HomeMy WebLinkAboutOrdinance 983ORDINANCE NO. 983
CITY OF MOUNDS VIEW
COUNTY OF RAMSEY
STATE OF MINNESOTA
AN ORDINANCE ADOPTING THE 2022 CITY OF MOUNDS VIEW FEE SCHEDULE
THE CITY OF MOUNDS VIEW ORDAINS:
SECTION 1. Pursuant to Minnesota Law, the Mounds View City Charter, and Mounds View
City Code, an updated City fee schedule for 2022 is hereby adopted as shown in Attachment
A.
SECTION 2. In accordance with Section 3.07 of the City Charter, City staff is hereby directed
to have the following summary printed in the official City newspaper in lieu of this entire 15-
page ordinance, as said summary would clearly inform the public of the intent and effect of
the ordinance:
On November 22, 2021, the City Council adopted Ordinance 983, entitled "An
Ordinance Adopting the 2022 City of Mounds View Fee Schedule," which
approved the City's 2022 fee schedule. Numerous city fees contained within
the fee schedule have been modified for 2022 via Ordinance 983. A printed
copy of the complete ordinance, which includes the entire 2022 fee schedule,
is available for inspection by any person during regular office hours at the office
of the city administrator. A copy of the ordinance, including the new fee
schedule, is also available online at the City's website at
www.moundsviewmn.org.
SECTION 3. This ordinance shall take effect and be in force 30 days from and after its passage
and publication, in accordance with Section 3.09 of the City Charter.
Introduction and First Reading by the Mounds View City Council on November 8, 2021.
Second Reading and Adoption by the Mounds View City Council on November 22, 2021.
Publication Date: December 7, 2021
Carol A. Mueller, M yor
Attest:
A/� 2 If-L-
Nyle cmu d, City dministrator
(SEAL)
Attachment A – Ordinance 983
2022 Fee Schedule
2401 Mounds View Boulevard | Mounds View, MN 55112 | (763) 717-4000 | Fax (763) 717-4019 | info@moundsviewmn.org
INDEX
I. Building/Community Development Fees Page 2
II. Other Inspection / Planning Fees Page 3
III. Miscellaneous (copies, maps, agenda, etc.) Page 4
IV. Police/Administrative Offenses Page 5
V. Licenses Page 6
VI. Parks, Recreation, and MVCC Facility Rental Fees Page 8
VII. Public Works/Municipal Utility Fees Page 10
Appendix A – 2018 2020 MN State Statutes: 326B.153 Building Permit Fees
Appendix B – 2018 2020 MN State Statutes: 326B.148 Surcharge
I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES
Building Permit (State Surcharge Required, See Fees shall be based according to the 2018 State
Appendix B) Statute 326B.153 and are determined by the City’s
Building Official (Appendix A) on valuation
according to Appendix A, unless specifically
noted otherwise or as determined by the City’s
Building Official
65% of Building Permit Fee (Building Official may
Building Permit Plan Review
waive plan review fee for certain projects that
require diminutive plan review such as partial
basement finishes, kitchen remodeling, and minor
repairs/alterations.
Building Permit Reinspection $63.25 per State Statute 326B.153
Building Permit Investigation Fee (starting work Equivalent to permit fee
without an approved/issued permit)
Renewable Energy System (Solar PV Building $100 $150
Permit: Small Rooftop Streamlined, Geothermal,
Wind Energy Conversion) – Residential
Renewable Energy System (Solar, Geothermal, See Appendix A
Wind Energy Conversion) – Commercial
Billboards/Billboard Alterations (includes Footings) $250 per billboard plus surcharge
Roofing or Siding – Single Family Residential $100
Partial (less than 25%) of principal structure; or $65
Detached Accessory Structures only
Roofing or Siding – Townhomes and rental $60 per unit
properties up to five units
Roofing or Siding – Commercial See Appendix A
Window or Door Replacement $65 for one window or door
(within existing openings) $100 for two or more windows and/or doors
Telecommunications Antenna – New System $750 plus engineering/inspection fees if located on
City-owned property plus surcharge (see Public
Works for further information)
Telecommunications Antenna – Repairs/ $250 per permit plus surcharge
Alterations/Swapping or Adding Antennas to
Existing System (City or Private Property)
Electrical Permits, State of MN Established by the Minnesota State Boards of
Electricity
Fire Inspections (DHS) $50
Fire Panel Systems See Appendix A
Fire Permit (no surcharge), All permits unless noted $100
otherwise
2022 Mounds View Fee Schedule Page 2 of 14
Fireworks Display/Fireworks Sales $100
Fireworks Sales Only (Businesses) $350
Fireworks Sales with other Retail (Businesses) $100
Fire Permit, Temporary Tent $50
Fire Permit, Tank Installation (fuel, oil, gas, etc.) $100 per tank
Fire Permit, Tank Removal $50 per tank
Fire Permit, Operational $50 per year
Fire Permit, Chemical Fire Suppression $100
Fire Sprinkler Systems See Appendix A
Fire Sprinkler Plan Check 65% of permit (for new construction or 20 heads or
more only)
Mechanical Permit, Residential (State Surcharge Minimum $60 or 2% of Valuation, whichever is larger
Required, See Appendix B)
Mechanical Permit, Commercial (State Surcharge See Appendix A
Required, See Appendix B)
Plumbing Permit, Residential (State Surcharge Minimum $60 or 1.25% of Valuation, whichever is
Required, See Appendix B) Larger
Plumbing Permits, Commercial (State Surcharge See Appendix A
Required, See Appendix B)
Zoning Permits (No Surcharge) Title XV, Chapter 150.050(C)(2)
Patio/Deck 30” and under, or not attached
$30
Driveways, Sidewalks, Parking Lots, Patios (no permit required for sealcoating or overlays without
expansion. A right-of-way permit is required for any construction that disrupts City-owned streets, curbing,
sidewalks, etc., residential includes churches and schools.
