and crafts dealers have
registered. It is felt that crafts people will
wait to see what the weather will be like
before registering.
-3 -
FESTIVAL UPDATE (CONT'D) Chairperson Burmeister commented that he
liked seeing the local groups involved in the
"Festival".
Director Saarion stated that the promotional
flyers and posters will be sent to businesses
this week and to the schools shortly after
school begins.
REVIEW RESIDENT'S LETTER
REGARDING BICYCLE PATH
ALONG OLD HWY. 8 Staff reviewed a letter received from Mounds
View resident Don McNamara requesting a
bicycle path along the section of Old Highway
8 in Mounds View as it runs from the New
Brighton/Mounds View city limits, north to
the intersection of Highway 10 and County
Road H.
Director Saarion stated that upon reviewing
the letter with City Engineer Minetor, he felt
that the installation of a bicycle path would
not be a priority of the county at this time
since this road is scheduled for improvement
in upcoming years. Director Saarion further
stated that Ramsey County has tentative plans
to make that area a trail access point for the
Rice Creek chain of lakes corridor.
After further discussion, Commissioner Silvis
requested staff to report at the next meeting
the reply from Ramsey County regarding this
request.
REVIEW RESIDENT'S LETTER
REGARDING SILVER VIEW
PARK PATHWAY Director Saarion stated that City staff has
been directed to respond to each item in the
letter from Mrs. Debbie Jones and to give
Council the response at the September 5
agenda meeting.
Mrs. Jones gave Chairperson Burmeister a map
showing the property lines per a land survey.
Chairperson Burmeister stated that he had
drawn a map and would forward that and
additional information he had retrieved from
past minutes and packets, to Director Saarion
for her use.
SILVER VIEW PARK
PATHWAY (CONT'D)
G=
Mayor Hankner stated that the City Council
had asked staff to research every aspect of the
letter. She further stated that there is a
change in population and a need to look at
plans, re-evaluation and resident's interests so
that this park can be removed from the
controversial arena. There will also be a need
to find funding for those items not in the
Long Term Financial Plan.
Commissioner Trettel suggested that if a re-
evaluation of people's interests were initiated
by way of a survey, that survey should be of a
random sampling of residents. Silver View is
a community park rather than a neighborhood
park and is intended to serve the entire
community rather than just those residents
living with its boundaries (as is the concept of
neighborhood parks).
Chairperson Burmeister re -stated that he had
found items from previous meetings dating
back to the conception of Silver View Park
with dates, meetings and motions.
Mayor Hankner stated that we need to figure
out what to do in 1989 not 1981, and try to
stick to it. It might be a reaffirmation of
plans that are in place or move things ahead.
What are we going to do as good planning in
this park as a community as a whole.
Mayor Hanker stated that if the pathway is
going in perhaps asphalt should be re-
considered.
Resident David Rademacher stated that the
planning process is badly flawed. Go back to
the original plan. Why was there a bridge
and different shelter? What was planned at
the other end? If we're going to do it, do it
complete.
Chairperson Burmeister responded that the
lake was constructed much different than the
original plan and that changed the other end
and the path.
SILVER VIEW PARK
PATHWAY (CONT'D)
-5 -
Resident Debbie Jones stated that the
demographics of the area has changed. There
are many elderly and young families. These
residents use the area, so their needs should
be taken into consideration.
Commissioner Trettel stated in regards to Ms.
Jones' letter that narrowing the path to a two
person walkway behind Ms. Jones' property
would be a suggestion, as 8 feet may be too
wide.
Mayor Hankner stated that Councilmember
Quick had suggested using asphalt. Mayor
Hankner suggested narrowing the path to 6
feet. Mayor Hankner also added that
woodchips are not easy to walk on. She
added that narrowing the path and getting rid
of the culvert and using the money for the
path is a possibility.
Commissioner Trettel stated that the City
needs to convey to all City residents that it is
City property along the pond. This is not
immediately evident. Some alternatives to
making residents aware of the park property
are:
1. Signs
2. Plantings to delineate the park
property.
3. Stakes - every 10 - 20 feet. There was
a question of safety if stakes are used.
Commissioner Trettel said that the
Commission should explore the least
unobtrusive manner in which to delineate the
park property. He added that Commission
members should be responsible to make sure
all residents can use and enjoy the parks.
Resident Carole Golden stated that one reason
she wants the path is to discourage people
from cutting through her yard. People go
through her yard now. She wants plantings
to dissuade people from going through her
yard.
M
Commissioner Trettel said he wasn't sure that
plantings would discourage people from
cutting through.
Mayor Hankner stated that the City's
perspective of plantings was to distinguish
City property versus private property.
Commissioner Trettel restated his desire to
have all residents aware that that area of the
park is their's to walk and enjoy.
Mayor Hankner asked if it would be
appropriate to pool together money to look at
plan - look at what's reasonable with money
available from the path and culvert.
David Rademacher suggested that maps
showing access and egress would be a good
idea.
Mayor Hankner stated that time is needed to
look at information from staff for path. This
information will not be available until
September 5. She asked the Commission
what they should do?
Chairperson Burmeister asked staff if a definite
date had been scheduled to begin work on the
pathway.
Director Saarion stated that a definite date
had not been set yet, but that Public Works is
ready to schedule this work.
Commissioner Starr stated that she was in
favor of a narrower path without a culvert.
Director Saarion stated that when the path
was discussed in the spring of 1988, it was
intended to be 6 feet wide. The Public Works
Department had suggested 8 feet wide in
order to accommodate maintenance vehicles
for path maintenance tasks. At that time the
plan for the path was changed to 8 feet wide.
-7 -
Ms. Jones asked what type of work needs to
be done on that side of the pond.
Commissioner Trettel replied that it is
necessary to bring in the maintenance vehicles
to add material to the path. Woodchips need
to be dumped by truck as using wheelbarrows
would be too time consuming.
Ms. Jones further stated that based on the
original plan, she questions whether there
should be a path at all. She understands the
need to delineate the park boundary but
wants another way of showing it. She asked
why a was necessary?
Commissioner Starr replied that the original
reasoning for the installation of a path was for
safety reasons. People were walking on wet
grass and mud. Many of them senior citizens.
Director Saarion added that the installation of
the pathway to continue around the pond was
re-initiated by people who walk the path.
They had requested that the path continue
around the pond.
Ms. Jones said that there should have been a
bridge, not a path, as per the master plan.
Chairperson Burmeister stated that the path
was not constructed to just get from one area
to another, but for exercise. He further stated
that he had went through his notes from
earlier meetings that referred to path
completion.
Ms. Jones stated that it had never been
approved on the master plan.
Chairperson Burmeister said that the minutes
had never mentioned a bridge.
Mayor Hankner questioned the status of the
path behind the apartment buildings. Director
Saarion stated that two letters have been
written to the Gaughan Companies with no
reply.
She added that she had talked to the manager
who was trying to set up a meeting with the
owners. Attorney Meyers recommended that
before any action is taken that approval is
attained from the Gaughan Companies with
the possibility of acquiring an easement later.
Mr. Rademacher stated that blacktop in that
area would not be good because it would shift
and that there are many crevices. He stated
that he had met four from the townhomes on
the trail and they said that "it sure was a long
way around". He asked them if they would
like a bridge and they said yes. He further
stated that they would like the option to take
a bridge because it would be easier for
parents and kids to cross the pond to the
future play equipment site.
Commissioner Trettel stated that installing a
bridge would only reduce the walk by 10-15
percent.
Commissioner Trettel further stated that he
would like to see a program implemented to
maintain a wild buffer shoreline for long
grass. This would be a way of showing
continuous park property as well as filter
fertilizers and provide a habitat for wildlife.
Ms. Golden stated that they did not sod back
to the pond; that was done by the City as a
"Green Area". She further stated that they
didn't fertilize their property. Commissioner
Trettel noted that the grass was not a fine
grass and that it would grow to 12 feet high
if left uncut. Ms. Golden added that if the
property was uncut, there may be a problem
with field mice.
Chairperson Burmeister asked what
Commission action should be taken?
Commissioner Silvis suggested exploring costs.
Chairperson Burmeister asked to see what the
cost of a 6 foot bituminous trail, just to join
the two paths. Mr. Rademacher would like
to know the cost estimate on a bridge across
the narrows of the pond.
SILVER VIEW PARK
PATHWAY (CONVD)
.In
Mayor Hankner suggested that Sabri Ayaz be
contacted regarding bridge design as he had
offered his time in designing a bridge. She
added that she would like to see bushes
planted at the property corners this fall to
help delineate public versus private property.
Director Saarion stated that Forester Wriskey
had expressed concern that plantings may be
injured if planted before pathway installation.
However, it was clarified that these plantings
need only be inexpensive temporary plantings
to designate property corners. Forester
Wriskey has discretion to choose species and
location spacing.
Councilmember Quick asked staff to get a
bituminous bid per linear foot as well as the
total price. Commissioner Silvis requested the
cost estimate of ag lime with a fabric base as
well, 6 feet in width. Chairperson Burmeister
stated that it would be his preference that
should a bridge be installed he would still
want the pathway constructed.
Councilmember Quick suggested that cost
estimates should be 8 foot and 6 foot.
Chairperson Burmeister made a motion to
direct staff to get cost estimates on
construction of a 6 foot wide bituminous trail,
8 foot wide bituminous trail, 6 foot and 8 foot
ag-lime trail with fabric underlayment, and a
per linear foot cost estimate of bituminous
trail. Estimates should be done for both the
entire trail around the pond and the 750 foot
section on the south side of the pond alone.
Funding options for the project should include
re-accessment of the culvert installation and
possible use of such funds for installation of
the bituminous pathway. Motion was
seconded by Commissioner Starr. Motion
carried: 4 ayes, 0 nayes.
Commissioner Starr asked staff to bring cost
estimates, measurements, and wetlands
information regarding bridge installation to
the next commission meeting.
SILVER VIEW PARK
PARK PATHWAY (CONT'D)
-10-
Commissioner Trettel asked staff to research
the possibility of putting up a cheap bridge.
He requested information on additional
considerations such as risk, permits required,
etc.
Chairperson Burmeister directed staff to
reaffirm background information from
residents regarding plantings. He asked which
residents present would be interested in
plantings. Mr. Rademacher and Ms. Golden
expressed interest. Commissioner Starr
restated that the corner property bushes
should be planted this fall to delineate
boundaries.
Commissioner Trettel stated that installation
of the plantings will be a good test if the use
of the path is increased. Director Saarion
stated that the timely installation of plantings
depend on stock and time availability of the
forester. Ms. Jones affirmed that there is a
need to define the property line but
questioned if she needs to have plantings.
Chairperson Burmeister suggested that Ms.
Jones work with Forester Wriskey.
Commissioner Starr stated that since Ms.
Jones' property is against the walkway, there
should be a sign there. Director Saarion
stated that Engineer Minetor had suggested
putting up bird houses on 4 x 4's delineating
private and public property. Ms. Jones stated
that she was not keen on signs of any kind.
Commissioner Trettel suggested a garden stone
low to the ground where hikers would see it.
Director Saarion asked the Commission if staff
should look into options on signage and
plantings. Chairperson Burmeister suggested
that plantings done right should be enough.
