HomeMy WebLinkAbout06-24-2021PARKS AND RECREATION AND FORESTRY COMMISSION
6:30 P.M. I JUNE 24, 2021 1 MOUNDS VIEW CITY HALL
MEETING AGENDA MC)UNDS VIEW
I. CALL TO ORDER
2. ROLL CALL: Commissioners: Arel, Curry, Kroeger, Lillem, Palm, Sullivan,Wake Wiesner,
Staff: Peterson I Thomas *to be absent
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES
May27, 2021
5. PUBLIC INPUT
Citizens may speak to issues not on tonight's agenda. Before speaking, please give your full
name and address. Please limit your comments to three minutes.
6. STAFF REPORTS
A. Parks and Recreation - Andy
B. Public Works — Don
7. UNFINISHED BUSINESS
A. Addition of Trail — 2360 Hillview Road
B. Review of future needs of Parks and Recreation
C. Review of Silver View Park — Netting for Outfield Ballfields
8. NEW BUSINESS
A. Greenfield trail — condition, repairs
9. COMMISSIONER REPORTS
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINES
11. ADJOURNMENT: Next Regular Commission Meeting July 22. 2021
PARKS AND RECREATION AND FORESTRY COMMISSION
6:30 P.M. I MAY 27, 2021 1 MOUNDS VIEW CITY HALL
MEETING MINUTES MULNDS VIEV
1. CALL TO ORDER at 6:25 PM
2. ROLL CALL: Commissioners: Arel, Curry, Kra, Lillemo, Palm, Sullivan, Wake Wiesner,
Staff: Peterson I Thomas
3. APPROVAL OF AGENDA: Motion to approve by Palm, 2nd by Sullivan. Motion Passed 6-0
4. APPROVAL OF MINUTES
April 22, 2021: Motion to approve by Wake -Wiesner, 2nd by Lillemo. Motion Passed 6-0
5. PUBLIC INPUT
Citizens may speak to issues not on tonight's agenda. Before speaking, please give your full name and
address. Please limit your comments to three minutes. Celena Monn and son, Martin, 2357 Sherwood
Rd. shared a slide show to encourage the Commission to consider a board for our tennis courts for
racquetball and bike racks at various parks. Ms. Monn showed examples of parks in Shoreview that have
these boards measured at 8' x 28' or even 8' x 16'. Need to consider surface material and cost, as well as
placement to allow for surveillance. Bike racks have been on the Park Improvement Plan for several
years. Concern about putting the surface on the fencing so that the poles would support any weight and
wind pressure. Cost of raw materials are really high right now, so we may need to weigh the cost with the
timing. Direct Staff to investigate options and costs.
6. STAFF REPORTS
A. Parks and Recreation — Andy: See packet: COVID capacity and distance restrictions expire tomorrow.
Masks are not required for fully vaccinated people, but recommended for those not vaccinated. MVCC
will not be asking for verification of vaccination. Masks still required for child care and school groups
through June 13. Job openings for Summer Program, custodian and event host!
B. Public Works — Don: See packet: SplashDown will be open this weekend. It will "officially" open
Memorial Day. Students for Climate Awareness helped plant trees in the north end of the City as well
as at Groveland Park. Social Media shows residents are upset about the parking situation on
Edgewood Drive across from the splash pad. There will be signs added that say "NO PARKING
Memorial Day -Labor Day" coming.
7. UNFINISHED BUSINESS -NONE
8. NEW BUSINESS
A. Addition of Trail — 2360 Hillview Road from Oakwood Dr. to Hillview Rd. The homeowner owns the
property where this trail and the drainage ditch are located. There used to be a crosswalk there, but is
no longer, and there is a curve on that road that could impact safety. Direct Staff to investigate costs
and options.
B. Review of Presentation at City Council Work Session of May 3, 2021 - future needs of Parks and
Recreation. Commissioners should go through the Iist presented at the meeting and prioritize each
item as low, medium, or high and then Staff will add pricing later so priorities are not determined by
cost, but by need. Don Peterson will send an Excel spreadsheet with the items to be prioritized and
returned to him about one week BEFORE the next meeting.
