HomeMy WebLinkAbout09/27/1990V�r
W1KI.
CITY OF MOUNDS VIEW
PARKS AND RECREATION COMMISSION
AGENDA
CALL TO ORDER
September 27, 1990
City Hall Council Chambers
6:30 p.m.
APPROVAL OF THE AUGUST 16, 1990 MINUTES
COUNCILMEMBER'S REPORT
CHAIRPERSON'S REPORT - LAKESIDE PARK STATUS
AGENDA ADDITIONS
REVIEW "FESTIVAL IN THE PARK"
SILVER VIEW PARK IMPROVEMENT PLAN UPDATE
REVIEW MEMO REGARDING CITY HALL
ATHLETIC FIELD LIGHTING
UPDATE ON ACTION TAKEN BY THE CITY COUNCIL
REGARDING PARK MAINTENANCE CONTROL AND
RESPONSIBILITY
INFORMATION FROM GAMETIME REGARDING GREENFIELD
PARK PLAYGROUND EQUIPMENT
REVIEW AND DISCUSS 1991 PARKS CAPITAL IMPROVEMENT
BUDGET REQUESTS
XII. ADJOURNMENT
MINUTES OF THE PROCEEDINGS OF THE
PARKS AND RECREATION COMMISSION
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
August 16, 1990
Mounds View City Hall
6:30 p.m.
CALL TO ORDER The meeting was called to order at 6:36 p.m. by
Chairperson Burmeister.
ROLL CALL Commissioners present: Burmeister, Long, Trettel,
Stevenson, Starr and Silvis.
Staff present: Director Saarion
MINUTES A motion was made by Commissioner Silvis,
seconded by Commissioner Long to approve the
July 18, 1990 minutes as written. Motion passed: 5
ayes, 0 nayes.
CHAIRPERSON'S REPORT Chairperson Burmeister reported on park
development at Lakeside Park . He informed the
Commission that peat material needed to be removed
in one section of the pathway near the softball field
and also the need for additional material for fill.
GREENFIELD PARK The Commission members drove to Greenfield Park
to observe the progress of the baseball field
improvement project and to inspect the playground
equipment.
A resident notified the department of his concern
regarding a cable rope on the play equipment at
Greenfield. The cable rope is to be used as a
monkey climb from pole to pole. Evidently, the
resident's daughter, 9 years old, had used the rope as
a high -wire and attempted to walk on the rope. She
fell and bruised her tailbone.
1
As the Commission observed the play equipment, it
was noted that the rope could be removed. It was
noted that if the rope was lowered, it would attract
the younger children, for which it is not designed.
The height of the play equipment is designed to fit
the motor skills and development of appropriate
ages.
Moving the rope would alter the equipment, thus
altering the specifications of the manufacture's
warranty. It was the Commissioner's request that
staff contact Gametime to inquire about any other
concerns regarding this apparatus and their
recommendations.
BOND REFERENDUM Commissioner Silvis reported the discussion of the
Council and the ultimate decision to go with only
the fire department's request.
PUPPET WAGON Director Saarion informed the Commission of the
need for a new puppet wagon. This item will be
included in the Capital Parks Budget for 1991.
Commissioner Stevenson commented that he heard
from a resident that the puppet wagon performances
were not as good as usual this year. Director
Saarion replied that she had many positive remarks
but also had a negative comment by a resident. The
resident happened to be the same individual that had
remarked to Commissioner Stevenson. Because of
the discrepancy in comments, staff sent evaluation
forms to summer playcenter participants. The great
majority of the evaluations were received with
positive comments regarding the puppet wagon.
SILVER VIEW PARK Director Saarion informed the Commission that
Councilmembers and Director Saarion were invited to
the annual membership meeting of the Silver Lake
Woods Homeowners Association to listen to their
thoughts concerning the Silver View Park
Improvement Plan. The meeting is Wednesday,
September 5 at City Hall lower level. Commissioners
are invited to attend.
2
PARKS MAINTENANCE Director Saarion reviewed the memo to Council
regarding park maintenance. Basically staff requests
that whoever has control of park maintenance should
also have the responsibility. In the past, the Parks
and REcreation Department had the responsibility,
but no control regarding park maintenance. Since
Public Works has control of park maintenance, it is
suggested that Public Works also be given the
responsibility for the operations budget and assume
responsibility of the parks maintenance services.
SECOND QUARTER
DEPARTMENT REPORT Director Saarion reviewed the second quarter
department report. The Commission had no
questions or comments.
"GYPSY" REVIEW Commissioner Silvis reported on the Mounds View
Community Theater production of "Gypsy". The
audience numbers were less than anticipated. The
production will run in a budget deficit. However,
the production was good and the audiences were
well pleased with the show.
ADJOURNMENT Commissioner Stevenson made a motion to adjourn
the meeting, seconded by Commissioner Long. The
motion passed: 5 ayes, 0 nayes. The meeting
adjourned at 8:15 p.m.
Resp
ectfully
Parks, Recreation and Forestry
MS/sl
3
r-,
PARKS MAINTENANCE Director Saarion reviewed the memo to Council
regarding park maintenance. Basically staff requests
that whoever has control of park maintenance should
also have the responsibility. In the past, the Parks
and REcreation Department had the responsibility,
but no control regarding park maintenance. Since
Public Works has control of park maintenance, it is
suggested that Public Works also be given the
responsibility for the operations budget and assume
responsibility of the parks maintenance services.
SECOND QUARTER
DEPARTMENT REPORT Director Saarion reviewed the second quarter
department report. The Commission had no
questions or comments.
"GYPSY" REVIEW Commissioner Silvis reported on the Mounds View
Community Theater production of "Gypsy". The
audience numbers were less than anticipated. The
production will run in a budget deficit. However,
the production was good and the audiences were
well pleased with the show.
ADJOURNMENT Commissioner Stevenson made a motion to adjourn
the meeting, seconded by Commissioner Long. The
motion passed: 5 ayes, 0 nayes. The meeting
adjourned at 8:15 p.m.
Respectfully submitted,
zz±��
Parks, Recreation and Forestry
MS/sl
k,
MEMO TO: PARKS AND RECREATION COMMISSION
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 20, 1990
SUBJECT: SILVER VIEW PARK IMPROVEMENT PLAN
Please review the enclosed plan. It has been re -written to include revisions directed
by the City Council.
This plan will be considered for approval at the City Council meeting on Monday,
September 24, 1990.
MS/SL
Enclosure
citq
Ofvouhj�ViQ
*I
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
764-3055
FAX: 784-3462
September 20, 1990
Dear Parks and Recreation Commissioner:
The regular Parks and Recreation Commission meeting will be held Thursday,
September 27, 1990 at 6:30 p.m. at City Hall Council Chambers.
Remember the "Festival in the Park" being held Saturday, September 22 at City Hall
Park. Refer to the schedule printed on the enclosed flyer.
If you are unable to attend the Commission meeting, please call me at 784-3055.
Gary Stevenson is celebrating his "29th" birthday the evening of our meeting, We are
so pleased that he has chosen to celebrate with us.
Sincerely,
zzn, Director
Parks, Recreation and Forestry
MS/SL
Enclosure
printed on recycled paper
4
MEMO TO:, MAYOR AND COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 13, 1990
SUBJECT: FURTHER DISCUSSION REGARDING SILVER VIEW PARK
IMPROVEMENT PLAN
As directed by Council, letters have been sent to Mr. Ash representing the Silver Lake
Woods Homeowners Association, the Parks and Recreation Commissioners and Task
Force members requesting their presence at the agenda meeting to further discuss the
improvement proposal for Silver View Park.
It is staffs hope that the Council will decide on revisions to the plan as desired or as
seen fit so that staff can insert the revisions to the plan as quickly as possible for final
approval on September 24, 1990.
MS/SL
MEMO TO: MAYOR & COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR -
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 12, 1990
SUBJECT: SYNOPSIS OF CONCERNS EXPRESSED BY THE MANOR
HOMEOWNERS ASSOCIATION -,SEPTEMBER SEPTEMBER 5, 1990
On Wednesday, September 5, 1990, Councilmembers Blanchard, Paone and I attended
the annual Silver Lake Woods Manor Homeowners Association meeting to listen to
their concerns regarding the Silver View Park proposal. The membership agreed with
the overall park concept plan as recommended in the proposal. Many of their specific
concerns are addressed in the proposal including:
I. WEEDS IN THE POND. They, too, agreed that week harvesting must begin as
soon as possible and agreed that it i~ a top priority for the pond area as
indicated in the proposal.
2. CONTROL OF POND FRINGE WOODY GROWTH_ The association is willing to
offer volunteer services in a supervised and controlled activity of trimming
woody brush from the pond fringe, understanding that a grassy buffer area
around pond will remain to provide a filtering element for pond run-off and to
help prevent pond penetration of trash and litter.
3. SCENIC VISTA AREAS. The membership agreed with the proposaPs
recommendation of mowed scenic vista areas.
4. PATHWAY. The membership was unanimously in favor of continuing the
pathway completely around the pond and agrees that it is a top priority.
The membership was in opposition to three elements of the proposal.
1. HARD SURFACE PATHWAY ALONG NORTHSIDE OF POND PATHWAY. The
membership unanimously agreed that a hard surface pathway will deteriorate
the nature aspect of the pond area and invite dangers of fast-moving users on a
walking path and detract wildlife in the pond area.
2. BRIDGE OVER THE NARROWS. The membership questions the need for a
bridge across the narrows, expressing their thoughts that pathway users choose
to walls for exercise and the pond pathway, if continued, is good enough.
3. EASEMENT CONNECTION TO LIBRARY. None of the homeowners wishes to
have an easement between the manor homes. It was the opinion of the
membership that when the sidewalk on Long Lake Road is finished, the
connection of the pond path and Long Lake Road sidewalk will provide an
adequate access avenue to the library.
-2-
4. PARK LIGHTING. The membership reiterated their desire to have no lighting at =
the park. {Lighting is not addressed or -
1 recommended in the proposal..)
The membership requested that the City look into two special requests:
1. Spraying for ragweed and Canadian thistles and nettles.
2. The membership would like the City Engineer to check on the outlet flow at
Long Lake Road. It was suggested that perhaps water flow has been hampered.
The membership concluded that they were eager and willing to assist the City with
volunteer services and requested expediency in these matters concerning Silver View
Park.
MS/SL
SILVER VIEW PARK
IMPROVEMENT
PLAN
SEPTEMBER, 1990
TABLE OF CONTENTS
LETTERS OF RECOMMENDATION ................ 3-4
INTRODUCTION ............................. 5
SILVER VIEW PARK IMPROVEMENT PLAN ......... 6-15
WORKING PAPERS:
POND AREA PLAN ................. 17-21
PASSIVE/NATURE AREA PLAN ......... 22-31
ACTIVE AREA PLAN ................ 32-57
APPENDIX:
TASK FORCE MEETING MINUTES .............. 58-68
MANAGEMENT STUDY OF SILVER VIEW PARK POND . 69-93
May, 1990
I V1,
0 0U� Se
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
784-3055
FAX: 784-3462
Dear Councilmembers and Parks and Recreation Commissioners:
We, the Silver View Park Task Force, thank you for giving us the opportunity to
review the priorities for park improvements at Silver View Park. As you review this
plan, please remember that it was our attempt to represent the whole community with
facility recommendations that are desireable for many ages and interests.
The narrative reflects the group's recommendations regarding park concept issues,
funding options and schedule, and future plan flexibility.
We look forward to meeting with you and reviewing our recommendations for the
Silver View Park plan.
Sincerely
THE SILVER VIEW PARK TASK FORCE
George Andres Deborah Ashworth
Ron Fagerstrom Adeline Lee
David Long Ron Margo
David Rademacher
3
printed on recycled paper
C(t4 of VOUH gvile
RAMSEY COUNTY, MINNESOTA
2401 HIGHWAY 10
MOUNDS VIEW, MINN. 55112
784-3055
FAX: 784-3462
May 30, 1990
To the Mounds View City Council:
The Mounds View Parks and Recreation Commission has reviewed the proposal for
improvements to Silver View Park as recommended by the Silver View Task Force.
The Commission recommends three modifications. One is the recommendation of a
hard surface pathway on the north side of the pond from Long Lake Road to the
picnic shelter.
The second recommendation is the provision of two play structures, one in front of
the picnic shelter specifically for pre-schoolers and one to the west of the picnic
shelter, to be handicapped accessible and designed for 6-12 year olds.
The third recommendation is to add sprinkling capabilities for future needs at the
soccer field and picnic shelter area.
The Commission unanimously and wholeheartedly approves the Silver View Park
Improvement Plan, including these additions, and recommends adoption by the City
Council, and requests implementation as soon as possible.
Wayne Burmeister, Chairperson
Frank Silvis, Commissioner
David Long, Commissio r Pam Starr, Commis ' ner
n
Gary Stevenson, Commissioner Edd Trettel, Commissioner
4
printed on recycled paper
INTRODUCTION
On November 13, 1990; the City Council appointed seven residents to form the Silver
View Park Task Force. This Task Force was commissioned to propose
recommendations regarding an improvement plan for Silver View Park to serve as a
plan for future improvements. Information received in the City survey by Decision
Resources, Ltd. and the Silver View Park Pond Management Study, prepared by
Environmental Specialists, was to be considered in the planning process. The plan
was to include facility improvements, funding recommendations, and a schedule or
time line for improvements to occur.
The Task Force met as a group three times. The first meeting included these six
items:
1. Reviewed the task of the committee.
2. Discussed the survey results regarding Silver View Park.
3. Reviewed the pond management study and Environmental Specialists
recommendations.
4. Became familiar with the present park facility map.
5. Reviewed past improvement recommendations and costs.
6. Discussed options for a plan for Silver View Park improvements.
The second meeting expanded on improvement ideas. The third meeting was to
review the collection of ideas and concepts for the park and to finalize the written
document. Minutes of these three meetings are provided in the appendix of this
document.
A joint meeting with the City Council, Parks and Recreation Commission and Task
Force was held on May 7, 1990 to review the proposal. At the conclusion of the
meeting, the Council requested that the entire Parks and Recreation Commission
review the proposal and offer a recommendation. The Parks and Recreation
Commission reviewed the proposal at their regular meeting on May 24, 1990 and
upon inclusion of three changes, which are included in their letter of recommendation
on page 4, unanimously recommended that the City Council approve the proposal.
P
SILVER VIEW PARK IMPROVEMENT PLAN
PURPOSE STATEMENT
It is intended that Silver View Park become a focal point of the community; a
gathering place for friends and neighbors; a resource for passive leisure and a facility
for active recreation. The Silver View Park Task Force recommends that the City
continue to move forward in the provision of park improvements at Silver View Park.
The following are thirteen recommendations for a plan of improvements at Silver View
Park. These thirteen recommendations are supplemented with additional information
given as a reference in the remaining portion of the proposal.
I. CONCEPT PLAN
It is recommended that Silver View Park should be divided into three concept areas.
Each area should constitute a different function or "concept". The three areas and
their functions are listed below in the description of the "Concept Plan".
Concept #1 - Silver View Park Pond.
This area includes the body of water and the pond buffer area. The function of this
area is to provide the natural resources for a nature setting.
Concept #2 - Nature/Passive Area.
This area includes all the upland natural wooded areas of the western area of the
park, and the pathway area around the pond. This area is predominantly for nature
activities such as hiking and nature study.
Concept #3 - Active Play/Social Area.