Residential R-1 or R-2 Driveway $45
Residential R-3, R-4 and R-5 Driveway or Parking $75
Lot
Residential Gravel (refer to Zoning Code for $25
limitations)
Commercial/Industrial Driveway or Parking Lot $150
Commercial/Industrial Sidewalk or Patio $75
Fence/Kennel – 7’ or below (if higher, Building $30
Permit, see Appendix A)
Retaining Wall – 4’ or below (if higher, Building $30
Permit, see Appendix A)
Shed (200 square feet or less) $30
Signs – Billboards (Building Permit) See Appendix A
Signs (Chapter 1008) up to 100 square feet $75
Signs 100 square feet or over $95
Signs – Re-Facing or Altering $40
Signs, Banners – Temporary $40 per 21-day period (Limit 4 permits per year plus
one additional permit for a banner)
Swimming Pools, Residential (Above Ground) $30
Swimming Pools (In-Ground, Building Permit) See Appendix A (Surcharge Required)
II. OTHER INSPECTION / PLANNING FEES
Applicants are responsible for all costs incurred associated with the filing, review and processing of
development applications. Such fees to be paid in escrow up front or upon receipt of statement from the
City of Mounds View. Fees may include, but are not limited to, costs for consultants retained by the City,
consultant planning services, attorney, and engineer fees. A deposit may also be required to cover costs of
public notices, materials and staff time spent in the review, research or preparation of materials associated
with each application. The applicant shall be responsible for all reasonable incurred costs in excess of the
initial fee and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to
the applicant within 30 days after consideration of the application is completed. Payment of park dedication
fees is required with subdivision applications. Application fees are not refundable.
2022 Mounds View Fee Schedule Page 3 of 14
Building Inspections Conducted Outside Normal $63.25/hour (two-hour minimum charge)
Business Hours
Change of Address $150
Change of Occupancy $75
Comprehensive Plan Amendment $500
Conditional Use Permit, R-1 or R-2 $200
Conditional Use Permit, All Other Districts $400
Conditional Use Permit Amendment Same as CUP Fee
Contractor License (Chapter 1001Title XV, Chapter
$60
150.053))
Contractor State License Verification Fee $5 per permit
Development/Site Plan Review $400
Escrow – Manufactured Homes $500 per permit
Escrow – Occupancy (Seed, sod, landscaping; as-$1,000 for each item
building grading survey; driveway installation; curb
cut modifications; site clean-up; storm water
management; drainage features; site erosion; right-
of-way restoration; or any other items as determined
by the Building Official)
No Charge (Chapter 1012Title XI, Chapter 119)
Housing Inspection Initial and One Follow-Up
(includes now shows)
Housing Inspection/No Show, each additional $100
Interim Use Permit (IUP) $400
IUP Amendment $400
Park Dedication Fees (Ord. 745) Residential: $3,500 per unit
Non-Residential: Up to 10% of estimated market
value (of land)
Plan Review (Payment Required Before Plans are 65 percent of permit fee for all commercial permits
Reviewed) and for residential permits for new dwellings, dwelling
additions, garages, garage additions, decks, sheds
over 200 square feet, and major remodeling.
Plan Review for Changes, Revisions, or Additions to $47/hour (one half-hour minimum charge)
Plans
Plan Review, Engineering (Applicable to any project $100 per permit
that changes the grade. To be determined by Staff
during application review).
