HomeMy WebLinkAbout03-25-2021PARKS AND RECREATION AND FORESTRY COMMISSION
6:30 P.M. I MARCH 25, 20211 MOUNDS VIEW CITY HALL
MEETING AGENDA MUUNDtSVFEW
Virtual Meeting
Please click the link below to join the webinar:
https://usO2web.zoom.us/j/88247628763?pwd=NzBCRmRiblAxdmh6SFVMVHcvZGNRUT09
Passcode:249088
Or iPhone one -tap :
US:+16465588656„88247628763# or+13017158592„88247628763#
Or Telephone:
Dial(for higher quality, dial a number based on your current location):
US: +1 646 558 8656 or +1 301 715 8592 or +1 312 626 6799 or +1 669 900 9128 or +1
253 215 8782 or +1 346 248 7799 or 833 548 0282 (Toll Free) or 877 853 5247 (Toll Free) or
888 788 0099 (Toll Free) or 833 548 0276 (Toll Free)
Webinar ID: 882 4762 8763
International numbers available: https://usO2web.zoom.us/u/kcwmHV5yXV
1. CALL TO ORDER
2. ROLL CALL: Commissioners: Arel, Curry, Kroeger, Lillem, Palm, Sullivan,Wake Wiesner,
Staff: Peterson I Thomas *to be absent
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES
August 12, 2020
February 25, 2021
5. PUBLIC INPUT
Citizens may speak to issues not on tonight's agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes.
6. STAFF REPORTS
A. Parks and Recreation - Andy
B. Public Works — Don
page 2
7. UNFINISHED BUSINESS
A. Silver View Park Ball Fields — install netting along out filed fence
B. Lambert Hockey Rink — Reconfigure boards and reduce overall size of rink
C. Review Random Park Playground
D. Review 5 year Capital Park Improvement Plan (2022-2026)
8. NEW BUSINESS
A. List from IBL on concerns of various ball fields.
B. City Council Work Session May 3, 2021 — Update on Parks and Recreation Department /
Review future needs of programs, parks, and facilities.
9. COMMISSIONER REPORTS
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINES
11. ADJOURNMENT: Next Regular Commission Meeting: April 22, 2021
PARKS AND RECREATION AND FORESTRY COMMISSION
6:30 P.M. I AUGUST 27, 2020 1 MOUNDS VIEW CITY HALL
MEETING MINUTES MOUNDS _VIEW
1. CALL TO ORDER AT 6:35 PM
2. ROLL CALL: Commissioners: Arel, Curry, Kroeger, Palm, Rundle, Sullivan, Zaige
Staff: Peterson I YMCA: Thomas
3. APPROVAL OF AGENDA: Motion to approve by Palm, 2"1 by Kroeger. Motion Passed 6-0
4. APPROVAL OF MINUTES: Motion to approve minutes from July 23, 2020 by Rundle, 2nd
by Curry. Motion Passed 6-0
5. PUBLIC INPUT
Citizens may speak to issues not on tonight's agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes. No residents present.
6. STAFF REPORTS
A. YMCA: See attached report
B. Public Works: See attached report
7. UNFINISHED BUSINESS
A. City Hall Park - T —Ball field: in northeast corner $11,705 for fencing
B. Random Park — Playground Rehabilitation Plan: $92,297 including concrete around the
playground. Do we add picnic table with or without shelter? With or without concrete base?
Need additional trail from parking lot for ADA accessibility. Direct Staff to find out existing
picnic table location and costs for adding some. Commissioner Zaiger present. There
is a matching grant available from MN/WI Playground for playground equipment that we
would need to commit to apply for soon.
C. Greenfield Park — Ball field layout and picnic shelters: Infield repair and grading of field -cost
staff time. Adding aglime just around home plate, not between baselines and dugouts would
not come out of Park Dedication Fund —it would come out of general maintenance/operating
budget. New picnic shelter $30,841 installed for ONE. The other could be added later.
D. Lambert Park — Hockey Rink — size layout: $40K estimated with LED lighting and new
boards to shorten existing rink and put in a pleasure rink on north side.
E. Silver View Park — Ballfield screening/netting for outfield fence: $10,895
F. Review Park Dedication Funds and Improvement Plan Worksheet: Current balance is
$182,770. Commissioners prioritized the above 5 park improvements. All agree to fix infield
grading at Greenfield Park. Could repair south side of Lambert Park rink now and adjust
north side in the future. Motion by Palm to move forward with Greenfield ball field repair
(in-house cost), Silverview ball field netting ($10,895), and City Hall t-ball field
($11,705), as well as repair south end of Lambert hockey rink (cost TBD, but much
1 1 P a g e
less than $40K). Motion fails due to lack of a 2"d. Motion by Arel to move forward with
Greenfield ball field repair (in-house cost), Silverview ball field netting ($10,895), and
City Hall t-ball field ($11,705), and Lambert hockey rink ($40,000). 2"d by Kroeger.
Motion Passed 5-1 Curry absent, Palm descent.
G. Contract between the City of Mounds View and the YMCA — Verbal update — Joint City
Council and Parks Recreation and Forestry Commission set for September 24, 2020.
8. NEW BUSINESS
A. Lakeside Park: Proposed Trail on the North side of the Park: Proposed by SLP: remove
"Life Guard on Duty" sign, adding nature interpretive signs, modify other signage at the
park. Need to work with SLP Park Commission about overall changes and costs with
respect to the Joint Powers Agreement. Direct Staff to investigate how future items
should be handled at Lakeside Park between SLP and MV, and to clarify roles between
the two cities regarding changes and improvements.
B. Vision of the Park and Recreation Program (YMCA). What is the vision of the PRF
Commission if the MVCC recreation program comes back to the City instead of
contracting with YMCA? To be discussed at City Council Work Session on September 8,
and at PRF joint meeting with City Council on Sept. 24.
9. COMMISSIONER REPORTS: Kroeger: MV Resident FaceBook page comments about city
parks. Comments about people not picking up dog droppings, and littering; and those that do pick
up trash along the trailways. Is there a policy from a City perspective for the Staff to respond to
these comments? Nyle Zikmund, City Administrator, says there is no policy for the City to respond.
It is complicated because it is not administered by the City. Could be a way for us to be aware of
what residents are thinking since they don't necessarily watch our meetings.
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINESS
11. ADJOURNMENT: Motion by Palm to adjourn at 8:48 PM, 2"d by Rundle. Motion Passed 6-
0 (Curry absent).