Sue Rademacher asked if it was the consensus
of the Commission to go with the most
unobtrusive manner, such as putting in corner
property plantings. The Commission stated
that they would attempt that manner.
Commissioner Trettel added that a bridge
would be an unnatural addition.
SILVER VIEW PARK
PATHWAY (CONT'D)
INFORM COMMISSION ON
UPCOMING PROGRAMS
-11 -
Sue Rademacher was unsure what was agreed
upon and asked if the trail was formally
tabled. Chairperson Burmeister declined to
agree to that statement but explained that the
Council will pursue information as 'discussed
this evening. Mayor Hankner added that the
issue of installation of corner property
plantings will go to the City Council.
Commissioner Starr suggested making a
recommendation to the Council. Director
Saarion asked for reaffirmation regarding
approval for Forester Wriskey to put in
plantings; these may not be the permanent
plantings. This is an effort to delineate
private and public property lines.
Commissioner Trettel added that it may be the
whole solution. Chairperson Burmeister asked
that staff work with the residents.
Commissioner Starr moved to direct Forester
Wriskey to plant bushes at the corner lot lines
of residential and park property abutting
Silver View Park at the south-western side of
the pond. These plantings are expected to
help designate public versus private property.
Forester Wriskey will use his own discretion
as to the selected species and spacing of the
plantings. The plantings should be in place by
Fall, 1989. Motion was seconded by
Commissioner Trettel. Motion carred: 4
ayes, 0 nayes.
Director Saarion distributed copies of the
September/October Brochure and a letter
written by Administrative Assistant Linke to
the printer expressing displeasure in the
quality of the printing. Staff reviewed the fall
programs highlighting the "Spring Tree Sale".
Notice of Kelly Lindquist's resignation as
Aquatics Supervisor was given. It was added
that staff is recruiting a replacement for the
position.
ARSENAL UPDATE
SILVER VIEW PARK PICNIC SHELTER
-12 -
Mayor Hankner asked why the pool was not
open in the month August. Mayda Raffee
from the Mounds View Community Education
Board had questioned her on that. Mayor
Hankner stated that Nick Temali had told her
that the reason was because the Recreation
Department didn't schedule classes in August.
Director Saarion stated that the reason classes
weren't scheduled is because the school
district does not issue permits for the last
three weeks of August because the pool area
is repaired and cleaned during that time. The
department, however, has been working with
the custodians to allow seniors to continue
swimming when it does not interfere with
custodial work. It is not available on a
predictable basis and therefore classes cannot
be scheduled.
Staff distributed a letter from Arden Hills
Parks and Recreation Director John Buckley
regarding the proposed Arsenal Playfield. Mr.
Buckley hoped that it would be placed on the
August agenda, however, there is no
indication when it will be acted upon.
Chairperson Burmeister read a letter from the
Mounds View Lion's Club indicating their
dedication of up to $75,000 for the
construction of a picnic shelter at Silver View
Park. It was suggested that a committee of
park commissioners and residents be formed
to proceed in the planning process of the
shelter.
Councilmember Wuori indicated that the
timeline was short and because of the
Celebrate MN grant it must be completed this
year. Mayor Hankner suggested the need to
get a variety of residents involved in the
planning. Chairperson Burmeister suggested
that there be Park Commission representatives,
city residents, staff and Council liaison. He
asked if the Lion's would be interested in
participating. Mayor Hankner indicated that
there were negative feelings over the situation
and they did not want to be involved.
SILVER VIEW PARK
PICNIC SHELTER (CONT'D)
GREENFIELD BASEBALL DIAMOND
-13 -
Commissioner Starr suggested representatives
from community groups such as scouts and
churches as they would be using the shelter.
Chairperson Burmeister stated that it would be
a fast hardworking committee. Mayor
Hankner asked that the Commission
recommend individuals or groups to
participate and have the City Council direct
staff to organize the committee.
Commissioner Starr suggested two park board
members, one councilmember, one senior
citizen and possibly Gary Jones from the
Planning Commission as he is also a resident
from the Silver Lake Park area. It was also
suggested that Peg Mountin be contacted as
an alternate if Mr. Jones is unable to
participate.
Councilmember Quick suggested that since
Jerry Linke had originally designed the park
shelter structure, that he be contacted to help
with the redesign process. Chairperson
Burmeister said that he would contact Mr.
Linke.
A motion was made by Chairperson
Burmeister, seconded by Commissioner Silvis
to present a list of proposed Park Shelter
Committee members to the City Council at the
next council meeting. Motion carried: 4 ayes,
0 nayes.
Staff distributed a letter from Mr. Neal Valley,
a Mounds View resident and coach of the
Mounds View Athletic Association. He was
concerned with the deteriorating condition of
the Greenfield baseball diamond. He would
like to see improved turf, a sprinkling system
and longer outfield fences and dugouts.
Staff stated that there was adequate room at
Greenfield to expand the centerfield and left
field fences. Turf improvement may be an
expensive project because the top soil is poor.
A sprinkling system would be desireable.
These items are not in the five year capital
improvement plan.
GREENFIELD BASEBALL
DIAMOND (CONT'D)
REVIEW LONG TERM
FINANCIAL
-14 -
Mayor Hankner mentioned that $14,000 is
budgeted for the irrigation of the City Hall
fields in 1990. She inquired as to what fields
were used more and who it would serve
better. Staff replied that participants of both
softball and baseball feel they need good
playing fields. After discussion, the
Commission agreed that a meeting should be
set up with the MVAA to ask if they are
interested in discussing options for funding the
improvements and to have staff look into
prices for doing the suggested improvements.
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to direct staff
to invite representatives from the Mounds
View Athletic Association to the next meeting
of the Park and Recreation Commission. In
addition, staff is directed to research costs for
improvements as listed in Mr. Valley's letter.
Motion carried: 4 ayes, 0 nayes.
Staff reviewed the Long Term Financial Plan
with the Commission and asked for any
suggestions. Commissioner Starr asked if the
resolution which was submitted to the City
Council regarding the Long Term Financial
Plan were accepted. Councilmember Wuori
replied that it was not. Director Saarion
reviewed changes that were made in the LTFP
and stated that they were recommended only
to the Council since the Parks and Recreation
Commission is an advisory commission not a
policy making body.
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to forward
the final draft of the Long Term Financial Plan
as submitted by staff and reviewed tonight by
the Park and Recreation Commission, to the
City Council for approval. Motion carried: 4
ayes, 0 nayes.
Commissioner Starr asked Mayor Hankner
why the resolutions submitted to the Council
were not acted upon. Mayor Hankner
responded that nothing pertaining to the
budget has been acted on.
REVIEW PARK MAINTENANCE
RESOLUTION WITH
COUNCILMEMBERS
OTHER BUSINESS
ADJOURNMENT
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
-15 -
Mayor Hankner reviewed Resolution 2516
establishing standards of maintenance for the
City's parks and public works infrastructure.
She stated that this document set a minimum
goal for maintenance within the budgetary
limitations. She also suggested that if
residents inquire about maintenance, that they
be given a copy of the resolution and
maintenance standards to see that the City is
at least meeting the minimum goal of
maintenance.
After discussion, a motion was made by
Commissioner Silvis, seconded by
Commissioner Starr to recommend to the City
Council, the approval of Resolution 2516
establishing standards of maintenance for the
City's parks and public works infrastructure.
Motion carried: 4 ayes, 0 nayes.
Director Saarion distributed copies of the
Department's quarterly report and summer
playground report for the Commission's
edification.
Motion by Commissioner Trettel, seconded by
Commissioner Silvis to adjourn at 9:25 p.m.
Motion carried: 4 ayes, 0 nayes.
citq
ofV0rjgV1'QW
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
DEPARTMENT OF PARKS, 784-3055
RECREATION AND FORESTRY
September 18, 1989
Dear Commissioners:
Representatives from the Mounds View Athletic Association have been invited to
attend the meeting on Thursday, September 28, 1989. They will be able to provide
the Commission with their thoughts and ideas regarding improvement of Greenfield
Park baseball field. I would like to lead the Commission and visitors on a walking
tour of the baseball diamond so that we can have a good visual perspective of the
facility.
Staff has prepared examples of improvements which could be made at Greenfield Park
baseball field along with estimates.
If you are unable to attend this meeting, please notify me at 784-3055, extension
#20.
Sincerely,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
Enclosure
Memo To :Mary Saarion, Director of Parks and Recreation
From :Ric Minetor, City Engineer/Director of Public Works
Date :September 21, 1989
L
Subject :Greenfield Park Baseball Field Expansion
I have developed a rough estimate of the cost of extending the
right field line to 300 feet. The main cost is the piping and
filling of the ditch adjacent to right field. I assumed a total
of 200 feet of ditch will need to be piped. The cost of the pie,
fill, and turf establishment is approximately $25,000. The major
cost is the fill required which accounts for $17,000 of the
total. This is a rough estimate and should not be relied upon for
project cost, the intent is only as a preliminary study cost to
determine if this option should be studied in detail. The actual
costs could be as much as twice the estimate or possibly as
little as half the estimate; the range could be considered to be
$12,500 to $40,000.
F-1
2281 Hampden Avenue P.O. Box 14154 St. Paul, MN 55114 612 / 646-8305
PROPOSAL
To: Ms. Mary Saarion
City of Mounds View
2401 Highway 10 North
Mounds View, MN 55112
Date: September 15, 1989
Proposal Number: 091084A
FOB: Jobsite
Regarding: Revised Quote for Removing, Reinstalling and Adding
Outfield Fencing.
Keller Fence Company, Inc. proposes to furnish and install
the following:
Remove 460' of 72" high chain link with a framework
consisting of 2 1/2" line posts with top and bottom rail.
All posts are earth set and consequently there is no
requirement to remove concrete from posts. Reinstall 460'
of owner furnished material and an additional 290' of new
materials that match existing specification. All line
posts will again be earth set and terminals will be set in
a concrete footing.
FOR A TOTAL COST OF .........$ 5,195.00
The above quotation is firm for a period of thirty (30)
days from the date of this proposal. Keller Fence
appreciates the opportunity to quote on this project and
hope that it merits your favorable review. If you have any
questions or need additional information do not hesitate to
call us at the above number.
r
Sincer&J"
,.
KE FE{VCE , INC .
JAl KELLER
I
7\
NUMBER
r'- r2 > S,c 210
ABLE
INC.FENCE
i 3
FREE ESTIMATES
DATE SOLD
114 E.
ACKER STREET
• ST. PAUL, MINN. 55117
Office: 222-4355
� �
We propose to sell and install a eel��
Al C-
Date •�
on your propert in accordance with sketch uantities fisted below.
it
WOOD --SB AB FT DE
Gauge Wire
Line Post4 -2- Term. 3 Tod Rail,/-4/Ugh
Type
Name B
'P 0 •` ft
Underground Utilities yes no
Address `J
City '41era'✓cI C
Cross Streets
Phone 7 -3 �-�S
Zone
Map Location
QUANTITY
Net
Tax
Permit
Totaa --�
By: !/C f '~
ACCEPTED:
By.
By:
SKETCH
N rn
Tki
Rf
N �
0• !V
�o o/
STREET
We are satisfied with the installation of our fence.