Plan Review for Outside Consultants for Plan Actual costs including administrative and overhead
Checking and Inspections or Both costs
Plan Review Similar (all units are same or similar) Each unit after the first shall be 25% or original fee
Planned Unit Development (PUD) Chapter $750
1120(Title XV, Chapter 160.300)
PUD Amendment $400
Refund, Permits (within 100 days of application if All but $40
work is not commenced)
Refund, Plan Review 100% (If review has not been done)
Refund, State Surcharge 100%
Rezoning $500
Vacation, Street or Easement $250
Subdivision $750
Subdivision Escrow $1,000 - $10,000 (at the discretion of the City
Administrator)
Subdivision (Reapproval Fee) $100
Text Amendment, Zoning Code $400
Text Amendment, Other City Code $300
2022 Mounds View Fee Schedule Page 4 of 14
Variance, Administrative R-1 or R-2 $100 (additional $125 if formal variance is required)
Variance, Formal R-1 or R-2 $200
Variance, All Other Districts $400
Wetland Alteration Permit, R-1 or R-2 $200
Wetland Alteration Permit, All Other Districts $350
Wetland Buffer Permit, R-1 or R-2 $30
Wetland Buffer Permit, All Other Districts $100
Zoning Code Review $200
Zoning Letter $50 per letter
III. MISCELLANEOUS FEES
Certified Copy $5 plus copy charges if any
Filing Fee for Public Office See Mounds View Charter
Insufficient Funds (NSF) Check $30
Municipal/City Code, Copy $200
Notary Public (Mounds View Residents Only) Free of Charge
Photocopy, B/W 8 ½ x 11 $0.25 per side
Photocopy, B/W 11 x 17 $0.50 per side
Photocopy, Color 8 ½ x 11 $1.00 per side
Photocopy, Color 11 x 17 $2.50 per side
Pending Assessment Search $10
CD/DVD Copy $15
th
50 Anniversary Mounds View Cookbook $5
Mounds View History Book $10
IV. POLICE/FIRE/ADMINISTRATIVE OFFENSES
Crime Free Multi-Housing Participant No charge
Fingerprint Card $20 for first card, $5 each additional
Police Report Research (if exceeds 100 pages) $50 per hour
Police Report Research (under 100 pages) No charge
Certified Copy of Report $5 for certification and .25 per page
Clearance Letter $5
st
Color Computer Printed Copy $5 for 1 page, $1 for each additional
Electronic Copies to Digital Media $15 per disc
Impound Vehicle Storage Fee $15 per day
Annual Permit to Purchase Firearm (State of MN No charge
Application)
stnd
1 or 2 Replacement Permit
No charge
rd
3 and each add’l Replacement Permit
$20 each
rd
False Alarm (Police/Fire), 3 False Alarm within $50
12 Months
False Alarm (Police/Fire), Each False Alarm in $75
Excess of 3 within 12 months
Maintenance-Related Fire Services (Multi-Family
$250
Rental Only)
Not less than $50 but no more than $200 $50
Ignition device - Providing to, or in the possession
of, a minor
Administrative Offenses
30’ Stop Sign $15
Alcohol in Public $50
st
Animal Violation, 1 Violation within 12 Months $25
nd
Animal Violation, 2 Violation within 12 Months $50
rd
Animal Violation, 3 and Subsequent Violations $75
within 12 months
Building Code $150
2022 Mounds View Fee Schedule Page 5 of 14
Blocking Driveways $100
rd
False Alarm, 3 False Alarm within 12 Months $50
False Alarm, Each False Alarm in Excess of 3 within $75
12 months
Fire Code $150
Fire Hydrant $25
Fire Lane $100
Garbage/Trash Dumping $100
House Numbers, Not to Code $25
Illegal Parking, Handicap Zone $200
Illegal Parking, Other $15
Illegal Parking, Trucks $25
Illegal Parking, Snowbird $24
Junk Vehicle See property based violations
Junk and Debris See property based violations
Loitering $25
Parks and Recreation (Chapter 909Title IX,
$25
Chapter 92))
Regulated Business Activity (Chapter 500Title XI)
$100
Noise/Loud Parties: Mufflers, Stereos and other $50
Violations of State and City Noise Codes
st
Property Based Violation, 1 Offense $150
nd
Property Based Violation, 2 Offense within 12 $300
Months
rd
Property Based Violations, 3 Offense within 12 $450
Months
Administrative Hearing $50
st
Tobacco, Sale to Minor (for individuals)1 Offense $100
Tobacco, Each Subsequent Offense within 24 $50
Months
st
Tobacco, Sale to Minor (for Licensee) 1 Offense $150
nd
Tobacco, 2 violation within 24 months $400
rd
Tobacco, 3 violation within 24 months $500
st