NEXT meeting will be JOINT with the City Council and Parks Recreation and Forestry Commission
set for September 24, 2020 at 6:30 PM. Also discuss Commission updates and how to proceed with
upcoming park needs and available funds in Park Dedication Funds. How would the Council like us
to proceed?
Next Regular Commission Meeting: October 22, 2020
2 1 P a g e
PARKS AND RECREATION AND FORESTRY COMMISSION
him
6:30 P.M. I FEBRUARY 25, 2021 1 MOUNDS VIEW CITY HALL _
MEETING MINUTES M LINDS
1. CALL TO ORDER at 6:35 PM
2. ROLL CALL: Commissioners: Arel, Curry, Kroeger, Lillemo, Palm, Sullivan, Wake Wiesner,
Staff: Peterson I Thomas *to be absent
3. APPROVAL OF AGENDA- Motion to approve by Palm, 2"d by Kroeger. Motion approved 7-0
4. APPROVAL OF MINUTES
January 28, 2021: Motion to approve minutes by Wake Wiesner, 2"d by Sullivan. Motion
passed 7-0
5. PUBLIC INPUT
Citizens may speak to issues not on tonight's agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes.
Michael Hanson 2401 Mounds View Blvd. (city employee) and representative of Irondale
Baseball Association:
Groveland, Hillview, Lambert, Greenfield, Silverview. Teams consist of MV, NB, SV and AH
residents. Would like to see improvements at the ball fields. Looking at infield drainage issues
and tree overhang as well as fencing for player protection and ball placement. Would like
dugout covers!
Palm suggested inviting Mike to our tours of the parks in the spring, perhaps we have an earlier
park tour before March meeting (weather dependent).
Wake Wiesner suggests getting a prioritized list of needs and issues. Safety would come first.
Kroeger: some items could be done as field maintenance (drainage) and tree trimming this
spring before park tour and before season starts.
Don Peterson: Get an itemized list about each park from IBL to City Staff and they can bring
concerns back to PRF Commission with costs and timelines. Jox Boxes are put in on purpose
for adult leagues and older students, but may impact younger players.
Arel: Some items we have addressed in the past, but may need to be revisited.
6. STAFF REPORTS
A. Parks and Recreation — Andy Thomas: See attached report including new MVCC activity
brochure! Will be mailed out and available online soon! Encouraged to get residents
pictured in future brochures.
B. Public Works — Don Peterson: See attached report
7. UNFINISHED BUSINESS
A. Review Park Projects for 2021: Items suggested for 2021 include Random Park
playground, Lambert Park hockey boards, Netting at Silver View Park, T-Ball field at City
Hall Park. Commission is good with moving forward with these items and financing with
Park Dedication Fund ($155,500). MVCC updates will be made using Special Projects
Fund.
8. NEW BUSINESS
A. Sidewalk and Trails Master Plan—2022-2023 Street Project: Trying to get trailway done on
Spring Lake Road both north and south of Mounds View Blvd. Trying to coordinate with City
of Spring Lake Park and Ramsey County for connecting trailway system. Also need to
complete sidewalk trailway plan on MV Blvd from Groveland Road to Spring Lake Road.
B. Review Projects 2022 -2025 as Part of the 5 year Financial Plan: Greenfield and Hillview
playgrounds will need some replacement parts and refurbishing in the next couple of years
($150K)
C. City Staff Duties — overview of Public Works / Parks and Recreation Organization Chart and
job duties
9. COMMISSIONER REPORTS: Look at possibility of sled donation bin at local sledding hills
(Free Sled Library) at Pinewood and Silver View Parks.
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINESS: City Hall Park Veterans'
Memorial -revisit
11. ADJOURNMENT: Motion by Palm to adjourn at 8:11 PM. 2nd by Kroeger. Motion Passed 7-0
Next Regular Commission Meeting: March 25, 2021
Item No. 6B
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From: Don Peterson — Director of Public Works/Parks and Recreation
Date: March 25, 2021
RE: Public Works Staff Report
The following is a synopsis of recent activities and events of the Public Works Department.
Maintenance
Staff worked on the following items since February 25, 2021
• Carpet cleaning Groveland and Random
• Spot wall repairs park buildings
• Equipment repairs and spring preparation
• Hillview building furnace installed
• Ordering summer stock
• Playground replacement part ordering
• Litter trash pick up
• Garden weed control applied
• Hockey rink clean up
• Certification hours/ Training hours for licenses
• Community center interior maintenance
• Baseball field inspections
• Spot black dirt and seeding for plow damage and winter kill
Forestry
Staff worked on the following items this last month:
m Resident consults
• Four Seasons consults and meets
• Private disease trees being removed by Four Seasons Tree Care 100% removed, 10 stumps
remaining
• Planting plan for spring complete
• Ash grant application written and turned in
• Chainsaw grant application written and turned in
• Training hours for licenses
• Historic tree preservation pruning of Red Oak — Silver View Park — estimated age of this tree
is over 100 years
The following is the List of Parks and projects / maintenance activities ongoing or planned this year.
Current updates are in black text, and updates from the previous two month period are in grey.
11Page
Public Works Staff Report
Ardan Park
• Working with Stantec Engineering on some drainage issues in the Park. Application to
perform some storm water pond maintenance was submitted to RCWD.
• Work to be scheduled for this winter — postponed at this time
City Hall Campus:
• New Picnic Shelters are being built, will be ready for next season rental.
• Worked with plumber and vendor to winterize the splash pad.
• Installation of the New Picnic Tables started
Groveland Park:
• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court
Greenfield Park:
Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA
accessible. Fencing contractor scheduled for next month Leveled the trail running in the
back portion of the Park, added class 5 as needed.
Commission will need to discuss at the August 2020, Green field baseball field. Take out
all turf from first and third base line and replace with Ag-lime to the fence. Most all new
park construction is going this way with ball fields. This would solve the wet home plate
issue and uneven base line issues.
Building has been re -roofed
Hillview Park:
■ Commission will need to discuss at the August 2020, playground Rehabilitation.
• Furnace at Park Shelter has been replaced — condensing still needs to be installed.
Lambert Park
• Inventory of Hockey Rink boards to re -place started.
■ Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink.
Random Park:
• Commission will need to discuss at the August 2020, playground Rehabilitation
Silver View Park
• Ramsey County continues to work in re -profiling the draining ditch along County Road I
and Silver View Road, located in Silver View Park.
