Loading...
HomeMy WebLinkAboutResolution 9264The Mounds View Vision A Thriving Desirable Community RESOLUTION 9264 CITY OF MOUNDS VIEW COUNTY OF RAMSEY STATE OF MINNESOTA APPROVING THE PROPOSAL FROM KLM ENGINEERING FOR ROOF REPAIRS ON THE GROUND RESERVOIR WHEREAS, the City has the responsibility to efficiently operate the water distribution system; and WHEREAS, In 2014 the City Council approved repairs to the ground reservoir (Res 8218) that included interior structural repairs, interior steel coatings, exterior structural repairs, and coating of the exterior roof and flashing; and WHEREAS, Staff recently had the ground reservoir inspected by KLM Engineering and upon completion of this inspection; repairs to the roof are required; and WHEREAS, Staff had KLM Engineering reach out to contractors in order to receive proposals for the needed repairs; one proposal was received from Champion Coatings of Prior Lake, MN. WHEREAS, The Scope of the repair work will include the following: • Remove the existing coating by grinding 4-inches, including feathering the existing coating to sound material, on both sides (minimum of 8-inches wide) of expansion and construction joints, as directed by the engineer. The total footage requiring repair is approximately 522-lineal feet. • On all joint repair areas, apply 6-inch wide bond breaker tape per manufacturer’s instructions, similar to those provided by Sherwin Williams. • On areas of cracked coating, not affiliated with joint repairs, remove coating back to tightly adhered coating and feather edges. • Apply, color-matched, Sherwin Williams Envirolastic AR530 to the all repaired areas at a thickness of 60 mils to match existing coating. • Prior to tape or coating application, surfaces shall be clean and dry per coating manufacturer’s recommendation NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mounds View, Ramsey County, Minnesota as follows: 1. Approves the proposal from KLM Engineering for roof repairs to the ground reservoir at a cost of $29,904.00. 2. Council approves a contingency of 7% or $2,093.00 for any unforeseen issues that may arise during the repair work. For a total project cost not to exceed of $31,997.00. The Mounds View Vision A Thriving Desirable Community Resolution 9264 Continued 3. Funded from the Water Department 2020 adopted budget account 700-4823- 7050. 4. The Mayor and City Administrator are hereby authorized and directed to execute all appropriate documents to effectuate the actions contemplated by this resolution. 5. The Mayor and City Administrator, Staff and consultants are hereby authorized and directed to take any and all additional steps and actions necessary or convenient in order to accomplish the intent of this Resolution. Adopted this 13th day of April, 2020 __________________________________ Carol A Mueller, Mayor ATTEST: __ Nyle Zikmund, City Administrator (SEAL) The Mounds View Vision A Thriving Desirable Community