Watering Ban, 1 Violation Written warning
nd
Watering Ban, 2 Violation $25
rd
Watering Ban, 3 Violation $50
th
Watering Ban, 4 Violation $100
th
Watering Ban, 5 Violation $200
th
Watering Ban, 6 Violation Given to City Attorney for criminal prosecution
Wetland, Altering of (Chapter 1010Title XV,
$150
Chapter 159)
Zoning Code (Chapter 1100Title XV,Chapter 160)
$150
V. LICENSES (All Licenses are Subject to 20% Late Fee)
Adult Establishment $2,500 per year
Adult Establishment, Investigation Fee $500 per person identified on the application as an
owner, operator or manager. (If it appears that the
investigative costs will exceed $500, the City Administrator shall notify
the applicant and give the applicant an estimate of costs. The
applicant either shall make an additional deposit equal to the
difference between $500 and the total estimate or may withdraw the
application)
Amusement Devices and Center (Chapter 506) $16 per location plus $16 per machine
(Over Three Devices)
Automobile Sales (Chapter 51Title XI, Chapter
$ 225 per year
112)
2022 Mounds View Fee Schedule Page 6 of 14
Amusement Rides, Carnivals, Circuses (Chapter $133 first day plus $21 for each additional day
506 Title XI, Chapter 111)
Bowling Alleys (Chapter 507 Title XI, Chapter 111)
$21 per alley per year
$204 per month per season
Christmas Tree Sales
Cigarette and Tobacco (Chapter 512 Title XI,
$330 per year
Chapter 118)
Contractor License $60 per year
Dog License Fees/Duplicate Tag, After One Year Decrease Full Price by 50%
Dog License, Spayed/Neutered $12 for 2 years
Dog License, Unaltered $20 for 2 years
Dog License, Duplicate Tag $5
Donation Collection Bin $100 per bin per year
Garbage/Recycling/Rubbish Hauler (Chapter 603 $120 plus $50 per vehicle per year
Title V, Chapter 50)
Gasoline Stations (Chapter 509 Title XI, Chapter
$75 plus $25 per pump per year
112)
Chickens/Ducks, Keeping of (Title IX, Chapter 90)
$100 first year
Chicken/Ducks, Renewal $30 per year
Honeybees, Keeping of (Title IX, Chapter 90)
$50 (one time license)
Kennel, Residential (Chapter 701Title IX,Chapter
$45 per year
90)
Kennel, Commercial $80 per year
Gambling, Lawful (Premises Permit Investigation $100 per permit
Fee)
Gambling, Lawful (Title XI, Chapter 111.128)
10% Contribution of Net Profits per year
Liquor (Chapters 502 and 503Title XI, Chapter 110)
On-Sale, Intoxicating $0.65 per square foot for that space used primarily as
bar area and $0.53 per square foot for that space
used primarily as dining area with a minimum fee of
$3,000 and a maximum fee of $10,000
On-Sale, Intoxicating (Movie Theaters Only) $3,000 base fee plus $100 per theater room allowing
alcohol
On-Sale, Sunday Sales $200 per year
$20 (new application only)
State of MN AGED Buyer’s Card
On-Sale, Brewery Taproom $800 per year
Off-Sale, Brewery Malt Liquor $200 per year
On-Sale Microdistillery $800 per year
Off-Sale Microdistillery $200 per year
Sunday Growler Sales $200 per year
On-Sale Wine $800 per year
Off-Sale Intoxicating $260 per year
Bottle Club $330 per year
On-Sale Malt Liquor/3.2 Beer $800 per year
Off-Sale Malt Liquor/3.2 Beer $200 per year
Set Ups $330 per year
Club $330 per year
Temporary Liquor $120 per event
Transfer Fee, Liquor License $160
Investigation Fee, Renewal License $50 per year
Investigation Fee, Single Person $350 (new application)
2022 Mounds View Fee Schedule Page 7 of 14
Investigation Fee, Partnership $385 (new application)
Investigation Fee, Corporation $450 (new application)
Rental Dwelling (Chapter 1012Title XI, Chapter 119)
Administrative Fee (Multi-Family Dwelling) $30 (active license with no renters)
Single-Family Dwelling $100 per year
New Single Family Rental $100 per year plus conversion fee
Multi-Family Rental $100 plus $25 per unit per year
Renewal Late Fee 10% of license fee (minimum $100)
License Fee Discount, Certification Level C 20% fee reduction
License Fee Discount, Certification Level B 33% fee reduction
License Fee Discount, Certification Level A 50% fee reduction
Transfer of License $100 per building
Conversion Fee (conversion from unlicensed rental $375 in addition to annual license fee.