Referral ❑ Newspaper ❑ Signs ❑ Other ❑
Knuckle up ❑ Twist up ❑
Top rail of fence to: follow ground ❑ be level ❑
All quotations subject to conditions beyond our control. Customer Biiling Address, If Different Than Above
agrees to furnish building permits, property lines and stake fence
location. This quotation does not include clearing trees, brush
or other obstructions from working area.
GOOD FENCES MAKE GOOD NEIGHBOgS '>
_I
�im
Net
Tax
Permit
Totaa --�
By: !/C f '~
ACCEPTED:
By.
By:
SKETCH
N rn
Tki
Rf
N �
0• !V
�o o/
STREET
We are satisfied with the installation of our fence.
Referral ❑ Newspaper ❑ Signs ❑ Other ❑
Knuckle up ❑ Twist up ❑
Top rail of fence to: follow ground ❑ be level ❑
All quotations subject to conditions beyond our control. Customer Biiling Address, If Different Than Above
agrees to furnish building permits, property lines and stake fence
location. This quotation does not include clearing trees, brush
or other obstructions from working area.
GOOD FENCES MAKE GOOD NEIGHBOgS '>
T
Screens and f"O", Neff
Ball Park Screens
FOR OUTFIELD FENCES AND BACKSTOPS. CUT OUT
VISUAL DISTRACTIONS FOR THE PLAYER AND THE
AUDIENCE. CAN BLOCK WIND PASSAGES. MADE TO
ORDER.
Composed of heavy duty polypropylene fiber material that will
stand the hazards of all weather conditions. Dark green color
provides the perfect back -drop to improve ball perception for
batters and players, Eliminates sun glare and other distractions.
Comes in standard W heights. All screens bordered with brass
grommets for easy installation. Please specify open or closed
mesh.
SPECIAL SIZES CAN BE MADE
PLEASE CALL US TOLL FREE FOR ESTIMATES
MT6PPXXX Open Mesh ........ . .........only .254 sq. ft.
MT6PPCMX Closed Mesh .....6' only .....only .314 sq. ft.
Protective and
Boundary Netting
FOR BASEBALL/SOFTBALL —
AN ALL WEATHER TREATED MESH
THAT LASTS AND LASTS.
420 NET Custom designed nets for either
protective or demarkation use are yours
from BSN direct. Our baseball/softball
1 VA" mesh is all weather treated and
bordered for a neat modular look and
easy installation. Call for information
and prices.
SN420NET 13/<" mesh for
baseballlsoffbatl ..........254 sq. ft.
600 NET SN60ONET Super heavy duty 1314 " mesh
for baseballlsoftball ........364 sq. ft.
NW
of"
MESK ' 3
v:
:rea.
THE LOW COST, LIGHTWEIGHT PORTABLE
FENCING SYSTEM
FENCE -IT is constructed of durable, knitted polyethylene! It's
tough. versatile and fray resistant. Great for separating playing
fields. Allows for several activities to be played without interfering
with one another.
• Easy to install. Just unroll and fasten to stakes for a neat,
attractive parititicn.
• Distributes stress loads evenly and prevents injury to players
• Available in red, blue, OSHA orange, green, black.
MTFIT--- 36 lbs. per roll, 4611W x 150'L.........$109.00 roll
(Please specify, color choice.)
FENCE -IT STAKES Now available! Fence stakes that give upon
impact the same way as the fence.
• Flexible to withstand repeated impacrs & flexing
• Weather -resistant — won't rust, rot or become brittle.
MSFITSTK .......... , , ...$22.50 ea.
lot
anc
tot
Vic
Sem Pi
2!, F__
Foal P
"CZ
open e
Caroun,
COMF
The
dek
Witt`
van
i
Field covers are custom
made to size in various
weights of mildew -resistant
polyethylene or vinyl -coated
polyester in almost any size
or shape.
L-1212—polyethylene
13 FR-13-oz—polyester
18 FR-18-oz—polyester
1r
i
: i f
Base covers give strategic protection at affordable prices. 6.5 -oz coated polyethylene (L-1212 #}
fabric), with high tear strength and excellent outdoor exposure characteristics. Heat -sealed
seams and double -sewn reinforced perimeters with brass grommets. Plated ground stakes'°`'
s
included.
4C-1010—Base cover, 10' X 10' MC-20C—Mound cover, 20' diameter
'C-26C—Plate cover, 26' diameter •€` "" ~ s`'-�~
'' Protective netting
BAT10—Bat bag holds 10 -. WDN-420-B-1-3/4" mesh,
regulation bats in heavy-duty u: '.. black
waterproof canvas. Straps. I =ti.' "_' WDN-420-G-1-3/4" mesh,
Olive drab.f '
x .i green
-►� ;�'' BB-20—Ball bag holds up
to 20 baseballs in 20" X z
15" nylon mesh. Drawstring
closure.
19
`-------
Barrier netting is an inexpen-
r.
"= r•' �
sive way to contain balls
within an area. 60 -Ib break
,�Iti •',Sid' J ryil, p•, .. . ... .M'::yr...'"
•' K.':;°
T.
polypropylene mesh in 25 X
.�' r,4;a
VI�L7!i."� ��yy�11�yedy�y�iy'+bi i
150' rolls. Custom sizes
available.
.' :`:: :.°.. ,��•
- GBN-1-1" mesh
�y�]✓tir::a--�y...;�::::b.y�.-.Y:F..�.� BBN -2-21r mesh
1r
i
: i f
Base covers give strategic protection at affordable prices. 6.5 -oz coated polyethylene (L-1212 #}
fabric), with high tear strength and excellent outdoor exposure characteristics. Heat -sealed
seams and double -sewn reinforced perimeters with brass grommets. Plated ground stakes'°`'
s
included.
4C-1010—Base cover, 10' X 10' MC-20C—Mound cover, 20' diameter
'C-26C—Plate cover, 26' diameter •€` "" ~ s`'-�~
'' Protective netting
BAT10—Bat bag holds 10 -. WDN-420-B-1-3/4" mesh,
regulation bats in heavy-duty u: '.. black
waterproof canvas. Straps. I =ti.' "_' WDN-420-G-1-3/4" mesh,
Olive drab.f '
x .i green
-►� ;�'' BB-20—Ball bag holds up
to 20 baseballs in 20" X z
15" nylon mesh. Drawstring
closure.
19
`-------
Barrier netting is an inexpen-
r.
"= r•' �
sive way to contain balls
within an area. 60 -Ib break
,�Iti •',Sid' J ryil, p•, .. . ... .M'::yr...'"
•' K.':;°
..i.
strength. 1" and 2" 100%
polypropylene mesh in 25 X
150' rolls. Custom sizes
available.
.' :`:: :.°.. ,��•
- GBN-1-1" mesh
�y�]✓tir::a--�y...;�::::b.y�.-.Y:F..�.� BBN -2-21r mesh
1r
i
: i f
Base covers give strategic protection at affordable prices. 6.5 -oz coated polyethylene (L-1212 #}
fabric), with high tear strength and excellent outdoor exposure characteristics. Heat -sealed
seams and double -sewn reinforced perimeters with brass grommets. Plated ground stakes'°`'
s
included.
4C-1010—Base cover, 10' X 10' MC-20C—Mound cover, 20' diameter
'C-26C—Plate cover, 26' diameter •€` "" ~ s`'-�~
'' Protective netting
BAT10—Bat bag holds 10 -. WDN-420-B-1-3/4" mesh,
regulation bats in heavy-duty u: '.. black
waterproof canvas. Straps. I =ti.' "_' WDN-420-G-1-3/4" mesh,
Olive drab.f '
x .i green
-►� ;�'' BB-20—Ball bag holds up
to 20 baseballs in 20" X z
15" nylon mesh. Drawstring
closure.
19
•
•lisle
rf
wea--l'--
SUPPORT INFORMATION FOR GREENFIELD BASEBALL FIELD IMPROVEMENTS
Turf Options•
A. Sodding with addition of topsoil
200 cu. yds. topsoil @ $7.00 per cu. yd. $2,400.00
3000 rolls sod @ $1.15/roll 3,450.00
Total 5,850.00
B. Slit seeding/broad leaf control/fertilizing
200 cu. yds. topsoil $1.400.00
Seed/machinery, broadleaf control,
fertilizing 11000.
Oa
$2,400.00
Warning Track•
150 ton @ $10.40/ton delivered $1,560.00
650 ft. x 8 ft. x 4 in. @ 5.90/ton
Equipment Shed:
8 ft. x 8 ft. barn style shed unassembled.
Can be placed on flat level ground.
(Menards) $367.86
8 ft. x 8 ft. barn style shed unassembled. 249.00
8 ft. x 12 ft. assembled shed. 551.00
Barn plus $50.00 delivery (Lamperts) 601.00
Backstop•
20 ft. wide x 10 ft. high center section
10 ft. x 10 ft. wings with hood $2,100.00
Netting•
100 ft. x 12 ft. $350.00
Relocation of walking path:
40 ft. bituminous $840.00
60 ft. x 14.00/lineal ft.
Relocation of 5 trees:
$50.00 hr. for 4 hrs. $200.00
single tree spade
MEMO
To: Parks & Recreation Commission
From: Mary Saarion
Date: 9-22-89
Subject: Estimated costs for Greenfield baseball field
improvements.
Below is a
improvements to
is attached.
Improvement
range of estimated prices for various
Greenfield baseball field. Support information
Estimated Cost
Field Expansion
$12,500.00
Expanded Fencing
3,895.00
Warning Track
885.00
Sprinkling System
Available
Equipment Shed
249.00
Dugouts ($4.000.00 ea.)
8,000.00
Backstop
2,500.00
Netting
350.00
Reseeding w/6" topsoil
2,400.00
Resodding w/6" topsoil
4,850.00
Grading (Rental w/staff labor)
600.00
Relocation of 5 trees
(spade rental)
200.00
Relocation of walking path
840.00
$40,000.00
5,195.00
1,560.50
Thursday
601.00
MEMO
To: Park & Recreation Commission
From: Mary Saarion A/�
Date: 9-22-89 CI\_I
Subject: Cost estimates for Silver View pathway
As requested by the Parks and Recreation Commission at the
August meeting, staff has collected estimated costs for trailway
construction options. The estimated distance surrounding Silver
View pond is approximately 6,600 feet. One estimate is given
below. Other estimates will be distributed at the meeting in
order to provide cost comparisons.
Bituminous Consulting & Contracting Co. Inc.
4" base and 2" bituminous $.70/sq. ft.
6 ft. pathway - $4.15/linear ft. $27,165.
8 ft. pathway - $5.50/linear ft. 36,220.
4" base only $.35/sq. ft.
6 ft. pathway - $2.10/linear ft. $13,345.
8 ft. pathway - $2.70/linear ft. 17,770.
Valley Paving
4" base and 2" bituminous 6,600 ft. distance
6 ft. pathway - $4.50/linear ft. $29,700.
8 ft. pathway - $5.35/linear ft. 35,310.
4" base only
6 ft. pathway - $1.55/linear ft. $10,230.
8 ft. pathway - $1.90/linear ft. 12,540.
Since Silver View Park improvements are "on hold" until a
master plan can be developed, staff recommends that this
information be placed in the master plan resource file for
possible future consideration.