• Four new pond aerators installed in the Storm Water Pond
2 1 P a g e
Public Works Staff Report
Woodcrest Park
• Working with Stantec Engineering and Ramsey County on some drainage issues in the
Park. Application to perform some storm water pond maintenance was submitted top
RCWD.
Met with contractor — work will be scheduled for this winter — postponed
3 1 P a g e
Item No. 6A
MOUNDS Vi�v
PARKS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From Andy Thomas — Parks & Recreation Superintendent
Date: March 25, 2021
RE: Parks & Recreation Staff Report
The following is a synopsis of recent activities and events of the Parks & Recreation Department.
Programs
■ Summer Programs
o Parks Program
o Explore More
• Classes
• Leagues
• Memberships
Community Center Projects
• New Teen Center
11Page
Parks & Recreation Staff Report
Rentals
• Increased to 50% capacity
$145,964
Event Center
$30,074 64,235
_$k
- ,gL74- — �2 — 64
— -
Imp
2019 2020 2021
-Number of Rentals Revenue
Staff
• Custodial
• Summer Seasonal
• Facilities Maintenance
Fields & Parks
• Field Reservations
o 102% utilization compared to 2019
• Park Rentals
Park Rentals
Number of Rentals YTD —i—Revenue YTD
2 1 P a g e
Parks & Recreation Staff Report
18
Park Rentals
10
21 22
�& — ... -- -
- -
_
6
4
-�
6
2019 YTD 2021 YTD 2021 YTD
City Hall Groveland Hiliview Lakeside
Random Silver View fm Lambert
3 1 P a g e
Item: 7A
MOU--NDtSVWE-W
PUBLIC WORKS • PARKS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From: Don Peterson — Director of Public Works/Parks and Recreation
Date: March 25, 2021
RE: Adding Netting to Silver View Ball Field Fence Line
Discussion/ Background
The Parks and Recreation and Forestry Commission has received several complaints over the
years of softball hitting the homes at the Silver Lakes Townhome Association.
The Commission requested staff obtain proposals for installing netting on top of the chain link
fence in the right and left outfields at Silver Park.
The Current chain link fence running in the outfield is 10' high.
Staff received two options from Century Fence of Forest Lake MN as follows:
1) Installing 10' high netting on top of the chain link fence line - 30' on the West fence
line and 130' on the East fence line. At a cost of $11,675.00
2) Installing 20' high netting on top of the chain link fence line - 30' on the West fence
and 130' on the East Fence line. At a cost $25,915.00
Recommendation:
Public Works Staff is recommending that the Parks and Recreation and Forestry Commission
approve the proposal to install the netting 20' high netting at a cost of $25,915.00
Respectfully submitted,
Don Peterson — Director of Public Works/Parks and Recreation
Attachments
ONTURY FENCE
COMPANY
SINCE 1917 THE MARK OF PERMANENCE
Office
(651)-464-7373
Toll Free
(800)-328-9558
Fax
(651)-464-7377
Cellular
(612)-666-1680
Cory Capra
ccapra@centuryfence.com
P.O. Box 277, Forest Lake, MN, 55025 3/25/2021
Phone:763-286-3632 Fax:763-717-4049
Proposal To: Ship To:
City of Mounds View Outfield Netting
Pete Szurek City of Mounds View
2466 Bronson Dr
Mounds View, MN 55112
✓❑ Installed ❑ Material Only 0 Prepaid Freight Freight Collect F.O.B. Delivery Schedule:
Description
Furnish and Install: Outfield Netting
1 - 20' H x 30' Section of Netting West of opening
1 - 20' H x 135' Section of Netting East of opening
Netting to be 20' High above existing outfield fence
Posts to be 6 5/8" set in 84" x 24" Footings
Materials and Labor: $25,915.00
Notes:
Excludes locating of private utilities
Excludes excavation through rock frost and backfill
Allow 4 weeks for special materials delivery
Proposal is valid for 30 days
Acceptance: This proposal when accepted in writing by purchaser and by Century Fence Company's Main Office becomes a contract
between two parties. The conditions on the attached "Terms and Conditions" sheet are made a part of this contract.
Terms of Payment: Net Cash upon receipt of invoice.
Buyer's signature Date Submitted by
Cory Capra
ONTURY FENCE
COMPANY
SINCE 1917 THE MARK OF PERMANENCE
Office
(651)-464-7373
Toll Free
(800)-328-9558
Fax
(651)-464-7377
Cellular
(612)-666-1680
Cory Capra
ccapra@centuryfence.com
P.O. Box 277, Forest Lake, MN, 55025 3/25/2021
Phone:763-286-3632 Fax:763-717-4049
Proposal To:
City of Mounds View
Pete Szurek
2466 Bronson Dr
Mounds View, MN 55112
Ship To:
Outfield Netting
City of Mounds View
Q Installed ❑ Material Only Q Prepaid Freight Freight Collect F.O.B. Delivery Schedule:
Description
Furnish and Install: Outfield Netting
1 - 10' H x 30' Section of Netting West of opening
1 - 10' H x 135' Section of Netting East of opening
Netting to be 10' High above existing outfield fence
8 - Post to be removed and replaced with 4" OD posts set in concrete footings 72" x 18"
Materials and Labor: $11,675.00
Notes:
Excludes locating of private utilities
Excludes excavation through rock frost and backfill
Allow 4 weeks for special materials delivery
Proposal is valid for 30 days
Acceptance: This proposal when accepted in writing by purchaser and by Century Fence Company's Main Office becomes a contract
between two parties. The conditions on the attached "Terms and Conditions" sheet are made a part of this contract.
Terms of Payment: Net Cash upon receipt of invoice.
Buyer's signature Date Submitted by
Cory Capra
Item: 713
M0 UN D5 WEN
PUBLIC WORKS • PARKS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From: Don Peterson — Director of Public Works/Parks and Recreation
Date: March 25, 2021
RE: Lambert Park Hockey Rink
Discussion/ Background
Public Works Staff proposed to the Parks and Recreation and Forestry Commission to reduce
the overall size of the hockey rink at Lambert Park. This would create a 3/ sized hockey rink and
place the pleasure rink on the North end of what is currently the hockey rink.
The Commission requested staff obtain proposals for reducing the size of the hockey rink and
replacing the hockey boards.
Staff received a proposal from Century Fence of Forest Lake MN to install new post and chain
link netting for the hockey rink for $19,935.00
Staff has priced out the materials need to replace the boards for the hockey rink at a cost of
$10,000.00
Recommendation:
Public Works Staff is recommending that the Parks and Recreation and Forestry Commission
approve the proposal from Century Fence to install new metal post and chain link netting for the
hockey rink and approve public Works Staff to reduce and replace the hockey boards for a cost
of $29,935.00.