This area includes the upper part of the park. This area is intended to provide play
and social gathering facilities to accommodate people of all ages.
This concept plan is important to understand because it was the basis of formulating
many recommendations for issues regarding improvements to Silver View Park.
The first concept or function area that was discussed was the pond area. The
consensus of the group was to adopt the water quality recommendations presented by
Environmental Specialists in their Silver View Pond Management Plan.
Cj
Silver View Park Concept AAap
BLUE- Concept 1, Pond
GREEN - Concept , Nature/Passive
'Yellow- Concept3,_Active Play/_ Social Area
� N
Sliver Lake Woods;
Silver Lake Woods
1lrL
SC
{
f
7
I
1iq
kmi
a&
n )nn on
1
1iq
kmi
a&
n )nn on
.�
v
DI
v
DI
wl
coo
0
Lki
'R31%
M31A
The second park concept or function area is the Passive/Nature Area. This includes
the upland wooded area of the park located on the western side of the parking lot
and the pathway area around the pond. This area is intended for passive activities
such as hiking, cross country skiing, quiet contemplation, nature study and low-key
picnicking. It is intended that this area resemble a wildlife habitat, to provide an
inner-city forest, nature area. The intention is to attract many plant species and
wildlife for observation and study. The rustic "state park", natural look is appropriate
for this area. Active play facilities and activities should not infringe on the passive,
nature area.
Concept or function number three is the Active Area. This area is intended to provide
facilities for people who want to participate in physical or social activity. The group's
desire was to try to provide facilities for all age groups and to incorporate social
activities as well as athletic and fitness facilities. The intention of this area is to
encourage people to recreate by offering them the opportunity to use facilities.
IT. PARK PRIORITIES
The issue of priorities for park improvements was discussed. The group wishes to
emphasize that priorities are not "set in stone" and should have flexibility to change
when and as funding is available or as special requests are made for different
improvements. The priority list and schedule is simply a guideline. It should be
noted that the costs listed in this plan are 1990 estimates. Priorities may change and
the schedule will probably be altered during annual budgeting to implement the
funding opportunities in the future.
III. FUNDING
Funding was another issue discussed. It is understood by the entire Task Force that
funding is the key to the implementation of the improvement plan. Since funding is
parochial in the realm of this group, it is assumed that the City Council will deal with
funding options as it relates to the entire city funding picture. Therefore, although
suggestions have been given for funding sources, it is understood that the schedule
will most likely be altered. The City will request donations from community
organizations for capital improvements as indicated on the Silver View Park
Improvement Plan - Capital Items (on page 11.) Other fundraising activities such as
grant applications will be actively pursued by the City. Funding sources which were
identified and recommended include:
1. PARK IMPROVEMENT FUND
The Park Improvement Fund is one funding option. Through park dedication
fees paid by Everest, LTD, the City receives $12,500 each year until 1995. A
portion of these Silver View Park Improvements are proposed to be funded
from this source.
E7
2. DONATIONS
It is hoped that the Mounds View Lions Club will be a local organization that is
interested in "adopting" Silver View Park by funding improvements.
3. PARK DEPARTMENT BUDGET
Construction projects can be budgeted in the annual park department fund with
the condition that the projects are scheduled one year in advance.
The $13,000 proposed for the culvert on the western inlet to the pond relies on
funding from the Storm Water Management Fund. It is assumed that since the
culvert would be an improvement to the storm water ditch and inlet that it
may have the criteria necessary for using Storm Water Management funds.
4. BOND REFERENDUM
One source of funding is not shown on the funding graph but is another
option. That option is a specific bond referendum for improvements at Silver
View Park. A bond referendum of $150,000 would cost a typical homeowner
approximately $4.78 per year for ten years. A small successful bond issue
would complete this improvement plan.
IN. DONATIONS AND CQNTRIBUITDNS
Donations and contributions by community organizations was another issue discussed,
especially since donations and contributions provide over half the improvement
funding. Therefore, the committee realizes the value and need for providing an open
avenue to request funding for park improvements. The City will apply for donations
as described in this plan. To facilitate willing donations, and grateful receiving of
donations, the Task Force has suggested these guidelines.
1. Donations may provide the funding of improvements according to items on the
priority list, or
2. If in -sufficient monies are available to fund the improvement, the donating
group could choose one of two options.
a. The City would retain the money until enough funds were accumulated
to fund the priority.
b. The group could choose another improvement in which the funds were
sufficient.
3. Facilities improvements which are not included in this plan, but wish to be
funded by the donating organization, must comply with the park concept plan
and must be recommended by the Parks and Recreation Commission and
approved by the City Council.
10
V. LIBRARY CONNECTION
The City will pursue an access to the library from the park pond pathway considering
feasibility, cost and easement agreement opportunities.
VI. PARK PATHWAYS
The issue of the pathway around the pond was discussed and resolved with
unanimous agreement that the path should continue around the entire pond. It was
also agreed that the path around the pond should remain a woodchip material to
comply with the nature concept. Furthermore, it is the group's recommendation that
the pathway be completed as soon as possible. An easement agreement is being
prepared for the pathway connection along the Scotland Green Apartment Complex.
The path will require narrowing at the easement access along 7405 Parkview Dr. At
the time the pathway is completed, landscaping will be planned and planted to
designate public versus private land along this pathway connection.
A hard surface pathway is designated for the active area of the park and along the
pathway following the north side of the pond. This path will connect the activity
areas. The hard surface pathway will continue along the north side of the pond from
Long Lake Road to the picnic shelter and connecting to Silver Lake Road with hopes
for a future connecting access to the library. This hard surface pathway along the
northern side of the pond will enable persons that are walking impaired with the
opportunity to walk a portion of the nature path to the active area of the park and
finally leading to the picnic shelter. The hard surface will enable bikes, skateboard,
rollerblade, wheelchairs and stroller use.
VIII. BRIDGES
It is suggested that the bridge should be a pedestrian bridge rather than a bridge
accommodating maintenance vehicles. With the installation of the culvert over the
west inlet to the pond, the maintenance staff will have a vehicular passageway
accessing the path. The opinion of the Task Force is that two vehicular passageways
are not needed. The cost of the pedestrian bridge would be less than a vehicular
bridge. This recommendation is contingent on the installation of the culvert over the
west inlet to the pond.
Two smaller bridges or culverts should be installed along the nature path. One must
be installed in the gully area off of the Silver Lake Road access. Another must be
installed in the area along Long Lake Road near the Scotland Green parking lot.
These bridges or culverts are necessary because of water or ditch hazards on the
pathway.
11
/-1
PLAN FOR PATHWAYS
�l r 1 �t1LlrA"i�w_Aarlr � i
~� Burger King
•~� SuperAmerica
rI � 4-
h
1p
Sliver View Plaza
Library
(Elderly Housing)
rWlldwood Manor
^ Sliver View Pond I.
. L3, �s
` 1
�...._
C Silver Lake Woods �0%
4:
Scat land Green Apartments
LIJU V � e
ounty Road h-2
\J
Woodchip pathway
• - - - ' ` - Hard surface pathway
12
0 200 400 It
V1II PLACEMENT OF AMENITIES
This plan is general in nature to allow for flexibility in an ever-changing world.
Specific direction such as placement of park amenities is not given but instead
suggests that the Parks and Recreation Commission and City Council will determine
such placement.
IX PROCEDURE FOR AMENDMENT
Procedures for the amendment of the Silver View Park Improvement Plan is as
follows:
1. The Park and Recreation Commission must review any amendment to the plan.
2. The Council upon recommendation from the Parks and Recreation Commission
will review the amendment.
3. A public hearing must be held.
4. Final approval by simple majority of the Council must be given by resolution.
The criteria of any amendment is that it follows the concept plan described in this
plan.
X. AMPHITHEATER
It is recommended that the amphitheater should be eliminated. The area should be
re -sloped for a gentler grade so that it can be used for a variety of purposes including
an outdoor, grassy entertainment area, performance space, or general multi-purpose
greenspace.
XI. PARK MA=NANCE PROPOSAL
Guidelines for the maintenance of Silver View Park is included in the general
Standards of Park Maintenance accepted by the City. Park maintenance duties
included in the standards include pathway upkeep, litter pick-up, trash removal,
sweeping the basketball court, raking the sand volleyball court, inspection, cleaning
and repair of equipment and facilities as necessary, mowing grass, tending bushes and
trees, maintaining the sprinkling system, and other duties as described for general
park maintenance. Park improvement projects will be implemented by contracting
services.
It has been determined that a reasonable buffer area should be left unmowed around
the pond while mowing as close to the pond as practical and mowing up to any
wooded areas. Also, mowed areas in the wooded pathway areas should be mowed as
wide as practical.
13
An annual activity with Silver View Park neighbors will be scheduled to rely on their
assistance in trimming trees and brush within park property. This volunteer program
will be supervised by staff to ensure control and uniformity in the maintenance of
Silver View Park wooded areas and pond buffer area.
XII. SPRINI{IMG SYSTEM EXPANSION
For future turf maintenance and park beautification, it is important to water the grass
to ensure healthy turf. The sprinkling system mechanics are already installed
including a pump and electrical timer. The system was installed with the capabilities
and expectations for future expansion to the soccer field and picric shelter area. The
expansion cost would include be additional pipe, sprinkler heads and installation labor.
M. CONCLUSION
In conclusion, it is recommended that the City continue to move forward in the
provision of park improvements at Silver View Park. It is intended that this park
become a focal point of the community, a gathering place for friends and neighbors, a
resource for passive leisure and a facility for active recreation.
14
ro ►-3
H
rt
03
_l
01
Ul
A.
W
N
H
O
10
03
N
H
:;`. = }}:: x`
�d
F33 P)
K
M rt
.. m
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
to
to
l0
0
w
0
l0
l0
l0
to
l0
l0
l0
l0
l0
to
10
10
K
o
ko
ko
%D
w
�o
ko
0
%0
0
�o
0
0
%0
ko
%0
w
b.P
A.
A.
W
W
W
N
N
N
N
H
H
H
H
H
H
HH
,y
UI O
....
(D o
z
ci
rn
m
to
0
00
ro
td
M
ro
En
H-
w
H-
X
n
G
n
w
E
H-
(D
b
H
w
(D
to w
w
10
Z
(D
H-
H
H-
m
H•
Q
::1
n
w
n
(D
G rt
PI o
H-
H
(D
n
a
C
z
ry
z
z
0
H-
tr
a
(D G
w
H
t7
UI
O
W
rD
x'
(D
kQ
H-
H
H
M
O
H-
(D
ri
H-
rt
Q
(D
7r
h
n
x
(D w
H a
rt
:r
ro
N
rt
tr
bo
In
H
O
(D
H-
(D
W
w
(D
�-3
H-
G
(D
H-
l0 tr
'IdH
(]
H
O (D
w
rt
0
CJ
M
H
n
�'
w
A.
w
(D
4 n
�
-
n
G
G
(D
n w
O
E
n
(
(D
cn
(D
N-
rt,
z
t
y
U1
fi
z
O
UI
(n
"C
H
H•
tsi
U1 4il.
w
rn
N
rt
G
N
G
H
t7 a
rt H
N-
rt.
P.
N
%Q
O
rnt
n O
rt
cn
rt O
G
rt a
H• o
n
n
$1
rt
m
(D
ft
.00
NH
N H
rl
W m
N
H
H0
H
H
w
rt w
t�
w
Pi z
w K
Z4
�d
In
v rt
u- O
H
0O
�'
�
�
{n
�
4j).
in
'd
N
rt
J
H
H
Ul
o ffo
o
m
cn
�
U,
o
o
ztC3l�d
(D
r
o
0
0
0
0
0
O
Ul
o
0
o
p�g N
0
0
0
0
0
0
o
z
N
P)
o
0
o
O
o
0
0
0
o
y
z
0
0
0
0
0
0
0
0
o
C7
z
O
jil.
4M.
4il.
�
0
o
0
rn
Li
ci
00
o
rt
0
O
O
O
p
z�
n
m0
0
O
0
p
yC
rt
O
O
o
0
0
0
zzH
0
0
0
o
p
cr)
H-
H
C
4A
n
H
W
Ul
H
H
H-
o
cn
O
o
cn
rn
roroM
tzj
o
o
o
o
0
d
0
�
o
o
r
15
WORMNG PAPERS
The following pages (16 through 57) are working papers which the Task
Force used as a reference to general ideas, purpose, description and
criteria of facilities recommended in this plan.
18
o
m
� P
�.
a
m �-j
rb
x
s3' �•
m
N
fi
U1
H.
rt
0 0
H-
z
m
W
H
N
N
O
N
N
-
rt
,r
m
a
n
a
rt
H-
O
rt
tri
E ol
00
0
�1
H- O
m o
!A
P.
Q
o
H
AG
LQ
,��
m
r m
P) 0
z
H
O
W
N
H
7d
H
H
K
N W
(D
I--'
lH0
kD
w
m m I
tlj
tD
H
amw
N
itaN
7d
m as
n �
a
mw
PCS
10�
rt PT,
K �-j
n x
x
• In
sv H-
w m
z
IC
o
Z m
z
m z
z O
w z
O
N
Iv n
Iry
h] fi
!n
�
E'
m
�H
C
a
�% rt
n
m H-
l�
O
18
PRELIMINARY PARII.AND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Pond management/weed harvesting
PRIMARY ACTIVITY/FUNCTION:
To maintain clean water providing for the habitat of wildlife and
aesthetically pleasing atmosphere for park users.
PLAN DESCRIPTION:
The plan of Silver View Park shows the pond as the key facility for a
nature -type passive area for hiking and wildlife observation.
RECREATION CRITERIA:
TO allow enough macrophytes to support wildlife yet control an
overabundance of macrophyte growth which may be aesthetically
displeasing.
GENERAL MAINTENANCE CRITERIA:
Requires weed harvesting whenever water biologists determine that
growth is overabundant and considering that extensive macrophyte
harvesting should not deter wildlife sustenance.
GENERAL DESIGN CRITERIA:
Alleviate weed stench. Increases water clarity. Is aesthetically pleasing.
19
PRELIMINARY PARIC AND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Pond buffer areas.
PRIMARY ACTIVITY/FUNCTION:
To serve as a buffer for filtering fertilizer run-off, to catch litter before
entering pond and to offer more nesting areas for wildlife.
PLAN DESCRIPTION:
The plan indicates the pond and surrounding trail as a nature area
available for wildlife observation. To provide wildlife habitat, the area
must offer nesting cover of long grasses to provide appropriate nesting
areas.
RECREATION CRITERIA:
GENERAL MAINTENANCE CRITERIA:
Mowing will be done as close as practical allowing for a reasonable buffer
area around the pond and mowing up to any wooded areas.
GENERAL DESIGN CRITERIA:
Mowing will be done on a regular weekly schedule as weather permits.
20
PRELIMINARY PARICLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNrIY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Request compliance from nearby areas to confine fertilizers to those
without phosphorous.
PRIMARY ACTIVITY/FUNCTION:
To decrease the imbalance of phosphorous in the pond which increases
the abundance of macrophyte growth.
PLAN DESCRIPTION:
RECREATION CRITERIA:
GENERAL MAINTENANCE CRITERIA:
Have the pond water tested twice per year to keep abreast of potential
chemical imbalances so that further chemical restrictions can be
determined and recommended to help manage the pond.