to licensed rental, if 3 or fewer units in one building). $100 if owner presents proof of participation in an
Buildings owned by Nonprofits are exempt from applicable education or hires a management
Conversion Fee. company for at least a year
Mobile Food Unit (MFU) Vehicle
$25 per day
$100 per ten (10) days
$200 per thirty (30) consecutive days
$400 per year
Mobile Food Vendor (Ice Cream Truck/Street
$20 per day
Vending) $100 per year
Pawn Shop (Chapter 516 (Title XI, Chapter 115),
$500
Non-refundable Application Fee (Includes
Investigation Fee)
Pawn Shop, New Manager Investigation Fee $150
Pawn Shop, License $10,000 per year (pro-rated in 30-day increments
th
after June 30)
Pawn Shop, Billable Transaction $1.50 per transaction
Pawn Shop, Performance Bond $10,000
$50 $100 per day
Pawn Shop, Failure to Provide Daily Report to City
Peddler/Transient Merchants/Solicitor (Chapter 504 $61 per day
Title XI, Chapter 113) Permits
$204 per month
$510 per year
Peddler Investigation Fee, Per Person $18.25
Peddler ID Card, Per Person $5
Recuperation/Half Way House (Chapter 511 Title
$33 per year
XI, Chapter 114) Less than 10 Beds
Recuperation/Half Way House, 10-49 Beds $55 per year
Recuperation/Half Way House, 50-99 Beds $82 per year
Recuperation/Half Way House, Over 100 Beds $110 per year
Restaurant, Class A (Occupancy Load Greater than $320 per year
100) Chapter 505 (Title XI, Chapter 111),
Operating 16 hours per day or less
Restaurant, Class A (Occupancy Load Greater than $560 per year
100) Chapter 505 , Operating More than 16 Hours
Per Day
Restaurant, Class B (Occupancy Load of 100 or $204 per year
Less) Chapter 505, Operating 16 Hours Per Day or
Less
Restaurant, Class B (Occupancy Load 100 or Less) $337 per year
Chapter 505, Operating More than 16 Hours Per
Day
Restaurant (Class A or B), Transfer $100
2022 Mounds View Fee Schedule Page 8 of 14
Therapeutic Massage (Chapter 514 Title XI,
$255 per year (pro-rated in 30-day increments after
th
Chapter 114)), Enterprise
June 30)
Therapeutic Massage, Each Therapist $102 per year
Therapeutic Massage Investigation, Individual $100 new application $50 per year renewal
Therapeutic Massage Investigation, Partnership or $350 per year
Corporation
Therapeutic Massage, Temporary $100
Transfer Fee, Any Other Commercial Business $65
License except Liquor (If Transferable).
VI. PARKS, RECREATION, AND MOUNDS VIEW COMMUNITY CENTER
(MVCC) FACILITY RENTAL FEES
Class 1 School District 621, Mounds View Scouts, Lions and 4-H, Mounds View Area Athletic
Associations (with 10% roster MV residents)
Class 2 Mounds View Residents, Mounds View Religious Groups (with Mounds View address), Local
Political Groups and Mounds View Non-Profits (with Mounds View Address)
Class 3 Mounds View City Employees, Non-Local School Districts, Non-Local Non-Profit Groups
Class 4 All For-Profit Groups, Non-Local Religious Groups, Non-Resident Individuals/Private Agencies,
Businesses/Vendors and Colleges and Universities
The City Administrator may waive the rental fees for charitable events held for the benefit of Mounds View
residents upon receiving a written request outlining the nature of such event.
Banquet and Conference Center Rentals
Fri, Sat, Sun, and Class 4 – 100% Class 3 – 75% Class 2 – 50% Class 1 – 25%
Mon-Thurs after 6
pm
Mon-Thurs 7 am-6 Class 4 – 60% Class 3 – 50% Class 2 – 45% Class 1 - 25%
pm
2021 2022
Hourly Daily Hourly Daily
Event Center 1/6 Seats 50 (Class 1 Excludes Set Up Services in Event $643
$64 $643 $64
N/A
Center or Additional Set Up in Multi-Purposes Rooms and Gymnasium)
Event Center 1/3, Seats 100 (Class 1 Excludes Set Up Services in
$1,067
Event Center or additional Set Up in Multi-Purpose Rooms and $105 $1,067 $105
N/A
Gymnasium)
Full Event Center, Seats 400 (Class I Excludes Set Up Services in
Event Center or Additional Set Up in Multi-Purpose Rooms and
$241 $2,435 $241 $2,435
Gymnasium) NOTE: MUST RENT LOBBY FOR 200 OR MORE
GUESTS.
Multi-Purpose Rooms – Aspen**, Birch; Seating up to 20 (For Multi-
Purposes Rooms and Gymnasium Rentals, if the MVCC is Not $64 $643
$64 $643
$50 $500
Otherwise Open, the Permit Holder will be Charged an Additional $20
per Hour for Staffing) **$100 Damage Deposit Required.
Multi-Purpose Room – CedarPine**, Seating up to 40, 2-HOUR
MINIMUM RENTAL. (For Multi-Purpose Rooms and Gymnasium
Rentals, if the MVCC is not Otherwise Open, the Permit Holder will be $75 $754 $75 $754
Charged an Additional $20 per hours for Staffing) **$100 Damage
Deposit Required.