Respectfully submitted,.
Don Peterson — Director of Public Works/Parks and Recreation
Attachments
<EWURY FENCE
COMPANY
SINCE 1917 THE MARK OF PERMANENCE
Office
(651)-464-7373
Toll Free
(800)-328-9558
Fax
(651)-464-7377
Cellular
(612)-666-1680
Cory Capra
ccapra@centuryfence.com
P.O. Box 277, Forest Lake, MN, 55025 3/25/2021
Phone:763-286-3632 Fax:763-717-4049
Proposal To:
City of Mounds View
Pete Szurek
2466 Bronson Dr
Mounds View, MN 55112
Ship To:
Ice Rink Expansion
2551 Hillview Rd
Mounds View, MN 55112
0 Installed ❑ Material Only 0 Prepaid Freight Freight Collect F.O.B. Job Site Delivery Schedule:
Description
Removals
Remove Existing Posts and Chain link Fence
Boards to be removed by City
Footings to be disposed of
Backfilling to be completed by city
Rails and Steel Frame work to be salvaged
Install:
220 L.F. of 8' high Posts, 4' High chain link fence on boards in corners
1 - 12' Double Gate on North End
140 L.F. of 2 1/2" posts for mounting boards on side wall east side
Posts to have Angle iron welded on either side to affix boards
Holes will not be drilled
All posts to be air driven 6'
Materials and Labor: $19,935.00
Notes
Excludes locating of private utilities
Excludes excavation through rock frost and backfill
Layout to be verified by city
Proposal is valid for 30 days
Acceptance: This proposal when accepted in writing by purchaser and by Century Fence Company's Main Office becomes a contract
between two parties. The conditions on the attached "Terms and Conditions" sheet are made a part of this contract.
Terms of Payment: Net Cash upon receipt of invoice.
Buyer's signature Date Submitted by
Cory Capra
Geocortex Viewer for HTML5 Page 1 of 1
Mi EL j. ren ar latitud- 45-1021 degrees North. Center longitude: 93.1906 degrees vdesi.',Visible Features: 31
feiRAMSEYle 3' jjjR,% M-CIOUPoints. SPnrrh
}�tMc•/(m�nc nn r�mcavmn ne/1•-T*m7G�Iiaa:�ar/ir�r�av 1�4m17rnnfnRocn=l,ttr�c•//m�rc .ten r.- '7/71 /)n)n
Item: 7C
MOUNDS VIEW
PUBLIC WORKS • PARRS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From: Don Peterson — Director of Public Works/Parks and Recreation
Date: March 25, 2021
RE: Random Park Playground
Discussion/ Background
The Parks and Recreation and Forestry Commission tours various City Parks annually. In 2019
the Commission toured Random Park and determined that the Playground should be replaced
and updated.
The commission requested staff obtain a proposal to replace and rehabilitate the playground.
With the new playground installed at City Hall in 2019, several pieces of the old playground at
City Hall were selected to be installed at Random Park.
Staff received a proposal from Minnesota/Wisconsin Playground Inc for replacing the current
playground and rehabilitating the current playground area at Random Park. Following is the
breakdown of cost;
1) Purchase of new playground equipment: $59,967.24
2) Installing of the playground equipment: $21,865.00
3) Installing of New sidewalk: $12,277.00
Total $94,109.24
Recommendation:
Public Works Staff is requesting that the Parks and Recreation and Forestry Commission
discuss and provide Staff with further direction
Respectfully submitted,.
Don Peterson — Director of Public Works/Parks and Recreation
Attachments
Minnesota / Wisconsin Playground 03/25/2021
5101 Highway 55, Suite 6000 Quote #100556-01-09
Golden Valley, Minnesota 55422
Ph. 800-622-5425 763-546-7787
Fax 763-546-5050 harlan@mnwiplay.com
CONSULTANT: HARLAN LEHMAN
Random Park - D10266H2 - Materials
City of Mounds View
Ship to Zip 55112
Attn: Don Peterson
2401 Mounds View Boulevard
Mounds View, MN 55112
Phone: 763-717-4053
Fax:N/A
don.peterson@ci.mounds-view.mn.us
Quantity
1 RDU
GameTime - Primetime Play Unit, ages 5-12
(7) 12024 — 3 1 /2" Uprt Ass'Y Alum 9'
(2) 12025 — 3 1/2" Uprt Ass'Y Alum 10'
(6) 12069 — 3 1/2"Uprt Ass'Y Alum 14'
(1) 12215 — Crunch Bar Prime Time
(1) 12728 — Single Seat P/T
(2) 18200 — 36" Sq Punched Deck P/T 1.3125
(3) 18201 — 36" Tri Punched Deck P/T
(1) 18679 — Bongos
(1) 18682 — High Whistle
(4) 18832 — Umbra Roof Extemsion 2'
(3) 18833 — Umbra Roof Extemsion 3'
(1) 19005 — Transfer System W/Barrier (2' Rise)
(1) 19007 — Transfer System W/Barrier (3' Rise)
(1) 19035 — Optional Access Step (3' & 5')
(1) 19055 — Twister (5' & 5-6")
(1) 19064 — Wavy Tree (T-6" & 8')
(1) 19076 — Arch (2'6" & T)
(1) 19092 — Chain Link (8')
(1) 19110 — Corkscrew (2'-6" & T)
(1) 19121 — Curved Zip Slide
(1) 19124 — Straight Zip Slide (5)
(1) 19217 — Bubble (T & 3'6")
(1) 19285 — Transfer Platform W/ Guardrail 3'
(1) 19372 — Play Port Bridge
(1) 19382 -- Single Entrance Wilderslide li
(3) 19386 -- Left Curve Section Wilderslide li
GameTrre
Minnesota / Wisconsin Playground 03/25/2021
5101 Highway 55, Suite 6000 Quote #100556-01-09
Golden Valley, Minnesota 55422
Ph. 800-622-5425 1 763-546-7787
Fax 763-546-5050 1 harlan@mnwiplay.com
CONSULTANT. HARLAN LEHMAN
Random Park - D10266H2 - Materials
Quantity Part # Description
Support
(1) 19424 -- Long Exit ( Use On T & 8' Slides)
(1) 19427 — Single Spiral
(1) 19701 — 90" Play Port Funnel Bridge
(1) 19756 — Umbra Triangle Roof
(1) 19757 — Umbra Square Roof
(7) 19762 — Umbra Roof Plug
(3) G12069 — 3 1/2"Uprt Ass Y Galv 14'
(3) G12077 — 3 1/2" Uprt Ass'Y Galy 15'
1 RDU GameTime - Primetime Ada Swings
(2) 8696 — Encl Seat 3 1 /2"(8696)
(2) 8910 — Beft Seat 3 1/2"Od(8910)
(1) 12584 — Ada Primetime Swing Aab, 3 1/2" Od
(1) 12583 — Ada Primetime Swing Frame, 3 1/2" Od
1 EKB01 I GameTime - ECHO Toddler Bloom Inground
1 178749 GameTime - Owner's Kit
3 161290 GameTime - Geo-Textile 2250 Sqft Roll
1 EWF-12L EWFLGE - Engineered Wood Fiber Safety Surfacing, 225 CY at 12" depth
Total S59,967.24
Comments
Owner is responsible to prepare and provide a flat and level site prior to the installation play equipment and safety surfacing.