9. COMMISSIONER REPORTS: None to report.
10. REQUESTS FOR FUTURE AGENDA ITEMS / OTHER BUSINESS:
A. Future recreation input from PRF Commission as the programs get moving.
B. Starting in July the City Council will meet in person. PRF Commission should follow then
11. ADJOURNMENT: Motion to adjourn at 7:40 PM by Palm, 2"d by Curry. Motion Passed 6-0
Next Regular Commission Meeting: June 24. 2021
Item No. 6A
MOUND s IV! EW
PARKS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From Andy Thomas — Parks & Recreation Superintendent
Date: June 24, 2021
RE: Parks & Recreation Staff Report
The following is a synopsis of recent activities and events of the Parks & Recreation Department.
Covid -19 Guidelines
Masks still required for inside Child Care/Summer Programs.
Programs
Summer Programs
o Parks Program
o Explore More
11Paae
Parks & Recreation Staff Report
Programs (cont,d)
■ Senior Programs
• Youth Sports
■ Fall Programs
o Sports
o Seniors
o Teens
Community Events
• Festival in the Park 5K
• Community Resource Fair — September 18tn
• Fall Festival — October 22nd
• Cookies with Santa — December 4tn
Rentals
Event Center
$71,725
,634
80 _ 32 52
AdhL Amok
2019 2020 2021 YTD
Number of Rentals YTD Revenue YTD
2 1 P a g e
Parks & Recreation Staff Report
Fields & Parks
DnA, Dimn+nlc
2019 YTD 2020 YTD 2021 YTD
Revenue -Permits
Park Rentals
M
all
46
42 1111111hlllillill 18
21
15 24 13
16.
2019 YTD 2020 YTD 2021 YTD
City Hall Groveland Hillview
j Lakeside Random Silver View
■ Lambert ■ Splash Pad 1 a Splash Pad 2
3 1 Page
Item No. 613
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From: Don Peterson — Director of Public Works/Parks and Recreation
Date: June, 24 2021
RE: Public Works Staff Report
The following is a synopsis of recent activities and events of the Public Works Department.
Maintenance
Staff worked on the following items since May 27, 2021;
• Splash pad cleaning
• Ball field game preparations and ball field maintenance
• Irrigation repairs and testing ongoing, most days
• Field stripping and painting weekly
• Mowing, Whipping, Trash and litter pickup
• Splash pad - test running and operation testing daily, new UV installation
• True green broad leaf and fertilizer applied
• Weed spraying all parks, fence lines, playgrounds wood chips
• Trail obstruction trimming of trees
Oak wood graffiti cleanup- police report made
• Power install complete on the East end of Silverview pond- Budget permitting bubbler and
aerator install fall 2021
• Disc golf Map installation T-Box1
• Community center islands- pulled bushes and wood chipped ready for flower planting
11Page
i"+
w e- m
HcAe ( i0)
Public Works Staff Report
SlIvervilew Park
T
oH.<s..wAw o..■
- Dr:.�wPyrf PA...Ar•��rP.. rAry.r Mnwrrw ruP4N ti�a Wl����r
�� r .c..w.w wa w..l.My1.v�..Y Mw. �PSP..r•�.{ Tlw.�.[A.w P.Py rgAw►wM
4ti1-, A- P.wm, T� Awkw •M.r
LAfa<TY /IRiT
>w .Vw+�O nwl PAH r. P-�1M�w
Apr rnsww.p ani.w.�www r.
7M71rwAw �•.e..a.e.�.r��.tYu�Mr��.Mwr��rr.����w
fl.
f1.4.h V•K .P.ehAy.l �..w +.a .r r.M IMY.rr.W �wwr r�r wrwrr
wr..+ h_ tq.P•wra h.w .. �� Wr41M A'�\ wA..rrr Ar. r �.�Miraw
tre M —1'ti
M p4W �0.%— . 0.0. ws YW AM
.*%A
hlrr4Tlrwa
r+� WFw..� F -�. M f.cM.�w ur A. w.w•. w r�1�An��.I r�ftY
. �rrrr Y�.rr Nw.�.dh wr Mr w.e �.�10 dMft=aAAt AY
•r ..�. �...Pwwa.wwrrrn•.
c..Wd.ww. a Md.