GENERAL DESIGN CRITERIA:
Encourage the surrounding property owners in the Silver View pond
storm water drainage area to use fertilizer low in phosphorus by means of
informational material published in the City Newsletter and with
informational letters sent to the neighboring residents.
21
SILVER VIEW PARK
PASSIVE/NATURE
22
o
rTI
n
z
.-. H
n
a
�
v
rtm
x
0
rt,
to�
m
rt,
�n
rta
o
w
z o
o
z
w
H�J_
O
rt,Ft
N
N
0
►' r
L=J
O
�Oi
N-
N
~
N
0
A
7r
m
N14
ror
-ta
P.
n Q
w
F-4
o
u. Gcn
m rt
o
o
o
rn
o
~
y
rnt
o
o
0
0
0
ro
�i
H
O
Ul
.P
W
N
F-'
�d
H
H
K
Q O tl
� O
rt.
ko
w
to
ko
n rt
O �C
u.
OO
b
W
Aro►
a
x
&0
171O
z
a ~
N
rrt-
m
d
�
Q'
rd w
m
G)
►S N
N
O
'_]
rt
rn
L.J. Al
G
O
N
hi
C:
a
ct
C)
a
r�
23
rTI
n
Y
�
x
rTI
n
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Establish a continuous trail around Silver View Park pond.
PRIMARY ACTIVITY/FUNCTION:
To provide a pathway completely around the pond to give hikers a
continuous hiking experience around the entire pond area.
PLAN DESCRIPTION:
The purpose of the trail is for hiking and a looped continuous trail is
recommended. The connection will provide the normal design standards
of a trail.
RECREATION CRITERIA:
Must provide a designated trail which is continuous in nature and does
not require a hiker to turn around and back -track on the trail system.
GENERAL MAINTENANCE CRITERIA:
Replenish woodchips on path. Spray path for weeds. Maintain culverts.
Install weed barrier on new installations.
GENERAL DESIGN CRITERIA:
Woodchip surface pathway. Installation of a culvert at the western inlet.
Easement at Scotland Green property. Completion of section on the
southwest side and along the Scotland Green Apartment Complex.
24
PRELIMINARY PAREI AND DEVELOPMENT PROGRAM
SILVER VIEW COM14UNrIy PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Culvert at the west inlet location.
PRIMARY ACTIVITY/FUNCTION:
To provide passage across the storm water drainage ditch inlet for both
hikers and maintenance vehicles.
PLAN DESCRIPTION:
The installation of the culvert will aid pond maintenance, provide an
access for trail maintenance and provide a passageway across the inlet for
trail hikers.
RECREATION CRITERIA:
GENERAL MAINTENANCE CRITERIA:
The culvert must accommodate maintenance vehicles for efficient park
maintenance.
GENERAL DESIGN CRITERIA:
See specifications on next page.
25
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMWMW PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Installation of a bridge at the narrows of the pond.
PRIMARY ACTIVITY/FUNCTION:
To provide a shorter hiking trail alternative and to provide a quick and
easy access across the pond.
PLAN DESCRIPTION:
Bridge engineers have suggested a 90 foot metal bridge structure
supported on pilings.
RECREATION CRITERIA:
GENERAL MAINTENANCE CRITERIA:
GENERAL DESIGN CRITERIA:
See specifications on next page.
PRELIMINARY PARELAND DEVELOPMENT PROGRAM
SILVER VIEW COhB4UNrIY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Pathway bridges or culverts
PRIMARY ACTIVITY/FUNCTION:
To provide two passageways across water run-off areas located along the
woodchip nature path.
PLAN DESCRIPTION:
The provision of these two bridges or culverts would enhance the
pathway system allowing easier access across water run-off areas of the
pathway.
RECREATION CRITERIA:
The bridges may be made of wood and should be large enough to
adequately span the run-off waters of the passageway during average
rainfall.
GENERAL MAINTENANCE CRITERIA:
The passageways should be as maintenance free as possible, requiring no
staining or painting. The passageways must be durable and as vandal
free as possible.
GENERAL DESIGN CRITERIA:
It is suggested that the small bridge currently located at the western inlet
could be used for the pathway section of run-off that often occurs at the
bottom of the gully off the Silver Lake Rd. sidewalk access. It is also
suggested that the pathway area between the bridge and Scotland Green
parking lot, located at the Long Lake Rd. access point, could be improved
with a small bridge or culvert.
27
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Swing Benches
PRIMARY ACTIVITY/FUNCTION:
To provide sitting/swinging apparatus for observation of natural area.
PLAN DESCRIPTION:
These rest areas overlook scenic vistas at each arm of the pond.
RECREATION CRITERIA:
The glider swings must be located in aesthetic areas which offer scenic
vistas and unobstructed observation of the pond.
GENERAL MAINTENANCE CRITERIA:
The glider swings must be permanently anchored in the ground and kept
clear of overgrown weeds and bushes. Bi -monthly equipment checks are
recommended.
GENERAL DESIGN CRITERIA:
See attached design options on next page.
28
i
•rti''- ,.. w •y-�yy a+ s_..v -%•,t .� .•:is. .y-:
- _ %.:,�==- � ti:=y+fsi�;' � � ' r ~ t..+.l.--"''i.'E•�e.i ��'": ^J;.'i:'i r� ; � � - i ; .I
- +.;� -. a►^ ----� — -- 1 is
---. -_.�. _ .•:ter ,
fir•-. 4• - • - _•• :=r. •�_Z •�' � � • � •1
tom• � ��� _�r�•--� �,�:.+;,;�:: r r�'�
1`�`.,�a�•�,��- =��.rib�"�;�'wq�. Y'�-�i-��� ter,. ..
�� E
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Wood duck houses.
PRIMARY ACTIVITY/FUNCTION:
To attract wood ducks for observation by park users.
PLAN DESCRIPTION:
The nature study/wildlife pond would host such facilities for the habitat
of such creatures.
RECREATION CRITERIA:
It would be advantageous to locate the wood duck houses in areas where
they can be seen by observers yet safe from human intervention.
GENERAL DESIGN CRITERIA:
As specified by naturalists to attract wood ducks.
30
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COAMUNrly PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Park benches for pond/nature area.
PRIMARY ACTIVITY/FUNCTION:
To provide a resting place for trail hikers who wish to observe the nature
area.
PLAN DESCRIPTION:
It is recommended that park benches be placed throughout the park for
casual contemplation and observation enjoyment.
RECREATION CRITERIA:
Park benches in the pond/nature area must be placed in strategic areas
where hikers can rest and enjoy the natural habitat. Benches should not
be clustered, but should be spaced throughout the trail in distances of
approximately 1,000 feet.
GENERAL MAINTENANCE CRITERIA:
Benches are to be embedded in a concrete slab.
U
33
m
�•
w
w
O
w
w K
p-
al
ct H•
0
O
K
w
K
N W
(D
U1
,7C
z
�:l
n
N•
' C
Zf
77,
H-
F✓
N
cn
O
fn
rt'
FJ- N•
Q
m
;7'
K
O
rt,
ro o'
N•
:0
tr
O:j
N
H
O
0
Fr- M
4
O
w
O LQ
H
Fl-
N
H
A F✓
�$
m
F✓
Fes-
w
z
a
�•ril
m
~
no
b,
a
m
n
�'-
Q K
O
0
In V,
m
U]
F-
~
N
N
,til
�n
K
<✓
N rt
W
G
I�
H
N
m N
fn
rt'
ft Fl-
(D
b
(D
O
rt.R'
c
UKI
p
¢a,
K
t7
FJ -
rt,
G
F✓
O
K
M
�
M
W
n
N
�
N
v
4A
iA
W
H
4A
4A
4A
_M
_M
iR
4A
iR
4A
O
0
U,
O
U,
ON
a1
U,
Ob
U1O
O
O
O
O
O
O
O
O
O
O
O
O
0
fn
0
0
0
0
0
0
o
O
o
0
0
H
•
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
H
F ,
F'
►''
O
N
N
O
kD
w
-]
',d
H
H
FC
N
N
N
FJ
N
�
FJ
N
FJ
FJ
N
F✓
�o
ko
w
ko
w
�o
�o
�o
►�
�o
�o
w
ko
w
w
til
�P
.P
W
W
N
N
N
G) rd
0
ro
0
ro
ro
ro
ro
ro
It
0
ro
mw
O
w
o
w
w
w
w
w
w
O
w
ro
cD x
rt
x
x
x
x
x
rt
x
z
N-
w H
FK'•
H
H
H
H
H
t7
v
0
�l
J
0
tr'
z
'L3
0
b
0
10
b
b
10
b
ro K
rt
rt
ft
N-4
o-
171o
"1
IM
ro
ro
ro
o
ro
o
x m
sr
s✓
c
N(D
a
a
a
a
a
a
a
a
It
W-1
33
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Barbecue grills near the picnicking area.
PRIMARY ACTIVITY/FUNCTION:
To provide the means for barbecuing food for picnics.
PLAN DESCRIPTION:
Barbecue grills are necessary for serving the large picnic shelter.
RECREATION CRITERIA:
A variety of sizes should be available to provide for large, as well as small
groups.
GENERAL MAINTENANCE CRITERIA:
The grills must be embedded in concrete slabs.
GENERAL DESIGN CRITERIA:
See examples.
34
'T4,-
EPTACLES
6
lk
'34
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Playground equipment.
PRIMARY ACTIVITY/FUNCTION:
To provide large motor muscle development and creative enjoyment for
children 3 - 12 years old.
PLAN DESCRIPTION:
As a designated handicapped accessible park, play equipment user friendly
for children in wheelchairs and those walking impaired will also be
provided.
RECREATION CRITERIA:
Two separate play structures are recommended. One, a pre-school age
structure to be located to the east of the picnic shelter and the other a
handicapped accessible structure for 6-12 year olds located to the west of
the picnic shelter. This play equipment must be diverse to accommodate
pre-schoolers, elementary, schoolers and handicapped children. Also it is
suggested that this equipment follow a natural type design to match the
wooded park setting.
GENERAL MAINTENANCE CRITERIA:
The base material must follow standards.
GENERAL DESIGN CRITERIA:
Play equipment should follow a natural appearance to coordinate with the
natural surroundings. The ground cover should be of such a substance
(such as a boardwalk) to accommodate wheelchairs and the walking
impaired.
�trinrr�fr�
. . . . . .....
NW -
Pill
-N 77:7
--77-
.1w
Tim
"a-.
VC
CA
�
_
n
Aei
CA
f 9
�• R
(�j y
�OfD 00
aqq 000 (—`
CA
"D n
00
cm
n
CA C-
CA
cy
f�c�e�
N
38
CA
��.
Y
�
_
n
Aei
cm71
CA
"D n
CA
CA C-
- -
cy
f�c�e�
38
��.
Y
Eirz Fs EB§O
/
c«E§p�()�
»--�-ten-•
m k
�cE§�k��\£
Eirz Fs EB§O
7.
c«E§p�()�
»--�-ten-•
m k
�cE§�k��\£
$ƒ
E§;2)§
.
2.2
2�•n��
rt -fA
�2�E
r -
-
�--
E7,c�--�--
c■
'. =
E�_n
S:
.f2!
. - . -
- .
§=F-
, . s • = I ; _ n
E,g§E
, E
E E E E `
E - ; �
`
.q&
\�
�Q;-=£
_•[_
�
- ; � :
� � � �
® � ■ E � k � E ■
j%
� �
/ `
7 E E § c ■
RE
� ¢
�
F
;-�
�,E�
�!§i&R®=®7
,�--
;
7
� �`�
`e;-%
■
E
¥ ¥ § & ■ § � rA
et 2
�
39
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNI71Y PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Sprinkling System Addition
PRIMARY ACTIVITY/FUNCTION:
To water the area around the picnic shelter and the soccer field.
PLAN DESCRIPTION:
Tap into the existing system and add additional sprinkling area as
anticipated when the sprinkling system was first installed.
GENERAL MAINTENANCE CRITERIA:
Annual autumn blow-out of the system, inspection of heads and repair of
any broken pipes.
GENERAL DESIGN CRITERIA:
Similar equipment that is the same or adaptable to the present system.
40
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITy PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Park benches for active area.
PRIMARY ACTIVITY/FUNCTION:
To provide seating for spectators of active play areas.
PLAN DESCRIPTION:
Park benches will serve those persons who come to the park as spectators
of activity.
RECREATION CRITERIA:
To be placed near active areas where spectators can enjoy watching
athletic competition.
GENERAL MAINTENANCE CRITERIA:
To be embedded in concrete. To be consistent with other park bench
designs. To be located in scenic vistas. To be cleared of weed and bush
growth.
GENERAL DESIGN CRITERIA:
Galvanized steel, rubber coated, metal mesh design consistent with others.
41
CLASSIC BENCHES — 6' & 8' MODELS MODEL A610M
This series combines durability with economy to make these benches a favorite with park directors.
Perhaps the most extensive selection offered anywhere. These rugged benches have unlimited versatility.
Seats and backs are 10" wide. Frames are constructed of 21/e" 0.0. pipe.
PORTABLE MODELS:
A610M 6' Classic Bench w/Back — Portable ............ .
A61OMP 6' Classic Bench w/o Back — Portable .......... '. ' ' ' • Wgt. 100 lbs.
A810M 8' Classic Bench w/Back — Portable ............ ...... ' . Wgt. 52 lbs.
A81OMP 8' Classic Bench w/o Back — Portable .. ........... ... ' ' ..• . ' • • Wgt. 125 lbs.
.... Wgt. 651bs.
INGROUNO MODELS:
A610I
6' Classic
Bench
w/Back — Inground
A610IP
6' Classic
Bench
............ ..
.... '
w/o Back — Inground
Wgt. 100 lbs.
A810I
8' Classic
Bench
......... • • � • • . .
w/Back — Inground
Wgt. 52 lbs.
A810IP
8' Classic
Bench
........
w/o Back — Inground
Wgt. 125 lbs.
......
................••
••.•
Wgt. 651bs.
SURFACE MOUNT MODELS:
A6108 6' Classic Bench w/Back — Surface Mount .................. Wgt. 100 lbs.
I"IBP 6' Classic Bench w/o Back — Surface Mount ................ Wgt. 52 lbs.
A 8' Classic Bench w/Back — Surface Mount ...... .. Wgt. 125 lbs.
A8108P 8' Classic Bench w/o Back — Surface Mount ................ ............ Wgt. 651bs.
42
Ci
4,
PRELIMINARY PARK AND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Picnic tables
PRIMARY ACTIVITY/FUNCTION:
To facilitate the picnic shelters.
PLAN DESCRIPTION:
Picnic tables provide a sitting facility for picnicking.
RECREATION CRITERIA:
Two picnic tables accessible to wheelchairs and two standard tables are
needed to utilize the picnic shelter to its greatest extent.
GENERAL MAINTENANCE CRITERIA:
Picnic tables ideally will be permanently embedded in concrete to prevent
them being moved. Also, the galvanized metal tables are a deterrent to
vandalism.
GENERAL DESIGN CRITERIA:
See descriptions.
43
SINGLE PEDESTAL PICNIC TABLE
Features main support construction of 4" x 4'
heavy square tubing. Seat supports are of 3" 0.0.
pipe. Design facilitates maintenance and ease
of seating.
A630I 6' Picnic Table —
Inground ..................... Wgt.275lbs.
MUUtL A63U1
DOUBLE PEDESTAL PICNIC TABLE
Sturdy 4" square steel center pedestals and cross
member. Seat supports are of 3" O.D. pipe. These
tables have exceptional durability and strength.