Multi-Purpose Room – Studio (For Multi-Purpose Rooms and
Gymnasium Rentals, if the MVCC is Not Otherwise Open, the permit $75 $754 $75 $754
Holder will be Charged an Additional $20 per Hour for Staffing)
Splash Pad Picnic Shelter Rental Fees
Pavilion #1 *One 4-Hour Block Per Customer Per Day $40* N/A $40* N/A
Pavilion #2 *One 4-Hour Block Per Customer Per Day
Miscellaneous MVCC Charges - *Items subject to class rate pricing
Screen $50*
2022 Mounds View Fee Schedule Page 9 of 14
Lobby $25 per hour or $150 per day
Bar $20
Fabric Backdrop $150
Backdrop Lighting $100
Coffee Pot and Carafes $25
Table Linens $3 each
Napkins $0.15 each
Prep Kitchen $150 per day
Kitchen $350 per day
Sound Package – Microphone and up to 4 Speakers $75*
Visual Package – Screen and Projector $75*
A/V Package – Sound Package and Visual Package $125*
Class 4 – 100% Class 3 – 75% Class 2 – 65% Class 1 – 50%
Gymnasium Rental
Full Gym, Hourly $135
Full Gym, All Day (8 am to 9 pm) $1,500
Half Gym, Hourly $70
Gym Rental Staffing, Hourly $20
Reservations Begin
Athletic Field Rentals
Level 1 – City of Mounds View and Community Center February 1-7
Level 2 – School District #621/Mounds View Recognized Youth Athletic Association February 8-14
Level 3 – Recognized Youth Athletic Associations February 15-21
Level 4 – Other Mounds View Resident Community Groups February 21
Level 5 – All Other Individuals or Groups February 21
Fees are based upon an individual event/game/practice. Field reservations may be limited depending upon
the number of teams and fields available. Mounds View Staff will set a seasonal field use policy that may
affect field availability.
Baseball and Softball Fields (Youth Only) Hillview, $15 for 2 hours
Groveland, Oakwood, Greenfield, Lambert and City
Hall Parks
Softball Fields (Youth) City Hall and Silverview $15 for 2 hours
Parks
Softball Fields (Adult) City Hall and Silverview Parks $20 for 2 hours
Soccer Fields (Youth Only), Groveland and $10 for 2 hours
Oakwood Parks
Soccer Fields (Youth Only) Silverview $50 for 2 hours
Lighting Fee for Softball Field, Level 1, 2 or 3 $20 per 2-hour time block
Lighting Fee for Softball Field, Level 4 $30 per 2-hour time block
Lighting Fee for Softball Field, Level 5 $40 per 2-hour time block
Soccer Tournaments (Excludes Silverview) $100 per field per day (If Field Maintenance is
Required During Tournament, an Additional $30 per
Hour with a 2-Hour Minimum will be Charged)
Soccer Tournament – Silverview Park Only $50 for 2 hours
Park Shelter/Building Rental, Hillview and City Hall $105 for 4 hours
$25 Refundable Key Deposit
$200 Refundable Damage Deposit
$100 Service Fee (Groups of 50 or More or in excess
of 10 trash bags) Should the event go past the
agreed rental period, a 2-hour public works call-out
fee will be incurred.
Park Shelter/Building Rental, Groveland, Lambert, $200 for 4 hours
Random and Silverview* $25 Refundable Key Deposit
$200 Refundable Damage Deposit
$100 Service Fee (Groups of 50 or More or in excess
of 10 trash bags) Should the event go past the
2022 Mounds View Fee Schedule Page 10 of 14
agreed rental period, a 2-hour public works call-out
fee will be incurred.
*Large Group Rental (200+) at Silverview Shelter $500 for 8 hours**
includes the Volleyball and Basketball Courts,
Horseshoe Pits and 100’ around Building. Non-
profit organizations and Night to Unite groups may
be eligible for a reduced fees (see policy below).
**NON-PROFIT POLICY:
1. Non-Profit entities duly registered in the State of Minnesota with active status as denoted on the Minnesota
Secretary of State registry that has real property or a physical presence and provide a measurable benefit to
the City of Mounds View can submit a written request to the City Administrator that $500 fee be waived.
2. Only one waived fee per year per Non-Profit is allowed.
3. Non-Profit’s making and receiving the waiver are still required to submit a $200 security deposit to cover
damages and cleaning.
4. Non-Profits making and receiving the waiver must clean the facility and remove all trash or will forfeit their $200
deposit.
5. Residents/Neighborhood Groups requesting use of a Park Facility for Night to Unite are required to pay the $25
security deposit for the key and sign a use agreement that details cleanup and usage requirements.
VII. PUBLIC WORKS RELATED FEES
Call-Out Rate Schedule (used for all hourly-based fees in Section VII) Based on Current Wages
Normal Business Hours for Call-Out Rates 7:00 am to 3:00 pm, Monday thru Friday
After Hours Call-Out Rate, Specified Time $100 (Minimum 2 hours)
Conducted Outside Normal Business Hours
Holiday Call-Out Rate, Specified Time Conducted $150 (Minimum 2 hours)
on Holidays
Right-Of-Way Management Fees (Chapter 910 Title V, Chapter 54) Additional Fees May be Required
for Legal and Engineering Costs Incurred by the City) All issued right-of-way permits will include a $125
administrative fee.
Excavation, Hole Fees, Boulevard Areas $100 per hole
Excavation, Hole Fees, Pavement Areas $200 per hole
Excavation, Underground Utility Work, Open $50 per 100 lineal feet or fraction thereof (requires
Trenching – Boulevard Areas Open hole fee)
Excavation, Underground Utility Work, Open $70 per 100 lineal feet or fraction thereof (requires
Trenching – Pavement Areas hole fee)
Excavation, Trenchless Installation $35 per 100 lineal feet or fraction thereof
Excavation, Overhead Installation $25 per 100 lineal feet or fraction thereof
Obstruction, New Pavement $100 per obstruction
Obstruction, Replace Existing Obstruction (in-kind) $50 per obstruction
Temporary Obstruction, Dumpster, Portable $25 per obstruction
Restroom, etc.