This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is
based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess
of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground.
Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions
of this quotation shall be as outlined herein with no other requirements applicable.
This quotation is subject to polices in the current Gametime Park and Playground catalog and the following terms and conditions. Our quotation is
based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess
of $1,000.00 to be supported by your written purchase order made out to Gametime, c/o MinnesotaWisconsin Playground.
Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and GameTime, terms and
conditions of this quotation shall be as outlined herein with no other requirements applicable.
Pricing: f.o.b. factory, firm for 30 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from
tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at
time of order entry.
GameTirrr�
Minnesota / Wisconsin Playground
5101 Highway 55, Suite 6000
Golden Valley, Minnesota 55422
Ph 800-622-5425 763-546-7787
Fax 763-546-5050 harlan@mnwiplay.com
CONSULTANT. HARLAN LEHMAN
08/27/2020
Quote #100556-01-04
Random Park - D10266H1 - Site Demo & Concrete Sidewalk
City of Mounds View
Attn: Pete Szurek
2401 Mounds View Boulevard
Mounds View, MN 55112
szurek33@gmail.com
Ship to Zip 55112
Quantity
1 Demo Other - Demolition and disposal of a portion of existing sidewalk / playgoound border- $4,522.00 $4,522.00
Demo of existing concrete border, 215 SF
Disposal of concrete in dumpster
Remove existing aggregate base / sand and dispose.
Concrete Other - New Concrete sidewalk / playground border- $7,755.00 $7,755.00
Excavation and site prep for new sidewalk.
Includes aggregate base and sand for leveling.
Include 1 mobilization to the site.
Owner must provide open and clear access to the site.
Excludes any site restoration.
Sub Total $12,277.00
Comments
Owner is responsible to prepare and provide a flat and level site prior to the installation play equipment and safety surfacing.
This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is
based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess
of $1,000.00 to be supported by your written purchase order made out to Minnesota/VVisconsin Playground.
Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions
of this quotation shall be as outlined herein with no other requirements applicable.
Indemnification; Owner/Owners Representative will indemnify and hold Minnesota Playground, Inc., dba, Minnesota Wisconsin Playground (MWP),
harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of Owner/Owners Representative's
negligence or noncompliance with any of its commitments under this document. MWP will indemnify and hold Owner/Owner's Representative
harmless for all claims, damages and related costs, including reasonable legal fees and costs, arising out of MWP's negligence or noncompliance
with any of its commitments under this document.
Pricing: f.o.b. factory, firm for 30 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from
tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at
time of order entry.
Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote,
credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any
or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax
supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be
invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted.
Unless already on file, please include a tax exempt certificate upon order entry whether a tax supported government agency or other.
Page 1 of 4
W
Minnesota / Wisconsin Playground 03/25/2021
5101 Highway 55, Suite 6000 Quote #100556-01-10
Golden Valley, Minnesota 55422
Ph. 800-622-5425 763-546-7787
Fax 763-546-5050 harlan@mnwiplay.com
CONSULTANT: HARLAN LEHMAN
Random Park - D102661-12 - Installation
City of Mounds View
Attn: Don Peterson
2401 Mounds View Boulevard
Mounds View, MN 55112
Phone: 763-717-4053
Fax:N/A
don. peterson@ci.mounds-view.mn.us
Ship to Zip 55112
Quantity
i INSTALL Install - Installation of Play Equipment- $17,150.00 $17,150.00
Includes concrete footings and packaging material disposal.
1 INSTALL Install - Installation of Engineered Wood Fiber and Geo Fabric $4,715.00 $4,715.00
Total $21.865.00
Comments
Owner is responsible to prepare and provide a flat and level site prior to the installation play equipment and safety surfacing.
This quotation is subject to current Minnesota/Wisconsin Playground (MWP) policies as well as the following terms and conditions. Our quotation is
based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess
of $1,000.00 to be supported by your written purchase order made out to Minnesota/Wisconsin Playground.
Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and MWP, terms and conditions
of this quotation shall be as outlined herein with no other requirements applicable.
This quotation is subject to polices in the current Gametime Park and Playground catalog and the following terms and conditions. Our quotation is
based on shipment of all items at one time to a single destination, unless noted, and changes are subject to price adjustment. Purchases in excess
of $1,000.00 to be supported by your written purchase order made out to Gametime, do Minnesota/Wisconsin Playground.
Each quote is handled on a per order/project basis. Unless a long-term agreement is in place between purchaser and GameTime, terms and
conditions of this quotation shall be as outlined herein with no other requirements applicable.
Pricing: f.o.b. factory, firm for 30 days from date of quotation. A tax-exempt certificate is needed at time of order entry for all orders whether from
tax -supported government agencies or not. Sales tax, if applicable, will be added at time of invoice unless a tax exempt certificate is provided at
time of order entry.
Payment terms: net 30 days for tax supported governmental agencies. Should this quotation be forwarded to an agency not listed on this quote,
credit terms, as well as other terms and conditions herein, may be need to be altered. For instance, non -tax supported organization purchasing any
or all products and/or services quoted herein may require full payment for that amount due at time of order entry. Remaining balance owed by tax
supported agency, if any, shall still be net 30 days. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment shall be
invoiced separately from other services and shall be payable in advance of those services and project completion. Retainage not accepted.
Unless already on file, please include a tax exempt certificate upon order entry whether a tax supported government agency or other.