A830I 8' Picnic Table —
Inground ..................... Wgt.295lbs.
44 MOOEL A8301
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Drinking fountains
PRIMARY ACTIVITY/FUNCTION:
To provide a drinking water source for park users.
PLAN DESCRIPTION:
One drinking fountain will be handicapped accessible and ideally be
mounted on the picnic shelter, while the other will service the athletic
field users and spectators.
RECREATION CRITERIA:
One to be placed between the ballfields where a water source is presently
available. This fountain is available requiring only the purchase of parts.
The other water fountain is to be handicapped accessible and located on
or near the picnic shelter.
GENERAL MAINTENANCE CRITERIA:
To be as vandal resistant as possible
GENERAL DESIGN CRITERIA:
See examples,
45
DRINKING FOUNTAINS
Vibracast pedestal drinking fountain, foruse by wheelchair users
and general public, has natural color exposed aggregate finish;
light sandblast flnish,Model 3174. Other colors available at extra
cost. Two lever handle valves for left-hand or right-hand opera-
tion. Stainless steel receptor, bubbler and bottom plate are
vandal resistanL See DIMENSIONAL DRAWING, page 10.
Model 3030
Pedestal drinking fountain in vibracast concrete available
in light sandblast or Model 3040 in exposed aggregate
^nish, with smartly sculptured receptor in =4 satin finish
less steel. Vandal -resistant, chrome plated, heavy-duty
,ler. Available with matching concrete step. Model
3032. 3042. See DIMENSIONAL DRAWING, page 11.
Model 3376
Outdoor pedestal drfnking fountain designed for use by the
general public and persons in wheelchairs. Dark bronze
toned fountain has two lever handle valves for left- or right-
hand operation and integral receptor with patented• vent for
quick drainage. See DIMENSIONAL DRAWING, page 9.
•Pst. a,sea.M **Design P&L D-239.254
Model 3060+
Circular, vibracast reinforced concrete pedestal drinking
fountain in natural color with exposed aggregate finish; light
sandblast finish. Model 3050. Vandal -resistant features in-
clude bubbler surrounded by precast stone. and flush -
mounted anchored stainless steel receptor. A matching
concrete step and a sand trap are available. See
DIMENSIONAL DRAWING, page 11.
toesign PIL D =J a1
Spectticatlona iubiect to Change without notice.
W
A
14
C
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW CO PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Hard court sealant/painting/striping.
PRIMARY ACTIVITY/FUNCTION:
To provide lines and boundaries for many different games.
PLAN DESCRIPTION:
The basketball/multi-purpose hard surface play court needs color coating
and line definition.
RECREATION CRITERIA:
To provide game lines for: 4 -square, hopscotch, shuffleboard and
basketball.
GENERAL MAINTENANCE CRITERIA:
Sealant, paint/color coded, game lines.
GENERAL DESIGN CRITERIA:
Color coated.
47
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Horseshoe Courts
PRIMARY ACTIVITY/FUNCTION:
To provide space and facility for pitching horseshoes.
PLAN DESCRIPTION:
Based on the desire for activity areas nearer to the picnic shelter
picnicking crowds, the courts have been proposed at the western side of
the picnic shelter.
RECREATION CRITERIA:
The courts must be placed in a separate area away from the active area
of children.
GENERAL MAINTENANCE CRITERIA:
Construction to follow regulation horseshoe court measurements and
design.
GENERAL DESIGN CRITERIA:
See design diagram.
48
PRELIMINARY PARELAND DEVELOPMENT PROGRAM
SILVER VIEW CONHAUNrly PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Park Signs
PRIMARY ACTIVITY/FUNCTION:
Park signage will provide facility information to direct safe activity.
PLAN DESCRIPTION:
Recreational areas must provide information and direction regarding safe
participation.
RECREATION CRITERIA:
Signs marking the hiking and ski trails.
Signs directing users to facilities such as drinking fountains, rest
rooms, picnic shelters, volleyball, horseshoes and other areas.
Signs designating intended user groups such as wheelchairs, hikers
and picnickers.
Signs prohibiting activities such as motorized vehicles, glass bottles,
fires and golfing.
GENERAL MAINTENANCE CRITERIA:
Signs will be posted in strategic areas of the park to help direct use of
facilities.
GENERAL DESIGN CRITERIA: See examples of signs.
49
USE
THESE STURDY COLORFUL SIGNS for INDOOR and OUTDOOR use
NUMBERS 30 Ga. Coated Steel Blanks, Baked Enamel Finish
TO 12' x i2' or 12' x 60, 2 wepunched mounting holes
ORDER Dimension (shape) & color as shown (available in brown when Indicated)
$11.50 Each
TRAILER CAMPING
TRAILER PARKING
NO' CAMPING
R-1 R-1 N
TENTING AREA
'NO'TENTS
R-2 R -2N
•
1 HIKERS' TRAIL
'NO' HIKING
R-3 R -3N
ikWikri TRAIL FOR }+IKING, 81KING,
CYCLING, .MOTORCYCLES
R4
FISHING
.NO, FISHING
R -S R -5N
SWIMMING AREA •
'NO' SWIMMING
R-42
[a MEN'S RESTROOM
R•138 (Bro-nl Inq
R-13
13 WOMEN'S RESTROOM
14/40 (Bron IIYD
R•14
PET EXERCISING
R-158 (Brown Ink)
31 NO' PETS
US R.q
CHILDREN'S PLAY AREA
R•I6
i'
ROAD OR HIGHWAY CROSSING
R-17
R-18
BOAT LAUNCHING AREA
OR RAMP
■
PICNIC AREA, CANOE RENTAL
OR PICNIC AREA AHEAD CANOEING AREA
R-7 R-19
FIRE PITS
!I OR GRATES
NO BURNING
R-3 R -3N
RECREATIONAL
BOATING
'NO' BOATING
R-� R -20N
OUTBOARD MOTOR
RENTAL, SERVICE OR SALES
R-21
I�L
ICE
LL ICE FOR SALE
R-22
INDICATES FA
GIVING AREA
'NO' OWING
R-25 R -25N
WATER SKIING AREA
WATER SKIING
EOUIPMENTISALES
'NO -NATER SKIING
R-26 R -20N
BOATING
RENTAL- DOCKING, PARKING
R-27
CMARINA
BOAT LANDING AND DOCKING
R-28
GASFOR SCATS
FLOATING
G
FLGATING GAS STATION
R-29
BIKE TRAIL
'NO' BIKING
R-30
!� .1 JEEP TRAIL
'NO' DRIVING
R31
C r11
LAUNDRY FACILITIES
R-9
'NO' MOTORCYCLES
�SI11
GARBAGE
11
'NO' DUMPING
R-10
R -10N
WATER
RECREATIONAL
BOATING
'NO' BOATING
R-� R -20N
OUTBOARD MOTOR
RENTAL, SERVICE OR SALES
R-21
I�L
ICE
LL ICE FOR SALE
R-22
INDICATES FA
GIVING AREA
'NO' OWING
R-25 R -25N
WATER SKIING AREA
WATER SKIING
EOUIPMENTISALES
'NO -NATER SKIING
R-26 R -20N
BOATING
RENTAL- DOCKING, PARKING
R-27
CMARINA
BOAT LANDING AND DOCKING
R-28
GASFOR SCATS
FLOATING
G
FLGATING GAS STATION
R-29
BIKE TRAIL
'NO' BIKING
R-30
!� .1 JEEP TRAIL
'NO' DRIVING
R31
C r11
MOTORCYCLE TRAIL
'NO' MOTORCYCLES
R-32
SKIING AAEAIARENA
EQUIPMENT -
SALESIRENTAL
NO' SKIING
R -M-
ICE SKATING
AAEA/ARENA
EOUIPMENT -
SALES/RENTAL
'NO' SKATING
R34
R -32N
•
R -33N
7
' R -3S
—L—ES FOR
UNSAFE DRINKING THE HANDICAPPED
WATER - RIDING TRAIL
HORSERENTAL-
R•11 R•11 N STABLE
R-23 NO' HORSES
SHOWERS. CAN BE USED FOR
HEADOVARTERS OR INFORMATION
ADDITIONAL SIGNS FOR RRANGER STATION, R-36 R -36N
' &248 IErown kip
'MEN' AND 'WOMEN'
SNOWMOSIL,NG
13 TRAIL MARKER
R-12 R-74 SALES'SERVICE _
NO' SNOWMOBILING
R-37 R-38
PLEASE NOTE- All "NO" Symbol Signs Are Superimposed With A Regulation
Off Limits Overprint (Meaning No) And Are In Two Colors.
50
R-39
R-41
C
It 45
R-46
M-1
M-2
M-4
I
M-5
M -S
M-7
M4
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Gazebo
PRIMARY ACTIVITY/FUNCTION:
To provide a convenient covered shelter from the sun and rain for
spectators of athletic competition. This gazebo could be used as a small
entertainment staging area or as food concession area during
tournaments.
PLAN DESCRIPTION:
A multi-purpose structure with electricity.
RECREATION CRITERIA:
This area is in a very popular spectators corner. There seems to be
ample opportunity to use such a structure for food concessions and as a
tournament headquarters area or as an entertainment stage. A gazebo
style structure offers traditional shelter cover but also adds a bit of classy
style and multi -functional opportunities for park -users.
51
�-1
rM10 . V
10 9- eMWQ� mv, NA �5.142M,..
'P§fiaiif6Fff1 ri -0 - . M-., - "
And' 16 -1d -z p'Gs2 "
punq uses,
,T90n. shelters'fea
Befu s iia, ie�iw hoor_space C61 OPTIONS
qya�re, ger
J*e 'ar, e--, I shQ
iaIIs norZ-,! . 0 Glue -laminated or steel tube columns
unlfir�i ted 7— �i Pim* teas; as outdoor con
46
yYe=med-retrqt m- nnatume•s Factory apphed stain on aU wood components
Random -ed -edge fiber
glass shingles orcedar shakes
tqctuji:-4Y rnai-gmp a Lightning Protection System
m
0'n97-ShL6'1ter raji'geiih ii7i- Erman 260 to 2545 s4uarji �. 0 Complete custom desi'gn available
Sirig"'_`6jesindtide 2Q 25,.'-` 0 Wall panels available
?iometer of the Haxneodrilin
0M -14 40,45,- 56 "d 60 f�&V,
IWUWn
The Home� S6iii othe
ing
eed For durable. -164 ty�_ nflt att cdvei ie
orea
66"
tycot>sl cttorxmaterials."
SLWEqARY SPECIFICATIONS
0 Both six- (Hex) and eight- (Oct) sided shelters
designed to meet and exceed all state and local
budding codes.
0 Architectural grade, glue-larnfilated components
manufactured in accordance with AINSPAITC1
-dried Southern Pine
0 Roof deck of select grade, kiln A
tongue and groove.
9 Support columns of -solid timber Southern Pine
remium
q structural grade, pressure treated.
p
Connectors of steel plate, shop -fabricated, hot -dip
MAi
galvanized after fabrication.
Roofing shingles ALD 20-vear, self-sealing laminated,
tiberglass mat, asphalt shingle with ceramic coated
T
rock granules.
Detailed specifications on page 15.
tw
!7
P.
The
HOMECOMING SeriesTM
W 4
----- ..... -
lag
NO
rM10 . V
10 9- eMWQ� mv, NA �5.142M,..
'P§fiaiif6Fff1 ri -0 - . M-., - "
And' 16 -1d -z p'Gs2 "
punq uses,
,T90n. shelters'fea
Befu s iia, ie�iw hoor_space C61 OPTIONS
qya�re, ger
J*e 'ar, e--, I shQ
iaIIs norZ-,! . 0 Glue -laminated or steel tube columns
unlfir�i ted 7— �i Pim* teas; as outdoor con
46
yYe=med-retrqt m- nnatume•s Factory apphed stain on aU wood components
Random -ed -edge fiber
glass shingles orcedar shakes
tqctuji:-4Y rnai-gmp a Lightning Protection System
m
0'n97-ShL6'1ter raji'geiih ii7i- Erman 260 to 2545 s4uarji �. 0 Complete custom desi'gn available
Sirig"'_`6jesindtide 2Q 25,.'-` 0 Wall panels available
?iometer of the Haxneodrilin
0M -14 40,45,- 56 "d 60 f�&V,
IWUWn
The Home� S6iii othe
ing
eed For durable. -164 ty�_ nflt att cdvei ie
orea
66"
tycot>sl cttorxmaterials."
SLWEqARY SPECIFICATIONS
0 Both six- (Hex) and eight- (Oct) sided shelters
designed to meet and exceed all state and local
budding codes.
0 Architectural grade, glue-larnfilated components
manufactured in accordance with AINSPAITC1
-dried Southern Pine
0 Roof deck of select grade, kiln A
tongue and groove.
9 Support columns of -solid timber Southern Pine
remium
q structural grade, pressure treated.
p
Connectors of steel plate, shop -fabricated, hot -dip
MAi
galvanized after fabrication.
Roofing shingles ALD 20-vear, self-sealing laminated,
tiberglass mat, asphalt shingle with ceramic coated
T
rock granules.
Detailed specifications on page 15.
tw
!7
P.
PRELIMINARY PARICL AND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNrIY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Small picnic shelters.
PRIMARY ACTIVITY/FUNCTION:
To provide a moderately sized picnic facility for the smaller groups of 6-8
people.
PLAN DESCRIPTION:
Small shelters are recommended for placement at the upland nature
indicates several picnicking areas.
RECREATION CRITERIA:
This option provides a cozy facility for small groups or individual family
picnics. The smaller picnic shelter can be placed in a "woodsy" area
which simulates a nature experience.
53
I CONTEMPORARY PARK SHELTER
U.S. Patent, Canadian Patent
:'he contemporary metal shelter that can be used singly or
n combinations for carports, drive-in restaurants, car
sealers, gun clubs, picnic areas, etc. These shelters will last
or ,years and are rugged enough to withstand the severest
:base. Die formed, 10 gauge, bolt -together trusses mount
:0" into concrete footing. Easy to erect, no field welding
equ:..;. ' Roof panels are self-locking at top to form water-
ight , . Buy one shelter now and add to it in the future.
40.2400 Series, Support posts -hot -dipped galvanized
:iter Fabrication. NO. 3400 Series, Support posts -baked -on
-town Powder Coat after fabrication.
Decking is 3005 aluminum alloy, .032 thick, painted
white on the bottom and brown on the top.
Roof has a T fall in 10' and a live load capacity of 30 lbs.
psf ; wind load 20 €bs. psf Higher loads available.
Main supports are 10 gauge steel tapered from3'A"to 1044"
All hardware and assembly instructions furnished.
:. STEEL FRAIME SHELTER
teel frame shelters are designed to be durable and vandal-
rsistant. They are suitable for city or isolated settings.
Supporting columns 6"x 6"x 3/is" tubular steel with
brown Powder Coat Finish.
Beams are 6"x 10"x 3A.," tubular steel with brown Powder
Coat finish. '
Roof decking is 2"x 6" southern yellow pine with tongue
and groove construction.
No.
Brown Steel
Shelter Style Size No. No.
N, 0.
Size
n 24'x 22' 3420 2420
16'x 20'
3854
-T—'T- 24'x 40' 3440 2440
8851
20'x'_3'
1' 24'x 60' 3460 2460
30'x 52'
5852
24'x 80' 3480 2480
5856
30'x60'
24'x 100' 3490 2410
20'x 44'
Decking is 3005 aluminum alloy, .032 thick, painted
white on the bottom and brown on the top.