Temporary Obstruction, Equipment Used for No Charge
Excavation
Miscellaneous ROW Management Fees and Costs (Discount for Work Done Pertaining to City Project;
Additional Fees May be Required for Legal and Engineering Costs Incurred by the City)
Street Opening Permit (Requires Deposit) $200
Street Opening Deposit To be determined by the Director of Public Works
Registration Fee (ROW Users and Registrants) $30
Permit Extension $30
Delay Penalty 10% of ROW Permit
Degradation Fee Calculated at time of permit
Restoration Cost Calculated at time of permit
Overhead Utility Line Repair No Charge
Penalty for Work Done without a Permit Double Fee 50%
2022 Mounds View Fee Schedule Page 11 of 14
Municipal Water System Fees (Chapter 906Title V, Chapter 52)
Water Availability Charge (WAC), Residential $500 per unit
WAC Charge, Commercial/Industrial $1,000 per acre of developable land ($1,000
minimum charge)
$ 19.00 20.00 per quarter
Residential Water Usage Base Charge
$ 2.50 2.60 per 1,000 gallons per quarter
Residential Water – 0 to 12,000 gallons
$ 2.75 2.86 per 1,000 gallons per quarter
Residential Water – 12,000 to 24,000 gallons
$ 3.48 3.29 per 1,000 gallons per quarter
Residential Water – Over 24,000 gallons
$ 19.00 20.00 per quarter
Commercial Water Usage Base Charge
$ 2.50 2.60 per 1,000 gallons per quarter
Commercial Water – 0 to 125,000 gallons
$ 2.75 2.86 per 1,000 gallons per quarter
Commercial Water – 125,000 to 700,000 gallons
$ 3.02 3.15 per 1,000 gallons per quarter
Commercial Water – 700,001 to 1,100,000 gallons
$ 3.48 3.62 per 1,000 gallons per quarter
Commercial Water – Over 1,100,000 gallons
Water Quality Testing Charge (State) $ 2.43 per connection per quarter
Water Service Line Repair Insurance Charge $ 8.00 per connection per quarter
Failure to participate or grant access regarding $150 per connection per quarter
Public Works Ordinance Programs.
(Installation/Repair/Inspect/Replace)
Utility Bill Late Payment 10% of delinquent bill amount
Utility Bill Assessment Search $10
Water Service Connection/Repair/Disconnect $100 plus surcharge
Size Less than 4 Inches
Water Service Connection/Repair/Disconnect $150 plus surcharge
Size Over 4 Inches
Water Service Inspection or Reinspection After After hours call-out rate per visit (Minimum 2 hours)
Hours
Manual Water Meter Read After hours call-out rate per visit
Hydrant Meter Deposit $2,500
Hydrant Meter Rental (One Week Minimum) $50 per week
$150 per month
Water Shut-Off/Turn-On No charge during normal business hours, otherwise
one hour at call-out rate per visit
Water Shut-Off/Turn-On (Snowbirds) $25 per shut –off
$25 per turn-on
Water Meter Testing Call-out rate per visit (Minimum 2 hours)
Water Testing One hour at call-out rate
Water Meter City cost plus 10% administrative fee
Water Meter Radio Remote Reading Device City cost plus 10% administrative fee
Curb Stop – Valve Cover City cost plus 10% administrative fee
Municipal Sanitary Sewer System Fees (Chapter 907 Title V, Chapter 52)
I/I Application Fee – H20PP Program $150 per lateral line
Sewer Service Availability Charge (SAC) $2,485 per Metropolitan Council Environmental
Services
Sewer Usage Rate Per Quarter
$3.14 3.27 per 1,000 gallons water sold per quarter
Sewer Usage Rate
$39.48 41.06 per residential equivalent unit (REU)
Sewer Service Charge, Residential
connection per quarter
$96.97 100.85 per REU connection per quarter
Sewer Service Charge, Commercial/Industrial/
Public Buildings and Churches
Sewer Connection/Repair/Disconnect $100 plus surcharge
Sewer Unit Charge (New Connection Only) $150 per connection
Sewer Inspection or re-inspection after hours. Call-out rate per visit (Minimum 2 hours)
Surface Water Management (SWM) Utility Fees (Chapter 908 Title V, Chapter 53)
SWM New Construction, R-1 $212 per lot
2022 Mounds View Fee Schedule Page 12 of 14
SWM New Construction, R-2 $1,038 per acre
SWM New Construction, R-3, R-4, R-O $1,500 per acre
SWM New Construction, B-1, B-2, B-3, B-4 $1,500 per acre
SWM New Construction, I-1, PUD $2,096 per acre
$14.00 15.00 per unit per quarter
SWM Utility Rate Charge, R-1 Single Family and R-
2 Single and Two Family Residential
$76.55 81.91 per acre per quarter
SWM Utility Rate Charge, R-3 Medium Density
Residential
$90.77 97.12 per acre per quarter
SWM Utility Rate Charge ,R-4 High Density
Residential, R-5 Mobile Homes and R-O Residential
Office
$118.90 127.22 per acre per quarter
SWM Utility Rate Charge ,B-1 Neighborhood
Business, B-2 Limited Business, B-3 Highway
Business and B-4 Regional Business
$92.83 99.33 per acre per quarter
SWM Utility Rate Charge, I-1 Industrial
$105.28 112.65 per acre per quarter
SWM Utility Rate Charge, PUD Planned Unit
Development
$14.00 15.00 per acre per quarter
SWM Utility Rate Charge, CRP Conservancy,
Recreation and Preservation
$42.72 45.71 per acre per quarter
SWM Utility Rate Charge, School or Church, Public
or Private
Illicit Discharge Fee To be determined by the Public Works Director on a
case-by-case scenario.