GameTime Standard Product Shipment: order shall ship within six to eight weeks after GameTime's receipt and acceptance of your purchase order
color selections, approved submittals, and receipt of deposit, if required. Receipt of anything other than what is stated herein will not constitute an
order and therefore no materials will be placed into production nor installation, if required, will be scheduled.
EWF Shipment: order shall deliver within 14 - 21 days after our receipt and acceptance of your purchase order as well as schedule and weather
allowing. Bulk material will ship via semi-truck/trailer with a live floor system in trailer which allows driver to deposit EWF directly onto a specific area
provided proper access is available. Driver has final say whether the site has proper access. Site restoration is not included and will be the
responsibility of the owner/owner's representative. Road restrictions may be in effect and cause delays depending on time of year.
WPage 1 of 4
0 10 U 40
I
i
/
� r
/ N
Please Initial & Sign the Final Top View:
EXISTING SIDEWALK BORDER
TO BE MODIFIED AND
EXPANDED BY OWNER
VERIFY
LOCATION
AND EXISTING SITE FURNISHING
ORIENTATION TO BE MOVED OR REMOVED
BY OWNER
ACCESS
BY OTHERS
MAXIMUM DEPTH OF
SAFETY SURFACE AND
DRAIN AGGREGATE BASE
SHOULD NOT EXCEED
AN 18' DEPTH AND
SHALL NOT BE INSTALLED
UNTIL PLAY EQUIPMENT
HAS BEEN INSTALLED
While it is our intention
to install your playground
in a safe and timely
rnanneC, our 5ucaess_
relies on your preparedness.
Site preparation and
grading to be performed
by others and prior to
installation. Slope within
the play area(s) shall not
excead IX to ensure o
successful installation and
a compliant playground.
Drain the systems other than
within 4' of the perimeter
along drain aggregate base
material may require installing
after the installation of the
play equipment and must be
cowdinoted with .nstnlEotion
of safety surface materials.
Failure to prepare sites)
to these expectations may
�ddiliariol chor,i:
if insto[Ier is required to
re -mobilize. Please con�bct
MN WI Playground if y),u
have any questions.
-_ll_
EXISTING
BASKETBALL COURT
SAFETY SURFACE
ENGINEERED
WOOD FIBER
4525 SF
GEO FABRIC
BELOW EWF
r
----J
I
�
L
I
I
WILT l/1T PAaaE
IK TEA
MA ggPI��EllE
1?'Jdl
Witp
I
I
i T TAT PA
3IK TEA
I
�In I
I
ADA PASEIK SEM
A'12g0AY
1310.0110) far LIT PMfAE
a IK aD.
ew
I
anon mr MAT PAC AE
I ] I1r ae.
L-----I r----J
AGES
TTT \ 2-5 /
5AGES
2 \\
r / \
I / i
\ / i
' SPMX LOOP am r
i 6415 i
I \
\ I
\ SPACE LC.GP CLIMBER r
\TO BE RELOCATED /
FROM OTHER SITE -
,TO BE INSTAIIFn BY MWP//
(AGES
LiIiIIIIIA, ROOF
I
2"L
Nod ME WILL
\\ 'i
/ PLATFORM WHIRL \ \ I� ./yE"eApw�ea�L
/ TO BE RELOGATED 94M STEP S 1'ioD(n"
/ FROM 01}Wp SfrE• \ a�Ele d' -
/ TO BE INC �0 U]7�
BY MWP \ / A Raw j
two
r rf cuue+x r
I O am MCI[ anion /
0. Trae1 wwar \InAI�aE � SIIIOLE low/
/ PGiiaAi T+AsmssN IPM 2-5
r
WALL CLIMBER \ / pop Taman BLOW
TO BE RELOCATED \ / pow) \ I
b05TING SITE FURNISHING
TO BE MOVED OR REMOVED
BY OWNER
EXISTING SIDEWALK BORDER
TO BE MODIFIED AND
EXPANDED BY OWNER
EXISTING TREE
\ f
-
\
V rur PanU1151A ROOF
\ \
\`
I DaBEE U%*
FLAW pla \I
s
I
CLO ER LEAF
\ a
or
�,R-5 WNaI
wur wssnF
FROM OTHER SITE. \ l�
j TO BE INSTALLED BY MW�\ -air \
I sNaswAul / � e
� Tope
\ AGES �'PL
\ 5-12
EXISTING TREE
Mfg- BY,
rr
ua>m���e
Sold 6 Distributed By.,
MINNE5OTA•WISCOS51N
PF.AROtMD
P.O. Box 27328. Golden Valley, MN 55427
763-546-7787 1-800-622-5425
Fax 763-546-5050
E-Mail info@mnwiplaycom
Random Park
Mounds View, Minnesota
(Enriching ChMkood Through Ploy.
THIS PLAN REQUIRES A FINISHED GRADE RESOLUTION
7-21 -20
1 DWG. D10266H
THIS PRINT IS THE PROPERTY OF MINNESOTA WISCONSIN PLAYGROUND INC. AND IS NOT TO BE USED, COPIED OR REPRODUCED WITHOUT THEIR EXPRESSED WRITTEN PERIMISSKXN.I SCALE: 1" = 12r-0"
r w
d 1st x a
SG11F N FEET — — — — "
+L f rt
T
�,R`SI•
r �
VERIFY
LOCATON
AND
ORIEMRION
I
Please Initial & Sign the Final Top View: i 3?
WL
EXISTING SIDEWALK
TO BE MODIFIED AN
EXPANDED BY OWN
EXISTING SITE FURNISHING
TO BE MOVED OR REMOVED
BY OWNER
ACCESS
BY OTHERS
I*TTY $!WAGE WAMWLPM OEM
AND
DRAIN AGGREGATE BASE
SHOULD NOT EXCEED
AN 18' DEPTH AND
SHALL NOT BE INSTALLED
UNTIL PLAY EOUIPMEAT
HAS BEEN INSTALLED
WHea B la our 'Aw tiim
to natdl your playground
i. a sale and Um*
manner, our eueoen
rug" on your prepay d—L
Site pmparation and
g—fiing to be pertanmed
by ethers and prior to
nddmw. Slaps eitm
tti play area(.) ehdl not
—d Is to ensure a
eutxeedul WAWkrUw and
a rarK+PtiaM pRayg,a�,.d.
DraXn h1a 1.plerm o1Ter flan
elhln 4' d Uu pMmetr
al" drain oggnKW. twee
materid may require inddgng
after the ndaAdlon of the
play equipment and mud M
mordinated sttn installation
d eddy -,f.- m.tadde.