A""w. -ww.1. Gwe H..+..M 4 b4
1MVbpW. Ln
A7 4.•4%. . w.M n+.w[.r.V.www4+rr1y qr r.•—N-i.
....hlwVl•.�w.W...�•h+.+'.yr r<µxaam.wa r.•.r M M..�r/.w
OH p Mrk
,Ow M rrsr
..I. MrPrN Wt Mkw �mA dYu.�
Crwq
• rr. riw r r.y .P.w.r� ..r.rr... Y.�
• A..A Arry w �.. r. w wv,.T rr r..... <wM.r
...-..• M. P.. or<hW µ+.� rr.•.r.ww� er ....
Py 9-4L r+n P.
•wr.�w<Psrm�Ar,. weirrV w
Yw�.���wP�rnFw...�.Mr TP.w r.�wr�A. rd'.y+r YPY.irYAN
D.
2 1 P a g 2
Public Works Staff Report
Forestry
Staff worked on the following items this last month:
• Resident consults
• New tree planting care —watering adding wood mulch
• Chainsaw grant application was approved
• Watering Trees
• Planter box maintenance weeding adding new wood mulch
• Hazard Tree remediation
The following is the List of Parks and projects / maintenance activities ongoing or planned this year.
Current updates are in black text, and updates from the previous two month period are in grey.
Ardan Park
Working with Stantec Engineering on some drainage issues in the Park. Application to perform
some storm water pond maintenance was submitted to RCWD.
• Work to be scheduled for this winter — postponed at this time, Still working with contractor for a
date on completion
CRY Hall Campus:
New Picnic Shelters are being built, will be ready for next season rental
Worked with plumber and vendor to winterize the splash pad.
Installation of the New Picnic Tables started
Splash Pad
• Testing will be in open the Weekend of May 29
• New UV light unit installed on Tuesday 6/22
Groveland Park:
• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court
Greenfield Park:
• Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA
accessible. Fencing contractor scheduled for next month Leveled the trail running in the back
portion of the Park, added class 5 as needed.
• Commission will need to discuss at the August 2020, Green field baseball field. Take out all turf
from first and third base line and replace with Ag-lime to the fence. Most all new park
construction is going this way with ball fields. This would solve the wet home plate issue and
uneven base line issues.
• Building has been re -roofed
3 1 P a g e
Public Works Staff Report
Hillview Park:
• Commission will need to discuss at the August 2020, playground Rehabilitation.
• Furnace at Park Shelter has been replaced — condensing still needs to be installed
Lambert Park
• Inventory of Hockey Rink boards to re -place started.
• Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink.
Random Park:
• Commission will need to discuss at the August 2020, playground Rehabilitation
Silver View Park
Ramsey County continues to work in re -profiling the draining ditch along County Road I and
Silver View Road, located in Silver View Park.
Four new pond aerators installed in the Storm Water Pond
Woodcrest Park
• Working with Stantec Engineering and Ramsey County on some drainage issues in the Park.
Application to perform some storm water pond maintenance was submitted top RCWD.
• Met with contractor — work will be scheduled for this winter — postponed
4 1 P a g e
df•��� .:r•,y��. � �y•�i , �, � ��� '!.. _ ter. y�� � r'+ f ;~ f� i, ca. r: _n
is -- NO��s�^,� � n•_"_�. ;�1�� -•7�:-`•�E '�•- ;�
r. ��.
7B
Line soar Park Park Amenities and Future Needs
No.