Roof has a T fall in 10' and a live load capacity of 30 lbs.
psf ; wind load 20 €bs. psf Higher loads available.
Main supports are 10 gauge steel tapered from3'A"to 1044"
All hardware and assembly instructions furnished.
:. STEEL FRAIME SHELTER
teel frame shelters are designed to be durable and vandal-
rsistant. They are suitable for city or isolated settings.
Supporting columns 6"x 6"x 3/is" tubular steel with
brown Powder Coat Finish.
Beams are 6"x 10"x 3A.," tubular steel with brown Powder
Coat finish. '
Roof decking is 2"x 6" southern yellow pine with tongue
and groove construction.
No.
Size
N, 0.
Size
8850
16'x 20'
3854
30'x 44'
8851
20'x'_3'
8855
30'x 52'
5852
20'x36'
5856
30'x60'
8853
20'x 44'
54
PRELIMINARY PARIIAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Mini -Shelters
PRIMARY ACTIVITY/FUNCTION:
To provide a secluded picnicking facility for 2-4 people.
PLAN DESCRIPTION:
The mini -shelters support a small family or groups of 2-4 people and are
recommended in the upland natural wooded area.
RECREATION CRITERIA:
The option is for the casual picnicker. The mini -shelters can be easily
installed in more secluded areas of the wooded areas to provide that
"woodsy atmosphere".
55
mause uteyrre mase rrom mainte-
ance-free anodized aluminum. Units
:ay be used singly or in multiples
,r malls, patios, playgrounds or parks.
Frames are high tensile, cast alu-
minum with normal wall thickness
o f -%."
Height to bench surface: 18"
12151 All -Aluminum Patio
!nch, 6' long with 3 slats and
Mes.
IF 'NCH
atu, cn6 Aluminum Slats
homes and planned communities, in
addition to parks.
• Stable four -point suspension.
• TWO 2%" O.D. galvanized steel pipe
toprails.
• Chain, hangers, and "S" hooks are
the same quality components
selected for heavy-duty swing sets.
NO. 367 Aero Bench, in aluminum,
ground space 8'x 2'6;' he 7.'
56
course, when a rest break is in order
• Columns and beams 3"x S" square
steel tubing in Powder Coated
brown finish.
• 2"x 6" tongue and groove decking
with brown asphalt shing;es.
'G.,NO. 6793 Sheltered Picnic Table,
ground space 8'x 8; ht. 8'6:'
'H. YO.6763 Golf Course Rest Shelter:
ground space S' x 8; ht. 8'6:'
NO. R6763 Redwood bench slats.
PRELIMINARY PARKLAND DEVELOPMENT PROGRAM
SILVER VIEW COMMUNITY PARK
IMPROVEMENTS
MARCH, 1990
FACILITY:
Asphalt Trail (active park area)
PRIMARY ACTIVITY/FUNCTION:
To provide a handicapped accessible pathway for use by wheelchairs and
the walking impaired. This pathway would link the active play, athletic,
picnic facilities and northwestern nature trail facilities.
PLAN DESCRIPTION:
This pathway system would link facility areas.
RECREATION CRITERIA:
It is predicted that users of this hard surface path would include
bicyclists, baby strollers, skateboards, wheelchair users, wagon users and
rollerbladers.
57
MINUTES
OF
TASK FORCE
MEETINGS
MINUTES OF THE PROCEEDINGS OF THE
SILVER VIEW PARK TASK FORCE
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
CALL TO ORDER
ROLL CALL:
Friday, March 16, 1990
Mounds View City Hall
Council Chambers
David Long, George Andres, Adeline Lee, Ron Margo, Ron Fagerstrom, Dave
Rademacher, and Mary Saarion. Debbie Ashworth was absent.
DISCUSSION:
Parks and Recreation Commissioner Long opened discussion by reviewing the task of
the Task Force. He reminded the group that the task is to plan improvements for
Silver View Park, formulate a "master plan" and suggest funding sources. These ideas
will be recommended to the City Council.
The group began by reviewing the questions from the survey which were pertinent to
Silver View Park. Adeline Lee opened discussion by stating that an asphalt trail would
allow wheelchair and impaired walkers access to use. She also expressed the need for
good park security for safety. Adeline suggested lighting the trail.
Ron Fagerstrom suggested that after hours park use or curfew occurs at darkness and
therefore, people should not be in the park after dark in the summertime.
Dave Rademacher expressed his desire for the natural look.
George Andres stated that an asphalt path would also be accessible for biking,
skateboarding and rollerblades.
Dave Rademacher expressed his opinion that this is a community park for residents,
not a regional park for neighboring community users. Dave further stated that it was
his opinion that some people don't like to walk the full path and would like to have a
bridge available as a shortcut. Ron Margo restated the issue of asphalt attraction to
bikers/bladers and skateboard users.
David Rademacher suggested the two path system with a natural woodchip path
around the pond and an asphalt path on the active upper area of the park.
Adeline Lee expressed her opinion that the park will get more use now with the new
picnic shelter, especially from the Senior Citizens.
Dave Long suggested that facilities lacking in Silver View are for the young and the
elderly.
Dave Rademacher suggested that the bridge would connect the single family homes to
the manor homes and gave an example of his daughter who missed the school bus
could run across the frozen pond to get on the bus as it made its rounds on Mounds
View Drive.
George Andres stated that he uses the park all the time and sees more active users
than passive.
Ron Fagerstrom stated that he sees lots of hikers himself included.
Adeline Lee asked about funding grants. Director Saarion explained that several
grants had been submitted, that funding has been difficult to obtain because the past
years of funding criteria has prioritized acquisition and water oriented projects, not
development projects.
Ron Margo stated that paved pathways could be plowed and used in the wintertime.
Dave Rademacher suggested that maybe the kids wouldn't be so bad.
Ron Margo told of examples of different paths in Minneapolis and their various uses.
Ron Fagerstrom suggested that the group divide the planning into three phases; the
pond, the nature area, and the active area.
Adeline Lee asked about the likelihood of a nature center, naturalists, and nature
walk.
Ron Fagerstrom asked about the continuation of the path.
David Long stated that he felt the path should be continued all the way around the
pond.
David Rademacher and Mary Saarion explained the history of when land was sold and
sales personnel erroneously indicated to buyers that the park plan was definite rather
than dependent upon the passage of the bond referendum. Therefore, property buyers
were erroneously convinced that the park plan was set in stone and not subject to
change.
The plan showed the bridge at the narrows and did not indicate a connected pathway.
The developer was to provide the bridge. However, the cost of the pond dredging
became more costly, and the elimination of the bridge become the negotiated item.
David Rademacher continued to state that the resident's around the pond are not
opposed to the path, but rather the principal of purchasing land with an expectation
that is changed.
CE
David Rademacher continued to say that the residents were opposed to the size and
shape of the picnic shelter but like it now and want more smaller ones around.
Security, a bridge and boardwalk for the bog are his concerns.
It was stated that Environmental Specialists expressed concern regarding a boardwalk
on the bog (as suggested in the original master plan) because that is the area where
wildlife nest and breed. A boardwalk would be an intrusion forcing the wildlife away.
Ron Fagerstrom suggested that more benches are needed. David Long suggested
glider swings. Ron Fagerstrom agreed because they are used and enjoyed by all ages.
Ron Fagerstrom again suggested that the group organize planning into three phases.
Ron Margo referred to the survey and suggested that path completion and bridge are
indicated as needs by the community.
PHASE I OF PLANNING - WATER QUALITY:
The first phase of the planning deals with water quality. Ron Fagerstrom suggested
that we recommend to the City Council a resolution and request for compliance by the
Silver View pond drainage area the reduction in use of phosphorous in fertilizers.
After discussion, the group requested Director Saarion to ask City Council approval for
requesting voluntary compliance for use of fertilizers without phosphorous as a means
of maintaining water quality in the pond.
The group also requested Director Saarion to look into costs of harvesting weeds with
a chain/winch method.
This group requests staff to use a substance for street plowing that does not harm
water quality and asked for alternatives.
Finally, the group requested information regarding development on County Road I to
consider ponding uses/use for filtering and sedimentation as it may benefit the pond.
PHASE II OF PLANNING - NATURAL AREA:
It was suggested that as recommended by Environmental Specialists, a wood duck
house should be placed at each arm of the pond.
David Long asked Adeline if the Seniors would be interested in donating a bench.
Adeline thought that they would.
The group decided that the completion of the path should be the second priority.
David Rademacher asked about alternatives for the inlet area which requires a culvert
installation. Director Saarion stated that the Parks and Recreation Commission had
originally requested a wooden foot bridge, but that public works requested vehicular
passage for more efficient maintenance, resulting in the culvert design.
61
David Long requested that staff provide prices on a bituminous pathway on the north
side of the park. The group thought that play equipment was a ,priority. Adeline Lee
suggested that perhaps the Shriners or Masons would be interested in donating money
for handicapped accessible facilities in the park.
Director Saarion suggested that playground equipment may be an item which the
Mounds View Lion's would be interested in funding.
Director Saarion asked the group to consider a recommendation regarding acceptance
of donations for items which are not on the priority list or which jump priorities.
After discussion, it was decided that the group will recommendation that donations
should be given without specification unless requested by the City for a specific item.
The unspecified donations would be used for priority items.
Ron Fagerstrom suggested that skating was a fun activity on the pond and asked if
some facilities should be offered for this activity. After discussion, it was agreed that
part of the skaters fun was clearing the ice, making benches, and nets and creating
their own skating areas.
George Andres brought up the idea of lighting the athletic fields. The group was
against lighting athletic fields referring to the 10:00 p.m. curfew.
After two hours, it was suggested that the meeting adjourn and next meeting date
chosen. The next meeting will be held on Wednesday, April 4 at 7:00 p.m.
ADJOURNMENT:
Meet adjourned at 9:00 p.m.
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
62
r)
SILVER VIEW PARK TASK FORCE
2ND MEETING
APRIL 4, 1990
QUESTIONS FOR DISCISSION
1. What other alternatives are there for the amphitheater? (i.e. re -terrace, let
grow, develop into a sliding, rock climbing area, fill in.
2. What should the buffer zone distance be from the pond?
3. Who is to determine when it would be beneficial to the pond to perform weed
harvesting.
4. The recommendations from this group regarding Silver View Park improvements
are dependent upon funding just as the 1981 Master Plan was dependent upon
funding. What will be the answer to community residents asking why
scheduled improvements are not occurring if monies are not appropriated as
recommended.
5. How can this improvement plan remain flexible for special opportunities or
needs which today are unforeseen such as grant opportunities, special
donations, requests for special facilities.
6. The issue of pathway construction materials must be decided, asphalt or
woodchip or combination. Is the group interested in the northern asphalt
pathway addition and if so, what is the priority?
7. Donations will probably provide the greatest funding for the majority of the
improvements. This group must review the "receipt of donations" issue to
ensure that donations will be generously given and received to encourage an
atmosphere of good will by donating organizations and the City.
63
MINUTES OF THE PROCEEDINGS OF THE
SILVER VIEW PARK TASK FORCE
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
Wednesday, April 4, 1990
Mounds View City Hall
Lower Level
CALL TO ORDER: 7:10 p.m.
ROLL CALL: David Long, Adeline Lee, Deborah Ashworth, Ron
Fagerstrom, David Rademacher, and Mary Saarion. Ron
Margo and George Andres were absent.
DISCUSSION:
Ron Fagerstrom wanted to further describe the pond buffer maintenance guidelines. A
map was presented to provide an illustration of the buffer areas.
The group reviewed each section of park improvements as discussed at the first
meeting. Priorities for each section were reviewed as well as descriptions of
improvements. Funding sources were reviewed and discussed.
Issues were also discussed. These issues will be present in a narrative with a
recommendation to Council regarding the Silver View Master Plan.
The letter requesting residents to comply with use of low or no phosphorus fertilizers
was distributed to residents of the Silver View drainage area and to Spring Lake and
White Oak pond residents as requested by the City Council.
Staffs list of issues were discussed and the committee recommendation for each is as
follows:
Question #1. What other alternatives are there for the amphitheater?
Answer. There were several options discussed for the amphitheater, but it was
unanimously agreed that it should remain just as is and permitted to let grow. At
some time in the future, a purpose or improvement may be decided, but at present, it
is a low priority and safety hazard for mowing. Consensus: Let grow and leave it
alone for the time being.
Question #2. What should the buffer area distance be from the pond?
Answer. Environmental Specialists suggested that a larger buffer area would attract
wildlife because it offers more nesting area. Also, the buffer provides a filtering
service, trapping litter and contaminants before they enter the pond.
64
It was unanimously agreed upon by the committee that the buffer zone should be left
to grow up to 1 - 2 feet from the pond side of the path. This 1 - 2 foot mowed area
alongside of the trail would alleviate encroachment of weeds on the path.
The buffer areas would be left alone except for areas indicated on the map which calls
for large tree or bush pruning to offer pond vistas. Vista areas will be mowed.
The overall guideline is that the weed growth buffer area between the pond and the
pathway should be at least 8 - 12 feet.
Furthermore, the south side of the sliding hill will be recommended to let grow to
curb erosion and to provide a wildlife nesting area.
Question #3. Who is to determine when it would be beneficial to the pond to
perform weed harvesting?
Answer. It was unanimously agreed by the committee that professional water
biologists such as Environmental Specialists would be requested to periodically test the
water and suggest appropriate action to maintain water quality.
Question #4. The recommendation from this group regarding Silver View Park
improvements are dependent upon funding just as the 1981 Master Plan was
dependent upon funding. What will be the answer to community residents asking
why scheduled improvements are not occurring; the reason being that monies are not
appropriated as recommended.
Answer. After discussion regarding the public's perception of a master plan, it was
unanimously agreed upon by the group that a narrative must be presented as part of
the plan to explain that the goals and priorities and funding sources are simply a plan
and guide for future improvements. Furthermore, this plan can be changed, but the
basic park concept plan should remain consistent. That concept plan offers three
areas of the park. The first is the pond. The second is the nature area around the
pond and the third is the active area. As long as future requested improvements
follow the theme of these three areas of the park concept plan, the improvements
should be considered.
Question #5. How can this improvement plan remain flexible for special
opportunities or needs which today are unforeseen such as grant opportunities, special
donations, or requests for facilities that are not included in the master plan?
Answer. It was unanimously agreed upon by the group that the master plan must
have a clause allowing flexibility for future improvements that may be req.iested or
opportunities for funding facilities as long as the improvements are compatible with
the park concept plan.
Question #6. The issue of pathway construction materials must be decided; asphalt,
woodchip or combination. Is the group interested in the northern asphalt pathway
addition, and if so, what is the priority?
;-v
Answer. It was unanimously agreed upon by the group that the pathway around the
pond should remain woodchips to follow the concept theme of nature trail. The
construction of the pathway segments was a priority with the recommendation that
construction begin as soon as possible, hopefully to be completed by October of 1990.
The group also unanimously agreed that the active area of the concept plan should
have an asphalt pathway that would provide a surface for bicyclists, skateboarders,
rollerbladers, strollers and wheelchairs. This path would connect the active area
facilities.
Question „#7. Donations could be the greatest funding source for the majority of the
improvements at Silver View Park. What recommendations can this group give to
ensure that donations will be generously given and gratefully received to encourage an
atmosphere of good will and community service by the donating organization and the
City?