Fagure to prepare efts(-)
to these e>ped u— may
if inemBer Is requbed to
m—rrablgee. Plpw aantbd
Aarry e._— —
EXISTING
BASKETBALL COURT
A,.
x
9'�.
� r
Rti1
SAFETY SURFACE
ENGINEERED I
WOOD FIBER
4525 SF
I
GEO FABRIC
BELOW EWF I �® resit
BORDER
D
ER >w•
2-5
L—_ J
}� II MY Nwr
. M.ES 1 uru soar ~`
!' S-12
r �
2-5
t
Q Mt qrt pm
To K "-IO I�SXCIAUEER }
TO �KYiO
^� rQGN DTHE" SIFL re a,a
, D w pf "X-Lo sr ww"JI �gna
�nw.une M"1�1i!"`
'�
f/ ITR7' fRR[e \ -wren•
Tr, 4F� : 15'�. l!•J a 1Aw' \I 9� urw em
t r te�91li
erwKa
f
,1 AGES n(�
5-12 J �...
. S BE IM]Dp6YDKIM
SITE FURNISHING I I
10 BE MOVED OR REMOVED r wr Y 1 S
BY OWNER 7R
I Q
'Al
AGES � ••••� _
EXISTING SIDEWALK BORDER 5-12 , fJ 1 7 ir w ti
TO BE MODRiED ANO ..
EXPANDED BY OWNER -
_ Y
EXISTING TREE pOSDNG TREE L
1
tiC
s
G llg. By: — Sall ,C Dis(nuuled B,K: P,O. Bar 2732N. Go!elcn l+'igoy, kfN 55417
IPAINNESOTA•WISCONSIN Tb3-5JG-r?&' 1-300-fi22-5425 Random Park
PLAYGROUND _Man 11R0@,Mw?p7Iay ;,m Mounds View, Minnesota
nriehing Childh—d Tlimu.jk PI 1 THIS PLAN REQUIRES A FIHISHE_,iuiHAD E REai11_fl'riQN 7-21 —20 DWG. D 10266H
THIS PRINT IS THE PROPERTY OF MINNESOTA WISCONSIN PLAYGROUND INC. AND IS NOT TO BE USED, COPIED OR REPRODUCED WITHOUT THEIR EXPRESSED WRITTEN PERIMISSION. I SCALE: 1„ = 15'-0a
c
0
O
N
d�
2
AIP
d�}
u
JF�
In
4r
v
/Z7
Q
Q
O
3
1.1
77
1
1 la
r
6
-Alt
' LN I
"RiO
. PF_
17, klv
Ar-
I=.= Wpm*
:rl
jo.
rR
0
PARK AND RECREATIONAL FACILITIES IMPROVEMENT PLAN WORKSHEET ****DRAFT**** 7D
March 2021
Year Planned _
a Q1
Line Year Park Park Improvement �: I N N N N N o o a
No. a�C d N N N N N N m D m U
C C
. • Estimated
a` Cost of
m Im rtruernarll•
001 0 5VP 5iI,werV1wPark
002 2027 SVP Build New Shelter Building - Silver View Park H1 X REP X
003 2023 SVP New Rest Room enclosure H1 x NEW
x $ 15,000
$ 15,000
005
2027
SVP
Install Shelter Card Key Access & Security Cameras - Silver View Park
M214+
x
I MOD
I
x $ 5,000
006
0
SVP
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Silver View P,
M2
PRO
$ 5,600
007
2021
SVP Netting on outfield Fence
H2
X
REP
$ 25,000
008
0
SVP New Parks signs
L1
L2
x
NEW
$ 5,000
008
2027
SVP Trailway Lighting - Silver View Park
x
NEW
$ 75,000
009
It
0
Park
GLP New Rest Room enclosure
011
H2
X
NEW
$ 7,500
012
2027
GLP Construct Irrigation System & Grading Improvements - Groveland Park
M2
x NEW
x
$ 45,000
013
2027
GLP Install Shelter Card Key Access & Security Cameras - Groveland Park
M2
x
MOD
x
$ 5,000
014
0
GLP New Park Sign
L1
x
NEW'
$ 2,500
015 . 0 GLP 'Replace Interior Shelter Furniture - Groveland Park
016 0 GLP I Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Groveland P. I
M21
PRO
x $ 7,000
M21
I
PRO
x
$ 5,000
017 1 _0 ! RDPnd _Raom Park
018 0 RDP Parking Lot Pavement Maintenance - Random Park H2 .
019 20221 RDP Replace Interior Furniture - Random Park M2
020 2022 RDP Replace Random Park Playground M1 X
PRO
I x
$ 45,000
X
PRO
x
$ 12,000
I
NEW
x $ 90,000
021
2027
RDP
Install Shelter Card Key Access & Security Cameras - Random Park
M2
x
MOD
x
$ 5,000
022
2027
RDP
Lighting Upgrades & Security Improvements - Random Park
M2
x
UPG
x
$
023
0
RDP
New Park Sign
L1
x
NEW
$ 2,500
024 2027
RDP
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Random P.
M2
x
PRO
x
$ 5,000
025
026
0
2027
OHP IE Hell Park
CHP Irrigation &Landscaping Improvements -City Hall
CHP 'Veterans Memorial
CHP ,Construction of Band Shell
CHP INew Rest Room enclosure
CHP INew Paris Sign
CHP Installation of T - Ball Field
CHP Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - City Hall P.
H1
x
IMP
$ 45,000
027
0
M1
x NEW
x
$ 75,000
028
0
L2
x
NEW
x
$ 200,000
029
0
M1
X
NEW
X
$ 7,500
030
0
L1
_
x
NEW
X
$ 2,500
031
032
2021
2027
L1
X
x
NEW x x
PRO {
$ 12,500
M2
x
$ 5,000
033
034
0 OWP Oakwood Park
2025 GLP Reconstruct Playground - Oak Wood Park 2008 M2
I
X
.
NEW!