L
2
Priority Ranking
�
�
o
J
001
TO
ADP Ardan Park
ADP New Park Sign 1 5 6
ADP 1 6
ADP Add Picnic I ables and Benches 1 1 2 T 3 6
002
0
003
0
004
0
005
0 CHP City Hall Park
0 CHP Irrigation & Landscaping Improvements - City Hall
1 3 2
1
6
6
6
006
007
0 CHP
008
0 CHP
Construction of Band Shell
1
1
4
009 0
CHP
New Rest Room enclosure 3
3
6
010 0
CHP
New Park Sign 1
5
6
011 0
CHP
Installation of T - Ball Field
3 3
6
012 0
CHP
Install new Trail from Mounds View Blvd. into Park
3
2
1
6
013
0
CHP Replace playground and splash pad equipment
1
1
4 6
014
0
CHP Install skate park
1
5 6
015
0
CHP Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - City Hall P.
3
3
6
015
0 COM Community Center
016
0 COM
Fence in New Outdoor Garden area for Event Center
Basketball Court Pavement Maintenance - Comm. Center
2
4 6
2 6
1 6
1 6
6
017
0 COM
1
3
018 0
019 0
020 0
COM
COM
COM
Addition to the Building _ New Locker rooms expand gym 2 3
p 1
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. 3 3
021 0
GFP
Greenfield Park
New Pitching Mounds 2 3 1 6
1 6
Light Baseball Field 1 5 6
022 0
023 0
024 0
GFP
GFP
GFP
025
0 _. GFP
New Rest Room enclosure 3 3
6
026
0
GFP
New Park Sign
3
3 6
027
0
GFP
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Greenfield P. 3 2 1 6
Maintenance on Tennis and Basket Ball Court 1 2 3 6
Reconstruct Playground - Greenfield Park (built in 2005) 3T 1 6
028
0
GFP
029 0 GLP
030
0
0
GLP Groveland Park
GLP New Rest Room enclosure 2
v
4 6
3 6
2 6
5 6
3 6
1 6
1 6
'1 6
031
3
032
0 GLP
0 GLP
0 GLP
0 GLP
0 GLP
0 GLP#e
0 GLP
Construct Irrigation System & Grading Improvements - Groveland Park 3
: Card Key Access & Security Cameras - Groveland Park
New Park Sign 1
Maintenance on Tennis and Basket Ball Court 1 2
Rehab Playground 2 3
1
Bike Racks, Benches, Trash Containers, Picnic Tables, etc. 3 2
033
034
035
036
037
038
7B
039 I 0 HVP Hillview Park
040 0 HVP' Install Shelter Card Key Access &_Security Cameras - Hillview Park 2
041 0 HVP Construct Irrigation System & Grading Improvements - Hillview Park 3 3
042 0 HVP 2
043 0 HVP i New Park Sign 1 5
044 1 0 HVP Reconstruct Playground (built in 2007) 2 2 2
045 0 HVP Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Hillview P. 3 2 1
046 0 HVP' Install new Furnace 4 2
_
047 0LSP Lakeside Park
048 0 LSP JPA with Spring lake Park
049 j 0 LBP Lambert Park
050 . ###' LBP 2
051 0 LBP New Rest Room enclosure 2
3 1
052 0 LBP New Park Sign
1 5
053 0 LBP Install Additional Irrigation
3 3
054 0 LBP Replace Playground Equipment 1
1
4
055 0 LBP II Shelter Card Key Access & Security Cameras - Lambert Park
1
056
0
0
OWP Oakwood Park
GLP! Reconstruct Playground - Oak Wood Park 2008
057
1 1
2
3 2
1 5_
058
0 GLP -Y
0 GLP New Park Sign _
059
060
0 1GLPINIMMWNe
0 OWP: Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Oakwood P.
3
1
061
3
062 0 RDP Random Park
063 0 RDP 2
064 0 RDP Replace Interior Furniture - Random Park 1 5 1
065 0 RDP Replan Random Park Playground OFF 6
066 0 RDP Install Shelter Card Key Access & Security Cameras - Random Park 3 2 1
067 0 RDP, New Park Sign 1 5
068 0 RDP; Bike Racks, Benches, Trash Containers, Picnic Tables, etc. - Random P. 3 2
069 0 SVP Silver View Park
070 0 1 SVP wilding Improvements - Silver View Park- Additional Seating_ I New Kitchen 5 1