Answer. It was unanimously agreed upon by the group that donations should not be
rejected. Donations would be accepted under these circumstances:
1. If donations would provide the funding of improvements according to items on
the priority list, or
2. If insufficient monies are available to fund the improvement the donating group
could choose one of two options.
a. The City would retain the money until enough funds were accumulated
to fund the priority.
b. The group could choose another improvement in which the funds were
insufficient.
3. Facilities or improvements not on the master plan which wish to be funded by
the donating organization must comply with the park concept plan and must be
approved by the Parks and Recreation Commission and City Council.
Staff was requested to provide information for the next Task Force meeting. The
information would include prices and examples of playground equipment for pre-
schoolers, handicapped users and elementary age children as well as exercise
equipment to better plan a three stage funding process for the play equipment.
Also, staff will prepare a narrative to accompany the master plan packet which
explains the groups recommendations regarding the issues which were discussed.
The next meeting to review the final packet was set for Monday, April 16, 1990 at
7:00 p.m. Meeting adjourned at 9:00 p.m.
1*9
I -i
MINUTES OF THE PROCEEDINGS OF THE
SILVER VIEW TASK FORCE
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
CALL TO ORDER
ROLL CALL
Monday, April 16, 1990
Mounds View City Hall
7:00 p.m.
Lower Level
David Long, Deborah Ashworth, Adeline Lee, David Rademacher, George Andres, Ron
Fagerstrom and Mary Saarion.
PROPOSAL REVIEW
The proposal was reviewed. The Task Force identified projects and issues to add to
the proposal. These additions are described below.
1. Two path areas were identified as difficult to maneuver when wet. A bridge
and culvert remedy was suggested. These pathway passageways will be added
as improvements in the passive nature portion of the proposal.
2. The pond buffer area maintenance was discussed. Forester Wriskey conveyed
his concern that the recommended map of the pond buffer maintenance plan is
beyond labor capacity of the City presently. After discussion, it was requested
by the Task Force that a recommendation be written to include a seasonal
maintenance employee specifically for Silver View Park.
3. The Task Force would like to see an easement offering access for people living
on the south side of the pond to the library. This easement would lie between
the Manor Homes buildings.
4. The Task Force requested that a park concept map be added to define the park
function areas.
67
5. It was also suggested that the mowers be supervised in mowing the pond area.
6. It was recommended that the triangular area between the Miller property and
stand of trees be mowed 8-12 feet in a free -form manner.
These recommendations will be added to the final proposal. The Task Force indicated
confidence in the proposal (with the additions), and are prepared to present the
proposal at the May 7 joint meeting.
ADJOURNMENT
Respectfully submitted,
Mary Saarion, Director
Parks, Recreation and Forestry
:�:
SILVER VIEW PARK POND MANAGEMENT STUDY
The Silver View Park Pond Management Study is a document prepared by
Environmental Specialists. This group of specialists provided information and
recommendations regarding the future management of Silver View Park pond.
The Silver View Park Task Force referred to this document as a resource for making
recommendations of park improvements to Silver View Park.
All of the Environmental Specialists recommendations were not offered in the Silver
View Park Improvement Plan. For instance, the weed harvesting recommendation was
implemented in the plan, but the expanded buffer areas with reduced mowing was not
recommended in the final Silver View Park Improvement Plan.
agement Study is included in the Silver View Park
tion resource and document.
SILVER VIEW POND
MANAGEMENT PI nN
Prepared for:
CITY OF MOUNDS VIEW
Prepared by:
���ENVIRONMENTAL SPECIALISTS
69
I. INTRODUCTION
In response to neighborhood and city concerns regarding the
management of Silver View Pond (Mounds View Wetland 893),
the City of Mounds View commissioned the preparation of this
study and management plan. In order to develop the
appropriate scope for the management plan, a broad proposal
for a study of a number of potential management objectives
was prepared and presented to the Mounds View Parks and
Recreation Commission and interested citizens. Four
objectives were considered; 1) improved water quality, 2)
wildlife habitat enhancement, 3) creation of a viable
fishery, and 4) improved aesthetics. Based on the input
received at this meeting, the Mounds View Park and
Recreation Commission recommended and the City Council
commissioned the development of a management plan which
focused.on water quality and wildlife habitat value.
II. PHYSICAL CHARACTERISTICS OF BASIN
Silver View Pond is located approximately 1/4 mile south of
Trunk Highway 10, between Long Lake Road and Siler Lake
Road (Figure 1). The pond is 11.39 acres in size (excluding
contiguous wetland) and has an average depth of about 4.0
feet; the distribution of depths within the basin is shown
�:- in Figure 2. The normal surface elevation of the pond is
893.0 and is controlled by an outlet structure on the east
end adjacent to Long Lake Road. Water discharging from the
pond outlet flows about 1 mile to Rice Creek.
The pond was created by excavation in 1982 to provide
stormwater storage for developments proposed within its
drainage area. The pond was designed to have three distinct
arms or basins with narrow connections between each to
retard the movement of sediment and nutrients toward the
outlet. approximately 9.34 acres (82 percent) of the pond
was originally wetland. The pond's dominant bottom
substrate is sand with a thin layer of peat or muck.
Several small areas of the pond are underlaid by deep peat
or muck deposits which appear to be remnants of the original
wetland soils.
III. DRAINAGE AREA CHARACTERISTICS
At the time that Silver View Pond was designed in 1982, its
drainage area was estimated at 203 acres and included about
57 acres north of County Road I (from Revised Hydraulic
Calculations, Oak Lake Park Ponding Area, Mounds View
Minnesota; Sunde Engineering, Inc., March 31, 1982). Since
that time the drainage area for the pond has been redefined
to total about 145.7 acres (from _Mounds View t_ Minnesota
Storm Water Drainage Analysis; Comstock and Davis, Inc.,
January 4, 1985). Based on the more recent figures and our
field review of the drainage area, we have concluded that
70
Burger King
SuperAmerlca
71
Silver View Plaza (Retail)
�1,Wlldwood Manor (Elderly Housing)
Area Boundary
-- a!••.' -Outlet Structure
�x
•
land Green Apartments
1 ^ _ U O fel f�
t7unly 6atl H'2
0 700 400 ft
Figure 1
STUDY AREA CONTEXT
72
PEI 0!121 6UO-1 t
m
C
02
LXc
d �r
3�
C R
Y O
d
3 ori
N
C C7
U Qn
E CO
C1 H
N
3
� C
O O
L �
CL
m d
� m
111 U
Oj
Z H
Z
0
m
D
W
a
N
L
the latter drainage area is more accurate. Drainage area
boundaries for Silver View Pond are shown in Figure 1.
Of the 145.7 acre drainage area, about 36.7 acres (25.2
percent) is presently impervious surface (e.g. rooftops,
roadways and parking areas). These figures assume'
completion of the remaining multifamily residential units at
Silver Lake Woods North but do not include any future
commercial development that may occur along County Road I or
TH 10. A breakdown of existing land uses within the
drainage area•is shown in Table 1.
Table 1. Existing land uses within Silver View Pond Drainage
Area, November 1989.
aIncludes about 10.8 acres which is anticipated to be
developed for commercial use in the future.
bExcludes internal streets and access drives within
developments.
Based on early conceptual plans for future commercial
development along County Road I and TH 10, it is anticipated
that roughly 10.8 additional acres of commercial use will be
added to the drainage area at some point. Roughly 4.7 acres
of this area would be impervious surface, resulting in a
future total impervious area of 41.4 acres or 28.4 percent
of the total drainage area.
At full development, the projected land use composition and
impervious surface ratio within the drainage area appears to
be very reasonable; particularly in light of the fact that
Silver View Pond was actually designed for a larger drainage
area. On purely a storm water storage basis, Silver View
Pond appears perfectly adequate to provide the remaining
storage needs within its drainage area.
On the other hand, as will be described below in the Water
Quality section, the pond is ecologically at a nutrient
73
I
Percentage of
Land Use
Acreage
Drainage Area
Upland Open Spacea
57.3
39.3%
Wetland/Pond
17.5
12.0%
Single-family Residential
17.2
11.8%
Multi -family Residential
33.6
23.1%
Commercial
9.8
6.7%
Streets/Highwaysb
10.3
7.1%
145.7 Acres
100.0%
aIncludes about 10.8 acres which is anticipated to be
developed for commercial use in the future.
bExcludes internal streets and access drives within
developments.
Based on early conceptual plans for future commercial
development along County Road I and TH 10, it is anticipated
that roughly 10.8 additional acres of commercial use will be
added to the drainage area at some point. Roughly 4.7 acres
of this area would be impervious surface, resulting in a
future total impervious area of 41.4 acres or 28.4 percent
of the total drainage area.
At full development, the projected land use composition and
impervious surface ratio within the drainage area appears to
be very reasonable; particularly in light of the fact that
Silver View Pond was actually designed for a larger drainage
area. On purely a storm water storage basis, Silver View
Pond appears perfectly adequate to provide the remaining
storage needs within its drainage area.
On the other hand, as will be described below in the Water
Quality section, the pond is ecologically at a nutrient
73
I
threshold beyond which future problems with blue-green algae
are likely. Consequently, serious consideration should be
given to providing on-site pre -ponding for any major
developments proposed within the drainage area in the
future. A suitable natural location for such ponding
appears available in an existing wet meadow which lies
between County Road I and the old County Road I corridor at
the north end of the drainage area.
IV. STORMWATER SYSTEM
Silver View Pond receives stormwater both overland and via a
number of storm sewer outlets that empty directly into the
pond. The Silver Lake Woods single-family residential
development in the southwest portion of the drainage area
drains to the pond via 3 storm sewer outlets; 12- and 15 -
inch reinforced concrete pipes (RCPs) emptying into the
south arm of the pond and a 27 -inch RCP emptying into the
west arm. This system also drains portions of Silver Lake
Road and County Road H-2.
The Silver Lake Woods Multi -family development in the north -
central portion of the drainage area drains directly to the
pond via 2 18 -inch RCPs. This system also receives drainage
from Silver View Plaza, Super America and Burger Bing at
the north end of the drainage area.
The Scotland Green apartment complex in the southeast
portion of the drainage area largely drains to the pond
overland, though there are several small culverts that serve
as surface drains from the northernmost parking areas. all
other portions of the drainage area drain overland to the
pond. Silver View Park partially drains directly to the
pond and partially to a wetland area adjacent to Silver Lake
Road. This wetland then drains via an intermittent
drainageway to the west arm of the pond.
V. BIOLOGICAL CHARACTERISTICS OF BASIN
A. Aquatic Vegetation
Aquatic macrophytes within Silver View Pond were mapped on
July 24, 1989. The distribution and density of macrophytes
varied with water depth and location. The predominant
aquatic macrophytes were elodea (Elodea canadensis), water
milfoil (MXriophXllum verticillatum), white water lilies
(jymphaea odorata, and yellow water lilies (Nuphar
variegatum). In scattered, very shallow locations along the
fringes of the pond, lotuses (Nelumbo lutea) have become
established. A few floating colonies of blue-green algae
were observed. The pond margins were vegetated with typical
emergent wetland plants including cattails (Typha
latifolia), spike rush (Eleocharis palustris),and hardstem
bulrush (Scirpuus acutus).
74
Elodea was found to be' the dominant macrophyte in shallow
water (i.e. 3 feet or less). In areas of deeper water,
water milfoil became dominant; however, when water depth
reached about 5 feet, water milfoil growth became very
sparse. Some sparse, scattered patches of sago pondweed
(Potamageton pectinatus) were also found in deeper water.
Overall, the composition of macrophytes within Silver View
Pond is not particularly diverse as would be expected of a
relatively shallow and recently created basin.
Silver View Pond also supports a number of species of algae,
the most visible of which is filamentous green algae of the
genus Ulothrix. Limited amounts of blue -green algae were
also observed. Since algal populations are important
indicators of the pond's water quality, a detailed
discussion of algae is contained in the water quality
section of this report.
B. Aquatic Wildlife Habitat Value
The wildlife habitat quality of the pond and its contiguous
wetlands is generally good. Because of its extensive
macrophyte growth and the associated high invertebrate
population, the pond supports a variety of waterfowl during
the spring, summer and fall. The primary waterfowl species
using the pond are mallards (Anas lat r nchos), wood ducks
(Aix sponsa) and Canada geese (Branta canadensis).
During the summer of 1988, we observed at least 3 mallard
and 2 wood duck broods on the pond at one time. This
unusually high density of waterfowl broods indicates that
Silver View Pond provides the high protein invertebrate diet
required by young waterfowl. However, it also suggests that
hens with broods were more concentrated due to drought
conditions in 1988. Since hens will often travel some
distance from the nest site to reach suitable brood habitat,
it appears that the pond may have been a "magnet" for hens
nesting some distance away.
While the pond provides an excellent food source for youn.-
waterfowl, the dominant macrophytes are not generally
considered high quality food for adult ducks. Waterfowl
food value ratings have been assigned by the Minnesota
Department of Natural Resources to the common aquatic plants
of Minnesota. Elodea, water milfoil and yellow water lilies
which dominate Silver View Pond are all rated as having
slight to fair waterfowl food value (Key to the Common
Aquatic Plants of Minnesota, Minnesota Department of Natural
Resources Special Publication No. 53; Carlson and
Moyle,reprinted 1973). White water lilies and lotuses have
no waterfowl food value. Sago pondweed which grows
sparingly in deeper water and spike rush which grows in
scattered patches on the pond margin are both rated as
75
excellent waterfowl food plants. Little high-quality upland
nesting habitat exists'in close proximity to the pond, the
primary reason being mowing patterns on adjacent lands.
Canada geese regularly rest and feed on Silver View Pond.
As many as i0 geese were observed feeding on mowed grass and
grass seed on uplands immediately adjacent to the pond. The
combination of mowed grass and open water has made the pond
highly attractive to geese. Nesting habitat for geese is
very limited since typical nesting sites consist of muskrat
houses or dry -hummocks within shallow marshes. The only
suitable nest location appears to be the shallow marsh/shrub
swamp which lies between the pond and Scotland Green
Apartments on the east arm; this area appears large enough
to support only one pair of nesting geese. Since geese
usually return to areas they have previously used (bringing
their broods with them), the number of geese using the pond
is likely to increase with time. It is likely that geese
will become a problem to adjacent landowners and the city
due to the vegetation damage and feces geese leave behind.
This is particularly likely if geese are allowed to nest in
proximity to the pond.
Silver View Pond is also utilized by a number of other bird
species. Numerous green herons (Butori.des virescens) were
observed feeding on minnows in the pond and a limited amount
of suitable nesting habitat exists for this species in
contiguous wetlands. Periodic feeding use by great blue
herons (Arden herodias), black -crowned night herons
lycticarax n,ycticorax) and common egrets (Casmerodius albus)
would also be expected; however, the limited fish population
in the pond is not sufficient to make it high quality
feeding habitat for these larger heron species. Contiguous
shallow marsh and shrub swamp areas are suitable habitat for
sedge wrens (Cistothorus platensis), yellow warblers
(Dendroicapetechia), and red -winged black birds (Agelaius
hoeniceus) .
P ._
Silver View Pond supports a limited population of muskrats
(Ondatt,a z_ibethicus). The limiting factor for muskrats is
the availabilit3• of den sites. All of the muskrats in the
pond utilize bank dens rather than building houses from
emergent vegetation (due to the limited amount of cattails
and bulrushes in the pond). The number of potential den
sites is controlled by soil types and by the territoriality
of individual muskrats. Muskrats do some damage to
shoreline areas with organic soils; however, they also
consume macrophytes year-round and help to control
macrophyte density.