MEMO TO: MAYOR AND COUNCIL
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 13, 1989
SUBJECT: COST INFORMATION REGARDING SILVER VIEW PARK BRIDGE
Mr. Sabri Ayaz has provided the City with an estimated cost of a bridge for the Silver
View Park pond narrows. Staff requests council direction regarding any action
requested on this matter.
MS/SL
PLANNING
TFAEsPOFITATiON
NGINEERiNG
URBAN [EESIGN
..Am.s
PHONE 612; 370-0700 FAX: 612-370-1378
SOUTH MINNEAPOLIS MINNESOTA 5515
BRW. INC THRESHER SQUARE '
700 THIRD STREET
September 89 1989
Ms. Mary Sarion
City of Mounds View
2401 Highway 10
Mounds View, Minnesota 55112
Dear Mary, proposed
is the CO�VersViewthousinghcomplex.
As per our conversation theopo d at the Siweathering steel
recreational bridge, will weathering
approxi
-
refabricated, maintenance free,
and handrails. The bridge spanSince no foun-
The estimate is based on using P and 10 feet widths• foundation
frame with treated wood decking the bridge site, two types of bridge
mately 90 feet. The estimate is for 6, 8,
dation investigation is made at
will be considered. files
Estimate #1 - Bridge founded on P = $29,700
$35,300
0 90 Ft. x Bridge = $39,700
6 Ft. � 39�
0 90 Ft. x 8 Ft. Bridge ...•..
x 10 Ft. Bridge
0 90 Ft. no piles)
Estimate #2 - Bridge on spread footing
_ $26,800
... $32,200
6 Ft. Bridge ....... •• .. _
0 90 Ft. x _ $36,900
0 90 Ft. x 8 Ft. Bridge • •. •,.,.
0 90 Ft. x 10 Ft. Bridge •• an this long. For
to be too expensive for a span
t
tion turned up a will be about $46,
The wood brid9ethe cost of all wood bridge
width of 6 Ft. uestions.
Please call me if you have any 4
Sincerely,
BRA(,__ INC.
Sabri Ayaz, PE
IC
SA/Ss SS
T aINGnCSs 11CLSr__. �DG^I:+..� _
aN AFFILIATE �F "HE SENNET -
-•ter NrS- :�aPC__ DAVID IF"
?ETER E
DGNALD 'N RINGr.CSE aICHARD P
S
`NCLSFELD .iA
DALE `I �Ec T. PETERSBURG
C;:IID 3E>Ir;ETT aPA 71CHaPD D P'U]PiM O.
cH^13 Mc>.A'n TUCs N
•,1P PK ''i S'%JE'ISQN - PHOENIX
DENVER
MINNEAPOLIS
MEMO TO: MAYOR AND COUNCIL
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 13, 1989
SUBJECT: SCOTLAND GREEN PATHWAY
Staff was directed to pursue the possibility of acquiring permission from Gaughan
Companies to pursue continuation of the Silver View Park pathway on their Scotland
Court Apartment properties.
Because my prior efforts with Scotland Green management was met without reply, I
was referred to the Gaughan Companies. I met with RoxAnn Hazelton, Director of
Property Management. After touring the site, she was very excited about the pathway
possibility. She presented the idea to the Board of Directors and they were affirmative
as relayed in the attached letter.
Staff realizes that development at Silver View Park is on hold until a master plan is
developed. This memo is for your information only. Staff awaits any direction
council may give regarding this matter.
MS/SL
The Gaughan Companies
Gaughan Land Incorporated, P. J. Gau�,han, Inc., Gaughan Management, Inc., Gaughan Realty
Northtoum Business Center
299 Coon Rapids Blvd., Suite 210, Coon Rapids, Minnesota 55433
September 11, 1989
Mary Saarion
City of Moundsview
2401 Highway # 10
Moundsview, MN 55112
Re: Scotland Green walking path
Dear Mary,
Thank you for taking time to walk around Scotland Green with me.
The Board of Director at the Gaughan Companies agreed to allow
the City of Moundsview to continue the jogging path along the
pond.
Please notify me if an easement is necessary. An easement would
cause a delay due to the additional paper work necessary.
Thank you for your time and concern in this matter.
Si erely,
Rox Ann Hazelton
Director of Property Management
cc: P.J. Gaughan
Dr. & Mrs. Levitan
MEMO TO: MAYOR AND COUNCIL
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 12, 1989
SUBJECT: SILVER VIEW PARK PLANTINGS
On Thursday, August 24, the Parks and Recreation Commission met. Also present
were Mayor Hankner, Councilmembers Quick and Wuori, and visitors Rademacher,
Jones and Golden. As you may recall, one of the agenda topics was Silver View Park
pathway. After discussion, Mayor Hankner proposed that the pathway be postponed
until after a master plan for Silver View Park has been developed.
Discussion continued regarding the problem of designating the area abutting
residential properties at the area of the proposed pathway. Several suggestions were
discussed. Finally, with input from those visitors present; Mr. Rademacher, Mrs. Jones
and Mrs. Golden; the decision was made to recommend to the City Council the
installation of bushes at the property corners designating public versus private
property. This option was chosen by the residents to be the least obtrusive way of
delineating parkland for users.
It was decided that Forester Wriskey be given the authority to choose the species,
spacing and placement of the bushes. Furthermore, this project was to be completed
as soon as possible depending upon the availability of stock. Likewise, a letter was to
be sent to those eight residents informing them of the plant installation. (See
attached).
This recommendation was forwarded to the City Council. On Monday, August 28, the
City Council directed staff to have Forester Wriskey put plantings in, in accordance
with the August 25, 1989 memo from Park and Recreation Director Saarion. (See
attached) .
After City Council approval on Tuesday evening, September 5, the letter, which was
approved and reviewed by the City Council, was mailed on Wednesday morning,
September 6 by certified mail.
Stock was purchased for both the Hillview Park building landscaping project and the
Silver View Park planting project. Staff planted the Hillview Park project on Monday,
September 11 and upon completion in the later afternoon, continued to the Silver
View Park planting project in an effort to get the plants in the ground rather than
leaving them on the truck risking potential stress damage to the plants.
The installation of the 3 foot Amur maple takes staff. approximately 30 seconds to dig
the hole and one minute to plant the bush and cover the base. The time commitment
is minimal. To relocate or reposition the plant takes minimal time.
-2 -
Staff understood that requests for changes may occur from residents after plant
placement. In fact, it would be very difficult for residents to visualize the placement
until the bush is seen in its setting. Relocation can easily occur after planting has
taken place.
Staff also understood that the indicator bushes were requested as temporary plantings
for the purpose of indicating public versus private property for park users until which
time the Silver View Park master plan is developed and further decisions on the use of
that particular area of parkland is made.
MS/SL
MEMO TO: MAYOR AND COUNCIL
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: AUGUST 25, 1989
SUBJECT: PLANTING AT SILVER VIEW PARK
It was recommended at the August 24, 1989 Parks and Recreation Commission
meeting that Forester Wriskey be directed to plant bushes at the corners of residential
and park property located on the southwestern side of Silver View Park pond. These
plantings are expected to help designate public versus private property.
It was recommended that Forester Wriskey use his own discretion as to the selection
of species and spacing of the plantings. The plantings should be planted this fall of
1989.
MS/SL
MEMO TO: MAYOR AND COUNCIL
FROM: MARY SAARION, DIRECTOR e
PARKS, RECREATION AND FORESTRY
DATE: AUGUST 31, 1989
SUBJECT: SILVER VIEW PARK PATHWAY PLANTINGS
Staff requests Council to review the letter prepared by Forester Wriskey informing
property owners abutting the proposed pathway extension of the planting project
directed by Council on August 28, 1989. If this meets with Council approval, the
letter can be sent immediately with plantings to follow the installation of property
stakes.
Staff requests direction as to the exact properties to receive the bushes. Please consult
the attached map. Staff presumes the indicated properties. Please verify if this
presumption if correct.
MS/SL
Attachment
August 29, 1989
Dear Silver View Neighbor:
IView Cftq VOVJS
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY10
MOUNDS VIEW, MINN. 55112
784-7055
The City will be planting "indicator" shrubs to mark the vicinity of the corner stakes of
your south property adjacent to the park.
In keeping with the framework of the eventual planting, the shrub selection will be
compact amur maple (3 ft. planted). The shrubs will be planted by the markers
shortly after they are located.
If you have any questions regarding this planting, please contact me at 784-3055
(Tuesday/Thursday).
Sincerely,
Rick Wriskey, Forester
City of Mounds View
RW/SL
O -S
07
•i j
r•r�}�
I'
i
Ads
� 5
trin4
Lake
W
■ ,
J, r n, Nr
U r
u
i
I
rr
y r n rr r
t
r- '=.=I t.. l.I, •i r".11f��alhrt�ti:r �' .r
R�R I •�� Sle fl �� t .i r, r: �� • `III i I''t
' — j=V�{!firi 7 rM.•q[trrrI , Ingi.l• FIF Irr.l
7.3
•i
• I i �:.a il•.� '
�-� '�Mrl Ni �: IIf,II�ay[I`,i'����.-y�L�Y: �J i�• `'�
inds, view City Council August 28, 1989
;gular Meeting Page Six
-------------------------------------------------------------------------
Mayor Hankner noted they need to work on recruiting
people for this group.
Park and Rec Director Saarion reviewed the bids 19. Consideration
received for the Oakwood Park grading project and of Bid Award
recommended the Council approve the low bid of on Oakwood
Stanway Excavating, Inc. Park Grading
Motion/Second: Blanchard/Paone to award the grading Project
project at Oakwood Park to Stanway Excavating, Inc.
with a bid of $3,850.00, to be funded from the Park
Improvement Fund.
5 ayes 0 nays Motion Carried
Clerk/Administrator Paule_v explained the proposed 20. First Reading
ordinance was drafted per Council direction, based of Ordinance
on action taken by the Legislature. No. 473
Motion/Second: Quick/Wuori to approve the f irst
reading o - --Ordinance No. 473, amending the Municipal
Code of Mounds View by repealing Chapter 108, entitled
"Public Dance Halls", and waive the reading.
5 ayes 0 nays Motion Carried
Ms. Saarion made a slide presentation showing improve- 21. Second Quarter
ments made to each of the City parks over the past Report of Parks,
five years. Recreation and
Forestry
Mayor Hankner reported the Council has discussed Director
plantings at Silver View Park before, to delineate
the private property from the park property. The
Park and Rec Commission has recommending the plantings
begin this fall.
Motion/Second: Quick/Blanchard to direct Staff to
have Forester Wriskey put plantings in in accordance
with the August 25, 1989 metao from Park and Rec
Director Saarion.
5 ayes 0 nays -I-- Motion Carried
Mayor Hankner reviewed the august 25 memo from Ms.
Saarion concerning recommendations for members to
serve on the Silver View Park Picnic Shelter
Planning Committee. It was agreed. that Councilme_mber
Quick would represent the Council. Mayor Hankner
reviewed who the other proposed members would be.