071 0 `, SVP New Rest Room enclosure 3 3
072 0 SVP . and Ke , Access &.�ecurily Garne[as -Silver View. Par. 4 2
073 0 SVP 2 4
074 0 SVP Replace / Rehab Playground 2 4
075 0 SVP New Parks signs _ 1 5
076 0 SVP Install Ballfield Lighting 2 4
077 0
SVP
Install Volley Ball Court Lighting
2 4
_078 0
SVP
Install New Trail from County Road I - North to existing trail system
2
3
1
079 0
SVP Re -purpose Horse Shoe Pit area 2
3
'1
080 0
SVP I Trailway Lighting - Silver View Park
1
3
2
081 0
jFP Greenfield Park Preserve
082 ! 0 GFPFj Construct Paved Trailway - Greenfield Park Preserve
1 2 i 3
083 0
WCP Woodcrest Park
084 0
WCPj Replace Playground Equipment
2
1
3
081 0
WCP
2 -
082_, 0
WCPiRemove Playground Equipment
2
2
2
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Item: 7C
MovNms ViEw
PUBLIC WORKS • PARKS & RECREATION
MEMORANDUM
To: Parks & Recreation & Forestry Commissioners
From Don Peterson — Director of Public Works/Parks and Recreation
Date: June 24, 2021
RE: Adding Netting to Silver View Ball Field Fence Line
Discussion/ Background
The Parks and Recreation and Forestry Commission has received several complaints over the
years of softball hitting the homes at the Silver Lakes Townhome Association.
The Commission approved the proposal for installing netting on top of the chain link fence in the
right and left outfields at Silver Park for a total of $25,915.00.
The City Council Approved installing the netting at the May 10, 2021 City Council Meeting.
Staff reached out to the contractor to schedule the installation of the netting. The contractor
informed staff the proposal would need to be reviewed.
After the contractor reviewed the proposal, staff received a revised proposal for installing the
netting to the outfield fence as follows;
1) Installing 20' high netting on top of the chain link fence line - 30' on the West fence
and 130' on the East Fence line. At a cost $30,700.00
Recommendation:
Public Works Staff is recommending that the Parks and Recreation and Forestry Commission
reject the revised proposal and request the City Council rescind resolution 9427. A resolution
for Installing Netting to the Silver View Baseball Outfield Fence
Respectfully submitted,
Don Peterson — Director of Public Works/Parks and Recreation
Attachments
Quote
Century Fence Company
14839 Lake Dr NE
Forest Lake, MN 5502S
7C
ONTURY FENCE
COMPANY
SINCE 1917 THE MARK OF PERMANENCE
Quote To: Project Location; Quote #: 4630
CITY OF MOUNDS VIEW Ball Field Netting Quote Date: 6/17/2021
2401 HIGHWAY 10 Moundsview, MN
MOUNDS VIEW, MN 55112
Description
Furnish and Install: Outfield Netting
1 - 20' H x 30' Section of Netting West of Opening
1 - 20' H x 135' Section of Netting East of Opening
Netting to be 20' High above existing outfield fence
Posts to be 6-5/8" set in 84" x 24" Footings
Notes:
Excludes Excavation through rock, Excavation through frost, Private Utility Locate
Quote Valid For 15 days
Buyer's Signature:
Date:
This quote when accepted in writing by purchaser and by Century Fence
Acceptance: Company becomes a contract between two parties.The conditions on the
attached 'Terms and Conditions' are made a part of this contract.
Terms of Payment: Net Cash upon receipt of invoice.