There is evidence of past beaver (Castor canad_ensis)
activity around Silver View Pond; however, no beaver
presently inhabit the pond. While beaver would add to the
wildlife diversity of the pond, they are incompatible with
76
M Aspen/Oak Forest
Shrub Swamp
t#�:�� Old Fleld
EDWet Meadow/Shallow Marsh
Area Boundary
77
91 lcfl4
\J
0 200 400 ft
Figure 3 1 l
EXISTING WILDLIFE HABITAT
water level control and the maintenance of landscape
plantings within adjacent residential areas and Silver View
Park. Should beaver become re-established in the pond, it
is probably most prudent to have them removed. If they are
allowed to recolonize, the outlet structure will need to be
cleaned on a continual basis and any hardwood trees to be
protected should be wrapped in 1/2 inch mesh hardware cloth
to a height of 3 feet.
C. Upland Wildlife Habitat Value
Several areas of good quality upland wildlife habitat exist
in close proximity to Silver View Pond (Figure 3). Along
the both shores of the south arm are stands of 10 to 20
year-old aspen which provide good habitat for songbirds and
also screen the pond from human activities in the adjacent
multi- and single family residential areas. Other than the
contiguous shallow marsh/shrub swamp on its south shore, the
lands adjacent to the east arm are essentially devoid of
habitat value. Because of the narrow strip of dedicated
park land along this arm, there are only limited
opportunities to improve upland habitat. Similarly, the
west arm has little upland vegetation to buffer it from
adjacent residences and Silver View Park. In contrast to
the east arm, the west arm has considerably more dedicated
land adjacent to it to allow upland habitat improvement.
The City has already undertaken landscape work in Silver
View Park which includes an extensive planting of fruit -
bearing trees which will enhance the area for songbird use.
There also is an excellent stand of aspen, oak and elm with
a dense shrubby understory that extends northwest from the
west end of the west arm of the pond. This area is
excellent habitat for cottontail rabbits (Syl_vilagus
floridanus), ring-necked pheasants (Phasianus colchicus),
gray squirrels (Sciurus carolinensis) and various songbirds
and small mammals. This area extends into the northwest
corner of Silver View Park.
As mentioned above, upland nesting cover for waterfowl is
limited in the pond area by the present pattern of extensive
mowing and by the limited amount of available public land
around most portions of the pond. It would be a very cost-
effective habitat improvement measure to reduce the extent
and frequency of mowing in certain areas adjacent to the
pond. This would also reduce the area's attractiveness for
geese. Supplemental plantings of dense native grass cover
would further enhance nesting cover. These measures are
discussed further in the Recommendations section of this
report.
78
VI. WATER QUALITY
A.Methods
Water quality samples were taken from three locations in
Silver View Pond on June 24, July 22, August 13, and
September 2, 1989. Sampling locations are shown -in Figure
4. Zooplankton were sampled with a standard Wisconsin net
equipped with a 80 micron bucket, phytoplankton (algae)
samples were preserved with Lugol's solution, and water
samples were filtered through a 0.5 micron glass -fiber
filter and frozen for chlorophyll analysis. Chlorophyll was
extracted with a 80-15-5 mixture of acetone -methanol -water
for 24 hours and quantified at 665 nanometers (the
wavelength for green pigment) on a Model 24 Beckman
spectrophotometer. Surface -water samples were submitted to
Northern Lake Service, Inc. (Crandon, WI) for analysis of
total phosphorus, total nitrogen, and, for the last two
sampling dates, the sum of nitrate plus nitrite. It was not
possible for the laboratory to analyze total nitrogen on the
July 22 samples because the storage period for these samples
was exceeded. Secchi disk data were not collected because
transparency was generally to the sediment surface even in
the deepest parts of the pond.
B. Results
Phosphorus
Phosphorus is typically the limiting nutrient for aquatic
plant growth in metro area lakes. The level of eutrophy in
a lake or pond is typically a function of the water body's
phosphorus concentration. A concentration of 20 to 30 ug/L
(micrograms per liter or parts per billion) is considered
the point where a mesotrophic water body becomes eutrophic.
It is clear from the phosphorus data collected (Table 2)
that Silver View Pond is eutrophic but that its three arms
are not similar in water quality. For instance, the east
sampling location always has the lowest phosphorus
concentration, often by a factor of two. This location had
an average phosphorus concentration of 65 ug/L (range 58-
73), in contrast to an average of 123 ug/L (range 120-125)
for the west sampling location. The south sampling location
was intermediate, with an average phosphorus concentration
of 96 ug/L (range 70-120; the September 2 south sample was
not included, as it appears this sample was contaminated,
having a concentration of 935 ug/L).
These phosphorus data suggest that most of the phosphorus
load is introduced in the west and south arms of the pond, �.
and that at least 25 to 50 percent of the phosphorus is
being lost to the sediment by the time the water reaches the
79
PH gNe-1 6uo�
80
Z_
J
a
d
w
a�
an
iz
co)ul
O
co tp
O
o C)
Z
C r
F�
w
w
Q
co)ul
C)
co
c
o C)
w
Q
V
J
U
W
Q
toOv POCl) NN
o
a
C
Z
F-
tn to at to Ln to
0 0 0 0 0 0
000000
E v v v v v
Z
_N
0
000 000000
_ 000 P.- ^n t7 to
Or O) T to r in
to
� r r
7
Z
000hOMM40Ntotn
t0 N N en N 01 N N N N N 0
Jr r r r r IM
im
CL
M u'1 to t0 �n 1� N v O t0 u7 r
M 7 N N O O N 7 7 N NIm
t0
I
7
J
S
U
w3:0w3rnw3cnw3u�
w
u
v< v N N N th N N N N N
W to to t0 P N N m co co
H
Q
� N c7 v O tp 1� O Of O r r
81
Q ❑
❑ Z
�a
a�
=w
c� y
wW
~ J_
cn
N
4)
.a
cz
eastern arm of the pond where the outlet is located. In
essence, the pond is performing as it was designed; the
majority of the incoming phosphorus is removed before being
carried downstream to Rice Creek. The average total
phosphorus concentration was lowest on June 24 (83-ug/L),
but was relatively constant the -rest of the summer, varying
between 95 and 101 ug/L) (Figure 5).
Chlorophyll
Chlorophyll is a convenient measure of the algal density
(and hence primary productivity) in a lake. It is clear
from the chlorophyll data that algal growth is controlled by
the variation in phosphorus concentration described above.
A scatter plot relating chlorophyll and total phosphorus
shows a statistically significant relationship with a
correlation coefficient (r) of 0.85 (P< 0.01; Figure 6).
This relationship strongly suggests that phosphorus
availability in Silver View Pond is limiting the growth of
algae. As sediment -borne phosphorus settles out and is lost
to the sediments, less algae can grow. As with phosphorus,
chlorophyll concentrations declined as water moved through
the pond toward the outlet at the east end.
Chlorophyll concentration averaged 39 ug/L over the summer,
and was fairly constant over time until the last sampling
date when the three sites averaged 51 ug/L (Figure 7).
Since phosphorus was did not appear to be higher on
September 2 than on the earlier sampling dates, (although
the anomalous phosphorus concentration of 935 ug/L occurred
on that date), there may have been slightly more chlorophyll
produced per unit phosphorus.
Nitrogen
In eutrophic systems such as Silver View Pond, nitrogen
limitation of algal growth is common, because an excess of
phosphorus allows algae to increase until the next most
abundant nutrient becomes limiting; this nutrient is almost
always nitrogen. In general, it is thought that systems
with a total nitrogen -to -total phosphorus (TN/TP) ratio less
than about 15=to-1 are limited by nitrogen.
Silver View Pond has an average TN/TP ratio of 13.4 -to -1,
indicating that the pond's algae are slightly nitr6gen-
limited. This is important because blue-green algae are
likely to dominate nitrogen -limited systems because many
blue-green species can obtain nitrogen from the atmosphere
whereas other types of algae cannot. Blue-green algae are
nuisance algae because they tend to form relatively large,
unsightly colonies that float at the water surface.
Occasionally blue -greens cause other problems, such as odors
as they decay or toxic blooms that can harm animals (both
wild and domestic) that consume the water.
82
120
Ic
6/24 7/22 8/13 9/2
1989
• (l
Figure 5
AVERAGE TOTAL PHOSPHORUS CONCENTRATIONS
SILVER VIEW POND
83
60
50
40
J
a�
30
20
10
0}
0
y = 8.0780 + 0.30583x R42 = 0.715
20 40 60 80 100 120 140
TP (ug/L)
Figure 6
RELATIONSHIP BETWEEN CHLOROPHYLL AND
TOTAL PHOSPHORUS CONCENTRATIONS
SILVER VIEW POND
84
■
20 40 60 80 100 120 140
TP (ug/L)
Figure 6
RELATIONSHIP BETWEEN CHLOROPHYLL AND
TOTAL PHOSPHORUS CONCENTRATIONS
SILVER VIEW POND
84
SC
N
6/24 7/22 8/13 9/2
1989
Figure 7
AVERAGE CHLOROPHYLL CONCENTRATIONS
SILVER VIEW POND
85
5C
J
4C
a
O
cr
O
30
J
2
U
W
U
20
Q
W
Q
10
N
6/24 7/22 8/13 9/2
1989
Figure 7
AVERAGE CHLOROPHYLL CONCENTRATIONS
SILVER VIEW POND
85
Apparently the algae in Silver View Pond are still obtaining
enough nitrogen, because there is a statistically
significant relationship between total nitrogen and and the
quantity of algae, as measured by chlorophyll (r =0.88; P<
0.01)( Figure 8). Presumably, at higher algal densities
algae are running short of nitrogen at which time blue -
greens begin to obtain nitrogen directly from the air
through the process of nitrogen fixation. On two sampling
dates, dissolved nitrogen compounds (nitrate plus nitrite)
were measured, and five of the six samples were below the
detection limit of 50 ug/L ( see Table 2), indicating that
the algae were taking up most of the available nitrogen.
Algae
Given that the system seems to be slightly nitrogen -limited,
one would expect blue-green algae to dominate the
phytoplankton of Silver View Pond. However, on every
sampling date, the algae population of the pond was
dominated by a non -blue-green species, Ce_ratium (Table 3).
The balance of the arae on each date were either blue -
greens or green algae. However, except for :Anabaena, the
blue -greens observed in were of a type that can not obtain
nitrogen from the air. These results apply to water samples
obtained from the middle of each arm of Silver View Pond.
Table 3. Estimated composition (by biomass) of
phytoplankton in Silver View Pond, 1989.
Date % N -Fixing BGa
% other BGb % Ceratium % Green
6/24 5 10 80 5
7/22 0 30 60 10
8/13 0 0 75 25
9/2 0 50 50 0
a The only nitrogen -fixing blue-green algae (N -fixing BG)
observed was Anabaena.
b Non -nitrogen -fixing' blue-green algae (non -ti -fixing BG)
observed were Oscillatoria or Lynob a and `licrocystis.
In contrast, colonies of blue-green algae were observed
floating around the margins of the pond on both June 24 and
September 2. On June 24 large colonies of Oscillatoria or
L.yri bLa (both non nitrogen -fixing blue -greens) and
filamentous green algae were observed floating at the
surface. On September 2 numerous (at least 50) colonies of
the blue-green alga Nostoc had been blown to the shore of
the western arm. Nost_oc colonies are hard, hollow green
spheres slightly smaller than a ping-pong ball. When
examined under a microscope, the colonies were rich with
heterocysts, which are the special cells that fix nitrogen.
86
y = - 10.304 + 4.0862e -2x R^2 = 0.765
70-
60
50
a�
40
U
30
20
■
10
0
0
y = - 10.304 + 4.0862e -2x R^2 = 0.765
ZUU 4UU 6UU UUU 1 UUU 12UU 1 400 1600 1800
TN (ug/L)
Figure 8
RELATIONSHIP BETWEEN CHLOROPHYLL
AND TOTAL, NITROGEN
SILVER VIEW POND
87
E��a
ti
■
ZUU 4UU 6UU UUU 1 UUU 12UU 1 400 1600 1800
TN (ug/L)
Figure 8
RELATIONSHIP BETWEEN CHLOROPHYLL
AND TOTAL, NITROGEN
SILVER VIEW POND
87
E��a
Zooplankton
Although no quantitative examination was made of the
zooplankton, it was clear from empirical review of the
samples taken that the community is dominated by small -
bodied copepods, rotifers, and cladocera. No large -bodied
Daphnia were observed. This qualitative observation
suggests that the numerous minnows and other small fish
observed in the pond are visually preying on larger forms of
zooplankton whereas smaller forms are escaping detection.
If a complete winterkill of fish occurred, large Daahnia_
would become common and in turn would graze algae -more
efficiently. This would result in a lower amount of
chlorophyll per unit phosphorus, and could result in a bloom
of large colonies of the nitrogen -fixing blue-green alga
Aphanizomenon.
C. Discussion
Silver View Pond is rich in phosphorus, averaging between 65
and 123 ug/L in the different basins. The west and south
basins appear to be receiving the majority of the phosphorus
loading from storm -sewer runoff; however, the phosphorus
concentration -is reduced substantially by the time the water
makes its way to the east basin. Algae grow in proportion
to the concentration of phosphorus, so algae populations are
lowest in the east basin. High densities of algae reduce
light significantly, so that macrophyte growth is inhibited.
In addition, macrophytes have more access to light in
shallow water. The eastern basin is shallow and has the
least algal growth; consequently, macrophyte growth is
highest in this part of the pond.
The nitrogen -to -phosphorus ratio (TN/TP) indicates that
Silver View Pond is slightly limited by nitrogen, so that
blue-green algae are sometimes found floating on the
surface. It is somewhat surprising (but desirable) that
blue -greens are not more abundant in this system. It is
likely that the TN/TP ratio need only be lowered slightly
more to shift the algae completely to the less -desirable
blue-green algae. This shift could occur if slightly more
phosphorus is introduced to the system. Therefore, future
watershed management should minimize additional loading of
phosphorus.
However, if phosphorus is greatly reduced, water
transparency could increase sufficiently to greatly increase
macrophyte growth. It appears that some algal growth is
desirable to shade macrophytes; thus, it probably is most
desirable to limit future phosphorus loading through
altering land -use practices, and to not pursue large
reductions in`phosphorus loading. Reasonable measures might
include additional upstream ponding for any neva developments
88
that are proposed within the drainage area, restrictions on
the use of phosphorus -containing fertilizers, and limited
harvesting of aquatic macrophytes. Large reductions in
phosphorus could only be achieved by constructing basins
upstream from Silver View Pond to treat storm water already
flowing into the pond or by applying chemicals which cause
phosphorus to precipitate and settle out. The application
of herbicides would create too drastic a change in the
ecology of the pond and would most likely lead to further
problems with excessive macrophyte growth. Although it may
be desirable to remove some macrophytes, herbicides leave
organic matter and nutrients such as phosphorus in the pond;
macrophyte harvesting does not leave behind these residues.
VII. RECOMMENDED MANAGEMENT MEASURES
A. Water Quality Measures
1. Ponding
Pre -ponding of storm -water runoff from new commercial
developments should be undertaken where practical to
minimize additional phosphorus loading to Silver View Pond.