I $ 65,000
X $ 7,500
035
0 1 GLP New Rest Room enclosure M2
X NEW
X NEW
X PRO
036
0 GLP .New Park Sign L1
20271 OWP Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Oakwood P. L2
X
$ 2,500
037
x
$ 5,000
038 0
039 F2021
GFP Mffl eld Park
GFP I New Pitching Mounds M2 X NEW
GFP New Fould Poles M2 X NEW
GFP Yellow Fence -Caps M2 X NEW
GFP New Rest Room enclosure L1 X NEW
X
$ 3,000 '
040
2021
X
$ 2,000
041 2021
I X
$ 2,000
042
0
x
x
X
$ 7,500
043
0 ' GFP New Park Sign
X
NEW
X
x
$ 2,500
$ 5,000
$ 100,000
044 . 0 GFP Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Greenfield P. L2 PRO
045 2023 GLP Reconstruct Playground - Greenfiled Park (built in 2005 M2 X NEW
x
046 1 0
JUPPIGmenftld
Park Preserve _
Construct Paved Trailway - Greenfield Park Preserve L4 x NEW $ 50,000
047 1 2027
GFPP
048 0
HVP
Hlllvlew Park
M2
M2
M2 X
_
X MOD x $ _ 5,000
X NEW x $ 20,000 _
049 . 2027
HVP
Install Shelter Card Key Access & Security Cameras - Hillview Park
050 2027
HVP
Construct Irrigation System & Grading Improvements - Hillview Park
051 0
HVP
New Rest Room enclosure
NEW x $ 7,500
X NEW x $ 2,500
NEW X $ 50,000
_
052 0
HVP'New Park Sign
L1
054
2023 HVP
Reconstruct Playgroud (built in 2007)
M2
X
X
055
0 H
2021 fVP HVP
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Hillview P-
Install new Fumance
L2
H! I
X
PRO
NEW
x
$ 5,000
$ 12,000
056
*Priority (Pri): H=High M=Medium L=Low I O=Ongoing 1=Important and Urgent 2=Important but Not Urgent 3=Not Imp.but Urgent 4=Not Imp. not Not Urgent 3/25/2021 112
PARK AND RECREATIONAL FACILITIES IMPROVEMENT PLAN WORKSHEET ****DRAFT**** 7D
March 2021
Year Planned
n m
Line o N
Year Park Park Improvement Ca rz NNo. NN NN NNN NN mO aa
y
U
.o
a
UU
Estimated
Cost of
Im f04erent
057
0
LBP Lambert Park
LBP Hockey Rink Boards - Smaller Rink
H1
_,..
X
X
UPG
058
2021
x $ 40,000
059
0
LBP New Rest Room enclosure M1
LBP New Park Sign _ L1
LBP Install Shelter Card Key Access & Security Cameras - Lambert Park M2
x
NEW
$ 7,500
$ 2,500
O60
0
_
x
x
NEW
061
2027
MOD
x $ 5,000
062 I 0 1 ADP
063 0 j ADP .New
064 01 ADP
065 _ 0 WCP
066 0 WCP
067
Ardan Park �^
Park Sign M1 •
_
1W0ederest Park
Repalce Playground Equipment L1
X
NEW
5 2,500
NEW
_
$ 88,000
x UPG
068 .._0 -LSP
LakesWe Park
l
069 9 COM lCommunky Center
070
0
COM
771
2027
COM,Basketball Court Pavement Maintenance- Comm. Center M2
COM Bike Racks, Benches, Trash Containers, Picnic Tables, etc. M2
X
UPG
x
$ 5,000
$ 5,000
072
2027
X
UPG
x
073
0
TRL
Won
074
2022
TRL
ITrailway Development & ADA Transition Project
H2
X
NEW
$ 100,000
075
2023
TRL
'Trailway Maintenance
H1
X
MAI
$ 20,000
076
0
TRL
Construct Co. Road H Sidewalk (Silver Lake Rd. to Edgewood Dr.)
H1
x
NEWI
x
I x
$ 275,000
077
2027
TRL
Construct CSAH 10 Trail Segment 7 (So. Blvd. from Pleasant View to Knollyl
M2
x
NEW
x
$ 300,000
078 1 20271
TRL
Construct CSAH 10 Trail Segment 8 (So. Blvd. from Knollwood to Silver La
M2
x
I NEW
x
$ 250,0001
078
1 0
1 TRL
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Trailways
M2
PRO
x x
$ 5,000
079
—
PMWBudget
SVP I. Netting on outfield Fence
RDP Replace Random Park Playground
080
2021
H1
X
REP
$ 25,915
081
2022
M1
I X
NEW
x
$ 94,109
082
2021
CHP
Installation ofT- Ball Field
1-1
_
X
NEW
x
x
$ 12,500
083
2021
LBP
Hockey Rink Boards - Smaller Rink
H1
X
UPG
x $ 29,935
084
2021
HVP
Install new Fumance
H1
X
X
j NEW
$ 12,000
085
Total
$ 174,454
086
087
088
2023
GLP
Reconstruct Playground - Greenfiled Park (built in 2005)
M2
X
NEW
x
$ 100,000
089
120231
HVP
Reconstruct Playgroud (built in 2007)
M2
X
X
NEW
X
$ 50,000
090
j
1
Total
i $ 150,000
091
Total combined
$ 324,459
092
093
Park Dedication Fund
$ 184,377
093
j
Total Cost Projects
$ 317,500
093
Balance
'Priority (Pri): H=High M=Medium L=Low I O=Ongoing 1=Important and Urgent 2=Important but Not Urgent 3=Not Imp.but Urgent 4=Not Imp. not Not Urgent 3/25/2021 212
Item: 8A
MDUNDS VIER
PUBLIC WORKS • PARKS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From Don Peterson — Director of Public Works/Parks and Recreation
Date: March 25, 2021
RE: List of Concerns from IBL
Public Works Staff received the following list of concerns from the Irondale Baseball League
(IBL).
Groveland Park
- Infield resurfacing, home plate area, leveling out low spots to make for better draining and field
play for players.
- foam plugs for bases. Extras kept in backstop storage.
- Resurfacing infield would include dugout area (possibly look at similar dugout options as
Lambert, concrete/fencing)
Hillview Park
- Infield resurfacing, home plate area, leveling out low spots to make for better draining and field
play for players.
- foam plugs for bases. Extras kept in backstop storage.
- Resurfacing infield would include dugout area (possibly look at similar dugout options as
Lambert, concrete/fencing)
Greenfield Park
- Resurfacing home plate area and pitchers mound.
- Grooming baselines from home plate to 1 st and 3rd base
Silver View Park
- Removing Trees branches over the field of play
- Foam plugs for bases (multiple spots for softball/baseball)
- Extension of fences along dugouts 1 st and 3rd baseline for both fields.
- Looking at replacing jox box batters box area
- looking at getting tops do dugout