MEMO TO: MAYOR AND COUNCIL
FROM: PARKS, RECREATION AND FORESTRY DIRECTOR
SAARION
DATE: SEPTEMBER 15, 1989
SUBJECT: RESOLUTION NO. 2067 ESTABLISHING A POLICY
FOR PARK LAND THAT ABUTS RESIDENTIAL PROPERTY
Councilmember Quick requested that Staff distribute
Resolution No. 2067 establishing a policy for park land that
abuts residential property. This resolution was developed
by a committee of five homeowners with property abutting
Silver View Park pond and two Parks and Recreation
Commissioners, Wuori and Long. The Task Force Committee
began meeting in June of 1986 under the leadership of former
Director Anderson.
A letter was sent, in the late Fall of 1986, to homeowners
of property abutting park land informing them of the
resolution and requesting their compliance. Because of the
change in computers the soft copy is no longer available and
a hard copy has yet to be found in the files.
MS/MJS
RESOLUTION NO. 2067
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION ESTABLISHING A POLICY FOR
PARK LAND THAT ABUTS RESIDENTIAL PROPERTY
WHEREAS, the City Council of the City of Mounds View is
the custodian of all public park lands within the City boundar-
ies; and
WHEREAS, the City of Mounds View needs to establish pol-
icies to define orderly growth that is mutually beneficial for
all Mounds View residents; and
WHEREAS, the City Council of the City of Mounds View
desires to provide parks and open space lands for the benefit of
all City residents.
NOW, THEREFORE, BE IT RESOLVED that the City Council of
the City of Mounds View hereby adopts the following policy for
the use of park land adjacent to private residental properties;
and
BE IT FURTHER RESOLVED that the it is the policy of the
City of Mounds View that all park land in the City belongs to the
residents on an equal basis and no priority or special attention
will be provided to landowners adjacent to park property; and
BE IT FURTHER RESOLVED that it is the intent of the City
Council of the City of Mounds View to accommodate resident's con-
cerns and or suggestions whenever possible as long as it does not
compromise the general public's access to the use of public park
property; and
BE IT FURTHER RESOLVED that the City Council of the City
of Mounds View hereby direct staff to develop a landscaping plan
outlining the specific tree and shrubbery placement for each of
the City parks which will be reviewed and adopted by the Mounds
View Parks and Recreation Commission; and
BE IT FURTHER RESOLVED that the landscaping plan will
identify future landscaping needs and be prioritized on an annual
basis for City budgeting procedures; and
BE IT FURTHER RESOLVED that the City Council of the City
of Mounds View hereby adopts the following policy statements to
serve as guidelines for the establishment of fencing within the
City parks:
1. Shrubbery, trees and similar foliage should be used
in place of man-made materials.
2. Fencing in general detracts from the visual aesthe-
tics of park property.
Resolution 2067
Page two
3. Water areas, when properly controlled and designed,
is a welcome and integral aspect of the City's park
system and should be encouraged and created whenever
possible. It is not financially feasible nor plaus-
ible to fence each of the City's water areas because
of potential safety hazards.
4. Wherever a potential water hazard should exist, the
City shall place a warning sign near the area to
enhance the citizen's level of safety consciousness.
5. Whenever man-made fences are to be installed, it
should be a wooden and/or earth -tone to blend into
the environment as much as possible.
6. Whenever fences are installed, proper access through
the use of gates, fences overlapping and/or openings,
shall be considered in the design process.
BE IT FURTHER RESOLVED that no permanent or temporary
structures will be allowed on park property including but not
limited to gardens, animal houses, bird feeders or other park
modifications unless formal approval is granted by the City Coun-
cil after review by the Parks and Recreation Commission; and
BE IT FURTHER RESOLVED that the City Council of the City
of Mounds View will adopt a formal maintenance policy outlining
the frequency and type of maintenance that will be provided on
park property, and any modifications to the proposed maintenance
program must be reviewed by the Parks and Recreation Commission
and approved by the City Council; and
BE IT FURTHER RESOLVED that the Mounds View Parks and
Recreation Commission will hold a public hearing whenever the
policy of park land use is modified and/or changed.
BE IT FURTHER RESOLVED that this policy will go into
effect immediately with enforcement to be commenced by City staff
no later than May 1, 1987.
Adopted this 25th day of August, 1986.
ATTEST:
Mayor
(seal)
Clerk -Administrator
MEMO TO: MAYOR AND COUNCIL
FROM: PARKS, RECREATION AND FORESTRY DIRECTOR
SAARION
DATE: SEPTEMBER 15, 1989
SUBJECT: UPDATE ON OAKWOOD PARK IMPROVEMENTS
Oakwood Park playground equipment has been installed along
with the two picnic tables and grill. The tot lot has been
timbered with sand as a base.
City Public Works staff has removed the bushes which
formerly surrounded the old playground equipment, players
benches, backstop, bleachers along with the concrete slabs.
The topsoil import dirt has been delivered and is currently
stockpiled at the site. Imported, common sand material will
be trucked in on Monday and Tuesday, September 18 and 19 at
which time Stanway Construction will begin the grading.
The old ag lime will be piled and Public Works staff will
relocate it to a new position for the Greenfield pathway
aligning it to the Quincy Street sidewalk.
Forester Wriskey will be removing two trees that lie in the
area of the left field. These will be relocated to Hillview
Park picnic area. Forester Wriskey prefers to wait until
after October lst to transplant the trees.
The ballfield backstop has been delivered and is currently
stored in the Public Works area. It will be installed after
the ballfield has been constructed.
If Council has any questions regarding Oakwood Park
improvements, please feel free to call me at 784-3055,
Ext. 20.
NIS / MJS
Ramsey County Department of Public Works
350 St. Peter Street
Suite 270
Saint Paul, Minnesota 55102
(612) 298.4127
September 8, 1989
Mr. Don McNamara
5551 St. Stephen Street
Mounds View, Minnesota 55112
Dear Mr. McNamara:
��, C6,, 2, Lcc,r'
Kenneth E. Weltzin
Director
and
County Engineer
Paul L. Kirkwold
Deputy Director
and
Assistant County Engineer
Thank you for your letter of August 14, 1989, regarding the
construction of a bicycle lane or detached path adjacent to Old
Highway 8 from the New Brighton/Mounds View border to Trunk
Highway 10.
In response to your concern over the need for improvements to
better accommodate bicycles along this section of Old Highway 8,
we have reviewed our 1989-91 Capital Improvement Program (CIP).
The CIP identifies which maintenance and construction projects
are scheduled to be implemented within the three-year time frame
of the program. The reconstruction of this section of Old
Highway 8 is listed in the non -programmed category of the CIP.
As projects are completed in the three-year programmed schedule,
non -programmed projects will enter the three-year schedule based
on their priority score. Based on existing priorities and
current funding levels, this section of Old Highway 8 could be
reconstructed in 1994.
Due to the fact that this section of roadway could be
reconstructed in four years, Ramsey County will not schedule any
major improvements for this section of Old Highway 8, i.e.
shoulder improvements. It is presumed that the reconstructed
roadway would accommodate four lanes of traffic commensurate with
the improved roadway to the south. Ramsey County will consider
the construction of a bicycle lane or detached path if requested
to do so by the city of Mounds View at the time Old Highway 8 is
scheduled for reconstruction.
The City of Mounds View is the agency responsible for initiating
the construction of a bicycle facility along this section of Old
Highway 8. They are responsible for the majority of the cost,
and in the case of the path, the maintenance of the bicycle
facility.
I hope I have adequately addressed
construction of a bicycle facility
the New Brighton/Mounds View Border
Please contact me at 298-4127'if I
to you.
Sincerely,
Kenneth E. Weltzin, P.E.
Director and County Engineer
TM
your concerns over the
adjacent to Old Highway 8 from
to Trunk Highway 10.
can be of further assistance
MEMO TO: MAYOR AND COUNCIL
- FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 13, 1989
SUBJECT: REQUEST APPROVAL DATE FOR PRESENTATION OF SILVER VIEW
PARK POND STUDY BY ENVIRONMENTAL SPECIALTIES
Environmental Specialties has concluded their year-long study of Silver View Park
pond. They are now prepared to present their findings and propose their
recommendations to the City.
Staff recommends that Environmental Specialties be given the opportunity to present
their study results and recommendations at the regular council meeting on Monday,
October 23, 1989.
Staff recommends that community -wide publicity regarding this be initiated so that
residents who are interested can attend this meeting or tune into the cable TV
telecast.
MS/SL
DEPARTMENT OF PARKS,
RECREATION AND FORESTRY
September 21, 1989
Mr. Ronald Peterson
Environmental Specialists
5940 Oaklawn Drive
Edina, MN 55424
d2vie
cif, 0 owl
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
7$43055
Good Day:
I approached the City Council to officially choose a date
for the presentation of information regarding the Silver View
Park pond study. I suggested the dates in October that we
previously talked about. Because budget hearings are scheduled
during the October dates, the Council requested that the
presentation be given on Monday, November 13, 1989 in City Hall
council chambers at 7:00 p.m., during the regular council
meeting. The presentation will be publicized through the City
Newsletter, letters to nearby residents and press releases. The
presentation will be televised on Cable TV.
I hope that this date is convenient for your research group.
Please call me as soon as possible at 784-3055 to confirmtthe
date. I look forward to your presentation. Recently,
with Scott Carlstrom, and he exhuberated his excitement about the
whole study process.
Sincerely,
�7
Mary Saarion, Director
Parks, Recreation and Forestry
MEMO
To: Park and Recreation Commission
From: Mary Saarion �G,
Date: 9-21-89 J
Subject: Purple Loosestrife and Eurasian Watermilfoil
Yesterday, Forester Wriskey and I attended a meeting which
gave information regarding Purple Loosestrife and Eurasian
Watermilfoil. Here is a brief synopsis regarding these two
plants.
Purple Loosestrife is a plant which is infesting wetland
areas. It tends to take over other native plants such a
cattails. It is a pretty, purple flowering plant and is often
times confused for other plants and vise versa. The problem with
Purple Loosestrife is that it is very prolific and tends to take
over an area, choking out other native plants. It does not have
any known natural preditors, and chemical treatment of the plant
has seen limited results. The plant is difficult to get at and
spreads by root, seeds blowing in the wind, seeds dropping and by
fowl.
Purple Loosestrife has been detected in Mounds View in two
places. One location has been along Long Lake Road at the ditch
culvert area of Silver View Park. Ramsey County recently came
out and chemically treated the plants. The other location found
to have Purple Loosestrife has been along the eastern shores of
Spring Lake in the middle of a cattail stand. A few days after
detection, the plants were gone. Evidently someone physically
removed the plants. These plants were growing on private
property.
The main strategy of attack suggested at this meeting was
the education of the hazards of Purple Loosestrife. Staff will be
providing information using various media to try to inform the
public about the hazards and removal of this plant.
Eurasian Watermilfoil is a plant which mats on the top of
lakes. It has been detected in twenty lakes in Minnesota. This
weed is also very prolific and hearty, but fragile. A paddle
wave can break off segments which then multiply. It is
transmitted by weed segments on boats, equipment and waterfowl.
The City is keeping a watchful eye on Spring Lake, and the City
of New Brighton and Ramsey County are doing likewise for Long
Lake.
If you wish additional information, please call me at
784-3055, ext. 20.
Expanding Use of Wildflowers
WILDFLOWER uses by highway
departments, golf courses, and
parks have matured over the past ten
years. These users now need lower -
growing mixtures, native and
naturalized species, more fall -
blooming species, and species that at-
tract wildlife.