Potential locations for such ponding are wet meadow wetlands
between County Road I and the old County Road I corridor at
the north end of the drainage area and similar wetlands east
and west of Silver Lake Road on the west edge of the
drainage area. Additional ponding for storm water already
flowing via storm sewers to the pond is not recommended.
2. Limitation of Phosphorus Containing Fertilizers
It is recommended that the City consider an ordinance to
eliminate the use of phosphorus -containing lawn fertilizers
within the drainage area of the pond. Nitrogen and
potassium -containing fertilizers are sufficient for lawn
maintenance and will minimize both aquatic macrophyte and
blue-green algae problems.
3. Limited Harvest of ASLUatic Macrophytes
It is recommended that the City undertake limited harvesting
of aquatic macrophytes within portions of Silver View Pond.
The portions where macrophytes are presently a problem and
where harvesting would not promote blue-green algae problems
are shown in Figure 9 and summarized as follows:
- southern portion of the south arm
(approximately 1 acre)
- shallow eastern portion of the east arm
(approximately 1.5 acre)
89
Potential Future Pond
mlAquatic Plant Harvest
Neat Cover Planting
Area Boundary
/D0 it
Figure 9
MANAGEMENT RECOMMENDATIONS
We have investigated the practicality of contracting for
commercial aquatic weed harvesting service for these
portions of Silver View Pond. Commercial harvesters we
contacted generally indicated that the acreage to be treated
within Silver Lake Pond was too small for normal mechanized
harvesting to be undertaken. Per hour costs for harvesting
service are normally $90 to $100/hour on harvesting projects
requiring a week or more. Since harvesting of Silver View
Pond with normal, mechanized means would take less than one
day, it would not be economically feasible to bring in weed
harvesting machinery for so short a period.
Also, weed harvesting machines require excellent access
facilities (preferably a concrete ramp) to gain entry to the
waters to be harvested. Since Silver View Pond does not
have such facilities, it appears that lack of access
precludes the use of such heavy machinery.
An alternative to normal weed harvesting techniques which
appears more suitable for small scale projects is a simple
winch and cable system used to encircle the area to be
harvested. This method could be carried out by City
maintenance personnel or by a private contractor. It is
important that any personnel handling aquatic plants wear
rubber gloves due to the high likelihood of contracting
swimmer's itch.
Harvesting should be undertaken up to twice the first
season; once in June and again if and when the macrophytes
have shown substantial regrowth. Since the sandy pond
substrate is not highly conducive to macrophyte re-
establishment, future harvests probably can be undertaken
with decreasing frequency. Harvested macrophytes can be
composted and used as a soil additive in agricultural,
garden and horticultural applications. This method has been
successfully been utilized in Massachusetts as an
alternative to landfill disposal of harvested macrophytes.
S. Wildlife Habitat Measures
1. Reduced Mowin
There are a number of upland areas adjacent to the pond
which could provide improved upland nesting habitatifor
waterfowl if mowing were substantially reduced. Potential
areas for mowing reduction are shown in Figure 9. Such
areas should be mowed once every 4 to 5 years to hold back
encroachment by woody vegetation. In addition to improving
nesting habitat, reduced mowing would also reduce the pond's
attractiveness for Canada Geese, thus helping to forestall
problems commonly Fssociated with large goose numbers.
Also, any artificial feeding that might be occurring on
91
private lands around the pond should be discouraged so as
not to delay geese during migration.
2. Upland Nest Cover Plantings
Upland nesting cover would be further enhanced if some areas
of dense, native grass cover were established in close
proximity to,the pond. One potentially suitable area would
be the the large hills at the south end of Silver View Park
(see Figure 9). Dense nesting cover would also act to
minimize erosion on these steep slopes. Seeding of such
material is not proposed in the immediate area of the park's
amphitheater, since it would be incompatible with heavy
human use. Also, if such seeding were done around the in
place landscape plantings, mulching around the bases of
trees will be necessary to prevent grasses from competing
with the trees for moisture. Again, any areas seeded in
this manner should be mowed every 4 to 5 years to minimize
woody competition. Prescribed burning is normally the
preferred method for periodically rejuvenating such stands;
however, this method may not be compatible in the area of
the pond.
3. Additional Nest Structures
There is presently one wood duck nesting structure on Silver
View Pond near the junction of the three arms. At least two
additional structures could be reasonably added, preferably
one near the south end of the south arm and another at the
east end of the east arm. If possible the existing
structure should be relocated to the west end of the west
arm. In this manner, the nesting structures will be placed
to be as far apart as possible, providing the hen wood ducks
with ample space to nest and raise broods without
interacting with each other. Wood duck nest structures
should be placed in sheltered areas to blend in with
existing trees. Other types of nesting structures, such as
purple martin and/or bluebird houses, might also be
considered to maximize the interpretive value of the pond
area.
4. Monitor Canada Goose Use and Prevent Nestin
Canada goose use in the pond area is already high and is
likely to increase in the future. In order to reduce the
likelihood of future goose problems, goose use should be
monitored to determine if deterrence or control measures
should be undertaken. Of particular importance is the need
to prevent goose nesting on the pond, since any goslings
produced will return to the same location to nest
themselves, thus aggravating any problems that may arise.
Should geese begin nesting, the Minnesota DNR Area Wildlife
Manager should be consulted on deterrence methods.
92
5. Monitor Beaver Use and Prevent Colonization
The pond should be monitored for beaver use periodically and
any beaver that move in should be removed. Should beaver
colonize the pond, the outlet structure will need to be
cleaned continually. Also, any landscape plantings that are
to be protected from cutting must be wrapped with 1/2 inch
mesh hardware cloth to a height of 3 feet.
93
MEMO TO: MAYOR AND COUNCILMEMBERS
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 12, 1990
1
SUBJECT: ESTIMATE OF COST TO LIGHT CITY HALL
WEST SOFTBALL FIELD
As requested by Councilmember Quick, I have received an estimate for lighting City
Hall west softball field. A number of years ago Musco Lighting, Inc. provided the City
with an estimate of about $50,000 for lighting both City Hall fields,
The cost estimate today for lighting the single field is 39 000. Musco is a reputable
sports lighting company in the State of Minnesota. Many metro facilities have
installed Musco lighting. The lighting is specific and offers excellent playing light.
The fixtures and poles are of the highest quality. Musco Lighting recently installed
lighting at the New Brighton Freedom Park softball field located on Silver Lake road
and the Mounds view High School football field.
Staff believes that lighting the west field, allowing for four games per night, would
benefit the City for these reasons:
1. One softball field generates parking needs of approximately 54 cars during peak
game turnover times from 6:30 - 7:30 p.m. This is the same time that parking
is needed for Council meetings. Having four games on one field would spread
out the parking needs throughout the evening.
2. The vacated field space could provide new opportunities for facilities such as
additional parking, tennis courts, green space or other.
3. Playing four games per night on one field versus playing four games per night
on two fields would save maintenance time and costs of field preparation.
Also, future expenses such as turf control and sprinkling would be less for one field
versus two fields servicing the same number of teams.
One final note is that the east softball field will most likely be dug up when well
number 1 is moved.
If you wish me to provide the Council with additional information regarding softball
field lighting, please call me at ext. #20.
MS/SL
Craig Gallop
Sports Technology, Inc.
P.O. Box 27231
Golden Valley, MN 55427
612/533-2030
September 10, 1990
7
Diary Sarrion
Park and Recreation Director
City of Mounds View
2401 Highway 10
Mounds View, Minnesota 55112
Re: Lighting of City Hall Softball Field.
Dear Diary,
The following information is provided to light the softball field
at City iiall Park. We propose to light the facility to 30 footcandles
infield and 20 footcandles outfield using the Diusco Sportscluster-2
lighting system. This will provide you with excellent lighting that
will be maintenance -free throughout the years. The poles would
be galvanized steel which would also be maintenance -free.
,1:..
The Sportscluster-2 lighting system uses new technology in control
of light both on and off of the field. By redirecting potential
spill light back onto the playing field, the system effectively
reduces spill and glare light while increasing field light by
25% per fixture. The Sportscluster-2 will reduce the glare light on
Highway 10 and will reduce the glare light from the eyes of the
ball players.
Installation shall include the following: ............. $39,000.0o.
1. Provide galvanized steel poles.
2. Provide Musco Sportscluster-2 lighting system.
3. Provide underground electrical system.
4. Mount lighting to poles and set poles.
5. Install complete lighting system and electrical system.
6. 5 year warranty on lighting system.
7. 15 year warranty on poles.
Please feel free to call if you have any questions.
Un"W The Wb?tdkBestn
�'Slcerel
Craig Gal op
Official Supplier of Lighting
to the 1990 Goodwill Games
Independent Representative for:
C
Musca®
LIGHTING, INC.
MEMO TO: PARKS AND RECREATION COMMISSION
FROM: MARY SAARION, DIRECTOR
PARKS, RECREATION AND FORESTRY
DATE: SEPTEMBER 20, 1990
SUBJECT: PARK MAINTENANCE
The City Council approved the recommendation that the Public Works Department
should be responsible for park maintenance because they have the control over
maintenance activity. The park maintenance operations will also be the responsibility
of Public Works.
The Parks, Recreation and Forestry Department continues to administer planning and
budget responsibilities for park development and planning, and parks capital as
advised by the Parks and Recreation Commission.
In conclusion, all park maintenance concerns will be referred to Public Works and all
park development and planning concerns will be referred to the Parks, Recreation and
Forestry Department.
MS/SL
MEMO TO: DON BRAGER
FROM: MARY SAARION
DATE: 09-04-90
SUBJECT: CAPITAL OUTLAY ITEMS
Listed below are capital outlay items requested for the Parks,
Recreation and Forestry Department and the reasons or need
regarding the requests.
1. Replacement for the Puppet Wagon ($10,000)- this past year
the puppet wagon ran on its last legs. The body is so deteriated
that the exhaust fumes penetrate the cab from the sides and
bottom of the body. The exterior looks bad because of the rust.
The engine is in poor working order especially due to a bad
transmission. The roof leaked profusely this summer and when
brought in for repair the service man suggested that we not put
any money into the repair because the vehicle was not worth the
cost of repair.
The vehicle is used as a puppet wagon during the summer
months and a rink flooding vehicle during the winter months. On
occasion it is also used as a support vehicle during winter time
sewer or water main breaks.
The requested funding includes a used full van vehicle and
includes funding for body work.
2. Sound Equipment for Puppet Wagon ($460) - Currently the
puppet wagon staff has used their own equipment or equipment
which they have been able to scrounge up for use of sound
equipment during the summer season. The sound equipment has not
been the best and limits the puppeteers because of need to share
microphones. Staff wishes to purchase sound equipment which is
adequate for the performances and can be adapted for use in the
puppet wagon. Equipment would include wireless microphones,
amplifiers, 400 watt inverter for power, cassette recorder and
switch.
3. 2 Roaster ($300) - The two City Hall roasters no longer
working, are old and need replacement. These roasters have been
available to city groups such as the PTA's, Scouts, and groups
using the City Hall or picnic areas, and used for various city
functions.
4. Cable ropes for swings ($5,500)- chains used on the swings
at various park playgrounds frequently chip the paint on the
metal posts due to misuse by children. One of the misuses is the
wrapping of swing chains around the top post. Also the chain
links often times wear out and must be replaced. A new product
on the market is cable ropes. These ropes do not damage the post
paint if wrapped around. There are no links so the danger of
weak links does not exist, requiring no replacements. The cable
ropes do not get as cold as the metal chain so can be easily used
in the wintertime for swinging. The cable ropes are attractive.
Currently the City Hall and Lakeside Park swings are the
only city facilities using the cable ropes. Staff would like to
replace all the chain links with cable ropes on the swings at
Groveland, Woodcrest, and Hillview Parks.
5. Park Signage ($500.00) - It has been requested by the Parks
and Recreation Commission and city residents that more signs be
placed in the parks publicizing the rules and regulations
pertaining to park usage, curfew, ordinances, emergency numbers,
etc.
6. Woodcrest Hockey Boards ($25,000) - The Woodcrest Park
hockey rink is the designated rink used by Lake Region Hockey.
It has extensive use by Irondale High School broomball leagues
and is a favorite site for league play. The hockey boards
however are in terrible shape and need replacement for safety and
aesthetics.
The replacement of the boards would include materials and
construction of the new rink in the latest style and construction
of hockey rinks including top of the line materials, turn key,
labor, painting, posts, gates, fencing, etc. It is estimated
that such a facility would have a 20-25 year longevity. The
current hockey boards are very old, at least 15-20 years old.
The new design of hockey boards use lateral boards at the ends
providing durablity.
7. Lambert Park Parking Lot and Burying of Storm Water Pipe ($
Lambert Park currently does not have a paved parking lot.
Parking is on a dirt portion of the park which is unsightly and
lacks definition. Staff wishes to provide an asphalt parking lot
with curbing. This would improve the aesthetics of the park and
could provide for some hard surface play areas such as basketball
and foursquare during summer playground activities.
Currently a large open storm water drain pipe is located in
Lambert Park. Not only does it take away space but it is also
unsightly and could be a safety hazard for children who climb on
the pipe or enter the pipe. This pipe could be buried and connec
ted to the storm water drainage plan.
8. Silver View Park Improvements $10400) - These improvements
are listed in the Silver View Park Improvement Plan and include
picnic tables, benches, grills, 2 glider swings, and completion
of the sprinking system including the soccer field and the area
around the picnic shelter.
9. City Hall Softball Field Sprinkling ($14,000) - City Hall
Fields would finish the sprinkling needs of the community parks
in the City. To date the fields at Silver View and Greenfield
Community Parks are sprinkled.City Hall fields are covered with
weeds and stickers because grass is vertually impossible to grow
without the use of sprinkling. City Hall gounds are currently
sprinkled in the front of City Hall and the lush grass is
beautiful. Such success is desired in the athletic fields.
10. New Pick-up Truck for Forestry ($17,000) - Currently the
Forestry Assistant is using the old LUV truck which i. on its
last legs. The body is rusting out and the floor is full of
holes and the engine is tired. A new truck for thecrester
would enable the City to provide the current forestry truck for
use by the Forestry Assistant. With this plan each wculd have a
truck bed capable of caring the necessary size of materials such
as branches, trees and shrubs, mulching material, etc. The
trucks would be more respectable when in the public eye.
11. Additional Sprinkling at Greenfield Park ($1,200; - This
additional sprinkling would cover the area around tha playground
area and building to provide water for the landscaped bushes and
trees.
12. Installation Costs ($2,500) - for park equipment including
grills „ picnic tables, benches, glider swings and playground
equipment (if donated by a charitable organization) fcr Silver
View Park.
13. Weed Harvesting ($2,000) - Initiation of a program to
harvest weeds from Silver View Park pond is a top priority
indicated by residents living around Silver View Park.
14. Pathway Completion ($7,000) - This has been inc_cated as a
priority by a majority of City Survey participants anM is a top
priority by the Parks and Recreation Commission and S_lver View
Park Task Force. Completion of the woodchip path arc=nd Silver
View Park pond, finishing the two sections.
15. Lighting for City Hall Softball Field #2 ($39,OC:) - This is
suggested if the softball field #1 must me abandoned for any
reason or if the city feels that it would be more advantageous to
maintain one field versus two fields while still serv_ng the same
number of adult softball teams by the scheduling of fzur games
per night on one lighted field versus two games per night on two
unlighted fields.