Storm Water Management (The permit fee schedule adopted 08/24/2016 by the Rice Creek Watershed
District Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government
entities are exempt from the permit fees).
Rule C (Storm water Management):
Single lot, single family residential projects
Home, Accessory Structure, Driveway, $150
Etc.
Residential, Commercial, Industrial, Institutional Development
<1 acre of new or reconstruction $1,000
impervious surface
1-2.5 acres of new or reconstructed $2,000
impervious surface
2.5-5 acres of new or reconstructed $3,500
impervious surface
>5 acres of new or reconstructed $5,000 plus $1,000 per acre (capped at $10,000)
impervious surface
Rule D (Erosion Control Plans):
<2.5 acres of land disturbance $100
2.5-10 acres of land disturbance $250
>10 acres of land disturbance $500
Rule E (Floodplain Alteration)
No mitigation required No fee
Mitigation required $100
Rule F (Wetland Alteration)
Exemption $250
< 1 acre of mitigation required $875
1-5 acres of mitigation required $1,750
5–10 acres of mitigation required $3,500
>10 acres $5,250
Banking Plan $1,750
Rule G (Regional Conveyance Systems): $500
Rule I (Public Drainage Systems): $500
2022 Mounds View Fee Schedule Page 13 of 14
Note: An action that requires a permit under both Rule G and Rule I will be subject under those rules to a
single permit fee of $500. Additionally, if the action is one for which a bond for costs has been provided under
MN Statute 103E, a Rule G/Rule I fee will not be required.
Rule J (Appropriate of Public Water): No fee
Rule L (Variances): Variable. See District Permit Variance Guidance
Policy
Storm Water Connection/Repair/Disconnect $100 plus surcharge
Storm Water Inspection or re-inspection after Call-out rate per visit (Minimum 2 hours)
hours
Street Lighting Utility Fees (Chapter 904 Title XV, Chapter 152.018)
Residential (single family homes, duplexes, $4.50 per unit per quarter
fourplexes, condominium and townhomes)
Commercial/Industrial $21.09 per acre per quarter
Institutional/Charitable $21.09 per acre per quarter
Apartments $21.09 per acre per quarter
Construction Site and Land Disturbance Fees (Ordinance 804, Chapter 1303 Title XV, Chapter 156.006)
Additional Fees May be Required for Legal and Engineering Costs Incurred by the City.
50 Cubic Yards or Less $25
51 to 100 Cubic Yards $50
101 to 1,000 Cubic Yards $50 base fee plus $20 for each 100 cubic yards or
fraction thereof
1,001 to 10,000 Cubic Yards $250 base fee plus $35 for each 1,000 cubic yards or
fraction thereof
10,001 to 100,000 Cubic Yards $500 base fee plus $100 for each 10,000 cubic yards
or fraction thereof
100,001 Cubic Yards or More $1,500 base fee plus $250 for each 100,000 cubic
yards or fraction thereof
Other Miscellaneous Public Works Fees
Load Limit Waiver (Must be authorized by the Public $125 per trip
Works Director)
Call-out rate per visit (Minimum 2 hours) plus
Call-Out Charge for Contractor Negligence (Lack of
cost(s)* of any materials required to remedy the
Maintenance, Traffic Signs, Etc.)
issue. *TBD by the Director of Public Works/Parks and
Recreation
Water Tower Telecommunications Maintenance or No charge if during normal business hours, otherwise
Repair Access Fee 2 hour minimum charge for each after hours call-out
Water Tower Telecommunications Plan Review and Actual legal and consulting engineering costs plus
Inspections $125 for administration costs and $1,000 escrow.
RPZ Annual Inspection Violation See Property Based Violations, Section IV,
Police/Administrative Offenses
Appeal of Public Improvement Bond
$250 (MN State Statutes 429.036)
2022 Mounds View Fee Schedule Page 14 of 14