Quote Total: $30,700.00
Submitted by:
Derek Harrison
Office: 651-464-7373
Cell:612-454-9755
Email:DHardson@Centuryfence.com
�' R r•i r �� - � r
w -
a � • - r
Ik
f
♦ r '
d qv
■�i71
�• 1 • * ■ , lip
Rp,
Y
rw
r i s ■
.1
amp
� c
-, -
PON-
},
4doWOW
-
Proposed Trailway 'A
23 6 o Hi l lv i ew
LZ
je
,f ice`'." ;'•: aM - -_
Hillvie", Rd
Hillview Rd
rf �. tir��`•c
Iff
hi �., ,. '� r' :�- - - �`r![� [i..,# � Sri. •- _. •-.ri'■r"Ti� -. '
211
f 4 �' ►
N
ti - -
fi*i�
`►y .J , 1• - _ _ ' •ti�. - •`��'� :'•� �.� � '� �=,.y . fin;^ '. .. ,. R�.pr a� ti •;�
`P k .:•_.:e r.. _ _ �' - - ;4 �`..,_,R• _�r _ err $ _ ,r.,
{•" .. T... - r. s� - 1" Y r a 1 +•.� `-~• . ^• - :�r '_ -- .x I�.. q =. • r
's'
= •Fri i +A. �•`�7 r j { ', - �'G z r ti�
- r.
Ditch (2)1.;,
--- Public Right of Way (1),, 'fir - - ,, `'- •, - �•
-F r
Y�" r ►ram f r • ?..i .i•'1:Y _•..'' - +'f "ec. _
Mlsc Easement (a�'" {r�l�• Y "'-_ r rlr +�- •. � '� i
Pedestrian System 4, — ` ,, ;� x� ►#* ::' : �.
Trail EXISTING 1
Striped Shoulder, EXISTING (5) � r74'
Sidewalk, EXISTING (3) `fit-, T , +.. 'fu " . '`'
Distance Notes (feet)
Oakwood Dr
'�,J ..f 'i}r i 6 •' -. 7 x' �"_+ S,•„ '' X .•ors �e"'#'+c �� K ; :r yr , - •ice -- -- -- __ - ----- A&L
�' .t�A �'• _�. f. .r •-y: .rl ,'�l r 'y� +�, R;, w6-`.• r� TJ L
WMOUNDS VIEW..44 'y.: � �Jrk �. • 'f�ry� � � L� � I
' � s �- -r �� r •s�r�-. .�. _•1`����_ �S. �.71r _ �" _ ,- � �i Ln
■ R K Sd,G `��F. .•mot= ur'' 1
r
2278
2297
r / / - s 2286
,.
i e i
r
dy
2335
-`•
2431 $ 790d ,; G1 }.63 - 7 ' S ?lJ 2209
t35o ' 23344 2316 23�
AIL 2360
— — - - -
0
1� W •2244 2236M-
.2-4 2408 �a � - '22Gfi"' 2 22Z8 22�
MOM
aV
9 7' F,. —
g 56jQ MlW5618 2 J79 22,73
78WON
57 785 lab Q5 OPP.7
I t .• 5513 5612 5613 12
".
7837 78 i r- 56D7- 06 y7274 2166. '
1' a
_ �b
7 ; t• 5601 i 56QU 5601 5 _ ; •22A
78 S �_.
f���^^6 72573K2 qq��``■■ ^'
ri.7 _ i— iL.71; -
2367
ledestrian System
8 0 0Aff
S 5 9550 5 1 22 Trall,EXISUNG,/
-- E)a
55
Formal . aa2359 a ;.� Y ',i 2.2i
Fonds
_ ■! 2$J 5- 245 x
PUBUC- -- 5539 - ' . �538 3 5
JF
.. - 96 2390 �82 U74 � r 2358 ;J� l 5532 � ' ` , — F
2 JD
Artificial �..
— Ditch/Canal
552
®River/Stream i
�� Z381 •' a �,t � � _ - - � � _ �� � 8 228.0 2274< 2266 98 Q, 7.2�4236 t.
3d9 2363 -, s * m k 6 223Q 2
t 7701 5 '
JJArm
MOUNDS VIEW • ■. • �.. - - • ■. ■ _
P U BLIC WORKS +