Low -growing wildflower species
and mixtures are in demand because
tall mixtures may look unkempt or too
wild in suburban and urban settings.
Mixtures less than 24 in. tall are well-
suited for commercial and residential
developments where a more tra-
ditional, "tamed" look may be appro-
priate. Fall mowing eliminates tall,
dead stalks and helps disperse the
seed. Very low -growing mixtures, 10
in. or less, do not require fall mowing.
Naturalized species are those that
have been introduced into an area
and have persisted because they are
native to regions with similar climates
and soil types. Native and naturalized
species are excellent choices for per-
manent plantings where low mainte-
nance is important. About 20,000
species of wildflowers are native or
naturalized to the United States, of
which only 100 to 200 species are pro-
duced commercially. In addition,
some species are grown or collected
in small quantities, making them
more expensive. The industry is
gradually developing economical
ways to produce a broader selection
of native and naturalized species at
affordable prices.
Regional wildflower mixtures
should contain high percentages of
both native and naturalized species
and be a well-balanced blend of an-
nuals and perennials. Annuals are
■ LOW -GROWING wildflowers enhance
rough at this golf course. Some mixtures
include species that bloom in late fall.
important as a nurse crop for the
slower developing perennials; it is not
as important that annuals be native or
naturalized to the region. Wildflower
seed should meet state standards foi
germination, have high purity (over
95 percent), and contain no noxious
weed seed.
Many wildflower mixtures avail-
able today contain few, if any, fall -
blooming species such as Asters anc
Goldenrods. Asters are famous for
their colorful fall display, and Golden-
rods contrast with the purples, pinks.
and whites of the Asters. New Eng-
land Aster (Aster novae-angliae) is
fall -blooming species that is no«
being commercially produced b,,
Applewood Seed Company, Arvada.
Colorado. Other attractive late -
season bloomers include Autumr
Helenium, Black -Eyed Susan, anc
New York Aster.
Because wildflowers are excellen
choices for low -maintenance areas
they are popular with many gol
course superintendents. Mainte-
nance costs can be reduced by a-
much as 30 percent as compared tc
turf. Popular areas for wildflower.
are in the roughs, in doglegs on fair-
ways, and close to tees. Rather thar
mixtures, some superintendents likt
to plant single species to providt
bright splashes of color that can bt
seen from a distance. Annual wild-
flowers are especially popular for thi-
purpose because they are showy
grow quickly, and tend to bloom al
summer.
102 PUBLIC WORKS for August, 198:
ro v ^s a g
Gr op' ^7 [n9 'Y r y C {N{ v In m
rCD c'
CLOq
n?CL
y W v n G ^s , r rn gri .s
Na 7 n y n o f °- '"' �- m e �i r° E; N �c
J,� o yy ❑ �' moa ten5 El
❑ a rirn 3
`c n �p ►s CD
`d ui m E
=���n y,vrorr+p f ro.^•dar-.4gf.3'V94 y�
roGq _rte^'= �0�n�'Jcrp� �'&iOR "ror � an 0imQ
�m �.� a.�.=' CL 6 as �
ren o."m2,�'3 ry'uao,Rmro. 0CL 0
O c a "r y o nz ` s !"s �n Oq m C° n 51 m WS r° n
lb
(b I'm � R -2c ,oma-`� PL
= rb :n 0 a v CA m m
�❑. t .00-,�. taro �m 0
Z:1 CD
'� • �' n rnb � 47 � r.� '� rR sp c � -.. y �
ro C =" rp 2 a� ro
� to � D .�„'. C• �
CG Z•y n. V�7 a V •'' �•g[0 �''.. v'�"� n
eD
CD
iV
ma
=Mv C C r`Cn'n n _� �� w_r7Oq
'•+00 �r.+�¢-mn <nm�
gD 04
ar m Tt�p --, ry q ake CD
I to CL
Q, n rhe n a
1
r
CIO of v
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN 55112
DEPARTMENT OF PARKS, 784-3055
RECREATION AND FORESTRY
September 18, 1989
Dear Commissioners:
Representatives from the Mounds View Athletic Association have been invited to
attend the meeting on Thursday, September 28, 1989. They will be able to provide
the Commission with their thoughts and ideas regarding improvement of Greenfield
Park baseball field. I would like to lead the Commission and visitors on a walking
tour of the baseball diamond so that we can have a good visual perspective of the
facility.
Staff has prepared examples of improvements which could be made at Greenfield Park
baseball field along with estimates.
If you are unable to attend this meeting, please notify me at 784-3055, extension
#20.
Sincerely,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
Enclosure
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CALL TO ORDER
ROLL CALL
APPROVAL OF MINUTES
COUNCILMEMBER'S REPORT
CHAIRPERSON'S REPORT
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
August 24, 1989
Mounds View City Hall
Council Chambers
6:30 p.m.
The meeting was called to order by
Chairperson Wayne Burmeister at 6:33 p.m.
Commissioners present: Burmeister, Silvis,
Starr and Trettel.
Commissioners absent: Long and Stevenson.
Councilmembers present: Hankner, Quick and
Wuori.
Staff present: Director Saarion and
Administrative Assistant Linke.
Visitors:
Debbie Jones, 7405 Parkview Drive
Sue and Dave Rademacher, 7421 Parkview Dr.
Carole Golden, 7417 Parkview Dr.
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to approve
the July 27, 1989 minutes as written. Motion
carried: 4 ayes, 0 nayes.
None
Chairperson Burmeister reported that at the
upcoming September 6 meeting the committee
will be planning a dedication ceremony for the
Lakeside Beach House. The Spring Lake Park
Lion's Club is still committed to doing more
projects at Lakeside Park. The projects
completed so far are the beach house,
retaining wall and playground. Chairperson
Burmeister further stated that the Lion's are
planning a work day at the park to install sod
around the sides of the beachhouse.
-2 -
CHAIRPERSONS REPORT CONT'D Director Saarion mentioned that purple
loosetrif had been discovered at Spring Lake
and that the weeds will be chemically treated.
This treatment was expected it eradicate the
weeds.
AGENDA ADDITIONS
REVIEW "FESTIVAL IN
THE PARK" PLANS
Director Saarion requested that the following
items be added to the agenda:
1. Review Long Term Financial Plan.
2. Review Silver View Park Shelter plans.
3. Discuss letter regarding Greenfield
baseball diamond.
Director Saarion reviewed the memo dated
August 16 outlining plans for the September
17, 1989 "Festival in the Park" celebration.
Changes to the plan after August 16 are as
follows:
1. City Council approved the hiring of a
warm-up band. "Westbound" Band was
contracted to play from 12:00 noon -
2:00 p.m.
2. Because "Westbound" was hired, the
Kitchen Kutups will not be performing.
3. Councilmember Paone suggested hiring
a local magician to perform a 20 - 40
minute show for a fee of $250.00.
Staff will bring this suggestion to the
Council at Mondays meeting.
Staff further stated that local groups will be
performing between the band sets under the
grove of trees in order to allow the "Rockin'
Hollywoods" time to set up.
There are several community groups doing
food sales and games for fundraising purposes,
but not too many arts and crafts dealers have
registered. It is felt that crafts people will
wait to see what the weather will be like
before registering.
Fca
FESTIVAL UPDATE (CONT'D) Chairperson Burmeister commented that he
liked seeing the local groups involved in the
"Festival".
Director Saarion stated that the promotional
flyers and posters will be sent to businesses
this week and to the schools shortly after
school begins.
REVIEW RESIDENT'S LETTER
REGARDING BICYCLE PATH
ALONG OLD HWY. 8 Staff reviewed a letter received from Mounds
View resident Don McNamara requesting a
bicycle path along the section of Old Highway
8 in Mounds View as it runs from the New
Brighton/Mounds View city limits, north to
the intersection of Highway 10 and County
Road H.
Director Saarion stated that upon reviewing
the letter with City Engineer Minetor, he felt
that the installation of a bicycle path would
not be a priority of the county at this time
since this road is scheduled for improvement
in upcoming years. Director Saarion further
stated that Ramsey County has tentative plans
to make that area a trail access point for the
Rice Creek chain of lakes corridor.
After further discussion, Commissioner Silvis
requested staff to report at the next meeting
the reply from Ramsey County regarding this
request.
REVIEW RESIDENT'S LETTER
REGARDING SILVER VIEW
PARK PATHWAY Director Saarion stated that City staff has
been directed to respond to each item in the
letter from Mrs. Debbie Jones and to give
Council the response at the September 5
agenda meeting.
Mrs. Jones gave Chairperson Burmeister a map
showing the property lines per a land survey.
Chairperson Burmeister stated that he had
drawn a map and would forward that and
additional information he had retrieved from
past minutes and packets, to Director Saarion
for her use.
SILVER VIEW PARK
PATHWAY (CONT'D)
-4 -
Mayor Hankner stated that the City Council
had asked staff to research every aspect of the
letter. She further stated that there is a
change in population and a need to look at
plans, re-evaluation and resident's interests so
that this park can be removed from the
controversial arena. There will also be a need
to find funding for those items not in the
Long Term Financial Plan.
Commissioner Trettel suggested that if a re-
evaluation of people's interests were initiated
by way of a survey, that survey should be of a
random sampling of residents. Silver View is
a community park rather than a neighborhood
park and is intended to serve the entire
community rather than just those residents
living with its boundaries (as is the concept of
neighborhood parks).
Chairperson Burmeister re -stated that he had
found items from previous meetings dating
back to the conception of Silver View Park
with dates, meetings and motions.
Mayor Hankner stated that we need to figure
out what to do in 1989 not 1981, and try to
stick to it. It might be a reaffirmation of
plans that are in place or move things ahead.
What are we going to do as good planning in
this park as a community as a whole.
Mayor Hanker stated that if the pathway is
going in perhaps asphalt should be re-
considered.
Resident David Rademacher stated that the
planning process is badly flawed. Go back to
the original plan. Why was there a bridge
and different shelter? What was planned at
the other end? If we're going to do it, do it
complete.
Chairperson Burmeister responded that the
lake was constructed much different than the
original plan and that changed the other end
and the path.
SILVER VIEW PARK
PATHWAY (CONT'D)
-5 -
Resident Debbie Jones stated that the
demographics of the area has changed. There
are many elderly and young families. These
residents use the area, so their needs should
be taken into consideration.
Commissioner Trettel stated in regards to Ms.
Jones' letter that narrowing the path to a two
person walkway behind Ms. Jones' property
would be a suggestion, as 8 feet may be too
wide.
Mayor Hankner stated that Councilmember
Quick had suggested using asphalt. Mayor
Hankner suggested narrowing the path to 6
feet. Mayor Hankner also added that
woodchips are not easy to walk on. She
added that narrowing the path and getting rid
of the culvert and using the money for the
path is a possibility.
Commissioner Trettel stated that the City
needs to convey to all City residents that it is
City property along the pond. This is not
immediately evident. Some alternatives to
making residents aware of the park property
are:
1. Signs
2. Plantings to delineate the park
property.
3. Stakes - every 10 - 20 feet. There was
a question of safety if stakes are used.
Commissioner Trettel said that the
Commission should explore the least
unobtrusive manner in which to delineate the
park property. He added that Commission
members should be responsible to make sure
all residents can use and enjoy the parks.
Resident Carole Golden stated that one reason
she wants the path is to discourage people
from cutting through her yard. People go
through her yard now. She wants plantings
to dissuade people from going through her
yard.
Commissioner Trettel said he wasn't sure that
plantings would discourage people from
cutting through.
Mayor Hankner stated that the City's
perspective of plantings was to distinguish
City property versus private property.
Commissioner Trettel restated his desire to
have all residents aware that that area of the
park is their's to walk and enjoy.
Mayor Hankner asked if it would be
appropriate to pool together money to look at
plan - look at what's reasonable with money
available from the path and culvert.
David Rademacher suggested that maps
showing access and egress would be a good
idea.
Mayor Hankner stated that time is needed to
look at information from staff for path. This
information will not be available until
September 5. She asked the Commission
what they should do?
Chairperson Burmeister asked staff if a definite
date had been scheduled to begin work on the
pathway.
Director Saarion stated that a definite date
had not been set yet, but that Public Works is
ready to schedule this work.
Commissioner Starr stated that she was in
favor of a narrower path without a culvert.
Director Saarion stated that when the path
was discussed in the spring of 1988, it was
intended to be 6 feet wide. The Public Works
Department had suggested 8 feet wide in
order to accommodate maintenance vehicles
for path maintenance tasks. At that time the
plan for the path was changed to 8 feet wide.
-7 -
Ms. Jones asked what type of work needs to
be done on that side of the pond.
Commissioner Trettel replied that it is
necessary to bring in the maintenance vehicles
to add material to the path. Woodchips need
to be dumped by truck as using wheelbarrows
would be too time consuming.
Ms. Jones further stated that based on the
original plan, she questions whether there
should be a path at all. She understands the
need to delineate the park boundary but
wants another way of showing it. She asked
why a was necessary?
Commissioner Starr replied that the original
reasoning for the installation of a path was for
safety reasons. People were walking on wet
grass and mud. Many of them senior citizens.
Director Saarion added that the installation of
the pathway to continue around the pond was
re-initiated by people who walk the path.
They had requested that the path continue
around the pond.
Ms. Jones said that there should have been a
bridge, not a path, as per the master plan.
Chairperson Burmeister stated that the path
was not constructed to just get from one area
to another, but for exercise. He further stated
that he had went through his notes from
earlier meetings that referred to path
completion.
Ms. Jones stated that it had never been
approved on the master plan.
Chairperson Burmeister said that the minutes
had never mentioned a bridge.
Mayor Hankner questioned the status of the
path behind the apartment buildings. Director
Saarion stated that two letters have been
written to the Gaughan Companies with no
reply.
She added that she had talked to the manager
who was trying to set up a meeting with the
owners. Attorney Meyers recommended that
before any action is taken that approval is
attained from the Gaughan Companies with
the possibility of acquiring an easement later.
Mr. Rademacher stated that blacktop in that
area would not be good because it would shift
and that there are many crevices. He stated
that he had met four from the townhomes on
the trail and they said that "it sure was a long
way around". He asked them if they would
like a bridge and they said yes. He further
stated that they would like the option to take
a bridge because it would be easier for
parents and kids to cross the pond to the
future play equipment site.
Commissioner Trettel stated that installing a
bridge would only reduce the walk by 10-15
percent.
Commissioner Trettel further stated that he
would like to see a program implemented to
maintain a wild buffer shoreline for long
grass. This would be a way of showing
continuous park property as well as filter
fertilizers and provide a habitat for wildlife.
Ms. Golden stated that they did not sod back
to the pond; that was done by the City as a
"Green Area". She further stated that they
didn't fertilize their property. Commissioner
Trettel noted that the grass was not a fine
grass and that it would grow to 12 feet high
if left uncut. Ms. Golden added that if the
property was uncut, there may be a problem
with field mice.
Chairperson Burmeister asked what
Commission action should be taken?
Commissioner Silvis suggested exploring costs.
Chairperson Burmeister asked to see what the
cost of a 6 foot bituminous trail, just to join
the two paths. Mr. Rademacher would like
to know the cost estimate on a bridge across
the narrows of the pond.
SILVER VIEW PARK
PATHWAY (CONT'D)
la
Mayor Hankner suggested that Sabri Ayaz be
contacted regarding bridge design as he had
offered his time in designing a bridge. She
added that she would like to see bushes
planted at the property corners this fall to
help delineate public versus private property.
Director Saarion stated that Forester Wriskey
had expressed concern that plantings may be
injured if planted before pathway installation.
However, it was clarified that these plantings
need only be inexpensive temporary plantings
to designate property corners. Forester
Wriskey has discretion to choose species and
location spacing.
Councilmember Quick asked staff to get a
bituminous bid per linear foot as well as the
total price. Commissioner Silvis requested the
cost estimate of ag lime with a fabric base as
well, 6 feet in width. Chairperson Burmeister
stated that it would be his preference that
should a bridge be installed he would still
want the pathway constructed.
Councilmember Quick suggested that cost
estimates should be 8 foot and 6 foot.
Chairperson Burmeister made a motion to
direct staff to get cost estimates on
construction of a 6 foot wide bituminous trail,
8 foot wide bituminous trail, 6 foot and 8 foot
ag-lime trail with fabric underlayment, and a
per linear foot cost estimate of bituminous
trail. Estimates should be done for both the
entire trail around the pond and the 750 foot
section on the south side of the pond alone.
Funding options for the project should include
re-accessment of the culvert installation and
possible use of such funds for installation of
the bituminous pathway. Motion was
seconded by Commissioner Starr. Motion
carried: 4 ayes, 0 nayes.
Commissioner Starr asked staff to bring cost
estimates, measurements, and wetlands
information regarding bridge installation to
the next commission meeting.
SILVER VIEW PARK
PARK PATHWAY (CONT'D)
-10-
Commissioner Trettel asked staff to research
the possibility of putting up a cheap bridge.
He requested information on additional
considerations such as risk, permits required,
etc.
Chairperson Burmeister directed staff to
reaffirm background information from
residents regarding plantings. He asked which
residents present would be interested in
plantings. Mr. Rademacher and Ms. Golden
expressed interest. Commissioner Starr
restated that the corner property bushes
should be planted this fall to delineate
boundaries.
Commissioner Trettel stated that installation
of the plantings will be a good test if the use
of the path is increased. Director Saarion
stated that the timely installation of plantings
depend on stock and time availability of the
forester. Ms. Jones affirmed that there is a
need to define the property line but
questioned if she needs to have plantings.
Chairperson Burmeister suggested that Ms.
Jones work with Forester Wriskey.
Commissioner Starr stated that since Ms.
Jones' property is against the walkway, there
should be a sign there. Director Saarion
stated that Engineer Minetor had suggested
putting up bird houses on 4 x 4's delineating
private and public property. Ms. Jones stated
that she was not keen on signs of any kind.
Commissioner Trettel suggested a garden stone
low to the ground where hikers would see it.
Director Saarion asked the Commission if staff
should look into options on signage and
plantings. Chairperson Burmeister suggested
that plantings done right should be enough.
Sue Rademacher asked if it was the consensus
of the Commission to go with the most
unobtrusive manner, such as putting in corner
property plantings. The Commission stated
that they would attempt that manner.
Commissioner Trettel added that a bridge
would be an unnatural addition.
SILVER VIEW PARK
PATHWAY (CONT'D)
INFORM COMMISSION ON
UPCOMING PROGRAMS
-11-
Sue Rademacher was unsure what was agreed
upon and asked if the trail was formally
tabled. Chairperson Burmeister declined to
agree to that statement but explained that the
Council will pursue information as discussed
this evening. Mayor Hankner added that the
issue of installation of corner property
plantings will go to the City Council.
Commissioner Starr suggested making a
recommendation to the Council. Director
Saarion asked for reaffirmation regarding
approval for Forester Wriskey to put in
plantings; these may not be the permanent
plantings. This is an effort to delineate
private and public property lines.
Commissioner Trettel added that it may be the
whole solution. Chairperson Burmeister asked
that staff work with the residents.
Commissioner Starr moved to direct Forester
Wriskey to plant bushes at the corner lot lines
of residential and park property abutting
Silver View Park at the south-western side of
the pond. These plantings are expected to
help designate public versus private property.
Forester Wriskey will use his own discretion
as to the selected species and spacing of the
plantings. The plantings should be in place by
Fall, 1989. Motion was seconded by
Commissioner Trettel. Motion carried: 4
ayes, 0 nayes.
Director Saarion distributed copies of the
September/October Brochure and a letter
written by Administrative Assistant Linke to
the printer expressing displeasure in the
quality of the printing. Staff reviewed the fall
programs highlighting the "Spring Tree Sale".
Notice of Kelly Lindquist's resignation as
Aquatics Supervisor was given. It was added
that staff is recruiting a replacement for the
position.
ARSENAL UPDATE
SILVER VIEW PARK PICNIC SHELTER
-12 -
Mayor Hankner asked why the pool was not
open in the month August. Mayda Raffee
from the Mounds View Community Education
Board had questioned her on that. Mayor
Hankner stated that Nick Temali had told her
that the reason was because the Recreation
Department didn't schedule classes in August.
Director Saarion stated that the reason classes
weren't scheduled is because the school
district does not issue permits for the last
three weeks of August because the pool area
is repaired and cleaned during that time. The
department, however, has been working with
the custodians to allow seniors to continue
swimming when it does not interfere with
custodial work. It is not available on a
predictable basis and therefore classes cannot
be scheduled.
Staff distributed a letter from Arden Hills
Parks and Recreation Director John Buckley
regarding the proposed Arsenal Playfield. Mr.
Buckley hoped that it would be placed on the
August agenda, however, there is no
indication when it will be acted upon.
Chairperson Burmeister read a letter from the
Mounds View Lion's Club indicating their
dedication of up to $75,000 for the
construction of a picnic shelter at Silver View
Park. It was suggested that a committee of
park commissioners and residents be formed
to proceed in the planning process of the
shelter.
Councilmember Wuori indicated that the
timeline was short and because of the
Celebrate MN grant it must be completed this
year. Mayor Hankner suggested the need to
get a variety of residents involved in the
planning. Chairperson Burmeister suggested
that there be Park Commission representatives,
city residents, staff and Council liaison. He
asked if the Lion's would be interested in
participating. Mayor Hankner indicated that
there were negative feelings over the situation
and they did not want to be involved.
SILVER VIEW PARK
PICNIC SHELTER (CONT'D)
GREENFIELD BASEBALL DIAMOND
-13 -
Commissioner Starr suggested representatives
from community groups such as scouts and
churches as they would be using the shelter.
Chairperson Burmeister stated that it would be
a fast hardworking committee. Mayor
Hankner asked that the Commission
recommend individuals or groups to
participate and have the City Council direct
staff to organize the committee.
Commissioner Starr suggested two park board
members, one councilmember, one senior
citizen and possibly Gary Jones from the
Planning Commission as he is also a resident
from the Silver Lake Park area. It was also
suggested that Peg Mountin be contacted as
an alternate if Mr. Jones is unable to
participate.
Councilmember Quick suggested that since
Jerry Linke had originally designed the park
shelter structure, that he be contacted to help
with the redesign process. Chairperson
Burmeister said that he would contact Mr.
Linke.
A motion was made by Chairperson
Burmeister, seconded by Commissioner Silvis
to present a list of proposed Park Shelter
Committee members to the City Council at the
next council meeting. Motion carried: 4 ayes,
0 nayes.
Staff distributed a letter from Mr. Neal Valley,
a Mounds View resident and coach of the
Mounds View Athletic Association. He was
concerned with the deteriorating condition of
the Greenfield baseball diamond. He would
like to see improved turf, a sprinkling system
and longer outfield fences and dugouts.
Staff stated that there was adequate room at
Greenfield to expand the centerfield and left
field fences. Turf improvement may be an
expensive project because the top soil is poor.
A sprinkling system would be desireable.
These items are not in the five year capital
improvement plan.
GREENFIELD BASEBALL
DIAMOND (CONT'D)
REVIEW LONG TERM
FINANCIAL
-14-
Mayor Hankner mentioned that $14,000 is
budgeted for the irrigation of the City Hall
fields in 1990. She inquired as to what fields
were used more and who it would serve
better. Staff replied that participants of both
softball and baseball feel they need good
playing fields. After discussion, the
Commission agreed that a meeting should be
set up with the MVAA to ask if they are
interested in discussing options for funding the
improvements and to have staff look into
prices for doing the suggested improvements.
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to direct staff
to invite representatives from the Mounds
View Athletic Association to the next meeting
of the Park and Recreation Commission. In
addition, staff is directed to research costs for
improvements as listed in Mr. Valley's letter.
Motion carried: 4 ayes, 0 nayes.
Staff reviewed the Long Term Financial Plan
with the Commission and asked for any
suggestions. Commissioner Starr asked if the
resolution which was submitted to the City
Council regarding the Long Term Financial
Plan were accepted. Councilmember Wuori
replied that it was not. Director Saarion
reviewed changes that were made in the LTFP
and stated that they were recommended only
to the Council since the Parks and Recreation
Commission is an advisory commission not a
policy making body.
A motion was made by Commissioner Silvis,
seconded by Commissioner Starr to forward
the final draft of the Long Term Financial Plan
as submitted by staff and reviewed tonight by
the Park and Recreation Commission, to the
City Council for approval. Motion carried: 4
ayes, 0 nayes.
Commissioner Starr asked Mayor Hankner
why the resolutions submitted to the Council
were not acted upon. Mayor Hankner
responded that nothing pertaining to the
budget has been acted on.
REVIEW PARK MAINTENANCE
RESOLUTION WITH
COUNCILMEMBERS
-15 -
Mayor Hankner reviewed Resolution 2516
establishing standards of maintenance for the
City's parks and public works infrastructure.
She stated that this document set a minimum
goal for maintenance within the budgetary
limitations. She also suggested that if
residents inquire about maintenance, that they
be given a copy of the resolution and
maintenance standards to see that the City is
at least meeting the minimum goal of
maintenance.
After discussion, a motion was made by
Commissioner Silvis, seconded by
Commissioner Starr to recommend to the City
Council, the approval of Resolution 2516
establishing standards of maintenance for the
City's parks and public works infrastructure.
Motion carried: 4 ayes, 0 nayes.
OTHER BUSINESS Director Saarion distributed copies of the
Department's quarterly report and summer
playground report for the Commission's
edification.
ADJOURNMENT Motion by Commissioner Trettel, seconded by
Commissioner Silvis to adjourn at 9:25 p.m.
Motion carried: 4 ayes, 0 nayes.
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
MS/SL
MEMO TO: PARKS AND RECREATION COMMISSION
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 22, 1989
SUBJECT: ESTIMATED COSTS FOR GREENFIELD BASEBALL FIELD
IMPROVEMENTS
Below is a range of estimated prices for various improvements to Greenfield baseball
field. Support information is attached.
IMPROVEMENT
Field Expansion
Expanded Fencing
Warning Track
Sprinkling System
Equipment Shed
Dugouts ($4,000.00 each)
Backstop
Netting
Reseeding w/6" topsoil
Resodding w/6" topsoil
Grading (rental w/staff labor)
Relocation of 5 trees (spade rental)
MS/SL
ESTIMATED COST
$12,500.00 - $40,000.00
3,895.00-
5,195.00
885.00 -
1,560.50
10,000.00-
12,000.00
249.00-
601.00
8,000.00
2,500.00
.].,, 350.00
2,400.00
' 4,850.00
600.00
200.00
$46,429.00 $78,256.50
MEMO
To: Park & Recreation Commission
From: Mary Saarion �/„
Date: 9-22-89 _1
Subject: Cost estimates for Silver View pathway
As requested by the Parks and Recreation Commission at the
August meeting, staff has collected estimated costs for trailway
construction options. The estimated distance surrounding Silver
View pond is approximately 6,600 feet. One estimate is given
below. Other estimates will be distributed at the meeting in
order to provide cost comparisons.
Bituminous Consulting & Contracting Co. Inc.
4" base and 2" bituminous $.70/sq. ft.
6 ft. pathway - $4.15/linear ft. $27,165.
8 ft. pathway - $5.50/linear ft. 36,220.
4" base only $.35/sq. ft.
6 ft. pathway - $2.10/linear ft. $13,345.
8 ft. pathway - $2.70/linear ft. 17,770.
Valley Paving
4" base and 2" bituminous 6,600 ft. distance
6 ft. pathway - $4.50/linear ft. $29,700.
8 ft. pathway - $5.35/linear ft. 35,310.
4" base only
6 ft. pathway - $1.55/linear ft. $10,230.
8 ft. pathway - $1.90/linear ft. 12,540.
Since Silver View Park improvements are "on hold" until a
master plan can be developed, staff recommends that this
information be placed in the master plan resource file for
possible future consideration.
FIVE YEARS OF PARK IMPROVEMENTS
What improvements have taken place in the
parks in the last five years? That is a
questions that Parks and Recreation
Commissioners are often asked. Following is
an overview of improvements to our City parks
over the past five years. The Parks and
Recreation Commission must plan for park
improvements based on the limited monies
available. Because of government grants, park
foundations, and donations the City Council
has been able to approve the funding of these
park improvements requested by the Parks and
Recreation Commission. If you have interests
in park improvements, please call and relay
your desires to any of the Parks and Recreation
Commissioners listed below:
Chairperson Wayne Burmeister (786-2585)
Commissioner David Long (784-1349)
Commissioner Frank Silvis (784-4587)
Commissioner Pam Starr (780-2409)
Commissioner Gary Stevenson (786-4638)
Commissioner Edd Trettel (780-3941)
1985 PARK IMPROVEMENTS
Greenfield Park - LAWCON Park Development
- Relocation of baseball field with fencing,
backstop and bleachers.
- Installation of lighted tennis courts and hard
surface play area.
- Installation of bituminous pathway and ag-
lime nature trail including the installation of
two wooden pathway bridges.
- Installation of paved parking lot and entry.
- Regrading for berm, storm water ditch
improvement and landscaping.
1986 PARK IMPROVENIF.NTS
Ciry Hall Paris - Installation of outfield fences
for the two adult softball fields.
Greenfield Par' - Installation of playground
equipment.
Groveland Park
- Installation of sand volleyball court.
Installation of playground.
- Landscaping park building.
- Installation of new windows.
1987 PARK IMPROVENW=
City Hall Park
- Installed pre-school age play equipment.
- Installed twin sand volleyball courts.
- Installation of sprinkling system in front of
City Hall.
Greenfield Park - Installation of horseshoe
courts (Eagle Scout project).
Groveland Park
- Installed twin tennis courts and hard surface
court play area.
- Installed tennis court lighting.
- Constructed a skating rink entry for winter
skating.
- Installed security lighting system.
Lambert Park
- Constructed a skating rink boardwalk.
- Replaced three garage door panels with
three permanent wooden walls with one
window.
Woodcrest Park
Installed playground equipment.
- Installed picnic tables and grill.
- Landscaped the park building.
- Improved the parking lot.
Re -located the direction of the pleasure rink.
Random Park
- Re -located a portable classroom building and
set on a permanent foundation.
- Landscaped the building area.
- Established a parking lot.
- Improved drainage.
Constructed retaining drainage area of the
berms.
- Installed toilet facilities in the building.
- Installed electricity and security lighting.
Silver View Park - Construction of a bridge
across the ditch on the west side of the pond.
1988 PARK IMPROVENIENI'S
Ardan Park
Maintained windrows, prepared for compost
distribution and collection of leaves.
- Installed class 5 rock on driveway.
City Hall Park
Installed portable toilet enclosures.
Re -roofed picnic shelters.
Greenfield Park
- Installed drain pipes.
- Installed drinking fountain.
- Installed portable toilet enclosure.
Installed tennis court sign.
- Moved sign and flower bed for better
viewing.
Groveland Park
- Installed drinking fountain.
- Installed portable toilet enclosure.
Installed tennis court sign.
Hillview Park
- Installed new play structure
- Re -located building.
- Improved drainage.
Installed new electrical lighting system.
Lambert Park
- Installed a timber border around the tot lot.
Installed portable toilet enclosure.
- Installed permanent walls and two windows.
Oakwood Park
Removed old play structure.
Installed portable toilet enclosure.
Random Park
Installed parking lot boundary posts.
- Installed picnic table and grill.
Silver View Park
- Installed curb and asphalt surface to parking
lot.
- Installed hard court surface play area.
Installed portable toilet enclosure.
. Installed park sign.
Woodcrest Park
- Installed maintenance gate.
- Installed parking lot boundary posts.
- Installed drinking fountain.
Improved drainage.
Installed portable toilet enclosure.
1989 PARK 1MPROVEMENI'S (incomplete)
As of August 15, 1989
Ardan Park - Maintained windrows, prepared
for collection of leaves.
Citv Hall Park
- Installed park regulation/curfew signs.
- Warning tracks installed on two adult
softball fields.
Greenfield Park
Installed park regulation/curfew signs.
Installed park security lighting.
Groveland Park
- Installed park regulation/curfew signs.
- Remodeled the building interior.
- Park sign timbering re -structured.
Hillview Park
- Installed picnic tables, grill and decorative
trash container.
- Landscaped around bldg./picnic area.
- Installed a sand volleyball court (Eagle Scout
project).
- Installed drinking fountain.
- Installed park regulation/curfew signs.
Lambert Park
- Installed park regulation/curfew signs.
- Installed permanent decorative trash
container.
Woodcrest Park
- Remodeled the building interior.
- Installed park regulation/curfew sign
Silver View Park
Installed a sprinkling system for the softball
fields with coupling capabilities for the tree
grove and berms.
- Backfilled the curbs, disced the soccer field.
- Installed additional park regulation and
curfew signs.
Random Park
- Re -shingled the roof, increased insulation.
- Planted bushes around the parking lot
perimeter.
• Installation of permanent decorative trash
container.
Lakeside Beach - Constructed new beach house.
ANTICIPATED PROJECTS TO BE COMPLETED;
Oakwood Park
* Re -location of the softball fields.
* Installation of playground, picnic tables and
grill.
* Installation of sand volleyball court and
horseshoe court.
Silver View Park
* Pond management proposal to be presented
in September/October.
* Turf management program.
* Installation of warning tracks on the two
softball fields.